Solicitation_FINAL.pdf
PDF 5 MB Posted
- Attached to
- Solicitation - Operation and Maintenance Services - U. S. Customs Cargo Inspection Facilities - 2018
- Solicitation number
- 47PF0018R0075
About this file
Solicitation for Operation and Maintenance Services - U.S. Customs Cargo Inspection Facilities - 2018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 47PF0018R0075_0003.pdf | ||
| 47PF0018R0075_0002.pdf | ||
| Cargo_O&M_Q&A_1.pdf | ||
| Cargo_Pre_Pro_Agenda.pdf | ||
| 47PF0018R0075_0001.pdf | ||
| Cost_Proposal_Sheet.xls | XLS spreadsheet | |
| SF24-16.pdf | ||
| Synopsis.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA GSA GSA GSA GSA GSA GSA GSA GSA GSA GSA GSA
REQUEST FOR PROPOSAL
(RFP)
U.S. GENERAL SERVICES
ADMINISTRATION
General Services Administration Acquisition Management Division
230 S. Dearborn St. Suite 3600 Chicago, IL, 60604
PROJECT: Operation and Maintenance Services U.S. Customs Cargo Inspection Facilities 2810 West Fort Street Detroit, MI, 48216
SOLICITATION NO: 47PF0018R0075
ISSUE DATE: April 4, 2018
CLOSING DATE & TIME:
PERIOD OF PERFORMANCE:
May 4, 2018 3:00 PM (Central Time)
August 1, 2018 to July 31, 2019
OY1: 08/01/2019 – 07/31/2020
OY2: 08/01/2020 – 07/31/2021
OY3: 08/01/2021 – 07/31/2022
OY4: 08/01/2022 – 07/31/2023
ISSUED BY:
U.S. General Services Administration Public Buildings Service Northern Services Team – 5P1QBC 230 S. Dearborn St. Suite 3600 Chicago, IL, 60604
GSA GSA GSA GSA GSA GSA GSA GSA GSA GSA GSA GSA
ATTENTION OFFERORS: This notice has been prepared to point out some of the important sections or requirements of this solicitation or to provide you with additional information related to this proposed contract. Please note that it is not inclusive - you are cautioned to carefully read the entire solicitation in order to be fully aware of all requirements, provisions, and clauses.
SOLICITATION NO. 47PF0018R0075
GENERAL SERVICES ADMINISTRATION’S MISSION
To provide quality services required by our clients in a timely manner and to ensure the best value to the Federal Government and the public thereby enhancing our clients’ ability to accomplish their mission.
“SHALL” “WILL” and “MUST” Throughout this solicitation, the terms “shall” “will” and “must “are used. “Shall” “will” and “must” denote the imperative. They indicate an obligation to act. In this solicitation, and any resulting contract, “shall” “will” and “must” have the same meaning.
INFORMATION COLLECTION REQUIREMENTS
The information collection requirements contained in this solicitation/contract are either required by regulation or approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned OMB Control No. 3090-0163.
SYSTEM FOR AWARD MANAGEMENT (SAM) REPLACES CCR and ORCA Effective July 30th, 2012, the System for Award Management (SAM) replaces the contractor registration sites CCR and ORCA. In an effort to streamline the acquisition process, SAM was established to consolidate several acquisition systems including CCR, ORCA, and EPLS and create a single repository of contractor information. As a single validated source of data on contractors doing business with the Government, the SAM database enables prospective contractors to update their information in one place.
If you have been using the legacy systems CCR and ORCA, you should now go to https://www.sam.gov to find your information. Training tools are available on the SAM website to help you get familiar with SAM. Start by going to https://www.sam.gov , and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well as Quick Start Guides and Helpful Hints that will help you create an account, migrate your roles from legacy systems (if applicable) and perform updates. PLEASE NOTE: SAM is completely free of charge for both registrants and users. You will be required to complete a one-time business registration, with annual updates. As a part of the registration process you will need to provide your DUNS identification number. If you do not have a DUNS number you may contact Dun and Bradstreet, Inc. at (800) 333-0505. You may register in SAM at https://www.sam.gov.
https://www.sam.gov/ https://www.sam.gov/ https://www.sam.gov/
In accordance with FAR Parts 1, 2, 4, 13, 32, and 52 contractors must have an active profile in the SAM database prior to award of any contract, basic agreement, basic ordering agreement, or blanket purchase agreement. No award will be made to any contractor without an active profile in SAM.
KEY SUSTAINABLE PRODUCTS PROGRAM (KSP)
GSA has implemented the Key Sustainable Products Program intended to maximize the use of recovered materials, environmentally preferable, and bio-based products. Offerors should familiarize themselves with the requirements for using and reporting on the use of such materials in performance under any resultant contract.
FAR 23.7 requires consideration of environmental factors when purchasing products and services. FAR 4.303 and FAR 52.204-4 require double sided printing on recycled paper for all reports required by this contract. FAR 52.223-10 encourages vendors to practice waste reduction.
SAFEGUARDING DOCUMENTS
Associated plans, drawings, or specifications provided under this solicitation are intended for use by prospective bidders/offerors (and their subcontractors and suppliers). In support of this requirement, GSA requires bidders/offerors to exercise reasonable care when handling documents relating to building drawings/plans, security equipment, security equipment installations, and contract guard service, to include:
1) Limiting reproduction and/or dissemination of covered materials only to persons/parties related to this acquisition or otherwise authorized to receive such information;
2) Making every possible effort that is reasonable and prudent to prevent unauthorized disclosure of this information;
3) Upon award and completion of any appeals process, unsuccessful bidders/offerors making every reasonable and prudent effort to destroy or render useless all information/documentation received during the solicitation and/or appeals process; and
4) The awardee continuing the efforts required above throughout the entire term of contract and for what specific time thereafter as may be necessary, as determined by the awardee.
PERFORMANCE BASED SPECIFICATIONS
Note that the service specifications included in this solicitation are performance-based specifications. These specifications express the Government’s requirements in the form of minimum quality standards. Work schedule, frequencies, resources utilized, and methods of performance are to be determined by offerors.
A-76 REQUIREMENT
Note paragraph entitled FAR 52.207-3, Right of First Refusal of Employment in Section I.
COLLECTIVE BARGAINING AGREEMENT
The current union agreement in effect with the incumbent contractor expires on 7/31/2021.
Prospective offerors should take this into consideration in preparing their offers.
