About this file

Amendment 0002 to Solicitation 47PF0018R0075

View the file

Other files

File Type Posted
47PF0018R0075_0003.pdf PDF
Cargo_O&M_Q&A_1.pdf PDF
Cargo_Pre_Pro_Agenda.pdf PDF
47PF0018R0075_0001.pdf PDF
Solicitation_FINAL.pdf PDF
Cost_Proposal_Sheet.xls XLS spreadsheet
SF24-16.pdf PDF
Synopsis.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Description of Amendment/Modification Please See Attached

RFP 47PF0018R0075

Operation and Maintenance Services U.S. Customs Cargo Inspection Facilities 2810 West Fort Street Detroit, MI, 48216

Amendment 0002 hereby incorporates the following changes to the solicitation:

1. Replace Section C.1.1 item (i) with the following:

a. Locks, vehicle barrier systems and static and dynamic bollard systems.

2. Replace Section C.8.1 Staffing’s third paragraph with the following:

a. The Contractor will be required to take all appropriate measures to maximize the life expectancy of the equipment, systems, infrastructure and property. At a minimum, the Contractor shall have a journeyman mechanic(s) on-site, to respond to service calls at all five locations, between the hours of 5:30 a.m. to 11:00 p.m., five (5) days per week, Monday through Friday, excluding Federal Holidays.

3. Replace Section J Exhibit 5 Building Information Sheet - Normal Working Hours with the following:

a. 5:30 AM – 11:00 PM EST, Monday – Friday, Excluding Federal Holidays

4. Replace Section J Exhibit 16 Inventory/NCMMS - with the attached Exhibit 16 (Pages 6-

41).

5. Replace Section L Attachment A – Past Performance References with the attached from (Pages 4-5)

6. Replace Section L.6 (B) with the following:

B. Past Performance Past performance is relevant information regarding an offeror’s actions under previously awarded contracts.

It includes the offeror’s overall quality of performance, record of conforming to contract requirements and to standards of good workmanship; the offeror’s adherence to contract schedules, including the administrative aspects of performance; the responsiveness of management; the offeror’s history of reasonable and cooperative behavior and commitment to customer satisfaction, including the offeror’s business-like concern for the interest of the customer; and the offeror’s overall performance on their contracts. Past performance as a prime contractor is essential to this procurement; therefore, past performance references will also inquire as to the contractor’s ability to coordinate multiple trades.

Past performance will be considered relevant if it meets ALL of the following criteria:

1) The contract was for Mechanical O&M services in a commercial or government owned facility for which the offeror served as the prime contractor under the contract.

2) The contract is/was in place for at least two consecutive years.

3) For previous contracts, the contract was completed within five years from the closing date of this solicitation.

4) The contract was for a “comparable” facility. A facility is considered to be “comparable’ if it is a commercial or federal office building of at least 50,000 gross square feet, or the total square footage from multiple buildings serviced under one (1) contract meets the 50,000 gross square foot minimum, (Example: A contractor has a contract that services three separate buildings, none of which meet the minimum requirements when looked at individually, however when totaled they do meet the minimum.

Building “A” is 25,000 gross square feet, building “B” is 25,000 gross square feet, and building “C” is 25,000 gross square feet. When this is totaled it comes to 75,000 gross square feet and would then meet the minimum Prior Experience requirement.)

Offerors shall complete Attachment A – Past Performance References Sheet at the end of this section.

This form must be completed for each reference submitted that meets the criteria identified above. The offeror cannot use the same reference (i.e., same project and same contact person) more than once. Past performance will be evaluated by analysis of information provided by the offeror and by interviews with the offeror’s past and/or current customers. If the offeror submits as a joint venture, unless the references submitted are for the joint venture, each firm in the joint venture will be evaluated and the composite score will be the average of all the scores for each firm of the joint venture.

While offerors must submit evidence of a minimum of 3 customer references for past performance evaluations--they may provide more, but in no case shall they submit more than 5 references. (The Government will consider two separate contracts as a single contract if they were consecutive and for the same location and services; e.g., two separate, but consecutive, one-year mechanical O&M service contracts for the same or similar work at ABC Federal Building, will be considered one contract.) The Government is not required to conduct or complete reference checks on more than 3 contracts, although it may choose to do so. Additionally, if more than 3 references are provided, the Government reserves the right to choose which references to include in its evaluation.

In addition to those references provided directly by the offeror, the Contracting Officer may identify and analyze the past performance of the offeror on any other relevant contract that they currently have or had of which the Contracting Officer has knowledge or obtains knowledge, including but not limited to projects listed in the Past Performance Information Retrieval System (PPIRS). Because of the wide variety of past performance history of individual offerors, the Government is not required to ensure that an equal number of references be obtained for each offeror.

