RFP-ATTACHMENT_B_(Pricing_Sheet)_FAA_Elevators.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Design Build - FAA Elevator Modernization Federal contract opportunity
- Solicitation number
- 47PM0218R0001
About this file
ATTACHMENT B - Pricing Sheet (FAA Elevator Modernization)
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT D | |
| PRICE SHEET | |
| FAA Elevator Modernization | |
| Solicitation #47PM0218R0001 |
| BASE | Passenger Elevators #1-8 & Traction Freight #17 | |
| Division | Description | Bid Price |
| 1 | General Requirements | |
| 14 | Conveying Equipment | |
| Base Subtotal (Divisions 1 + 14) | $0.00 | |
| Design % | ||
| Overhead % | ||
| Profit % | ||
| Bond % | ||
| Insurance % | $ | |
| BASE - TOTAL BID PRICE | $0.00 |
| OPTIONS | ||
| Description | Bid Price | |
| OPTION 1 | Passenger Elevators #9-16 & Traction Freight #18 | |
| OPTION 2 | Modernize six (6) escalators | |
| OPTION 3 | Modernize two (2) Hydraulic freight elevators | |
| OPTION 4 | Provide all maintenance and call back services for all vertical transportation (16 traction passenger elevators, 2 traction freight elevators, 2 hydraulic freight elevators and 6 escalators) until all base contract and awarded options are substantially completed | |
| OPTION 5 | Provide full 5 years maintenance and call back contract that will start immediately after the 1 year warranty period ends | |
| OPTIONS - TOTAL BID PRICE (Options 1 - 5) | $0.00 |
| ALTERNATES | ||
| Description | Bid Price | |
| Alternate 1 | Accelerate the work schedule for all elevators and freight elevator under BASE to be completed in 122 calendar days ADDITIVE ALTERNATE |
: This represents Estimated Cost of Construction Award. Should design amount be added? Alternate 2 Alternate #2: Accelerate the work schedule for all elevators and freight elevators under OPTION #1 to be completed in 122 calendar days ADDITIVE ALTERNATE
| : This represents Estimated Cost of Construction Award. Should design amount be added? | Alternate 3 | Accelerate the work schedule for all elevators and freight elevator under BASE to be completed in 45 calendar days ADDITIVE ALTERNATE | |
| Alternate 4 | Accelerate the work schedule for all elevators and freight elevators under OPTION #1 to be completed in 45 calendar days ADDITIVE ALTERNATE | ||
| Alternate 5 | Retain the existing 328 passenger elevator hoist-way doors. Repair, clean and paint versus replace the 292 painted doors and frames on the upper floors. Clean and repair the 16 stainless steel doors and frames. DEDUCTIVE ALTERNATE | ||
| ALTERNATES - TOTAL BID PRICE (Alternates 1 - 5) | $0.00 |
TOTAL BID PRICE (Base Total + Options Total + Alternates Total) $0.00
File details come from the government source that posted it.