WAGE DETERMINATION BASED ON A COLLECTIVE BARGAINING AGREEMENT
Offerors are cautioned that the Wage Determination included in this solicitation is based upon an existing collective bargaining agreement (CBA). The Wage Determination may not explicitly set forth the full extent of the successful offeror's liability under the agreement. Offerors may contact the Contracting Officer to obtain copies of the CBA. Offerors may also contact the union at the address shown below.
International Union of Operating Engineers, Local 324 – A, B, C, D, G, H, P, RA, S – AFL-CIO 500 Hulet Drive Bloomfield Township, MI, 48302
LICENSE REQUIREMENTS
Offerors should note the requirements of paragraph entitled License Requirement, on page 126, that evidence of having or having made application for all appropriate permits and licenses for the state specified must be submitted with their offer.
CURRENT CONTRACTOR AND CURRENT CONTRACT PRICE
The current contractor is Penobscot Support Services LLC, located in Indian Island, ME. The current monthly price is $ 37,765.57. Although this solicitation is for services basically the same as the current contract Scope of Work, it should be reviewed carefully before submitting a bid.
NOTICE CONCERNING COMPLETION OF SOLICITATIONS
Offerors are cautioned to carefully read the entire solicitation in order to be fully aware of all requirements, provisions and clauses. Fill-ins should be properly completed and verified. All copies should contain the same information. Verify calculations before signing your bid.
Offerors shall submit with their offer the following documents:
• FAR 52.209-7 Information Regarding Responsibility Matters (Included in GSA Form 3501 and 3502 Solicitation Provisions)
• Standard Form 24 – Bid Guarantee
• Standard Form 33 – Solicitation, Offer, and Award
• Section B – Supplies or Services and Prices Offer
• Offeror’s Checklist (See Section L)
• Quality Control Plan (See Section C)
• Past Performance References
• Cost Proposal Worksheets
BOND REQUIREMENTS
BID GUARANTEE AND BOND ARE REQUIRED [X] ARE NOT REQUIRED []
If a bid guarantee is required to be submitted with your offer, any contract awarded will require a performance bond as specified in this solicitation. Offerors who utilize individual sureties should note (1) the requirement for a certified, audited, financial statement for each person acting as an individual surety (see Section L, clause entitled FAR 52.228-1 Bid Guarantee) and
(2) the requirements of the clause entitled FAR 52.228-11 Pledge of Assets in Section I.
If bonds are required, also note the requirements of the various bid guarantee and bond clauses in Section I. For example, a new performance bond is required if a contract option for an additional performance period is exercised.
SITE VISIT
Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Please Contact:
Dennis Turzak, Property Manager, via phone at 313-226-2624 or via email at dennis.turzak@gsa.gov.
CONTRACTOR DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER.
Enter your DUNS number in Block 15A on the first page of this solicitation. If you do not know or do not have a DUNS number please contact Dun and Bradstreet directly to obtain one. A DUNS number will be provided immediately by telephone at no charge to you. For information on obtaining a DUNS number, you should call Dun and Bradstreet at 1-866-705-5711. Be prepared to provide the following information: (1) Company name, (2) Company address, (3) Company telephone number, (4) Line of business, (5) Chief executive officer/key manager, (6) Date the company was started, (7) Number of people employed by the company, (8) Company affiliation.
EXERCISING OPTIONS AND MULTIPLE AWARD CONTRACTS
If this is a multiple award contract with optional performance periods, please note that the successful awardee will be required to re-certify size status prior to the option being exercised.
FAIR LABOR STANDARDS/SERVICE CONTRACT ACT PRICE ADJUSTMENT PROVISIONS
If this is a multiyear service contract or a service contract that may exceed a year in length if options are exercised, offerors should note the price adjustment provisions in Section I of this solicitation.
FREEDOM OF INFORMATION ACT (FOIA) REQUESTS
It is not necessary to reference the FOIA when requesting procurement history, such as the name of the current contractor, contract amount, contract copies, or abstracts of bids. For this information, you may contact the point of contact shown in Block 10 on the first page of the solicitation.
USE OF EXPRESS PACKAGE CARRIERS
Because of increased security standards and building renovations, “next-day” express package carriers may experience delays in making deliveries within the Chicago Loop Federal Center.
Offerors should take this fact into consideration when determining when to submit their offers.
SOLICITATION COPIES
Note that Block 9 on the first page of the solicitation specifies the number of copies of the offer that must be returned by offerors.
Do not include any allowance for any contingency to cover increased cost for which adjustments are provided for under the Fair Labor Standards Act and Service Contract Act - Price Adjustment (Multi-year Contract) contained in the CONTRACT CLAUSES section of this contract.
Reimbursement for emergency call-back, overtime, and additional services will only be computed for the man hours performed at the work site.
PRICING OF OPTIONS
Offerors shall price the initial one (1) year base period and the option requirements for the four
(4) additional 1 year periods by assuming that the minimum hourly wages and fringe benefits established by the Administrator, Wage and Hour Division, U.S. Department of Labor for the initial 1 year period of performance will apply to the four (4) year option periods. The minimum wage rates and fringe benefits applicable to the initial 1 year period of performance are outlined on the wage rate sheet.
PROMPT PAYMENT DISCOUNT
Block 13 on the first page of the solicitation and possibly the solicitation pricing page(s), is to be used to offer prompt payment discounts. Payment terms are set forth in the Prompt Payment clause in this solicitation. Offerors are cautioned against inserting any statement that indicates that payment is due sooner that the time stipulated in the Prompt Payment clause. EXAMPLE:
Inserting "Net 20" may cause the offer to be rejected as unacceptable, because the entry would be contrary to the 30-day payment terms specified in the Prompt Payment clause.
OPTION TO EXTEND SERVICES
Offerors should note that Section I of this solicitation includes FAR 52.217-8, Option to Extend Services, which allows the Government the unilateral option to extend the term of any resultant contract up to six months, exclusive of any other option provisions which may be included as part of any resultant contract.
EVALUATING CONTRACTOR PERFORMANCE
The General Services Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process. CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is https://www.cpars.gov.
Completed CPARS evaluations are sent to the Past Performance Information Retrieval System (PPIRS) which may then be used by Federal acquisition community for use in making source selection decisions. PPIRS assists acquisition officials by serving as the single source for contractor past performance data.
CPARS Registration
Each award requiring an evaluation must be registered in CPARS. The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned.
Contractors will be granted one user account to access all evaluations.
CPARS Training
Contractors may sign up for CPARS training. Training courses are available at the CPARS training site (https://www.cpars.gov/webtrain.htm) and updated as needed.
