Page_303.pdf
PDF 52 KB Posted
- Solicitation number
- 47PM0918R0001
About this file
Edited Page #303
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CFM_New_K_L_&_M.pdf | ||
| SF1449_MOD_003.pdf | ||
| CFM_New_K_L_&_M.pdf | ||
| The_purpose_of_this_amendment_is_as_follows.docx | DOCX document | |
| Questions_2.pdf | ||
| CFM_New_L_&_M.pdf | ||
| Fire_Alarm_Inspection.pdf | ||
| MAXIMOI_INVENTORY__8.10.2017_(1).xlsx | XLSX spreadsheet | |
| SF1449_MOD_002.pdf | ||
| Parking_Lot_Map.pdf | ||
| Questions_1.docx | DOCX document | |
| SF1449_MOD_001.jpg | JPG image |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M. EVALUATION FACTORS FOR AWARD
The Government will award a Lowest Price Technically Acceptable contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
1. Prior Experience
2. Past Performance
3. Management Plan
Technical factors and past performance, when combined, are significantly more important than cost or price.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the
| C.1.44 CONTRACTOR SUBMITTALS/DELIVERABLES CHART (O&M) |
| C.2.17.6 Quality Standards for Child Care |
| C.2.18 QUAILITY CONTROL PLAN |
| C.2.19 CLEANING SCHEDULES |
| C.2.20 COMMUNICATION REQUIREMENTS |
| C.2.21 FEDERAL REQUIREMENTS |
| C.2.22 CONTRACTOR SUBMITTALS / DELIVERABLE CHART |
| C.3 VERTICAL TRANSPORTATION |
| D. PACKAGING & MARKING |
| H.15.3.13 Qualification of Emergency and Standby Power System Technicians |
| H.15.3.14 Qualifications of Emergency Lighting Equipment and Exit Signage Technicians |
| 52.223-1 Bio-based Product Certification. |
| 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Items (Jan 2017) |
| J LIST OF J-1 ATTACHMENTS – OPERATION AND MAINTENANCE |
| J-1.1 Operation and Maintenance Contract Deliverables |
| J-1.2 Quality Assurance Plan (QASP) |
| J-1.3 Green Purchasing Report |
| Non Bio-Based Report |
| Bio-Based Report |
| J-1.5 Summary of Environmentally Sustainable Product Attributes and Offerings |
| J-1.6 Building Information Sheet |
| B. SERVICES, ORDERING AND PRICES |
| DESCRIPTION OF SERVICES |
| C. DESCRIPTION/SPECIFICATION/STATEMENT OF WORK |
| Introduction |
| C.1 OPERATION AND MAINTENANCE |
| C.1.1 OPERATION AND MAINTENANACE (O&M) PERFORMANCE-BASED STATEMENT OF WORK (PBSOW) |
| C.1.1.1 Contractor Responsibility for Equipment and Systems The Contractor shall provide management, supervision, labor, materials, equipment and supplies, administrative, subcontracts, reimbursable building alterations, and is responsible for the ... |
| C.1.1.2 Contractor Responsibilities for Management and Communication |
| The Contractor Shall: |
| C.1.2 DEFINITIONS |
| C. 1.2.1 Acceptance |
| C.1.2.2 Acts of God |
| C.1.2.6 Approval |
| C.1.2.8 Basic Services |
| C.1.2.9 Building |
| C.1.2.10 Building Automation System (BAS) |
| C.1.2.11 Building Operating Plan |
| C.1.2.12 Cleanable Square Feet |
| C.1.2.15 Computerized Maintenance Management System (CMMS) |
| The Contractor is responsible for any consumables (including fuel) used during day-to-day operation of a generator, i.e., exercising the generator, testing, etc. Operation of a generator for an extended period or due to a power loss would be treated a... |
| C.1.2.17 Contracting Officer (CO) |
| Contracting Officer (CO) has the overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditio... |
| C.1.2.19 Contractor |
| C.1.2.20 Contractor’s Other Than Normal Working/Duty Hours |
