Amendment 001 47PF0020R0098.pdf

PDF 794 KB Posted

Attached to
JCK IRS CMc - Award Federal contract opportunity
Solicitation number
47PF0020R0098
Issued by
General Services Administration Public Buildings Service Region 5

About this file

This document provides responses to questions regarding solicitation number 47PF0020R0098 for construction services at the JCK IRS building. The solicitation involves tenant improvements to floors 17 and 19 including demolition, new construction, and mechanical, electrical, and plumbing modifications. Both floors will be available for construction. The project is to be completed during normal business hours with noisy work after hours. The General Services Administration is the contracting agency and the work includes sprinkler and lighting modifications, fireproofing installation, and ceiling and door replacements.

View the file

Other files for this federal contract opportunity

Other files attached to JCK IRS CMc - Award, newest first.
File Type Posted
SAM Award Public Notice.pdf PDF
Amendment 003 47PF0020R0098.pdf PDF
Amendment 002 47PF0020R0098.pdf PDF
PPQ RFP 47PF0020R0098 05.12.2021.docx DOCX document
JCK IRS CMc Preproposal Conference Meeting Minutes.pdf PDF
RFP 47PF0020R0098 JCK IRS CMc.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

R10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

5P1QAB

5P1QAB

Programs/ Quality Assurance Branch 230 S. Dearborn St.

Chicago, IL 60604 USA

Programs/ Quality Assurance Branch 230 S. Dearborn St.

Chicago, IL 60604 USA

47PF0020R0098

47PF0020R0098

05/12/2021

04/12/2021

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This Amendment is for the following purposes:

1. Extending the proposal due date from May 17th to May 21st 2021 no later than 3:00PM CST.

2. Issuing Amendment 001 Document

3. Issuing Specification Divisions 011000, 012100, 081416, 084113, and 095113 Dated 05/12/2021

4. Issuance of Counsel Construction Schedule Dated 05/12/2021

5. Issuance of responses to RFIs received Dated 05/12/2021

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

GSA Great Lakes Region

Solicitation 47PF0020R0098 Amendment 001 Document

The solicitation is amended to extend the date for receipt of offers to: May 21, 2021 no later than 3:00 PM CST

I.C. Authorized Representatives

Alternate POC Information Name:

Anna Vanko anna.vanko@gsa.gov

Phone: 614-469-2791

I.G. Receipt of Offers

(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 3:00 pm CST on the following date and at the following address.

Date: May 21, 2021

Address: Anna.Vanko@gsa.gov

II.D. Technical Proposal

Factor #4 of the RFP is amended as follows (delete red strikethrough text and insert yellow highlighted text)

Submittal Requirements

The client must submit the questionnaire directly to the Contracting Officer Alternate POC, via email at

Alicia.lerum@gsa.gov Anna.Vanko@gsa.gov prior to proposal closing date.

Issuing Specifications Divisions 011000, 012100, 081416, 084113, and 095113 Dated 05/12/2021 to replace in total corresponding divisions in JCK IRS Counsel 3.22.2021 Specifications

Issuance of Counsel Construction Schedule Dated 05/12/2021

Issuance of response to RFIs Dated 05/12/21

Issuing PPQ RFP 47PF0020R0098 Dated 05/12/2021 mailto:Anna.Vanko@gsa.gov

JCK – IRS Backfill -Counsel GS-05P-15-FA-D-0003

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

SUMMARY 011000 - 1

Update May 12, 2021

SECTION 011000 – SUMMARY

PART 1 - GENERAL

1.1 PROJECT INFORMATION

A. Project Name and Location: JCK IRS Backfill – Counsel Interior Tenant Improvements in the JCK Federal Office Building, located at 230 S. Dearborn St., Chicago, IL

B. Project Summary Description:

1. IRS Counsel – 17TH and 19TH Floor. The work includes approximately 18,631 SF (17TH Floor) and 15,885 SF (19TH Floor) of tenant improvements work. The project includes demolition of existing office areas, removing and reinstalling existing light fixtures, HVAC & Fire alarm systems. New construction will include full height drywall partitions, door & frames, electrical, security, teledata, finishes, carpeting, and modifications to the existing HVAC, lighting, and fire alarm systems. Structural framing will be installed at locations where high-density file storage system, conference room projection screens, and folding partitions are installed.

C. Architect: The term Architect refers to the project designer. The Architect's status relative to the construction will be stated in writing by the Contracting Officer prior to the pre-construction conference.

The project was designed by: EXP US services, Inc., 205 N. Michigan Avenue, Chicago, Illinois, 60601, Contact: John M. Stryker. 312-6161-7919, john.stryker@exp.com

D. Project Delivery Method: Indefinite Delivery, Indefinite Quantity Contract (IDIQ)

E. Environmental Consultant: Environmental Design International, Inc. (EDI) contact: Raymond Cicenas, 312-345-0649, rcicenas@envdesigni.com.