ATTACHMENT A

PAST PERFORMANCE REFERENCES

PROJECT NAME OR ______________________________________________________________

TYPE OF SERVICE _______________________________________________________________

CONTRACT NUMBER _____________________________________________________________

ADDRESS _______________________________________________________________________

CITY _________________________________________STATE_______________

BUILDING OWNER/MANAGER’S NAME

CONTACT PERSON AND TITLE ________________________________________________________

COMPANY OR GOVERNMENT AGENCY NAME

TELEPHONE NUMBER

CONTRACT NO. _________________________________________________________________

CONTRACT START & COMPLETION DATES __________________________________________

BUILDING TYPE (OFFICE, COURTHOUSE, ETC) _______________________________________

GROSS SQUARE FOOTAGE_______________________

Description of Services Performed:

Relevancy Questions:

_____ Was the contract for Mechanical O&M services in a commercial or government owned facility for which the offeror served as the prime contractor under the contract?

_____ Was the contract in place for at least two consecutive years?

_____ If a completed contract, was the contract completed within five years from the closing date of this solicitation?

_____ Was the contract for a “comparable” facility? A facility is considered to be “comparable’ if it is a commercial or federal office building of at least 50,000 gross square feet, or the total square footage from multiple buildings serviced under one (1) contract meets the 50,000 gross square foot minimum, (Example:

A contractor has a contract that services three separate buildings, none of which meet the minimum requirements when looked at individually, however when totaled they do meet the minimum. Building “A” is 25,000 gross square feet, building “B” is 25,000 gross square feet, and building “C” is 25,000 gross square feet. When this is totaled it comes to 75,000 gross square feet and would then meet the minimum Prior Experience requirement.)

Relevant past performance? (YES or NO):

Location Equipment

Number Description PM Guide Number QTY FREQ

Inspection Booths 1-7 A-6/1-7 A-06a 7 Annual Room 127 Computer A-7-1 Package A/C Unit A-07a 1 Monthly

Roof A-9/1-2-3 Air-Cooled Condenser A-09b 3 Annual Roof A-11/1-2-3 Air Handler A-11a 3 Annual

Room 204 B-1-1 Battery Charger B-01 1 Quarterly Room204 B-2-1 Gas-Fired Boiler B-02d 1 Annual Room 204 B-3-1 Gas Burner Assy B-03 1 Annual Room 204 B-2-1 Boiler Internal Insp. B-07d 1 Annual Room 204 B-2-1 Boiler External Insp. B-08d 1 Annual

Rooms 204, 205 & 206 C-2/1-3 Air Intake Dampers C-02 3 Semi-Annual

C-4-1 Bldg Automation System C-04 1 Quarterly Fed Office Area C-5/1-33 VAV Boxes C-05 33 Annual

Building C-6/1-96 HVAC Control Devices C-06 96 Annual Building Roof C-6/39-40 HVAC Control Devices C-06 2 Annual

Inspection Dock D-1/1-17 Power Rollup Doors D-01 17 Semi-Annual Roof D-3/1-15 Roof Drains D-03 15 Annual

1st Floor D-5/1-10 Doors D-05 10 Semi-Annual 1st Floor D-5/11/13 Doors D-05 3 Semi-Annual

Broker Bldg, Drains - Trench Drains & Catch D-6/1-24 Drains D-06 24 Annual

Fed Off Area & Dock E-19/1-28 Emrgy & Exit Battery

Lights E-19 28 Quarterly Penthouse E-26-1 Circuit Breaker E-26 1 3 Years Penthouse E-26-2 Circuit Breaker E-26 1 3 Years

Gen Room, Gen Pnl GDP-1 E-26-3-5 Circuit Breakers E-26 3 3 Years Gen Room, Emerg Pnl E-26-6-9 Circuit Breakers E-26 4 3 Years

Room 205 E-27/1-2 Circuit Breaker E-27 2 3 Years Supply & Exhaust Fans Variable Freq Drives E-28A 6 Annual

Room 205 E-30-1 Switchboard E-30 1 3 Years Rm 205 E-30-2 Switchboard E-30 1 3 Years rm 205 E-30-7 Switchboard E-30 1 3 Years Rm 205 E-30/3-4 Switchboard E-30 2 3 Years Rm 205 E-30/5-6 Switchboard E-30 2 3 Years

Pad Mtd w Sd E-32-1 Transformer E-57 1 3 Years Room 205 E-32-4 Transformer E-57 1 3 Years Room 205 E-32-5 Transformer E-57 1 3 Years