CPARS Role_Contractor Representative (CR)
All evaluations will be sent the Contractor Representative (CR) named on your award. Access to CPARS will be granted to the CR after the award is registered in the system.
The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the contracting officer will request the name and email address of the person that will be responsible for the CR role on your award.
Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.
The contractor must promptly notify the Contracting Officer of any change in their CR to allow the update to be made in the system.
GSA shall provide for review at a level above the contracting officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding GSA’s evaluation of the contractor. Based on the review, the individual at a level above the contracting officer will issue the ultimate conclusion on the performance evaluation.
https://www.cpars.gov/ https://www.cpars.gov/webtrain.htm
Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.
QUALITY CONTROL PLAN (QCP)
The contracting Officer (CO) must accept a completed Quality Control Plan (QCP) prior to award of a contract. The QCP will be specific to the contract specification and location(s) in accordance with the provisions and requirements of the solicitation.
NOTICE TO PROCEED (NTP)
Notice to Proceed (NTP) will NOT be issued until the COR has officially notified the CO that approved clearances for proposed employees have been received and approved.
AVAILABILITY OF FUNDS
Funds are not presently available for award. The Government's obligation under this contract is contingent upon the availability of appropriated funds. No legal liability on the part of the Government may arise until funds are made available to the Contracting Officer.
PROJECT LABOR AGREEMENT
Offerors may submit a price proposal subject to the PLA requirements set forth in this solicitation (a PLA proposal), a price proposal not subject to the PLA requirements set forth in this solicitation, or both.
Any price proposal submitted shall clearly identify whether it is subject to such PLA requirements.
PRE-BID/PRE-PROPOSAL CONFERENCE
A pre-bid/pre-proposal meeting has been scheduled for this solicitation. Please see the Pre-proposal Conference Notice on the next page for details.
To request a reasonable accommodation due to a disability, please contact Building Management Specialist Dennis Turzak at (313) 226-2624 or by email at dennis.turzak@gsa.gov by April 19, 2018, 1:00 PM EST.
PRE- AND POST-AWARD DEBRIEFINGS
The General Services Administration’s hours of operation are 8 a.m. to 4:30 p.m. Requests for pre-award debriefings postmarked or otherwise submitted after 4:30 p.m. will be considered submitted the following business day. Requests for post-award debriefings delivered after 4:30 p.m. will be considered received and filed the following business day.
[THIS NOTICE SHOULD BE REMOVED BEFORE OFFER IS SUBMITTED TO GSA] Rev. July 2017
PRE-PROPOSAL CONFERENCE NOTICE
ATTENDENCE FORM
SOLICITATION #: 47PF0018R0075
Operation and Maintenance Services
U.S. Customs Cargo Inspection Facilities Detroit, MI
A pre-proposal conference is scheduled at the time and place set forth below. All prospective offerors are encouraged to attend. Please complete and return this form via email to Hunter Van Horn, Contract Specialist, at hunter.vanhorn@gsa.gov. A Site Visit will be held as part of the pre-proposal conference.
TIME/DATE: April 19th, 2018 at 1:00 PM EST
PRE-PROPOSAL CONFERENCE LOCATION:
U.S. Customs Cargo Inspection Facilities Broker Building, Room 121 (Conference Room) 2810-B W. Fort Street Detroit, MI, 48216
GSA Contact for Pre-Proposal Conference Location Questions Email: dennis.turzak@gsa.gov
FAX (313) 226-2050
PHONE: (313) 226-2624
[ ] I plan to attend the conference.
Number of attendees: _____________.
[ ] I do not plan on attending the conference.
In case of last minute changes, please be sure to include a phone number:
mailto:hunter.vanhorn@gsa.gov
Name: ___________________________________________
Company: ___________________________________________
Phone: ___________________________________________
TABLE OF CONTENTS
Table of Contents
2 SOLICITATION NO. 47PF0018R0075
SECTION A - SOLICITATION 13
A.1. STANDARD FORM 33 13
SECTION B - SERVICES, ORDERING AND PRICES 22
B.1. DESCRIPTION OF SERVICES 22
B.1.0 Offer for Standard Services 22
B.1.1 Offer for Above Standard Services 24
SECTION C - DESCRIPTION/SPECIFICATION/STATEMENT OF WORK 31
Introduction 31
C.1. SCOPE OF WORK 31
C.1.1 Scope 31
C.1.2 The Contractor Shall 32
C.1.3 Excluded from this scope are 34
C.2. DEFINITIONS 34
C.2.1 Acceptance 34
C.2.2 Acts of God 34
C.2.3 Additional Services 34
C.2.4 Advanced Meters 35
C.2.5 Advanced Metering Systems 35
C.2.6 Approval 35
C.2.7 Architectural and Structural 35
C.2.8 Basic Services 35
C.2.9 Building Automation System (BAS) 35
C.2.10 GSALink 36
C.2.11 Building Operating Plan 36
C.2.12 Commissioning 36
C.2.13 Ongoing Commissioning 36
C.2.14 Computerized Maintenance Management System (CMMS) 36
C.2.15 Consumable Parts 36
C.2.16 Contracting Officer (CO) 37
