ROH00760_OH0046ZZ_Dwg02_A101.pdf

PDF 2 MB Posted

Attached to
Cooling Tower Replacement Federal contract opportunity
Solicitation number
47PF0019R0099
Issued by
General Services Administration Public Buildings Service Region 5

About this file

RFP 47PF0019R0099 Drawing 02

View the file

Other files for this federal contract opportunity

Other files attached to Cooling Tower Replacement, newest first.
File Type Posted
Pre-Bid_Walkthrough_Q&A_and_Attendance_Sheets.pdf PDF
RFP_47PF0019R0099.pdf PDF
ROH00760_OH0046ZZ_Dwg03_H201.pdf PDF
(specs)_ROH00760_Cooling_Tower_100pct_Specifications_2019-04-17.pdf PDF
ROH00760_OH0046ZZ_Dwg01_G000.pdf PDF
ROH00760_OH0046ZZ_Dwg04_E101.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Existing Drain

Paint Existing Ladder

Existing Gate

Replace Existing Composite Concrete Deck

Replace Existing Topping Slab

Pop-Up Barricade

Field V erify5' -

2 1/4"

F ield V erify 6' - 8"

Boiler Room Access Tunnel Below

Existing Vent

Access to West Long Street One Way

East Bound

C o n c re te W a lk

Sandstone/Granite Enclosure

(PROTECT, SEE NOTE)

C o n c re te W a lk

Ramp From Basement Garage

(DO NOT BLOCK ACCESS)

ACCESS LANE

Parking (DO NOT BLOCK)

Parking Garage Exit

(DO NOT BLOCK ACCESS)

Mesh Fencing

Park ing

COORDIN

ATE A

CCESS W

IT

H G

SA P

ROPERTY

M

ANAGER

Existing Support Beams Below Existing Cooling Towers.

Adjust or Provide New Support Steel (GALV)

PHO

TO

S

Security Gate

AREA FOR CRANE

Semi-trailer with replacement units

Coordinate unloading and loading schedule with GSA P.M.

24" x 66" Barriers

E0

E1

E2

E3

E4

E5

E6E7

E8

E9

E10

E11

NOTE:

Cooling Tower Stone Surround Walls:

1. Provide 1/2" plywood protection on 1-1/2" polystyrene rigid insulation board, for sandstone enclosure walls with 2x4 framing.

DO NOT anchor to sandstone, use clamp ties.

2. Blanket granite surround walls with 1-1/2" polystyrene insulation underneath blankets.

DO NOT damage historic stone surround walls during demolition, removal, or installation.

PROTECT WITH PLYWOOD AND INSULATION

PROTECT WITH BLANKETS AND INSULATION

New Topping Slab

New Waterproofing

New Galvanized Metal Composite Deck

NOTE:

• Provide new galvanized composite metal deck to replace existing composite deck.

Provide 200# SF L.L. for spans indicated.

• Provide new 4000 psi air entrained concrete for composite concrete deck and new topping slab.

• Provide new waterproofing membrane between composite deck and topping slab.

Turn waterproofing up, minimum 8" above topping slab at walls and provide termination bar and sealant.

• Coordinate

RE

VI

SI

ON

B

LO

CK

CO

NT

RA

CT

DE

SI

GN

ER

ID

EN

TIF

IC

AT

IO

N

ST

AM

P

OR

S

EA

L

OW

NE

R

ID

EN

TIF

IC

AT

IO

N

BU

ILD

IN

G

PR

OJ

EC

T

SH

EE

T

S E

N S

IT

IV

E B

U T

U N

C L

A S

S

IF

IE

D

S

B U

P

R O

P E

R T

Y O

F T

H E

U N

IT

E

D S

T A

T E

S G

O V

E R

N M

E N

T

F O

R O

F F

IC

IA

L U

S E

O N

L Y

D

O N

O T

R E

M O

V E

T H

IS

N

O T

IC

E

P

R O

P E

R L

Y D

E S

T R

O Y

D O

C U

M E

N T

S W

H E

N N

O L

O N

G E

R N

E E

D E

D

CONST. CONTRACT NO.

DELIVER ORDER NO.

A/E CONTRACT NO.

BUILDING NAME

ADDRESS

CITY, STATE, ZIP

BUILDING NO.

PROJECT TITLE

GSA PROJECT NO.

SUBMISSION STAGE

SUBMISSION DATE

DRAWN BY

CHECKED BY

FLOOR NO.

DISCIPLINE

PLAN TYPE

SHEET NUMBER

AND FILENAME

KE

Y

PL

AN

GR

AP

HI

C

SC

AL

E

General Services Administration Public Buildings Service Great Lakes Region

Design and Construction Division John C. Kluczynski Federal Building 230 South Dearborn Street Chicago , IL 60604

Columbus, OH, 43215

300 Marconi Boulevard, Suite 100 | Columbus, Ohio 43215 | schooleycaldwell.com

Kinneary U.S. Courthouse

Architecture

100% Construction Documents

ROH00760OH0046ZZ

COOLING TOWERS

GS-05P-17-SC-D-0010

47PF00-18-F-0076

/1

/2

:4

:2

A

M

A101

Cooling Tower Replacement

ROH00760

LWD

RKS

85 Marconi Boulevard

Site Plan

4-17-2019

N

1/8" = 1'-0"

Cooling Tower Area Site Plan

Existing Cooling Tower Enclosure

Existing Cooling Tower Enclosure

12" = 1'-0"

Existing Cooling Tower Lot Entry 12" = 1'-0"

Parking Lot Adjacent to Cooling Tower

12" = 1'-0"

Underside of Existing Composite Deck 12" = 1'-0"

Existing Cooling Tower Piping

12" = 1'-0"

Existing Cooling Tower Enclosure Interior

3" = 1'-0"

New Composite Concrete Deck Detail

MARK DATE DESCRIPTION

Sheets
A101 - Site Plan
G000 - Cover Sheet

File details come from the government source that posted it.