Rm 205 E-32-6 Transformer E-57 1 3 Years Room 205 E-32/2-3 Transformer E-57 2 3 Years

Electrical Room Transformer 45 KVA E-57 1 3 Years Electrical Room Transformer 30 KVA E-57 1 3 Years

Generator Room Transformer 30 KVA E-57 1 3 Years Rm 205 E-35-1 Motor Control Center E-35a 1 Semi-Annual

Emer. Gen. Room E-35-2 Motor Control Center E-35a 1 Semi-Annual Room 205 E-35-1 Motor Control Center E-35b 1 Semi-Annual

Emer. Gen. Room E-36-1 Motor Control Center E-37.1 1 Annual Emer. Gen. Room E-36 ATS-2 Auto Transfer Switch E-36 1 Semi-Annual

Pad Mtd w Sd E-39-1 Supervisor Set E-39a 1 Annual Rm 206 E-40-1 Emergency Generator E-40 1 Annual

Emer. Gen. Room E-43/1-2 Batteries E-43 2 Quarterly

EQUIPMENT LIST - CARGO U.S. INSPECTION STATION, DETROIT, UPDATED - April 23, 2018

Exhibit 16

J.16. INVENTORY/NCMMS

NOTE: The Contracting Officer or their designee will provide the NCMMS Equipment Template after award.

Number Description PM Guide Number QTY FREQ

Rm 205 E-58/1-7 Power Distribution Unit E-58 7 Semi-Annual

Emer. Gen. Room E-58/15-16 Power Distribution Unit E-58 2 Semi-Annual Rm 205 E-58/8-14 Power Distribution Unit E-58 7 Semi-Annual

Detention Cell, 210cfm F-27-1 Fan, Centrifugal F-27a 1 Annual Van Inspection, 400cfm F-27-12 Fan, Centrifugal F-27a 1 Annual

Toilets, 500cfm F-27-13 Fan, Centrifugal F-27a 1 Annual Lab Fume Hood, 700cfm F-27-14 Fan, Centrifugal F-27a 1 Annual

Vet Shower Room, 250cfm F-27-15 Fan, Centrifugal F-27a 1 Annual Car Insp, 220cfm F-27-17 Fan, Centrifugal F-27a 1 Annual

Vault, 280cfm F-27-18 Fan, Centrifugal F-27a 1 Annual Women's Lkr, 670cfm F-27-2 Fan, Centrifugal F-27a 1 Annual Men's Lkr, 1020cfm F-27-3 Fan, Centrifugal F-27a 1 Annual Mech Rm, 370cfm F-27-5 Fan, Centrifugal F-27a 1 Annual

Electrical Rm, 800cfm F-27-6 Fan, Centrifugal F-27a 1 Annual Generator Rm, 7300cfm F-27-7 Fan, Centrifugal F-27b 1 Annual Insp Area Toilet, 350cfm F-27-8 Fan, Centrifugal F-27a 1 Annual

Inspection Dock, F-27/9-11 Fan, Centrifugal F-27c 3 Annual Through out F-32 1-26 Fliters F-32 26 Quarterly

Building F-38/1-4 Lightning Protection F-38 4 Annual Building G-3/1-2 Security Gates G-03 2 Semi-Annual Building H-2-1-3 Gas Hot Wtr Heater H-02 3 Annual

Cargo Inspect. Dock L-2/1-16 Loading Ramps L-02 16 Quarterly

Outside L-5-1 Lawn Sprinkles (per nozzle) L-05 335 Annual

Outside M-1/1-4 M-01 Electrical Manholes M-4 4 Annual Outside M-4 Electrical Manholes M-4 2 Annual

For Radiation Monitors M-01/5-7 Manhole, Electric M-1 3 Annual

Outside M-2/1-15 M-02 Storm & Sewer

Manholes M-02 15 Quarterly Standby Gentr. M-3-1 Motors M-03.a 1 Annual

Cargo Roof M-3/2-4 Motors M-03.a 3 Annual Roof M-3/5-6 Motors M-03.a 2 Annual Roof M-3/7-8 Motors M-03.a 2 Annual

Roof Exhaust Fan EF 7 M-3/9 Motors M-03.a 1 Annual Lounge (need Rm #) Misc - 1-1 Motors M-03.a 1 Annual Air Handler RTU-3 Motors M-03a 2 Annual

Rm 204 P-4-1 Pumb, Centrifugal P-04a 1 Annual Rm 204 P-4-2 Pumb, Centrifugal P-04a 1 Annual Rm 204 P-4-3 Pumb, Centrifugal P-04a 1 Annual Offices R-1 R-01 Radiator Heating R-1 1 5 Years