| C.1.2.21 Controls and Control System |
| C.1.2.23 Defective Service |
| C.1.2.24 Electrical |
| C.1.2.25 Elevator |
| C.1.2.26 Emergency |
| C.1.2.27 Emergency Callback |
| C.1.2.28 Environmentally Sustainable |
| C.1.2.31 Exterior |
| C.1.2.33 Federal Holidays |
| C.1.2.34 Federal Executive Holidays, Unanticipated |
| C.1.2.35 Fire Protection and Life Safety Systems |
| C.1.2.36 Furnishings |
| C.1.2.37 General Program |
| C.1.2.38 Green Cleaning |
| C.1.2.39 Guiding Principles for Sustainable Existing Buildings |
| C.1.2.40 GSAlink |
| C.1.2.42 Heating, Ventilation and Air-Conditioning (HVAC) |
| C.1.2.43 HVAC Operations Manual |
| C.1.2.44 Indefinite Quantity |
| “Indefinite quantity” provisions permit the Government to order work, in addition to the Basic Services, and upon acceptance permit additional payment to the Contractor. |
| C.1.2.45 Landscape Irrigation Systems |
| Work required preventing a breakdown of a piece of equipment or system, or put equipment or systems back in service after a breakdown or failure. |
| C.1.2.48 Mechanical |
| All building and site systems of the types generally included in Division 15 in R.S. Means Facilities Construction Cost Data, with the exception of equipment |
| C.1.2.49 Miscellaneous Work |
| C.1.2.50 Modification of Contract |
| C.1.2.51 Monthly Progress Report |
| C.1.2.52 Negligence |
| C.1.2.54 Normal Working Hours |
| C.1.2.55 Occupant Emergency Plan (OEP) |
| C.1.2.57 Operations |
| C.2.1.58 Ordering Official |
| C.1.2.59 Performance- Based Statement of Work (PBSOW) |
| C.1.2.61 Predictive Maintenance |
| C.1.2.62 Preventive Maintenance (Scheduled and Unscheduled) |
| C.1.2.64 Punch List |
| C.1.2.65 Quality Assurance Surveillance Plan (QASP) |
| C.1.2.66 Quality Control Plan |
| C.1.2.67 Repair |
| C.1.2.69 Sanitize |
| C.1.2.70 Security Systems |
| C.1.2.71 Sequence of Operations |
| C.1.2.72 Service Calls |
| C.1.2.73 Service Request |
| C.1.2.75 Supervisor, On-site |
| C.1.2.76 Tour |
| C.1.2.77 Vertical Transportation Systems |
| C.1.2.78 Watch |
| C.1.2.78.1 Ability One Commission (the Commission) - Formerly Known As The Committee For Purchase For People Who Are Blind Or Severely Disabled. |
| C.1.2.78.2 Commission for Purchase for People Who Are Blind or Severely Disabled |
| C.1.2.78.3 Community Rehabilitation Programs (CRP) |
| C.1.2.78.4 Contracting Activity (CA) |
| C.1.2.78.5 Fair Market Price (FMP) |
| C.1.2.78.6 Follow-on Year (FOY) |
| C.1.2.78.7 Impasse |
| C.1.2.78.8 SourceAmerica (formerly NISH) |
| C.1.2.78.9 Procurement List (PL) |
| C.1.2.78.10 Purchase Exemption |
| C.1.4 EXISTING DEFICIENCY LIST REPORT AND INSPECTION |
| The existing list report is a list of deficiencies that may exist in the equipment and systems covered by this Performance-Based Statement of Work, as well as the Contractor’s itemized price (including , but not limited to labor, materials, overhead, ... |
| C.1.8 GENERAL AND ADMINISTRATIVE REQUIREMENTS |
| C.1.8.3 Onsite Records |
| C.1.8.5 Use of CMMS |
| C.1.8.6 Quality Control Program |
| C.1.8.7 Government Quality Assurance Surveillance Program |
| C.1.9 BUILDING OPERATING PLAN (BOP) |
| C.1.9.1 Building Operating Plan (BOP) Purpose |
| C.1.9.2 Components of the Building Operating Plan (BOP) |
| C.1.11 MONTHLY PROGRESS REPORTS |
| C.1.12 PERFORMANCE REVIEW MEETINGS |