F. CMC: TBD

G. The Contracting Officer for the project is: Alicia Lerum (612) 725 1863, Email:

alicia.lerum@gsa.gov

1.2 WORK SEQUENCE

A. The work is anticipated to be constructed in a single phase in this building: The Work is in an occupied building. Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways."

1.3 WORK BY OTHER CONTRACTORS (There is a FAR clause; coordinate with Legal, ok to leave to reinforce an existing requirement.) Reminder: FAR clause always trumps the specification

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

SUMMARY 011000 - 2

Update May 12, 2021

A. The Contractor shall cooperate with other contractors performing related work, including providing labor, materials and other costs necessary to satisfactorily coordinate the Contract work with work performed under other contracts.

1.4 SCHEDULE OF GOVERNMENT-FURNISHED PROPERTY

A. The project includes the following Government furnished property to be installed by the Contractor.

The contractor shall advise GSA at least 30 days in advance of when the property should be delivered.

1. TBD

1.5 MISCELLANEOUS PROVISIONS

A. Work in existing facilities shall correspond in all respects with the existing conditions to which it connects, or to similar existing conditions, in materials, workmanship and finish.

B. Alterations to Existing Conditions: Existing conditions shall be cut, drilled, removed, temporarily removed, or removed and replaced, as necessary for performance of Work under the Contract.

Work out of alignment where exposed by removal of existing work shall be called to the attention of GSA. Necessary corrective work shall be as directed.

1. Replacements of existing conditions that are removed shall match similar existing conditions.

2. Unless otherwise indicated, existing structural members shall not be cut or altered without authorization by the Contracting Officer.

3. Conditions remaining in place, which are damaged or defaced during the Work, shall be restored to the condition existing at time of award of Contract.

4. Discolored or unfinished surfaces exposed by removal of existing conditions, that are indicated to be final exposed surfaces, shall be refinished or replaced as necessary to produce uniform and harmonious contiguous surfaces.

C. Existing structures will remain in place.

D. Existing utility services with related meters and equipment will remain in place.

E. Removed items indicated to remain the property of the Government shall be stored on site where directed by the Contracting Officer.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 011000

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ALLOWANCES 012100 - 1

Update May 12, 2021

SECTION 012100 - ALLOWANCES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. The Government is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents. Drawings and general provisions of the Contract, including Federal Acquisition Regulations (FAR) and General Services Administration Acquisition Regulations (GSAR) contract clauses, and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements governing allowances.

1. Certain items are described in the Contract Documents as allowance items. The purpose of allowance items is to defer selection of actual products and systems to a later date when direction will be provided to the Contractor. [Allowances must be part of the total evaluated price and the award amount. Work with your Contracting Officer during the procurement phase. See Agreement section 2b and pricing sheet.] The Contracting Officer will issue Modifications to incorporate allowance items in the Work after actual products and systems have been determined.

B. Types of allowance items may include the following :

1. Lump-sum allowance items.

2. Unit-price allowance items.

3. Quantity allowance items.

1.3 SELECTION AND PURCHASE

A. At the earliest practical date after award of the Contract, advise the contracting officer of the date when final selection and purchase of each product or system described by an allowance item must be completed to avoid delaying the Work. Allowances must be included in all schedule submissions

1.4 ACTION SUBMITTALS

A. Submit proposals for products or systems described by allowance items in the form specified for Change Orders.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ALLOWANCES 012100 - 2

Update May 12, 2021

1.5 INFORMATIONAL SUBMITTALS

A. Submit copies of invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each unit-price and quantity allowance item.

B. Coordinate and process submittals for allowance items in same manner as for other portions of the Work.

1.6 COORDINATION

A. Coordinate allowance items with other portions of the Work. Furnish templates as required to coordinate installation.

B. Modifications based on an allowance item shall include cost to Contractor of specific products and systems selected by the contracting officer under allowance and shall include taxes, freight, delivery to Project site, Contractor's costs for receiving and handling at Project site, labor, installation, overhead, and profit.

1. If requested by the contracting officer, purchase additional quantities under unit-price or quantity allowances and prepare unused material for storage by Contracting officer.

Deliver unused material to Contracting officer's storage space as directed.

1.7 ADJUSTMENT OF ALLOWANCE ITEMS

A. Modifications to an allowance item shall comply with the changes clauses and any other contract modifications procedures found in the Contract Documents.

B. Contracting officer reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine products covered by an allowance item promptly on delivery for damage or defects.