C.2.17 Contracting Officer's Representative (COR) or Designee 37
C.2.18 Contractor 37
C.2.19 Contractor’s Other Than Normal Working/Duty Hours 37
C.2.20 Controls and Control System 37
C.2.21 Defective Service 37
C.2.22 Emergency 38
C.2.23 Emergency Callback 38
C.2.24 Environmentally Sustainable 38
C.2.25 Existing Deficiency List Report 38
C.2.26 Exterior 38
C.2.27 Federal Holidays 38
C.2.28 Federal Executive Holidays, Unanticipated 39
C.2.29 Fire Protection and Life Safety Systems 39
C.2.30 Government-furnished Equipment (GFE) 39
C.2.31 Guiding Principles for Sustainable Existing Buildings 39
C.2.32 GSA Green Purchasing Program (GPP) 39
C.2.33 Indefinite Quantity 39
C.2.34 Maintenance Repair 40
C.2.35 Miscellaneous Work 40
C.2.36 Modification of Contract 40
C.2.37 Negligence 40
C.2.38 Non-Reimbursable Repair 40
C.2.39 Normal Building Operating Hours 40
C.2.40 Normal Working Hours 40
C.2.41 Occupant Emergency Plan (OEP) 41
C.2.42 Open Systems 41
C.2.43 Operations 41
C.2.44 Performance Based Service Contracting 41
C.2.45 Performance Work Statement (PWS) 41
C.2.46 Predictive Maintenance 41
C.2.47 Preventive Maintenance (Scheduled and Unscheduled) 41
C.2.48 Product Preference (See Exhibit 4 Summary of Environmentally Preferable Product Attributes)
C.2.49 Quality Assurance Surveillance Plan (QASP) 42
C.2.50 Quality Control Plan 42
C.2.51 Repair 42
C.2.52 Reimbursable Repair 42
C.2.53 Sequence of Operations 42
C.2.54 Service Request 42
C.2.55 Standard Services 43
C.2.56 Stewardship 43
C.2.57 Delegated On-site Authority 43
C.2.58 Tour 43
C.2.59 Vertical Transportation Systems 43
C.2.60 Watch 43
C.2.61 Software Upgrade 43
C.2.62 Software Update 44
C.3. REFERENCES 44
C.4. EXISTING DEFICIENCY INSPECTION/INITIAL DEFICIENCY LIST 46
C.4.1 Initial Inspection 46
C.4.2 Initial Deficiency List 47
C.4.3 Adjustments and Corrections 47
C.5. STARTUP PHASE/TRANSITION PHASE 47
C.5.1 Startup Phase - RESERVED 47
C.5.2 Startup Phase Schedule - RESERVED 47
C.5.3 Transition Phase Startup 48
C.6. PHASE-OUT TRANSITION PERIOD 48
C.7. DEFICIENCY LIST COMPLETION AND WITHHOLDING OF FINAL PAYMENT 48
C.8. GENERAL AND ADMINISTRATIVE REQUIREMENTS 49
C.8.1 Staffing 49
C.8.2 Communication Equipment 50
C.8.3 Onsite Records 50
C.8.4 Service Request Function 50
C.8.5 Use of CMMS 51
C.8.5.1 Use of Contractor Owned CMMS - RESERVED 51
C.8.5.1 Use of Government Provided CMMS (NCMMS) 51
C.8.5.2 NCMMS Start-Up - RESERVED 51
C.8.6 Quality Control Program 51
C.8.7 Government Quality Assurance Surveillance Program 53
C.8.7.1 Contract Performance 54
C.8.7.2 Methods 54
C.8.7.3 Records and Files - RESERVED 54
C.8.7.4 Cooperation – Inspections 54
C.8.7.5 Contractor Performance Assessment Reporting System (CPARS) 55
C.9. BUILDING OPERATING PLAN 55
C.9.1 Building Operating Plan 55
C.9.2 Components of the Building Operating Plan (BOP) 55
C.10. EQUIPMENT INVENTORY 59
C.11. MONTHLY PROGRESS REPORTS 60
C.12. PERFORMANCE REVIEW MEETINGS 60
C.13. EQUIPMENT CONDITION ASSESSMENT 60
C.14. RESERVED 61
C.15. REFERENCE LIBRARY 61
C.16. REVIEW OF DESIGN DOCUMENTS 61
C.17. BUILDING MANAGEMENT SUPPORT SERVICES (Miscellaneous and Utility Escort Hours) 61
C.18. IINSPECTION ASSISTANCE FOR SPACE BUILDOUTS 62
C.19. EMERGENCY SHUTDOWN INSTRUCTIONS AND TOUR CHECKLISTS 62
C.20. LABELING OF ELECTRICAL CIRCUITS 62
C.21. OPERATIONAL REQUIREMENTS 62
C.21.1 General 62
C.21.2 Extended Operating Hours 63
C.21.3 Continuity of Operations (COOP) 63
C.21.4 Emergency Operations Plan 63
C.21.5 Tenant Environment 63
C.21.6 Energy and Water Efficiency 64
C.22. SYSTEM PERFORMANCE STANDARDS OR PROCEDURES 64
C.22.1 Control Systems 65
C.22.2 Smart Buildings - RESERVED 65
C.23. SERVICE REQUESTS 65
C.23.1 General 65
C.23.2 Emergency Service Request 65
C.23.3 Emergency Call Back (after hours) 66
C.24. TOURS 66
C.24.1 General 66
C.24.2 Operating Logs and Tour Check Sheets 67
C.24.3 Tour Frequencies 67
C.24.4 Condensate Pans 67
C.24.5 Monitoring of Central Plant Equipment - RESERVED 67
C.24.6 Boiler Operation 67
C.25. DEMAND RESPONSE PROGRAMS 68
C.26. CURTAILMENT PROGRAM 68
C.27. BAS ALARM RESPONSE 68
C.28. ADVANCED METERING PROGRAM 68
C.28.1 Verification and Calibration 69
C.29. PROTECTION AND DAMAGE 69
C.30. NEGLIGENCE 69
C.31. KEY CONTROL 69
C.32. DISRUPTIVE OR HAZARDOUS TOOLS 70
C.33. SCHEDULED DISTRUPTION TO UTILITIES, LIGHTING, FIRE PROTECTION & LIFE SAFETY EQUIPMENT, or SPACE CONDITIONING 70
C.34. PLUMBING SYSTEMS 70
C.34.1Restrooms 70
C.34.2 Irrigation Systems 70
C.35. MAINTENANCE PROGRAM 71
C.35.1 General 71
C.35.2 Maintenance Standard 71
C.35.3 Application of Diagnostic Software 71
C.35.4 BAS Control Systems 72
C.35.5 Smart Building Technology 73
C.36. WATER TREATMENT 74
C.36.1 General 74
C.36.2 RESERVED 74
C.36.3 Initial Report and Development of Program 74
C.36.4 RESERVED 75
C.36.5 Corrosion Monitoring 75
C.36.6 Periodic Testing 75
C.37. OIL ANALYSIS AND OIL CHANGES 75
C.37.1 Periodic Oil Analysis 76
C.37.2 Oil and Refrigerant Additives 76
C.38. LAMPS AND BALLASTS 76
C.39. ARCHITECTURAL AND STRUCTURAL SYSTEMS MAINTENANCE 76
C.39.1 General 76
C.39.2 Maintenance and Repair 77
C.39.3 Repair and Replacement Work 77
C.39.4 Painting 77
C.39.5 Interior Signage and Directories 77