| The Contractor shall meet with the CO or their designee and other Government representatives, at the discretion of the CO or designee, to review Contract performance monthly after receipt by the Government of the Monthly Progress Report. |
| C.1.13 EQUIPMENT CONDITION ASSESSMENT |
| C.1.14 OCCUPANT FEEDBACK PROGRAM |
| C.1.15 REFERENCE LIBRARY |
| C.1.17 BUILDING MANAGEMENT SUPPORT SERVICES (miscellaneous and utility escort hours) |
| The Contractor shall provide reasonable and competent assistance during normal working hours to GSA personnel or other GSA Contractors performing energy studies, engineering studies, building condition evaluations, fire protection facility surveys, pr... |
| C.1.19 EMERGENCY SHUTDOWN INSTRUCTIONS AND TOUR CHECKLISTS |
| C.1.20 LABELING OF ELECTRICAL CIRCUITS |
| C.1.21.1 General |
| C.1.21.2 Extended Operating Hours |
| C.1.21.3 Continuity of Operations (COOP) |
| C.1.22 SYSTEM PERFORMANCE STANDARDS OR PROCEDURES |
| C.1.23 SERVICE REQUESTS |
| C.1.23.1 General |
| C.1.23.2 Emergency Service Request |
| Emergency service requests are service requests where the work consists of correcting failures that constitute an immediate danger to personnel or property, including but not limited to: broken water pipes, stalled elevators with trapped passengers e... |
| C.1.23.3 Emergency Call back (after hours) |
| C.1.23.4 Urgent Service Request Response |
| C.1.23.5 Routine Service Request Response |
| C.1.23.6 Inspection of Mechanical, Electrical, Fire Protection and Control Systems |
| C.1.23.7 Posting Operating Instructions |
| C.1.24 TOURS Procedures will be documented in the Building Operating Plan (BOP) |
| C.1.24.1 General |
| C.1.24.2 Operating Logs and Tour Check Sheets |
| C.1.24.3 Tour Frequencies |
| C.1.24.4 Condensate Pans |
| C.1.24.5 Monitoring of Central Plant Equipment |
| C.1.24.6 Leak Testing |
| C.1.25 DEMAND RESPONSE PROGRAMS |
| The Government may participate in any of the available demand response programs or critical peak pricing tariffs administered by utilities, State agencies, or third-party administrators. If the Government participates in such a program and advises the... |
| C.1.27 BAS ALARM RESPONSE |
| C.1.29 PROTECTION AND DAMAGE |
| C.1.31 KEY CONTROL |
| C.1.32 DISRUPTIVE OR HAZARDOUS TOOLS |
| C.1.33 SCHEDULED DISRUPTION TO UTILITIES, LIGHTING, FIRE PROTECTION & LIFE SAFETY SYSTEMS, OR SPACE CONDITIONING |
| C.1.34 PLUMBING AND RESTROOMS |
| C.1.35 MAINTENANCE PROGRAM |
| C.1.35.1 General |
| C.1.35.3 Application of Diagnostic Software |
| C.1.35.4 BAS Control Systems |
| C.1.36 WATER TREATMENT |
| C.1.36.1 General |
| C.1.36.2 Tolerances |
| C.1.36.3 Initial Report and Development of Program |
| C.1.36.4 Cooling Tower Water Management Plan |
| Refer to Exhibit J-1.10. |
| C.1.36.5 Corrosion Monitoring |
| C.1.36.6 Monthly Testing |
| C.1.36.7 Water Treatment Monitoring |
| Reseved |
| C.1.37 OIL ANALYSIS AND OIL CHANGES |
| C.1.37.1 Periodic Oil Analysis |
| C.1.37.2 Oil and Refrigerant Additives |
| C.1.38 LAMPS AND BALLASTS |
| C.1.39 ARCHITECTURAL AND STRUCTURAL SYSTEMS MAINTENANCE |
| C.1.39.5 Interior Signage and Directories |
| C.1.39.6 Finishes Maintenance |
| C.1.39.7 Historic Building Preservation |
| C.1.39.8 Vertical Transportation and Associated Equipment. See reference section C.3 |
| C. 1.40 REPAIRS |
| C.1.40.1 General |
| C.1.40.2 Non-reimbursable Repairs |
| C.1.40.3 Reimbursable Repairs |