Inspection Dock R-1 R-01 Radiator Heating R-1 38 5 Years

Roof R-2 R-02 Roof Insp per 100 sf R-02 350 Semi-Annual Room 204 - Y-Strainer S-8-1 Strainer, Y-Type S-8 1 Annual

Rm 204 T-1-1 Tank, Water T-1 1 3 Years Entrance NorthEast U-1-1 Cabinet Unit Heater U-1 1 Annual

Entrance East U-1-2 Cabinet Unit Heater U-1 1 Annual Entrance NorthWest U-1-4 Cabinet Unit Heater U-1 1 Annual

Electric Room U-1-6 Cabinet Unit Heater U-1 1 Annual

Number Description PM Guide Number QTY FREQ

Lobby U-1-7 Cabinet Unit Heater U-1 1 Annual Lobby U-1-8 Cabinet Unit Heater U-1 1 Annual

Cargo Truck Insp. U-2-4 Gas-Fired Unit Heater U-2 1 Annual Cargo Truck Inspect. U-2-8 Gas-Fired Unit Heater U-2 1 Annual

Cargo Truck Insp. U-2/1 & 3 Gas-Fired Unit Heater U-2 2 Annual Inspect. Areas U-2/13-14 Gas-Fired Unit Heater U-2 2 Annual

Cargo Truck Inspect. U-2/5-7 Gas-Fired Unit Heater U-2 3 Annual Cargo Truck Inspect. U-2/9-12 Gas-Fired Unit Heater U-2 4 Annual

Generator Room U-2-16 Gas-Fired Unit Heater U-2 1 Annual Inspection Dock U-2-17-20 Gas-Fired Unit Heater U-2 4 Annual

Room 204 V-2-1 Valve, Safety Relief V-2 1 Monthly Building V-3/1-31 Valve, Regulating V-03 31 Annual

Rm 204 V-5-1 Valve, Manually Operated V-05a 1 Annual

Rm 204 V-5-2 Valve, Manually Operated V-05a 1 Annual

Room 204 V-7-1 Valve, Hydraulic/

Pneumatic/Electric V-7 1 Annual Rm 204 V-9-1 Backflow Preventer V-09a 1 Annual Rm 204 V-9-2 Backflow Preventer V-09b 1 Annual

Outside - Flag Poles X-22/1-2-3 Flag Pole, Electric X-22 3 Quarterly Canopy X-23-1 Heater Unit, Electric X-23 1 Semi-Annual

Through out X-37-1-3 EyeWash / Shower X-37 3 Annual

Insp Booths 8 - 10 A/C Unit, Ceiling-mounted A-06a 3 Annual

Insp Booths 8 - 10 Booth Heater, Ceiling-mounted A-13c 3 Annual Insp. Booths 1 - 7 C-06-1-14 Booth Thermostats C-06 14 Annual

Insp. Booths 8 - 10 C-06-15-20 Booth Thermostats C-06 6 Annual Canopy Drains & Downspouts D-3 4 Annual

Insp. Booths 1 - 7 Entrance Door D-5 7 Semi-Annual Insp. Booths 1 - 7 Sliding Door D-5 7 Semi-Annual

Insp. Booths 8 - 10 Entrance Door D-5 3 Semi-Annual Insp. Booths 8 - 10 Sliding Door D-5 3 Semi-Annual Insp. Booths 1 - 7 Booth heater, wall- X-23 7 Semi-Annual

Insp. Booths 8 - 10 Booth heater, wall- X-23 6 Semi-Annual

Insp. Booths 1 - 10 Booth Heater, Portable

1500W A-13b 1 Annual

Insp Booths 11 - 14 A/C Unit, Ceiling-mount, Coleman A-13a 4 Annual Insp Booths 11 - 14 Booth Heater, Ceiling- A-13a 4 Annual Insp Booths 11 - 14 Booth Thermostats C-06 8 Annual Insp Booths 11 - 14 Drains & Downspouts D-03 2 Annual

Insp Booths 11 - 14 Personnel Entrance Door D-05 4 Semi-Annual Insp Booths 11 - 14 Sliding Door D-05 4 Semi-Annual Insp Booths 11 - 14 Booth heater, wall- X-23 8 Semi-Annual Insp Booths 11 - 14 Manhole, Storm Drains M-02 2 Quarterly Insp Booths 11 - 14 Lighting Controls, L-4a 1 As required Insp Booths 11 - 14 Sliding Window W-11 4 As required Insp Booths 11 - 14 Roll-up Window Blinds N/A 36 As required