Return damaged or defective products to manufacturer for replacement.

3.2 PREPARATION

A. Coordinate materials and their installation for each allowance item with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ALLOWANCES 012100 - 3

Update May 12, 2021

3.3 SCHEDULE OF ALLOWANCE ITEMS

A. Allowance Item No. 01: Lump-Sum [$80,000] Allowance: Sprinkler Pipe system.

B. Allowance Item No. 02: Lump-Sum [$100,000] Allowance: Existing light fixture modifications

C. Allowance Item No. 03: Lump-Sum [$50,000] Allowance: Circuit Breaker Rework.

D. Allowance Item No. 04: Lump-Sum [$15,000] Allowance: Furniture – Whips.

E. Allowance Item No. 05: Lump-Sum [$24,000] Allowance: IT Data Drops

F. Allowance Item No. 06: Lump-Sum [$16,000] Allowance: Security Devices

G. Allowance Item No. 07: Lump-Sum [$40,000] Allowance: Lighting Controls

H. Allowance Item No. 08: Lump-Sum [$20,000] Allowance: Floor Coring

I. Allowance Item No. 09: Lump-Sum [$15,000] Allowance: Floor Leveling 17 & 19 floor due to raised floor

J. Allowance Item No: 10: Lump-Sum [$192,664] Allowance: AV

K. Allowance Item No. 11: BAS Buss Cable [$0]

L. Allowance Item No. 12: Structural Steel ( HD Files & Moveable Partitions) $185,000

END OF SECTION 012100

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

FLUSH WOOD DOORS 081416 - 1

Update May 12, 2021

SECTION 081416 - FLUSH WOOD DOORS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification sections, apply to work of this Section.

1.2 SUMMARY

A. Provide all flush wood doors as required by the contract documents.

B. Types of doors required include the following:

1. Solid core flush wood doors with transparent finished faces.

2. Shop priming solid core flush wood doors.

C. Factory-finishing of flush wood doors is included in this section.

D. Factory-prefitting to frames and factory-premachining for hardware for wood doors is included in this section.

E. Related Requirements:

1. Division 8 Section "Door Hardware" for door hardware installed in doors and frames, including installation requirements.

2. Division 9 Section “Interior Painting” for field finishing doors.

1.3 ACTION SUBMITTALS

A. Product Data: Door manufacturer's technical data for each type of door, including details of core and edge construction and factory-finishing specifications.

B. Sustainable Design Submittals:

1. Environmental Product Declaration: For each product.

2. Health Product Declaration: For each product.

3. Sourcing of Raw Materials: Corporate sustainability report for each manufacturer.

4. Chain-of-Custody Certificates: For certified wood products. Include statement of costs.

5. Chain-of-Custody Qualification Data: For manufacturer and vendor.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

FLUSH WOOD DOORS 081416 - 2

Update May 12, 2021

6. Laboratory Test Reports: For adhesives, indicating compliance with requirements for low-emitting materials.

7. Laboratory Test Reports: For composite wood products, indicating compliance with requirements for low-emitting materials.

C. Shop Drawings: Submit shop drawings indicating location and size of each door, elevation of each kind of door, details of construction, location and extent of hardware blocking, fire ratings, requirements for factory finishing and other pertinent data.

D. Samples: Submit samples, 1'-0" square or as indicated, for the following:

1. Doors for Transparent Finish: Door faces with solid wood edging representing typical range of color and solid lumber required.

2. Factory-Finished Doors: Each type of factory finish required.

1.4 QUALITY ASSURANCE

A. Quality Standards: Comply with the following standards:

1. NWWDA Quality Standard: I.S.1 "Industry Standard for Wood Flush Doors", of National Wood Window and Door Association (NWWDA).

2. AWI Quality Standard: "Architectural Woodwork Quality Standards";

including Section 1300 "Architectural Flush Doors", of Architectural Woodwork Institute (AWI) for grade of door, core construction, finish and other requirements exceeding those of NWWDA quality standard.

B. NWWMA Quality Marking: Mark each wood door with NWWDA Wood Flush Door

Certification Hallmark certifying compliance with applicable requirements of NWWDA I.S. 1 Series.

C. Manufacturer qualifications: Firm experienced in successfully producing wood doors similar to that indicated for this project, including the ability to execute the specified finish systems, and sufficient production capacity to produce required units without causing delay in the work. Firm must also have a working veneer processing department, veneer processing equipment and hot pressing capability.