| C.1.40.4 Miscellaneous Work |
| C.1.40.6 Approval of Work |
| C.1.40.7 Invoicing |
| C.1.40.8 Ordering Repairs from Outside Source |
| C.1.40.9 Force Majeure (Uncontrollable events) |
| C. 1.40.10 Warranties |
| C.1.40.11 Quality of Materials and Replacement Parts |
| C. 1.41.1 General |
| The Contractor shall use to the extent practicable, the safest and most environmentally friendly products and processes available. The Contractor shall be cognizant of and comply with all Federal, State, and Local laws and Regulations related to buil... |
| C. 1.41.2 Scheduling and Recordkeeping |
| The Contractor shall maintain copies of all tests, certifications, permits and other required records, and provide copies to the CO and designee. In addition, all required safety and environmental tests; certifications, permits, and other procedures ... |
| C. 1.41.3 Refrigerants |
| C.1.41.4 AQMD Operating Permits |
| C.1.41.5 Above Ground Storage Tanks |
| level of Underground Storage Tank Operator Training. |
| C.1.41.7 Polychlorinated Biphenyl (PCB) Control |
| C. 1.41.9 Workplace Safety |
| C.1.41.10 Electrical Safety |
| C.1.41.11 Fall Protection |
| C.1.41.13 Lock Out / Tag Out |
| C.1.41.14 Confined Spaces |
| C.1.41.16.7 Radon Mitigation |
| C.1.41.16.8 Refrigerant Monitor Testing |
| C.1.41.17.3 Backflow Prevention Devices |
| C.1.41.18 Labeling and signage |
| C.1.41.19 Roof Anchorage Points |
| C.1.42 FIRE PROTECTION AND LIFE SAFETY EQUIPMENT AND SYSTEMS |
| C.1.42.1 General |
| C.1.42.2 Fire Alarm System Services |
| FIRE ALARM INSPECTION & TESTING… GSA CONTRACT via O&M SHOP ((NEED POINTS LIST)) |
| FIRE ALARM REPAIRS… GSA CONTRACT via FIRE ALARM SHOP |
| C.1.42.3 Fire Alarm System Testing |
| FIRE ALARM INSPECTION & TESTING… GSA CONTRACT via O&M SHOP |
| C.1.42.4 Fire Alarm System Maintenance RESERVED NA |
| FIRE ALARM REPAIRS… GSA CONTRACT via FIRE ALARM SHOP |
| C.1.42.5 Fire Alarm System Central Station Monitoring RESERVED NA |
| FIRE ALARM CENTRAL STATION… DHS MEGA-CENTER/GSA FIRE ALARM SHOP |
| FIRE ALARM EMERGENCY RESPONSE… DHS MEGA-CENTER/GSA FIRE ALARM SHOP |
| C.1.42.6 Water-Based Fire Suppression Systems RESERVED NA |
| FIRE SPRINKLER INSPECTION & TESTING… GSA CONTRACT via O&M SHOP |
| FIRE SPRINKLER REPAIRS... CFM CONTRACTOR |
| C.1.42.7 Fire Doors and Other Opening Protective |
| FIRE ALARM INSPECTION & TESTING… GSA CONTRACT via O&M ((LIMITED TO OPERATION of DOOR RELEASE UPON FIRE ALARM ACTIVATION ONLY)) ((NO REPAIRS)) |
| REPAIRS via... CFM CONTRACTOR |
| Services consist of, but are not limited to, the inspection, testing and maintenance of all fire-rated door assemblies. All fire-rated door assemblies’ inspections, test, and maintenance performed under this contract shall comply with the NFPA 80, Sta... |
| Fire doors and windows shall be inspected, tested and maintained in accordance with NFPA 80. |
| C.1.42.8 Fire and Combination Fire/Smoke Dampers RESERVED NA |
| FIRE ALARM INSPECTION & TESTING… GSA CONTRACT via O&M ((NO REPAIRS)) |
| REPAIRS via... CFM CONTRACTOR |
| C.1.42.9 Smoke Doors and Other Opening Protective |
| FIRE ALARM INSPECTION & TESTING… GSA CONTRACT via O&M ((LIMITED TO OPERATION of DOOR RELEASE UPON FIRE ALRM ACTIVATION ONLY)) ((NO REPAIRS)) |
| REPAIRS via... CFM CONTRACTOR |
| C.1.42.10 Smoke Dampers RESERVED NA |
| FIRE ALARM INSPECTION & TESTING… GSA CONTRACT via O&M ((NEED AS-BUILTS 1ST)) |