C.39.6 Finishes Maintenance 78
C. 39.7 Historic Building Preservation - RESERVED 78
C.39.8 Vertical Transportation and Associated Equipment - RESERVED 78
C.39.9 Flag Procedures 78
C. 39.10 Fine Arts Collection 78
C. 40. REPAIRS 78
C.40.1 General 78
C.40.2 Non-reimbursable Repairs 79
C.40.3 Reimbursable Repairs 79
C.40.4 Miscellaneous Work - RESERVED 79
C.40.5 Repair Shared Liability Example 79
C.40.6 Approval of Work 80
C.40.7 Invoicing 80
C.40.8 Ordering Repairs from Outside Source 80
C.40.9 Force Majeure (Uncontrollable events) 80
C. 40.10 Warranties 81
C.40.11 Quality of Materials and Replacement Parts 81
C. 41. SAFETY AND ENVIRONMENTAL MANAGEMENT 81
C. 41.1 General 81
C. 41.2 Scheduling and Recordkeeping 82
C. 41.3 Refrigerants 82
C.41.4 AQMD Operating Permits 82
C.41.5 Fuel Storage Tanks - RESERVED 82
C.41.6 Solid Waste Audit - RESERVED 82
C.41.7 Polychlorinated Biphenyl (PCB) Control - RESERVED 82
C.41.8 Facility Hazards 83
C. 41.9 Workplace Safety 83
C.41.10 Electrical Safety 83
C.41.11 Fall Protection 83
C.41.12 Powered Platforms 83
C.41.13 LockOut/TagOut 83
C.41.14 Confined Spaces 83
C.41.15 Asbestos Management - RESERVED 84
C.41.16 Hazardous Materials 84
C. 41.17 Boiler/Pressure Vessel Operation and Inspection Standards 87
C.41.18 Labeling and Signage 88
C.41.19 Roof Anchorage Points 88
C.42. FIRE PROTECTION AND LIFE SAFETY EQUIPMENT AND SYSTEMS 88
C.42.1 General 88
C.42.2 Fire Alarm System Services 89
C.42.3 Water-Based Fire Protection Systems 90
C.42.4 Fire Doors and Other Opening Protective 91
C.42.5 Combination Fire /Smoke Dampers 91
C.42.6 Smoke Door Assemblies 91
C.42.7 Smoke Dampers 91
C.42.8 Portable Fire Extinguishers 91
C.42.9 Non-Water-Based Fire Extinguishing Systems 91
C.42.10 Smoke Control Systems 92
C.42.11 Emergency and Standby Power Systems 92
C.42.12 Emergency Lighting Systems and Exit Signage 92
C.42.13 Fire Alarm System Central Station Monitoring 92
C.42.14 Egress Marking Systems 93
C.42.15 Egress Door Openings 93
C.43. MAINTENANCE AND REPAIR OF VERTICAL TRANSPORTATION SYSTEMS - RESERVED 94
C.44 SUBMITTALS CHART (Contractor Deliverables) 94
C.45 FEDERAL REQUIREMENTS 98
C.46 RESERVED 99
C.47. SUBCONTRACTING 99
SECTION D – PACKAGING AND MARKING 100
D1. PAYMENT OF POSTAGE AND FEES 100
D2. MARKING 100
SECTION E – INSPECTION AND ACCEPTANCE 101
E1. RESERVED 101
E2. FAR 52.246-4 Inspection of Services – Fixed Price (Aug 1996) 101
E3. RESERVED 101
E4. INSPECTION METHODS 101
E5. CANCELLATION CLAUSE - RESERVED 102
E6. DEDUCTIONS 102
E7. CONTRACT CLOSEOUT EXAMINATION 105
SECTION F – DELIVERIES OR PERFORMANCE 106
F1. PLACE OF PERFORMANCE 106
F2. TERM OF CONTRACT 111
F3. OPTIONS 111
F4. RECOGNIZED HOLIDAYS 111
SECTION G – CONTRACT ADMINISTRATION DATA 112
G1. PAYMENT (General) 112
G2. METHODS OF PAYMENT 112
G3. GSAR 552.232-77 Payment By Government Charge Card (NOV 2009) 113
G4. EVALUATING CONTRACTOR PERFORMANCE 113
G5. CONTRACTING OFFICER (CO) 114
G6. CONTRACTING OFFICER’S REPRESENTATIVE (COR) 114
G7. DESIGNATED ORDERING OFFICIALS 114
G8. LIMITATION OF GOVERNMENT’S OBLIGATION - RESERVED 115
SECTION H – SPECIAL CONTRACT REQUIREMENTS 116
H.1. SECURITY 116
H.1.1 Security Requirements and Personal Identity Verification Procedures (Non-Classified Contract)
H.1.2. GSAR 552.237-70 Qualification of Offerors (MAY 1989) 116
H.1.3. GSAR 552.237-71 Qualifications of Employees (MAY 1989) 116
H.1.4. Suitability Determinations 117
H.1.5. Compliance with Security Requirements 119
H.1.6. Identification Credential 120
H.1.7. GSA Criteria for Adjudication 120
H.2. RESERVED 123
H.3. RESERVED 123
H.4. STANDARDS OF CONDUCT 123
H.5. REMOVAL FROM CONTRACT WORK 123
H.6. SENSITIVE BUT UNCLASSIFIED (SBU) BUILDING INFORMATION 125
H.7. RECORDING PRESENCE 126
H.8. GOVERNMENT FORMS 126
H.9. OTHER CONTRACTORS 126
H.10. ORDINANCES, TAXES, PERMITS AND LICENSES 126
H.11. DISCREPANCY IN THE SPECIFICATIONS 127
H.12. GREEN PURCHASING PROGRAM (GPP) 127
H.12.1 Standards 127
H.12.2 Reporting 127
H.12.3 Recycled Content Certification 128
H.13. ASBESTOS AWARENESS TRAINING 128
H.14. UNIFORMS 128
H.15. PERSONNEL QUALIFICATIONS 128
H.15.1 Personnel Training 128
H.15.2 Qualifications of Project Manager and Supervisory Personnel 128
H.15.3 Qualifications of Technicians 129
H.15.4 SUBMISSION OF RESUMES FOR NEW EMPLOYEES 133
H.15.5 STATE LICENSING 133
H.15.6 COMPLIANCE WITH FEDERAL, STATE AND LOCAL CODES 133
H.16. GOVERNMENT-FURNISHED MATERIALS 133
H.17. CONTRACTOR-FURNISHED MATERIALS 134
H.18. ADDITIONAL SERVICES [Indefinite Quantity Provisions] 135
H.18.1 General 135
H.18.2 Price Proposal for Additional Services Work 135
H.18.3 Pricing 135
H.18.4 Parts and Materials 135
H.18.5 Subcontracts 135
H.18.6 Cost Documentation 135
H.18.7 Competitive Bids 136
H.18.8 Method of Ordering 136
H.19. AWARD FEE - RESERVED 136
H.20. STRIKE CONTINGENCY PLAN (SCP) 136
H.21. OCCUPANT EMERGENCY PLAN (OEP) 136
H.22. CONTRACTOR PANDEMIC PLAN 136
SECTION I – CONTRACT CLAUSES 138
52.204-21 Basic Safeguarding of Covered Contractor Information Systems 138
52.216-18 Ordering 139
52.216-19 Order Limitations 139
52.216-22 Indefinite Quantity 140
52.217-8 Option to Extend Services 140