Number Description PM Guide Number QTY FREQ

Outside Electrcal Gates (additional G-3 1 Semi-Annual Loading dock Backflow preventers 6" V-9e 2 Annual Command Ctr A/C Unit 2 Ton Unit A-13 1 Annual

Main Fire Water Supply Backflow preventers 8" V-9 2 Annual

Electronic Management System Johnson Metasys -

Dell Computer N/A 1 N/A

Location Equipment

Number Description PM Guide Number QTY FREQ

Waiting Room N/A A/C Package Unit, Trane Model PTED1501WCA A-06 1 Annual

Mechanical Room N/A

990,000 BTUH, Model

CHN0991 B-02a 1 Annual

Mechanical Room N/A Burner, Natural Gas Boiler B-03 1 Annual

Mechanical Room N/A Boiler Inspection & Hydro

Test B-07a 1 Annual

Garage South Side N/A Remote Air Intake

Dampers, Electric, 72" x C-02 2 Semi-Annual Toilet N/A Thermostat C-06 1 Annual

Mechanical Room N/A Thermostat C-06 1 Annual

Garage N/A Door, Power-Operated

Roll-up, Electric D-01 2 Semi-Annual

West Side N/A Gates, Power-Operated

Electric D-01 2 Semi-Annual

Mechanical Room N/A Roof Drains / Gutters /

Downspouts D-03 1 Annual N/A Door, Personnel D-05 5 Semi-Annual

Garage N/A Trench Drain, 10' Sections D-06 10 Annual Toilet N/A Floor Drain D-06 1 Annual

Mechanical Room N/A Floor Drain D-06 1 Annual Garage N/A Circuit Breaker, 60Amps E-26 1 Three Years

Mechanical Room N/A Motor Starter Panel, GE

300-Line Control E-28 2 Annual

Garage N/A Motor Starter Panel, GE

300-Line Control E-28 2 Annual

Garage N/A Motor Starter Panel, Cutler-Hammer E-28 1 Annual

Garage N/A Main Disconnect Switch, 300 amp E-34a 1 Annual

Garage N/A Main Disconnect Switch, Generator, 300 amp E-34a 1 Annual

Garage N/A Automatic Transfer Switch, Kohler E-36 1 Semi-Annual

Outside North Side N/A Emergency Generator, Natural Gas-Fired, Kohler E-40 1 Annual Outside North Side N/A Battery Charger B-01 1 Quarterly

VACIS Building UPDATED: April 2018

Number Description PM Guide Number QTY FREQ

Outside North Side N/A Batteries, Generator Start E-43 6 Quarterly

Outside North Side N/A Emergency Generator, Monthly E-42a 1 Monthly

Waiting Room N/A Filter, Throw-Away, A/C Package Unit, 10"x30" F-32 1 Quarterly

Toilet N/A Exhaust Fan, 100 cfm F-36 1 Annual Garage N/A Garage Fans, 4400 cfm F-36 2 Annual Garage N/A Oil / Water Separator G-02 1 Monthly

Garage N/A Oil / Water Separator

Cleanout As Required As Required

Toilet N/A Hot Water Heater, Electric, EEMax SP3512 H-03 1 Annual

Mechanical Room N/A Pumps, Snow Melt Circ

System P-04 2 Annual

VACIS Building N/A Roof Inspection, 6760 sf

(per 100 sf) R-02 68 Semi-Annual

Mechanical Room N/A Roof Inspection, 115 sf

(per 100 sf) R-02 1 Semi-Annual Mechanical Room N/A Expansion Tank T-01 1 Three Years

Outside West Side N/A Underground Waste Oil

Storage Tank, 550 Gallons T-04 1 Monthly Mechanical Room N/A Chemical Feed Tank T-06 1 Three Years

Number Description PM Guide Number QTY FREQ

Toilet N/A Unit Heater, Cabinet Wall

Mount, 235 cfm U-01 1 Annual

Mechanical Room N/A Unit Heater, Ceiling- Mounted, 543 cfm U-01 1 Annual

Mechanical Room N/A Valve, Safety Relief V-02 1 Annual Mechanical Room N/A Valve, Water Regulating V-03 1 Annual

Waiting Room N/A Control Valve, 1/2", for

Package A/C Unit V-06 1 Annual

Mechanical Room N/A

Backflow Preventer, Reduced-Pressure, Watts

1/2" V-09a 1 Annual Garage N/A Emergency Eye Wash W-02 1 Weekly

Mechanical Room N/A Emergency Eye Wash W-02 1 Weekly

Mechanical Room N/A Water Treatment, Heating

System W-09 1 Monthly

Toilet N/A Water Closet N/A 1 N/A Toilet N/A Lavatory N/A 1 N/A

Mechanical Room N/A Valve, Trap Primer N/A 2 N/A

Garage N/A Zone Control Panel N/A 4 N/A Mechanical Room N/A Zone Circulating Pumps N/A 4 N/A