D. Single-Source Responsibility: Arrange for production of like doors by a single firm.

E. Single-Source Manufacturing / Installation Responsibility: Engage a qualified

Manufacturer that can demonstrate ten (10) years successful experience in the fabrication, veneering and installation of the wood doors in the type and quality to those required for this project and to assume undivided responsibility for doors specified in this section, including fabrication, and installation.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

FLUSH WOOD DOORS 081416 - 3

Update May 12, 2021

F. Manufacturer Qualifications: A qualified manufacturer that is certified for chain of custody by an FSC-accredited certification body.

A. Vendor Qualifications: A vendor that is certified for chain of custody by an FSC-accredited certification body.

1.5 DELIVERY, STORAGE AND HANDLING

A. Protect doors during transit, storage and handling to prevent damage, soiling and deterioration. Comply with requirements of referenced standards and recommendations of NWWDA pamphlet "How to Store, Handle, Finish, Install, and Maintain Wood Doors", as well as with manufacturer's instructions.

B. Doors shall be stored on level supports. Protect all door faces.

C. Protect all doors from exposure to light.

D. Do not store doors in damp areas, including freshly plastered areas. Storage areas shall be dry and well ventilated. Do not subject doors to extreme high or low humidity.

E. Identify each door with individual opening numbers that correlate with designation system used on shop drawings for door, frames, and hardware, using temporary, removable or concealed markings.

1.6 FIELD CONDITIONS

A. Conditioning: Do not deliver or install doors until conditions for temperature and relative humidity have been stabilized and will be maintained in storage and installation areas during remainder of construction period to comply with the following requirements applicable to project's geographical location:

1. Referenced AWI quality standard including Section 100-S-3 "Moisture

Content".

1.7 WARRANTY

A. General: Warranties shall be in addition to, and not a limitation of, other rights the

Government may have under the Contract Documents.

B. Door Manufacturer's Warranty: Submit written agreement in door manufacturer's standard form signed by Manufacturer, Installer and Contractor, agreeing to repair or replace defective doors that have warped (bow, cup or twist) or that show

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

FLUSH WOOD DOORS 081416 - 4

Update May 12, 2021 telegraphing of core construction in face veneers, or do not conform to tolerance limitations of referenced quality standards.

1. Warranty shall also include reinstallation that may be required due to repair or replacement of defective doors where defect was not apparent prior to hanging.

2. Warranty shall be in effect during following period of time after date of Substantial Completion.

3. Solid Core Interior Doors:

a. Life of installation.

C. Contractor's Responsibilities: Replace or refinish doors where Contractor's work contributed to rejection or to voiding of manufacturer's warranty.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufactures that offer products that may comply with the requirements of this contract include, but are not limited to, the following:

1. Solid Core Doors:

a. Algoma Hardwoods, Inc.

b. Eggers Industries, Architectural Door Division.

c. Marshfield Door Systems, Inc. (Weyerhauser)

2. Proprietary Names: Use of manufacturer's proprietary product names to designate colors or materials is not intended to imply that products named are required to be used to the exclusion of equivalent products of other manufacturers. Provide either the product indicated, or an equal product in performance and appearance, as acceptable to the Contracting Officer.

Furnish samples to the Contracting Officer according to the requirements of Division 1 for both the originally specified product and the proposed substitute in addition to the manufacturer's material data and certificates of performance required for proposed substitutions.

3. Manufacturer's Product Designation: In some instances use of manufacturer's proprietary product designations and name of single manufacturers are listed for hardware items. The purpose of such listing is for establishing minimum requirements for those items of hardware materials and is not intended to imply that products named are required to be used to the exclusion of equivalent products of other manufacturers. Provide either the product indicated, or an equal product as acceptable to the Contracting Officer. Furnish the manufacturer's material data and certificates of performance for proposed substitutions.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

FLUSH WOOD DOORS 081416 - 5

Update May 12, 2021

2.2 FLUSH WOOD DOORS, GENERAL

A. Quality Standard: In addition to requirements specified, comply with AWI's, AWMAC's, and WI's "Architectural Woodwork Standards.”

1. Provide AWI Quality Certification Labels indicating that doors comply with requirements of grades specified.

2. Contract Documents contain selections chosen from options in quality standard and additional requirements beyond those of quality standard.

Comply with those selections and requirements in addition to quality standard.

B. Regional Materials: Wood doors shall be manufactured within 100 miles (160 km) of Project site from materials that have been extracted, harvested, or recovered, as well as manufactured, within 100 miles (160 km) of Project site.

C. Certified Wood: Wood doors shall be certified as "FSC Pure"[ or "FSC Mixed Credit"] according to FSC STD-01-001 and FSC STD-40-004.

D. Adhesives: Use adhesives that meet the testing and product requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."

E. Composite Wood Products: Products shall be made using ultra-low-emitting formaldehyde resins as defined in the California Air Resources Board's "Airborne Toxic Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products" or shall be made with no added formaldehyde.