52.217-9 Option to Extend the Term of the Contract 140
52.222-35 Equal Opportunity for Veterans 141
52.222-36 Equal Opportunity for Workers with Disabilities 141
52.222-42 Statement of Equivalent Rates for Federal Hires 141
52.228-1 Bid Guarantee 142
52.228-16 Performance and Payment Bonds—Other Than Construction – Alternate I (JUL 2000) 142
52.252-2 Clauses Incorporated by Reference 143
552.215-73 Notice 143
552.252-6 Authorized Deviations in Clauses 143
PBS P 3490.2 – DOCUMENT SECURITY FOR SENSITIVE BUT UNCLASSIFIED BUILDING
INFORMATION 144
SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS 149
J.1. Quality Assurance Surveillance Plan (QASP) 150
Section 1 - Contract Information 153
Section 2 - Purpose/Objective 154
Section 3 - Roles and Responsibilities of Government Officials 154
Section 4 – Partnering 155
Section 5 - GSA/Contractor Meetings 155
Section 6 - Performance Evaluation 156
Section 7 - Effectiveness of Quality Control 156
Section 8 - Routine Service Request 166
Section 9 - Emergency Service Request 166
Section 10 - Documentation, Submittals and Deliverables 167
Section 11 - Receiving Reports 167
Section 12 - Tenant Recurring Work Authorizations (RWA) 167
Section 13 - Employee Health, Safety and Training 167
Section 14 - Subcontractors 168
Section 15 - Energy Management and Conservation 168
Section 16 - O&M Contract Inspection Tool 168
J.2. – RESERVED 187
J.3. – RESERVED 188
J.4.Summary of Environmentally Preferable Product Attributes 189
J.5. Building Information Sheet 191
J.6. Monthly Report Template 194
J.7. Building Operating Plan Template 198
J.8. – WAGE DETERMINATION / CBA 201
J.9. - RESERVED 225
J.10. Energy & Water Operational Performance Targets 226
J.11. Energy & Water Efficiency Use Plan 228
J.12. Energy and Water Efficiency Monthly Report 231
J.13. Annual Energy & Water Efficiency Report 234
J.14. – RESERVED 237
J.15. - RESERVED 238
J.16. INVENTORY/NCMMS 239
J.17. – RESERVED 262
J.18. Building Operations Recycling and Waste Data Capture Sheet 263
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF
BIDDERS/OFFEORS 265
52.204-8 Annual Representations and Certifications 265
Complete (b)(2) and (d) as applicable (attach additional sheets if necessary). 265
52.209-7 Information Regarding Responsibility Matters 267
Complete (b) as applicable. 267
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/OFFERORS 272
L.1 BID GUARANTEE REQUIREMENT (Optional: Required for 8a contracts; Refer to GSAM 528.101-1 (b)) 272
L.2 PERFORMANCE BOND REQUIREMENT 272
L.3 FINANCIAL QUALIFICATIONS OF OFFERORS 272
L.4 INSPECTION OF FACILITY 272
L.5 INSURANCE REQUIREMENT 273
L.6 INSTRUCTIONS FOR SUBMITTING PROPOSALS 273
L.7 INCONSISTENCIES IN SPECIFICATIONS 275
L.8 TYPE OF CONTRACT 275
L.9 OFFERORS CHECKLIST 276
52.216-1 Type of Contract 279
52.228-1 Bid Guarantee 279
52.233-2 Service of Protest 279
52.252-1 Solicitation Provisions Incorporated by Reference 280
552.217-71 Notice Regarding Option(s) 280
SECTION M – EVALUATION FACTORS FOR AWARD 281
M.1 BASIS OF AWARD 281
M.2 PAST PERFORMANCE 281
M.3 TOTAL EVALUATED PRICE 281
M.4 SPECIAL STANDARD(S) OF RESPONSIBILITY: 282
M.5 FAR 52.217-5 Evaluation of Options (JULY 1990) 282
SECTION A - SOLICITATION
A.1. STANDARD FORM 33
SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. E-MAIL ADDRESS
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECS./WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)
DATEAMENDMENT NO.AMENDMENT NO. DATE
15A. NAME AND
ADDRESS
OF OFFER-
OR
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER SUCH
ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:
10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 6/2014)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB)
NEGOTIATED (RFP)
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
PAGE
GENERAL SERVICES ADMINISTRATION
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
Maintenance Services for the
August 1, 2018.
MO
August 1, 2018.
Facility, Detroit MI to begin
Request solicit for Operations &
Request solicit for Operations &
12 __________
PoP: 08/01/2018 - 07/31/2019
Facility, Detroit MI to begin
PoP: 08/01/2018 - 07/31/2019
Building O&M
Inspection Facility O&M
Base Year-Location 3, Broker
U.S. Customs Cargo Inspection
August 1, 2018.
U.S. Customs Cargo Inspection
August 1, 2018.
Maintenance Services for the
Base Year-Location 1, Cargo
MO
Maintenance Services for the
Facility, Detroit MI to begin
Facility, Detroit MI to begin
Request solicit for Operations &
PoP: 08/01/2018 - 07/31/2019
U.S. Customs Cargo Inspection
MO
Request solicit for Operations &
U.S. Customs Cargo Inspection
Base Year-Location 2, VACIS O&M
PoP: 08/01/2018 - 07/31/2019
Base Year-Location 4, USDA O&M
Maintenance Services for the
MO
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
Maintenance Services for the
Facility, Detroit MI to begin
Facility, Detroit MI to begin
U.S. Customs Cargo Inspection
Request solicit for Operations &
Request for Operations &
12 __________
PoP: 08/01/2018 - 07/31/2019
U.S. Customs Cargo Inspection
PoP: 08/01/2019 - 07/31/2020
Option 1-Location 2, VACIS
O&M
MO
Maintenance Services for the
August 1, 2018.