Inspector's Booth N/A A/C Unit, Ceiling Mount, Coleman A-13a 1 Annual Inspector's Booth N/A Thermostat C-06 1 Annual

Inspector's Booth N/A Roof Drain / Gutter /

Downspout D-03 1 Annual

Inspector's Booth N/A Sliding Entrance Personnel

Door D-05 2 Semi-Annual

Inspector's Booth N/A Booth Heater, Wall-Mount X-23 2 Annual Inspector's Booth N/A Rollup Window Blinds 14 As Required

Driver's Waiting Booth N/A Thermostat C-06 1 Annual

Driver's Waiting Booth N/A Roof Drain / Gutter /

Downspout D-03 1 Annual

Driver's Waiting Booth N/A Sliding Entrance Personnel

Door D-05 1 Semi-Annual

Driver's Waiting Booth N/A Booth Heater, Ceiling

Mount Infrared X-23 1 Annual Driver's Waiting Booth N/A Rollup Window Blinds 10 As Required

VACIS Booth N/A A/C Unit 5 Tons A-12 1 Monthly Control Room (VACIS Bth) N/A Roll up blinds (RWB1) D-5 1 Semi-Annual

South Inspection Booths

Snow Melt System

Plumbing System

Number Description PM Guide Number QTY FREQ

Location Equipment

Number Equipment PM Guide Qty Frequency

Roof Air Cooled Condensing

Unit, York A-09 1 Annual

Roof Air Handler Unit, York

22,000cfm A-11c 1 Annual Generator Room Battery Charger B-01 1 Quarterly

Mechanical Room Boiler, Hot Water, Natural

Gas-Fired, Munchkin B-02c 3 Annual

Mechanical Room Burner, Natural Gas Boiler B-03 3 Annual

Mechanical Room Boiler Inspection & Hydro

Test B-07c 3 Annual

Mechanical Room Remote Air Intake

Damper, Electric, 24" x 24" C-02 1 Semi-Annual

Throughout VAV Reheat Coil, Hot

Water Heating C-03 22 Annual Building Management System (BMS) Central

Computer C-04 1 Annual Throughout VAV Mixing Box C-05 22 Annual Throughout Thermostat C-06 45 Annual

Roof Roof Drains / Gutters /

Downspouts D-03 17 Annual Main Entrance Doors D-05 9 Semi-Annual

Toilets Floor Drain D-06 5 Annual Mechanical Room Floor Drain D-06 4 Annual

Throughout Exit Lighting E-19 5 Quarterly Electrical Room Circuit Breaker, 30Amps E-26 4 Three Years Electrical Room Circuit Breaker, 60Amps E-26 1 Three Years

Electrical Room Circuit Breaker, 100Amps E-26 5 Three Years

Electrical Room Circuit Breaker, 200Amps E-27 5 Three Years

Electrical Room Circuit Breaker, 400Amps E-27 2 Three Years

Electrical Room Circuit Breaker, 600Amps E-27 1 Three Years

Roof

Motor Starter Panel, Rooftop A/C Unit, 200

Amp E-28 1 Annual

Mechanical Room Motor Starter Panel, Heating HW Pumps, 5HP E-28 2 Annual

Mechanical Room

Motor Starter Panel, Irrigation Booster Pump, 2.5HP E-28 1 Annual

Mechanical Room Motor Starter Panel, Duplex Cistern Pumps E-28 1 Annual

Electrical Room Switchboard, Main Service, 800 amp E-30 1 Annual

Broker Building UPDATED: April 2018

Number Description PM Guide Number QTY FREQ

Electrical Room Switchboard, Emergency

Service, 600 amp E-30 1 Annual

Electrical Room Main Disconnect Switch, 800 amp E-34b 1 Annual

Electrical Room

Main Disconnect Switch, Emergency Switchboard, 600 amp E-34b 1 Annual

Electrical Room Automatic Transfer Switch E-36 1 Semi-Annual

Generator Room Emergency Generator, Natural Gas-Fired, E-40 1 Annual Generator Room Emergency Generator, E-42a 1 Monthly Generator Room Emergency Generator, E-42c 1 Annual

Generator Room Batteries, Generator Start E-43 6 Quarterly

Generator Room

Fiberglass Pressure Blower Series 42 Type F - 10"