F. Smoke- and Draft-Control Door Assemblies: Listed and labeled for smoke and draft control, based on testing according to UL 1784.

2.3 VENEER-FACED DOORS FOR TRANSPARENT FINISH

A. Interior Solid-Core Doors – DoED 37th, 38th & 39th Floor

1. Grade: Premium.

2. Species: Red Oak.

3. Cut: Plain Sliced.

4. Match between Veneer Leaves: Book.

5. Assembly of Veneer Leaves on Door Faces: Center-balance.

6. Pair and Set Match: Provide for doors hung in same opening.

7. Room Match: Match door faces within each separate room or area of building. Corridor-door faces do not need to match where they are separated by 20 feet (6 m) or more.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

FLUSH WOOD DOORS 081416 - 6

Update May 12, 2021

8. Room Match: Provide door faces of compatible color and grain within each separate room or area of building.

9. Exposed Vertical and Top Edges: Same species as faces.

10. Core: Glued wood stave.

11. Construction: SLC-5, Stave Core, (Glued block core, 5 ply-bonded core) provide doors with 4-1/2" wide solid wood stiles and rails. Particleboard door cores will not be permitted.

B. Interior Solid-Core Doors – EEOC 18th & 29th Floor

1. Faces: Face veneer for doors to be the building standard Brookline 0.70mm thickness composite veneer Ash 2-323/XV or equal as is installed on the 18th & 29th floor of the J. C. Kluczynski Federal Building.

a. Finish: Rotary Veneer Components are to be dyed with a computerized system to insure color consistency and match the Architect’s sample.

b. Dyed Obeche shall be glued under pressure, using dyed formaldehyde resin, to form flitch block.

c. Composite Veneer shall be sliced to a uniform thickness and dried to a 12% moisture content.

d. Minimize false hearts created by swing in grain structure.

e. Lamination Widths: Repeat in random order; thickness of laminations not to exceed 1/8".

f. Color Range and proportions of color of laminations to match hues of the approved flitch.

2. AWI Grade: Premium.

3. Construction: SLC-5, Stave Core, (Glued block core, 5 ply-bonded core) provide doors with 4-1/2" wide solid wood stiles and rails. Particleboard door cores will not be permitted.

2.4 DOORS FOR OPAQUE FINISH

A. Interior Solid Core Doors for Opaque Finish: Comply with the following requirements:

1. Grade: Premium.

2. Faces: Any closed-grain hardwood of mill option.

3. Construction: SLC-5, Stave Core, (Glued block core, 5 ply-bonded core) provide doors with 4-1/2” wide solid wood stiles and rails. Particleboard door cores will not be permitted.

4. Hardboard Faces: ANSI A135.4 Class 2.

2.5 FABRICATION

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

FLUSH WOOD DOORS 081416 - 7

Update May 12, 2021

A. Fabricate flush wood doors to produce doors complying with following requirements:

1. Factory-prefit and premachine doors to fit frame opening sizes indicated with the following uniform clearances and bevels:

a. Comply with tolerance requirements of AWI for prefitting. Comply with final hardware schedules and doorframe shop drawings and with hardware templates.

b. Coordinate measurements of hardware mortises in metal frames to verify dimensions and alignment before proceeding with factory premachining.

2.6 SHOP PRIMING

A. Doors for Opaque Finish: Shop prime faces, all four edges, edges of cutouts, and mortises with one coat of wood primer specified in Section 099123" Interior Painting."

2.7 FACTORY FINISHING

A. General: Comply with referenced AWI quality standard including Section 01500 "Factory Finishing".

B. Prefinish wood doors at factory. Finish entire doors.

C. Transparent Finish: Comply with requirements indicated for grade, finish system, staining effect and sheen.

1. AWI Grade: Premium.

2. Finish: Manufacturer's standard finish with performance requirements comparable to either AWI System #2 catalyzed lacquer or AWI System #3 alkyd urea conversion varnish.

3. Staining: None required.

4. Effect: Filled finish.

5. Sheen: Satin-medium rubbed effect.

2.7 SHOP PRIMING

A. General: Doors for Opaque Finish: Shop prime faces, all four edges, edges of cutouts, and mortises with one coat of wood primer.

PART 3 - EXECUTION

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

FLUSH WOOD DOORS 081416 - 8

Update May 12, 2021

3.1 EXAMINATION

A. Examine doors and frames before hanging doors:

1. Verify that frames comply with indicated requirements for type, size, location, and swing characteristics and have been installed with level heads and plumb jambs.

2. Reject doors with defects.

B. Do not proceed with installation until unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Hardware: For installation see Division-8 "Door Hardware" section of these specifications.