| REPAIRS via... CFM CONTRACTOR |
| C.1.42.11 Portable Fire Extinguisher |
| FIRE EXTINGUISHER ANNUAL INSPECTION & TESTING… GSA CONTRACT via O&M |
| FIRE EXTINGUISHER MONTHLY SERVICE... CFM CONTRACTOR |
| C.1.42.12 Non-Water-Based Fire Extinguishing Systems RESERVED NA |
| FIRE EXTINGUISHING SEMI-ANNUAL INSPECTION & TESTING… GSA CONTRACT via O&M |
| MONTHLY INSPECTIONS via... CFM CONTRACTOR |
| EMERGENCY & STANDBY POWER SYSTEMS SERVICE... CFM CONTRACTOR |
| Services consist of, but are not limited to; the inspection, testing, preventive maintenance, and exercising of equipment per the manufacturer’s recommendations for the following types of emergency and standby power systems: |
| C.1.42.15 Emergency Lighting Systems and Exit Signage |
| EMERGENCY LIGHTING & EXIT SIGNAGE SERVICE... CFM CONTRACTOR |
| C.1.42.16 Fire Alarm Central Station Monitoring RESERVED |
| FIRE ALARM EMERGENCY RESPONSE… FIRE ALARM SHOP / DHS MEGA-CENTER |
| C.1.42.17 Fire Drills |
| FIRE ALARM DRILLS… GSA FA SHOP SUPPORT |
| C.1.42.19 Miscellaneous Work |
| C.1.43 MAINTENANCE AND REPAIR OF VERTICAL TRANSPORTATION SYSTEMS. |
| See Section C.3 |
| C.1.44 Contractor Submittals/Deliverables Chart (O&M) |
| C.1.45 CRITERIA FOR NON-COMPLIANCE EVENTS |
| C.3.0 MAINTENANCE AND REPAIR OF VERTICAL TRANSPORTATION SYSTEMS |
| D. PACKAGING & MARKING |
| E. INSPECTION & ACCEPTANCE |
| F. DELIVERIES OR PERFORMANCE |
| G. CONTRACT ADMINISTRATION DATA |
| H. SPECIAL CONTRACT REQUIREMENTS |
| Special Contract Requirements Clause identified in Section H, will be identified as Operation and Maintenance (O&M), Custodial or O&M /Custodial using the parentheses. Each paragraph is individually annotated. |
| H.1.1 Security Requirements and Personal Identity Verification Procedures (Non-Classified Contract) – |
| (O&M/Custodial) |
| FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL |
| (SEPT 2007) |
| H.2 IDENTIFICATION CREDENTIAL - (O&M/Custodial) |
| H.3 ESCORT REQUIREMENTS - (O&M/Custodial) |
| H.4 STANDARDS OF CONDUCT - (O&M/Custodial) |
| H.5 REMOVAL FROM CONTRACT WORK - (O&M/Custodial) |
| H.7 RECORDING PRESENCE - (O&M/Custodial) |
| H.8 GOVERNMENT FORMS - (O&M/Custodial) |
| H.9 OTHER CONTRACTORS - (O&M/Custodial) |
| H.10 ORDINANCES, TAXES, PERMITS, AND LICENSES - (O&M/Custodial) |
| H.11 DISCREPANCY IN THE SPECIFICATIONS - (O&M/Custodial) |
| H.12.6 LEED-EB – (Custodial) |
| H.13 ASBESTOS AWARENESS TRAINING - (O&M/Custodial) |
| H.14 UNIFORMS - (O&M/Custodial) |
| H.15.1 Personnel Training - (O&M) |
| H.15.3 QUALIFICATIONS OF TECHNICIANS - (O&M) |
| General Requirements |
| H. 15.3.10 Qualification of Fire Damper, Smoke Damper, and Combination Fire/Smoke Damper Technicians – (O&M) |
| H.15.3.13 Qualification of Emergency and Standby Power System Technicians – (O&M) |
| H.15.3.14 Qualifications of Emergency Lighting Equipment and Exit Signage Technicians – (O&M) |
| H.15.4 Submission of Resumes for New Employees – (O&M/Custodial) |
| H.16 GOVERNMENT-FURNISHED MATERIALS - (O&M/Custodial) |
| H.16.1 Requirements for Network Connection - (O&M) |
| Government-furnished network equipment and computer hardware must be used in all cases for PBS IT systems. Network equipment- includes any equipment that has IP routing and switching functionality. |
| H.17 CONTRACTOR-FURNISHED MATERIALS - (O&M) |
| H.17.1.1 Supervisors – (Custodial) |