Direct, Rotatable Housing Man Specs 1

Generator Room

Fiberglass Pressure Blower Series 42 Type F - 10"

Direct, Rotatable Housing M-3 1

Generator Room

Exhaust Fan - Coolair Type CDC Direct Drive Propeller

Fan Man Specs 1

Generator Room Exhaust Fan Wall Shutter -

Coolair Type S Man Specs 1 Electrical Room Transformer, 112.5KVA E-57 1 Three Years Electrical Room Transformer, 30KVA E-57 2 Three Years

Mechanical Room Alarm Check Valve F-1 1 Monthly Mechanical Room Fire Control Valve F-4 2 Monthly

Outside NW Corner Fire Dept Hose Connection F-9 1 Monthly Throughout Fire Smoke Detectors F-14 6 Annual

Mechanical Room Fire WaterFlow Alarms F-14 1 Quarterly

Throughout Fire Detection System, Operational Testing F-14c 1 Semi-Annual

Electrical Room Fire Alarm Control Panel &

Annunciator F-15 1 Annual Throughout Fire Alarm Pull Stations F-17 3 Annual Throughout Fire Sprinklers (per F-20 25 Annual Throughout Fire Extinguisher F-24 4 Monthly

Roof Air Handler Return Fan, 22,000 cfm F-27 1 Annual

Roof Toilet Exhaust Fan, 1200 cfm F-27 1 Annual

Roof Mechanical Room Exhaust

Fan, 800 cfm F-27 1 Annual

Roof Filter, Throw-Away, A/C

Package Unit F-32 20 Quarterly

Roof Bag Filter, Throw-Away, A/C Package Unit F-40 20 Semi-Annual

Number Description PM Guide Number QTY FREQ

Mechanical Room Hot Water Heater, Gas

Fired, 48 Gallon capacity H-02 1 Annual

Cistern Pump Enclosure Manway, Cistern Pump

Enclosure M-04 1 Semi-Annual

Roof Motor, Air Handler Supply

Fan, 25 HP M-03 1 Annual

Roof Motor, Air Handler Return

Fan, 7.5 HP M-03 2 Annual

Mechanical Room Motor, Heating Hot-Water

Circ Pump, 5 HP M-03 2 Annual

Mechanical Room Motor, Irrigation Booster

Pump, 2.5 HP M-03 1 Annual

Cistern Pump Enclosure Motor, Cistern Circ Pump, 5 HP M-03 2 Annual

Mechanical Room Centrifugal Pump, Heating

Hot Water Circ P-04 2 Annual

Mechanical Room Centrifugal Pump, Irrigation Booster Pump P-04 1 Annual

Cistern Pump Enclosure Centrifugal Pump, Cistern

Circ Pump P-04 2 Annual Throughout Radiant Heating Panel R-01 45 Five Years

Roof Roof Inspection, 25,140 sf

(per 100 sf) R-02 250 Semi-Annual

Mechanical Shaft Strainer, Storm Water, Victaulic Tee-Type S-09 2 Annual

Mechanical Room

Expansion Tank, Heating Hot Water System, 180

Gallon T-01 1 Three Years

Mechanical Room Expansion Tank, Cistern

System, 100 Gallon T-01 1 Three Years

Outside West Side

Underground Cistern Storage Tank, 12,000

Gallons T-04 1 Monthly

Mechanical Room Unit Heater, Hot Water, 50

MBH U-01 1 Annual

Receiving Unit Heater, Hot Water, 50

MBH U-01 1 Annual

North Vestibule Unit Heater, Cabinet, Hot

Water, 40MBH U-01 1 Annual

East Vestibule Unit Heater, Cabinet, Hot

Water, 40MBH U-01 1 Annual

South Vestibule Unit Heater, Cabinet, Hot

Water, 40MBH U-01 1 Annual

Mechanical Room

Backflow Preventer, Reduced-Pressure, 4" City

Water V-09a 1 Annual

Mechanical Room

Backflow Preventer, Reduced-Pressure, 2 1/2"

Cistern Makeup V-09a 1 Annual

Number Description PM Guide Number QTY FREQ

Mechanical Room

Backflow Preventer, Double-Check Detector, 6"

Fire System V-09a 1 Annual

Mechanical Room Backflow Preventer, 1"

Heating Hot Water V-09a 1 Annual

Mechanical Room Water Treatment, Heating

System W-09 1 Monthly Electrical Room Unit Heater, Electric X-23 1 Semi-Annual

Turn Stiles G-3 2 Semi-Annual Corridor East of Cmd Ctr

Rm 1147

OHS-040-

HAHU Stulz A/C Unit A-11 2 Annual

Roof

OHS-040-

RCU-O Stulz A/C Unit 3 Ton A-6 2 Annual

Room C1139 & C1122

OHS-012-

AHU Stulz A/C Unit A-11 2 Annual

Roof

OHS-012-

RCU-O Stulz A/C Unit 1 Ton A-6 2 Annual Throughout SDV5-8 VAV Boxes I-5A 4 Annual