B. Manufacturer's Instructions: Install wood doors to comply with manufacturer's instructions and of referenced AWI standard and as indicated.

C. Prefit Doors: Fit to frames for uniform clearance at each edge.

D. Factory-Finished Doors: Restore finish before installation, if fitting or machining is required at the job site.

3.3 ADJUSTING AND PROTECTION

A. Operation: Rehang or replace doors that do not swing or operate freely.

B. Finished Doors: Refinish or replace doors damaged during installation.

C. Protect doors as recommended by door manufacturer to ensure that wood doors will be without damage or deterioration at time of Substantial Completion.

END OF SECTION 081416

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 1

Update May 12, 2021

SECTION 084113 – ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section Includes:

1. Interior aluminum frames for doors.

2. Interior aluminum frames for glazing.

B. Related Requirements:

1. Division 6 Section "Rough Carpentry" for carpentry for wood framing and blocking.

2. Division 7 Section "Joint Sealants" for joint sealants installed with interior aluminum frames and for sealants to the extent not specified in this Section.

3. Division 8 Section "Flush Wood Doors" for wood doors installed in interior aluminum frames.

4. Division 8 Section "Door Hardware" for door hardware.

5. Division 9 Section "Gypsum Board Assemblies" for partitions.

1.3 ACTION SUBMITTALS

A. Product Data: Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of interior aluminum frame indicated.

B. Sustainable Design Submittals:

1. Environmental Product Declaration: For each product.

2. Health Product Declaration: For each product.

3. Sourcing of Raw Materials: Corporate sustainability report for each manufacturer.

4. Chain-of-Custody Certificates: For certified wood products. Include statement of costs.

5. Chain-of-Custody Qualification Data: For manufacturer and vendor.

6. Laboratory Test Reports: For adhesives, indicating compliance with requirements for low-emitting materials.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 2

Update May 12, 2021

7. Laboratory Test Reports: For composite wood products, indicating compliance with requirements for low-emitting materials.

C. Shop Drawings: For aluminum-framed entrances and storefronts. Include plans, elevations, sections, details, and attachments to other work.

D. Samples for Initial Selection: For units with factory-applied color finishes.

E. Samples for Verification: 12-inch- (300-mm-) long framing member with factory-applied finish for each type of interior aluminum frame indicated.

F. Fabrication Sample: For each vertical-to-horizontal intersection of systems, made from 12-inch (300-mm) lengths of full-size components and showing details of assembly.

G. Entrance Door Hardware Schedule: Prepared by or under supervision of supplier, detailing fabrication and assembly of entrance door hardware, as well as procedures and diagrams. Coordinate final entrance door hardware schedule with doors, frames, and related work to ensure proper size, thickness, hand, function, and finish of entrance door hardware. Coordinate with security hardware provided by tenant.

1.4 CLOSEOUT SUBMITTALS

A. Maintenance Data: For interior aluminum frames to include in maintenance manuals.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.

B. Manufacturer Qualifications: A qualified manufacturer that is certified for chain of custody by an FSC-accredited certification body.

C. Vendor Qualifications: A vendor that is certified for chain of custody by an FSC-accredited certification body.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis of Design:

Steelcase Privacy Wall System

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 3

Update May 12, 2021

B. Manufacturers: Subject to compliance with requirements, provide the basis of design products by Steelcase or a system of equal performance and appearance by one of the following manufacturers.:

1. Steelcase (basis of design system manufacturer)

2. Custom Components Company

3. Dual Lock Partition Systems, Inc.

4. Frameworks Manufacturing.

5. Modulex, Inc.

6. RACO Interior Products, Inc.

7. Versatrac.

8. Western Integrated Materials, Inc.

9. Wilson Partitions.

2.2 MATERIALS

A. Aluminum Framing, General: ASTM B 221 (ASTM B 221M), Alloy 6063-T5 or alloy and temper required to suit structural and finish requirements, not less than 0.062 inch (1.6 mm) thick.

B. Sheet and Plate: ASTM B 209 (ASTM B 209M).

C. Extruded Structural Pipe and Tubes: ASTM B 429/B 429M.

D. Door Frames: Reinforced for hinges and strikes.

1. Fabricate frame members for 90-minute fire-protection rating with interior cold-formed, primed, steel liner.

E. Glazing Frames: For glazing thickness indicated.

F. Ceiling Tracks: Extruded aluminum.

G. Trim: Extruded aluminum, not less than 0.062 inch (1.6 mm) thick, with removable snap-in glazing stops without exposed fasteners.

H. Regional Materials: Wood doors shall be manufactured within 100 miles (160 km) of

Project site from materials that have been extracted, harvested, or recovered, as well as manufactured, within 100 miles (160 km) of Project site.