| H.17.1.2 Communication – (Custodial) |
| H.17.1.3 Training – (Custodial) |
| H.17.1.4 Exposure Control Program – (Custodial) |
| H.18.1 General – (O&M) |
| H.18.2 Price Proposal for Additional Services Work – (O&M) |
| H.18.3 Pricing – (O&M) |
| The Contractor's price proposal for an Additional Services job shall follow the guidelines described below. |
| H.18.4 Parts and Materials – (O&M) |
| H.18.6 Subcontracts – (O&M) |
| H.18.7 Cost Documentation – (O&M) |
| H.18.8 Competitive Bids – (O&M) |
| H.18.9 Method of Ordering and Invoicing - (O&M) |
| H.19 AWARD FEE – (O&M) |
| H.20 STRIKE CONTINGENCY PLAN (SCP) – (O&M/Custodial) |
| H.21 OCCUPANCY EMERGENCY PLAN (OEP) – (O&M/Custodial) |
| H.22 CONTRACTOR PANDEMIC PLAN - (O&M/Custodial) |
| I. Contract Clauses |
| J-1 LIST OF ATTACHMENTS – Operations and Maintenance (List of documents, exhibits and Other Attachments) |
| EXHIBIT J-1.1 CONTRACTOR SUBMITTALS/DELIVERABLES CHART |
| EXHIBIT J-1.2 QUALITY ASSURANCE PLAN (QASP) |
| EXHIBIT J-1.3 GREEN PURCHASING REPORT |
| Bio and Non Bio-based Reports |
| EXHIBIT J-1.5 SUMMARY OF ENVIRONMENTALLY SUSTAINABLE |
| PRODUCT ATTRIBUTES AND OFFERINGS |
| EXHIBIT J-1.6 BUILDING INFORMATION SHEET |
| EXHIBIT J-1.2 |
| Quality Assurance Surveillance Plan (QASP) |
| EXHIBIT J-1.3 |
| Green Purchasing Report |
| Green Purchase Report |
| Note: US Department of Agriculture (USDA) Bio- based products http://www.biopreferred.gov/ProductCategories.aspx |
| This exhibit is provided as a guide for additional considerations for post-audit monitoring, plan implementation, training and other ancillary activities that may assist GSA in meeting the listed objectives. |
| I. Background GSA’s Public Buildings Service (PBS) provides work environments for over one million Federal employees nationwide. The inventory consists of courthouses, laboratories, offices and border stations. Tenant activities in these buildings gen... |
| II. II. Objectives |
| a. Determine the most efficient methods to maximize reduction, recycling, and composting of solid waste/trash and to minimize waste shipments. |
| b. Achieve a minimum of 50% waste diversion through waste minimization, recycling, and composting. |
| c. Determine the right service level for solid waste/trash collection and removal. |
| III. Extent of Work |
| a. . Contractor shall conduct a solid waste/trash audit to include: |
| 1) 100% of the waste and/or recycling collected in a 24 hour period must be audited (excluding durable goods or construction waste). |
| 2) The audit must represent a 24 hour period on a typical work day. |
| 3) Use scales to weigh sorted waste, as weight is the preferred metric. |
| 4) Determine the amount of recyclable materials being thrown away that could have been recycled and composted. At a minimum, the recyclable items within the waste/trash must be identified and separated into the following categories: Paper, Plastic, Ca... |
| b. Contractor will develop a written report and analysis of the conclusions drawn from this audit, including recommendations for improving the economy and efficiency of waste collection, storage, transfer, and disposal (including recycling and compost... |
| 1) Recommendations to maximize waste minimization, recycling, and composting to achieve at least 50% waste diversion. |
| 2) Recommendations to right-size service level for solid waste/trash removal services to minimize trash shipments. |