Maintenance Services for the
August 1, 2019.
Request for Operations &
Base Year-Location 5, NII Gantry
MO
Request for Operations &
Facility, Detroit MI to begin
Facility, Detroit MI to begin
PoP: 08/01/2019 - 07/31/2020
Building
August 1, 2019.
U.S. Customs Cargo Inspection
MO
Inspection Facility O&M
U.S. Customs Cargo Inspection
Option 1-Location 1, Cargo
August 1, 2019.
Option 1-Location 3, Broker
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
Request for Operations &
Facility, Detroit MI to begin
PoP: 08/01/2019 - 07/31/2020
Facility, Detroit MI to begin
PoP: 08/01/2020 - 07/31/2021
U.S. Customs Cargo Inspection
Option 1-Location 4, USDA Canopy
Inspection Facility O&M
August 1, 2019.
U.S. Customs Cargo Inspection
August 1, 2020.
2000 Option 2-Location 1, Cargo MO
1003 MO
Maintenance Services for the
Facility, Detroit MI to begin
Maintenance Services for the
Facility, Detroit MI to begin
Request for Operations &
PoP: 08/01/2019 - 07/31/2020
Request for Operations &
U.S. Customs Cargo Inspection
U.S. Customs Cargo Inspection
MO
PoP: 08/01/2019 - 07/31/2020
PoP: 08/01/2020 - 07/31/2021
Option 2-Location 2, VACIS
August 1, 2019.
Maintenance Services for the
Option 1-Location 5, NII Gantry
MO
Maintenance Services for the
August 1, 2020.
Request for Operations &
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
U.S. Customs Cargo Inspection
August 1, 2020.
MO
August 1, 2021.
Option 3-Location 1, Cargo
Facility, Detroit MI to begin
Request for Operations &
Maintenance Services for the
12 __________
PoP: 08/01/2020 - 07/31/2021
Facility, Detroit MI to begin
Request for Operations &
Building
Option 2-Location 5, NII Gantry
U.S. Customs Cargo Inspection
August 1, 2020.
U.S. Customs Cargo Inspection
PoP: 08/01/2020 - 07/31/2021
Maintenance Services for the
Option 2-Location 3, Broker
MO
Maintenance Services for the
Facility, Detroit MI to begin
August 1, 2020.
Request for Operations &
PoP: 08/01/2020 - 07/31/2021
U.S. Customs Cargo Inspection
MO
MO
Request for Operations &
Facility, Detroit MI to begin
Option 2-Location 4, USDA Canopy
PoP: 08/01/2021 - 07/31/2022
Inspection Facility O&M
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
U.S. Customs Cargo Inspection
August 1, 2021.
MO
Option 3-Location 3, Broker
PoP: 08/01/2021 - 07/31/2022
Option 3-Location 5, NII Gantry
Facility, Detroit MI to begin
Maintenance Services for the
Maintenance Services for the
August 1, 2021.
MO
Request for Operations &
Request for Operations &
Option 3-Location 4, USDA Canopy
U.S. Customs Cargo Inspection
PoP: 08/01/2021 - 07/31/2022
Facility, Detroit MI to begin
PoP: 08/01/2021 - 07/31/2022
Maintenance Services for the
Option 3-Location 2, VACIS
U.S. Customs Cargo Inspection
August 1, 2021.
August 1, 2021.
Maintenance Services for the
MO
PoP: 08/01/2021 - 07/31/2022
Facility, Detroit MI to begin
MO
MO
Request for Operations &
Facility, Detroit MI to begin
Building
Request for Operations &
U.S. Customs Cargo Inspection
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
Maintenance Services for the
August 1, 2022.
MO
August 1, 2022.
Facility, Detroit MI to begin
Request for Operations &
Request for Operations &
12 __________
PoP: 08/01/2022 - 07/31/2023
Facility, Detroit MI to begin
PoP: 08/01/2022 - 07/31/2023
Building
Inspection Facility O&M
Option 4-Location 3, Broker
MO
U.S. Customs Cargo Inspection
August 1, 2022.
U.S. Customs Cargo Inspection
August 1, 2022.
Maintenance Services for the
Option 4-Location 1, Cargo
MO
Maintenance Services for the
Facility, Detroit MI to begin
Facility, Detroit MI to begin
Request for Operations &
124004
PoP: 08/01/2022 - 07/31/2023
U.S. Customs Cargo Inspection
Request for Operations &
U.S. Customs Cargo Inspection
Option 4-Location 2, VACIS
PoP: 08/01/2022 - 07/31/2023
Option 4-Location 4, USDA Canopy
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
Maintenance Services for the Request for Operations &
PoP: 08/01/2022 - 07/31/2023
Option 4-Location 5, NII Gantry
August 1, 2022.
Facility, Detroit MI to begin U.S. Customs Cargo Inspection
SECTION B - SERVICES, ORDERING AND PRICES
B.1. DESCRIPTION OF SERVICES
The Contractor shall provide all management, supervision, labor, materials, supplies, repair parts, tools, equipment and subcontracts necessary to provide Operation and Maintenance and related services described in this solicitation including inspection, testing, and maintenance of all fire protection systems.
Work under this contract is expected to comment on or about August 1, 2018.
Location 1
U.S. Customs Cargo Inspection Facility 2810 W. Fort Street Detroit, MI 48216
Location 2 VACIS Building 2810 W. Fort Street Detroit, MI 48216
Location 3 Broker Building 2810-B W. Fort Street Detroit, MI 48216
Location 4 USDA Canopy 2810 W. Fort Street Detroit, MI 48216
Location 5 NII Gantry 2810 W. Fort Street Detroit, MI 48216
B.1.0 Offer for Standard Services
Location 1, Customs Cargo Inspection Facility, MI0401CI
ITE
M # DESCRIPTION UNIT QTY
BASE
YEAR
UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional
12 Month Period)
OPTION 4
UNIT
PRICE
(Fourth
Additional 12 Month Period)
1.
Standard Services:
Operation and Maintenance Services Including Preventive Maintenance, Repair, Service Call and Related Services
Month
Prompt Payment Discount:_______%______ Days
Location 2, VACIS Building, MI0403CI
BASE
YEAR
UNIT
PRICE
OPTION 1
UNIT
PRICE
(First Additional
OPTION 2
UNIT
PRICE
(Second
OPTION 3
UNIT
PRICE
(Third Additional
OPTION
4 UNIT
PRICE
(Fourth
(Initial 12 Month Period)
12 Month Period) Additional 12 Month Period)
12 Month Period) Additional 12 Month Period)
2.