I. Certified Wood: Wood doors shall be certified as "FSC Pure"[ or "FSC Mixed Credit"] according to FSC STD-01-001 and FSC STD-40-004.

J. Adhesives: Use adhesives that meet the testing and product requirements of the California

Department of Public Health's "Standard Method for the Testing and Evaluation of

Volatile Organic Chemical Emissions from Indoor Sources Using Environmental

Chambers."

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 4

Update May 12, 2021

K. Composite Wood Products: Products shall be made using ultra-low-emitting formaldehyde resins as defined in the California Air Resources Board's "Airborne Toxic

Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products" or shall be made with no added formaldehyde.

L. Panel Products: Any of the following unless otherwise indicated:

1. Particleboard: ANSI A208.1, Grade M-2.

2. Particleboard: Straw-based particleboard complying with requirements in

ANSI A208.1, Grade M-2, except for density.

3. Medium-density fiberboard, complying with ANSI A208.2, Grade 130.

4. Hardboard complying with ANSI A135.4.

5. Veneer-core plywood.

M. Safety Glass: Provide no less than 3/8” thick laminated safety glass and products complying with testing requirements in 16 CFR 1201, for Category II materials, unless those of Category I are expressly indicated and permitted.

2.3 ACCESSORIES

A. Fasteners: Aluminum, nonmagnetic stainless-steel or other noncorrosive metal fasteners compatible with frames, stops, panels, reinforcement plates, hardware, anchors, and other items being fastened.

B. Sound Seals: Manufacturer's standard replaceable components.

C. Glazing Gaskets: Manufacturer's standard extruded or molded plastic, to accommodate glazing thickness indicated.

D. Glazing: Comply with requirements in Division 8 Section "Glazing."

E. Hardware: Comply with requirements in Division 8 Section Door Hardware.

2.4 FABRICATION

A. Machine jambs and prepare for hardware, with concealed reinforcement plates, drilled and tapped as required, and fastened within frame with concealed screws.

B. Provide concealed corner reinforcements and alignment clips for accurately fitted hairline joints at butted or mitered connections.

C. Fabricate frames for glazing with removable stops to allow glazing replacement without dismantling frame.

D. Fabricate all components to allow secure installation without exposed fasteners.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 5

Update May 12, 2021

E. Entrance Door Frames: Reinforce as required to support loads imposed by door operation and installing entrance door hardware.

F. Entrance Door Hardware Installation: Factory install entrance door hardware to the greatest extent possible. Cut, drill, and tap for factory-installed entrance door hardware before applying finishes.

G. Entrance Doors: Install doors to produce smooth operation and tight fit at contact points.

2.5 ALUMINUM FINISHES

A. Power-coat Finish: AAMA 2603 except with a minimum dry film thickness of 1.5 mils (0.04 mm). Comply with coating manufacturer's written instructions for cleaning, conversion coating, and applying and baking finish.

1. Color and Gloss: As selected by Architect from full range of industry colors and color densities.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine walls, floors, and ceilings, with Installer present, for conditions affecting performance of work.

1. Verify that wall thickness does not exceed standard tolerances allowed by throat size indicated.

2. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. General:

1. Comply with frame manufacturer's written installation instructions.

2. Do not install damaged components.

3. Install frames plumb and square, securely anchored to substrates.

4. Fit joints to produce hairline joints free of burrs and distortion.

5. Rigidly secure nonmovement joints.

6. Install anchors with separators and isolators to prevent metal corrosion and electrolytic deterioration and to prevent impeding movement of moving joints.

7. Do not leave screws or other fasteners exposed to view when installation is complete.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 6

Update May 12, 2021

3.3 CLEANING

A. Clean exposed frame surfaces promptly after installation, using cleaning methods recommended by frame manufacturer and according to AAMA 609 & 610.

B. Touch up marred frame surfaces so touchup is not visible from a distance of 48 inches (1220 mm). Remove and replace frames with damaged finish that cannot be satisfactorily repaired.

END OF SECTION 084113

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ACOUSTICAL PANEL CEILINGS 095113-1

Update May 12, 2021

SECTION 095113 - ACOUSTICAL PANEL CEILINGS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes acoustical panels and exposed suspension systems for interior ceilings.

B. Related Requirements:

1. Division 1 Section “Construction Waste Management”

2. Division 7 “Applied Fireproofing”

3. Division 21 Section "Wet-Pipe Sprinkler Systems" for sprinkler heads in acoustical ceilings.

4. Division 23 Section "Diffusers, Registers and Grilles" in acoustical ceilings.

5. Division 26 Section "LED Interior Lighting" for lighting fixtures in acoustical ceilings.

C. Products furnished, but not installed under this Section, include anchors, clips, and other ceiling attachment devices to be cast in concrete.

