Option_Items.pdf
PDF 9 KB Posted
- Attached to
- NFATC CHILD CARE FACILITY EXPANSION
- Solicitation number
- 47PM0517R0028
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NFATC CCF Option Items
OPTION ITEMS DESCRIPTION COST
Site
O1
Permanent fencing new & reconfiguration. Sheets C130, AD101 & A101. Requriments for temporary
Construction fencing to remain. Installed at start of project.
O2 Landscape plantings. Sheets C160, A101.
O3 Permanent Ramps and supports on west near entry vestibule. Sheets A101, A506.
O4 Exterior rubber walkways in playground area. Sheets
A101, Rubber walkways at north entrance to remain.
O5 Jogging trail removal and re-sodding. Sheets C120, C150.
Exterior
O6 Shatter resistant window film on all glazing Spec
08800.2.9.
Interior
O7 Kitchen L44 and Staff Lounge L40 equipment, cabinetry, appliances & lockers.
O8 Millwork - reception desk, cabinetry, discovery wall, manufactured cubbies, window seat millwork at classroom windows
O9 Roller Window Shades. Section 122413. Details A307, A508, A602.
Value Engineering
Items
VE1
Change angled wall at Lobby vestibule to vertical.
Drawings 2/A308, 5/A308, A506. Metal panel heights will match others on the project.
VE2
Eliminate all 5 clerestory window groups above roof place. One group if windows per classroom. Eliminate associated film, roller shades and electrical connections.
Elminate structural steel framing at these window openings. Infill is structural metal framing and metal panel. Drawings 3/A105, A201, A301, S301, S302, S533.
V3
Remove gypsum board ceilings and associated painting and extend plat ACT in 5 classrooms. Replace diffusers with ACT-type grilles compatible. Drawings A107, A602
Finish schedule. M 102, FX401.
File details come from the government source that posted it. Updated .