Standard Services:
Operation and Maintenance Services Including Preventive Maintenance, Repair, Service Call and Related Services
Location 3, Broker Building, MI0404CI
ITEM
# DESCRIPTION UNIT QTY
BASE
YEAR UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional
12 Month Period)
OPTION 4
UNIT
PRICE
(Fourth
Additional 12 Month Period)
3.
Standard Services:
Operation and Maintenance Services Including Preventive Maintenance, Repair, Location 4, USDA Canopy, MI0405CI
BASE
YEAR
UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional
12 Month Period)
OPTION 4
UNIT
PRICE
(Fourth
Additional 12 Month Period)
4.
Standard Services:
Operation and Maintenance Services Including Preventive Maintenance, Repair, Service Call and Related Services
Location 5, NII Gantry, MI0407CI
BASE
YEAR
UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional 12 Month Period)
OPTION
4 UNIT
PRICE
(Fourth Additional 12 Month Period)
5.
Standard Services:
Operation and Maintenance Services Including Preventive Maintenance, Repair, B.1.1 Offer for Above Standard Services
Location 1, Customs Cargo Inspection Facility
BASE
YEAR
UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional 12 Month Period)
OPTION 4
UNIT
PRICE
(Fourth
Additional 12 Month Period)
1.
Overtime Services Requested by the Government Refer to Notes 2,3,4
Hour
2.
Emergency Call-Back Services During Other Than Normal Working Hours Refer to Notes 2,3
Hour 1 $ $ $ $ $
3. Additional Services Refer to Notes 2,3,4 Hour 6 $ $ $ $ $
4.
Maintenance Repair Services Between $2,000 and $10,000 Refer to Notes 2,3
Hour 1 $ $ $ $ $
5.
Non-Destructive Chiller Tube Eddy Current Analysis
Job N/A N/A N/A N/A N/A N/A
6.
Maintenance Repair Services for Agency Owned Equipment
Hour 1 $ $ $ $ $
BASE
YEAR
UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional 12 Month Period)
OPTION 4
UNIT
PRICE
(Fourth
Additional 12 Month Period)
Refer to Notes 2, 6
7.
Preventative Maintenance of Fluorescent Lighting Fixture (Washing & Relamping) Refer to Note 7
Per Fixtur e N/A N/A N/A N/A N/A N/A
8.
Preventative Maintenance of Fluorescent Lighting Fixture (Relamping Only) Refer to Note 7
Per Fixtur e N/A N/A N/A N/A N/A N/A
9.
Standard Coefficient (Markup for parts, materials and subcontracts)
Job
Location 2, VACIS Buildings
BASE
YEAR UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional 12 Month Period)
OPTION 4
UNIT
PRICE
(Fourth
Additional 12 Month Period)
1.
Overtime Services Requested by the Government Refer to Notes 2,3,4
Hour 6 $ $ $ $ $
2.
Emergency Call-Back Services During Other Than Normal Working Hours Refer to Notes 2,3
Hour 1 $ $ $ $ $
3. Additional Services Refer to Notes 2,3,4 Hour 6 $ $ $ $ $
4.
Maintenance Repair Services Between $2,000 and $10,000 Refer to Notes 2,3
Hour 1 $ $ $ $ $
BASE
YEAR UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional 12 Month Period)
OPTION 4
UNIT
PRICE
(Fourth
Additional 12 Month Period)
5.
Non-Destructive Chiller Tube Eddy Current Analysis
Job N/A N/A N/A N/A N/A N/A
6.
Maintenance Repair Services for Agency Owned Equipment Refer to Notes 2, 6
Hour 1 $ $ $ $ $
7.
Preventative Maintenance of Fluorescent Lighting Fixture (Washing & Relamping) Refer to Note 7
Per Fixtur e N/A N/A N/A N/A N/A N/A
8.
Preventative Maintenance of Fluorescent Lighting Fixture (Relamping Only) Refer to Note 7
Per Fixtur e N/A N/A N/A N/A N/A N/A
9.
Standard Coefficient (Markup for parts, materials and
Location 3, Broker Building
BASE
YEAR UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional 12 Month Period)
OPTION 4
UNIT
PRICE
(Fourth
Additional 12 Month Period)
1.
Overtime Services Requested by the Government
2.
Emergency Call-Back Services During Other Than Normal Working Hours Refer to Notes 2,3
Hour 1 $ $ $ $ $
3. Additional Services Refer to Notes 2,3,4 Hour 6 $ $ $ $ $
BASE
YEAR UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional 12 Month Period)
OPTION 4
UNIT
PRICE
(Fourth
Additional 12 Month Period)
4.
Maintenance Repair Services Between $2,000 and $10,000 Refer to Notes 2,3
Hour 1 $ $ $ $ $
5.
Non-Destructive Chiller Tube Eddy Current Analysis
Job N/A N/A N/A N/A N/A N/A
6.
Maintenance Repair Services for Agency Owned Equipment Refer to Notes 2, 6
Hour 1 $ $ $ $ $
7.
Preventative Maintenance of Fluorescent Lighting Fixture (Washing & Relamping) Refer to Note 7
Per Fixtur e N/A N/A N/A N/A N/A N/A
8.
Preventative Maintenance of Fluorescent Lighting Fixture (Relamping Only) Refer to Note 7
Per Fixtur e N/A N/A N/A N/A N/A N/A
9.
Standard Coefficient (Markup for parts, materials and
Location 4, USDA Canopy
BASE
YEAR UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional 12 Month Period)
OPTION 4
UNIT
PRICE
(Fourth
Additional 12 Month Period)
1.
Overtime Services Requested by the Government
BASE
YEAR UNIT
PRICE
(Initial 12 Month
Period)
OPTION 1
UNIT
PRICE
(First Additional
12 Month Period)
OPTION 2
UNIT
PRICE
(Second
Additional 12 Month Period)
OPTION 3
UNIT
PRICE
(Third Additional 12 Month Period)
OPTION 4
UNIT
PRICE
(Fourth
Additional 12 Month Period)
2.
Emergency Call-Back Services During Other Than Normal Working Hours Refer to Notes 2,3
Hour 1 $ $ $ $ $
3. Additional Services Refer to Notes 2,3,4 Hour 6 $ $ $ $ $
4…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.