1.3 ACTION SUBMITTALS

A. Product data: For each type of product.

B. Sustainable Design Submittals:

1. Product Data: For recycled content, indicating postconsumer and preconsumer recycled content and cost.

2. Product Data: For adhesives and sealants, indicating VOC content.

3. Laboratory Test Reports: For adhesives and sealants, indicating compliance with requirements for low-emitting materials.

4. Laboratory Test Reports: For ceiling products, indicating compliance with requirements for low-emitting materials.

5. Laboratory Test Reports: For insulation, indicating compliance with requirements for low-emitting materials.

6. Environmental Product Declaration: For each product.

7. Health Product Declaration: For each product.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ACOUSTICAL PANEL CEILINGS 095113-2

Update May 12, 2021

8. Sourcing of Raw Materials: Corporate sustainability report for each manufacturer.

9. Environmental Product Declaration: For each product.

10. Health Product Declaration: For each product.

11. Sourcing of Raw Materials: Corporate sustainability report for each manufacturer.

C. Samples: For each exposed product and for each color and texture specified, 6 inches (150 mm) in size.

D. Samples for Initial Selection: For components with factory-applied finishes.

E. Samples for Verification: For each component indicated and for each exposed finish required, prepared on Samples of sizes indicated below:

1. Acoustical Panels: Set of 6-inch- (150-mm-) square Samples of each type, color, pattern, and texture.

2. Exposed Suspension-System Members, Moldings, and Trim: Set of 6-inch- (150-mm-) long Samples of each type, finish, and color.

1.4 INFORMATION SUBMITTALS

A. Coordination drawings: Reflected ceiling plans drawn accurately to scale and coordinating penetrations and ceiling-mounted items. Show the following:

1. Ceiling suspension-system members.

2. Method of attaching hangers to building structure.

3. Items penetrating finished ceiling and ceiling-mounted items including the following:

a. Lighting fixtures.

b. Diffusers

c. Grilles

d. Speakers

e. Sprinklers

f. Fire Alarm Devices

g. Audio/Visual Devices

4. Minimum Drawing Scale: 1/8 inch = 1'-0".

B. Qualification data: For testing agency.

C. Product test reports: For each acoustical panel ceiling, for tests performed by an independent qualified testing agency.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ACOUSTICAL PANEL CEILINGS 095113-3

Update May 12, 2021

D. Coordination drawings: Reflected ceiling plans drawn accurately to scale and coordinating penetrations and ceiling-mounted items. Show the following:

1. Ceiling

1.5 CLOSEOUT SUBMITTALS

A. Maintenance data: For finishes to include in maintenance manuals.

1.6 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra material from the same product run that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Acoustical Ceiling Units: Full-size panels equal to 5 percent of quantity installed.

2. Suspension-System Components: Quantity of each exposed component equal to 5 percent of quantity installed.

1.7 QUALITY ASSURANCE

A. Installer Qualifications: Engage an experienced Installer who has successfully completed acoustical ceilings similar in material, design, and extent to those indicated for Project.

B. Coordination of Work: Coordinate layout and installation of acoustical ceiling units and suspension system components with other construction that penetrates ceilings or is supported by them, including but not limited to light fixtures, HVAC equipment, fire-suppression system components, and partition system.

C. Preinstallation Conference: Conduct conference at Project site to comply with requirements of Division 01 Section "Project Management Coordination."

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver acoustical panels, suspension-system components, and accessories to Project site and store them in a fully enclosed, conditioned space where they will be protected against damage from moisture, humidity, temperature extremes, direct sunlight, surface contamination, and other causes.

B. Before installing acoustical ceiling units, permit them to reach room temperature and a stabilized moisture content.

C. Handle acoustical ceiling units carefully to avoid chipping edges or damaging units in any way.

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

ACOUSTICAL PANEL CEILINGS 095113-4

Update May 12, 2021

1.9 FIELD CONDITIONS

A. Environmental Limitations: Do not install interior acoustical ceilings until space is enclosed, wet-work in space is completed and nominally dry, work above ceilings is complete, and ambient conditions of temperature and humidity will be continuously maintained at values near those indicated for final occupancy.

1. Pressurized Plenums: Operate ventilation system for not less than 48 hours before beginning acoustical tile ceiling installation.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Source Limitations: Obtain each type of acoustical ceiling panel and its supporting suspension system from single source from single manufacturer.

2.2 PERFORMANCE REQUIREMENTS

A. NOT USED

B. Surface-Burning Characteristics: Comply with ASTM E 84; testing by a qualified testing…

This is the start of the file's text. The full file is on GovTribe.