| EXHIBIT J-1.5 |
| EXHIBIT J-1.6 |
| BUILDING INFORMATION SHEET |
| EXHIBIT J-1.7 |
| 1.0 GENERAL GUIDANCE |
| 2.1 BOILER PLANT |
| 2.2 CHILLER PLANT: |
| 2.3 DOMESTIC HOT WATER PLANT |
| 2.5 GENERAL PLUMBING AND DOMESTIC WATER SYSTEMS |
| 2.6 WATER TREATMENT PLANS |
| 2.7 FIRE ALARM SYSTEMS |
| 2.8 FIRE SUPPRESSION SYSTEMS |
| 3.0 HVAC EQUIPMENT DESCRIPTIONS AND sequences of operation |
| 3.1 PENTHOUSE MECHANICAL ROOM |
| As Applicable |
| 3.2 PENTHOUSE AIRHANDLERS |
| As Applicable |
| 3.3 MAIN AIRHANDLERS |
| 4.0 ELECTRICAL DISTRIBUTION AND SPECIFICATIONS |
| 4.1 EMERGENCY GENERATORS |
| 4.2 MAIN ELECTRICAL SUBSTATIONS |
| 4.3 ADDITIONAL SUBSTATIONS |
| 5.0 energy MANAGEMENT controls |
| 7.0 tour procedures and |
| 7.1 TOUR PROCEDURES |
| 9.4 LOADING DOCK ACCESS |
| As Applicable |
| As Applicable |
| As Applicable |
| Smart Technologies - Background and Purpose |
| 1.0 Trend toward Integrated Building System Technologies |
| GSA Specific Smart & Sustainable Building Objectives Related to O&M Contract Support |
| Integrated Building Systems |
| Mandatory Training (at least one staff member): |
| Optional Training (Recommended for more in depth proficiency): |
| Definitions |
| Building Automation System (BAS) |
| Controls and Control System |
| GSAlink. |
| Open Systems |
| Government-furnished Equipment (GFE) |
| Applicable References |
| 1.0 Introduction |
| 2.0 Types of Recirculation Water Loops |
| 2.1 Open Loop Cooling Water System |
| 2.2 Closed Loop Cooling Water Systems |
| 2.3 Steam and Condensate Recirculation Systems |
| 2.4 Closed Loop Hot Water Systems |
| 2.5 Domestic Hot and Cold Water System |
| 3.0 Water Chemicals Treatment Additives |
| 3.1 Mineral Scale Inhibitor |
| 3.2 Corrosion Inhibitor |
| 3.3 Bacteria Contamination Control |
| 3.4 General Fouling Inhibitor |
| 3.5 Oxygen Corrosion Control |
| 3.6 General Corrosion Control |
| 3.7 Condensate Corrosion Control |
| 4.0 Setting Up a Water Treatment Program |
| 4.1 Open Loop Cooling Water Systems |
| 4.2 Closed Loop Cooling and Hot Water Systems |
| 4.3 Steam and Condensate Recirculation Systems |
| 5.0 Water System Testing |
| 5.1 Water Sampling |
| 5.2 Common Water Chemistry Tests |
| 5.3 Maintenance Parameters |
| 6.0 Alternatives to Chemical Water Treatment |
| 6.1 Pulsed Electromagnetic Fields |
| 6.2 Ozone Generators |
| Appendix A – Building Energy Use History |
| Appendix B – BUILDING wATER USE HISTORY |
| EXHIBIT J-1.20 |
| Milestone Chart for Contractor Deliverables |
| Note: All documents due to the CO /Designee. |
| EXHIBIT J-2.1 |
| CONTRACTOR DELIVERABLES |
| EXHIBIT J-2.2 BUILDING INFORMATION SHEET |
| EXHIBIT J-2.3 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) |
| CONTRACT No. – TBD |
| EXHIBIT J-2.5 BUILDING EXTERIOR AND HARDSCAPE PLAN |
| EXHIBIT J.2.6 EROSION AND SEDIMENT CONTROL |
| EXHIBIT J-2.7 GREEN PURCHASE REPORTS (Bio Based) |
| EXHIBIT J-2.8 GREEN PURCHASE REPORTS (Non Bio Based) |
| Workplace Safety Plan |
| Underground Storage Tanks |
| Roof Anchorage Points |
| C.42.15 Emergency Lighting Systems and Exit Signage |
| I. Background |
| EXHIBIT J-2.10 EXAMPLES OF ENVIRONMENTALLY SUSTAINABLE PRODUCT ATTRIBUTES AND OFFERINGS |
| I. Background |
| 1. Prior Experience 30% |
| 2. Past Performance 30% |
| 3. Management Plan 40% |
File details come from the government source that posted it.