Roof Feeding C1137 EF-1 Exhaust Fan 1/3 HP F-27 1 Annual Rooms C1139 & C1147 100-DST Delta Faucets N/A 2 N/A

C1147 to C1137 through HWAT-R2 Heat Trace Cable N/A 1 Annual Millwork Room C1147 HWAT-ECO Heat Trace N/A 1 Annual

Throughout N/A Urinals N/A 3 N/A Break Rm C1139 & Cmd

Ctr C1147 E480 Tempering Valve N/A 1 N/A Elec/Mech Room C1120 PRL2a Electrical Panel E-30 1 Every 3 Years

Cmd Ctr C1147 PRL1a Electrical Panel E-30 1 Every 3 Years

Elec/Mech Room C1120 E-MON 1 Energy Monitoring Meter N/A 1 N/A Throughout SCWD Doors (Cherry) N/A 25 N/A Throughout HM Doors (Painted) N/A 3 N/A Throughout SCWD-B Doors (Ballistic) N/A 1 N/A

Corridor East of Cmd Ctr Rm 1147

OHS-040-

HAHU Stulz A/C Unit A-11 2 Annual

Roof

OHS-040-

RCU-O Stulz A/C Unit 3 Ton A-6 2 Annual

Room C1139 & C1122

OHS-012-

AHU Stulz A/C Unit A-11 2 Annual

Roof

OHS-012-

RCU-O Stulz A/C Unit 1 Ton A-6 2 Annual Throughout SDV5-8 VAV Boxes I-5A 4 Annual

Roof Feeding C1137 EF-1 Exhaust Fan 1/3 HP F-27 1 Annual Rooms C1139 & C1147 100-DST Delta Faucets N/A 2 N/A

C1147 to C1137 through HWAT-R2 Heat Trace Cable N/A 1 Annual Millwork Room C1147 HWAT-ECO Heat Trace N/A 1 Annual

Throughout N/A Urinals N/A 3 N/A Break Rm C1139 & Cmd E480 Tempering Valve N/A 1 N/A Elec/Mech Room C1120 PRL2a Electrical Panel E-30 1 Every 3 Years

Cmd Ctr C1147 PRL1a Electrical Panel E-30 1 Every 3 Years Elec/Mech Room C1120 E-MON 1 Energy Monitoring Meter N/A 1 N/A

Throughout SCWD Doors (Cherry) N/A 25 N/A

Number Description PM Guide Number QTY FREQ

Throughout HM Doors (Painted) N/A 3 N/A Throughout SCWD-B Doors (Ballistic) N/A 1 N/A Throughout HM-B Doors (Ballistic) N/A 3 N/A

Electric Room ERP9 XMFR 45 KVA 480/208 E-57 1 Every 3 Years Command Center ERP9B 100a 120/208v Electrical E-58 1 Semi-Annual

Electric Room ERP8 Electrical Panel E-30 1 Every 3 Years Throughout HM-B Doors (Ballistic) N/A 3 N/A

Location Equipment

Number Equipment PM Guide Qty Frequency

Canopy N/A

(1)Thermostat, (2) Heat Tapes, Roof Conductor

(System) C-06 1 Annual Canopy N/A Roof Drains D-03 4 Annual Canopy N/A Roof Drain Conductor D-03 4 Annual Canopy N/A Door, Mechanical Room D-05 1 Semiannual

Canopy N/A Floor Drain - Mechanical

Room D-06 1 Annual

Canopy N/A Low Voltage 40 amp Molded Case Circuit E-26 1 Every 3 Years

Canopy N/A Low Voltage 100 amp Molded Case Circuit E-26 1 Every 3 Years

Canopy N/A Low Voltage, Dry Type

Transformer E-57 1 Every 3 Years

Canopy N/A Power Distribution Panel E-58 1 Semiannual Canopy N/A Fire Extinguisher F-24 1 Monthly

Canopy N/A Canopy Roof Inspection

(2808x100 sq. ft.) R-02 28 Semiannual

Canopy N/A Roof Inspection

(Mechanical Room) R-02 1 Semiannual Canopy N/A Backflow Preventer (1 V-09 1 Annual Canopy N/A Trap Primer, Floor Drain, A- VTP - 1 1 Semiannual

Canopy N/A Wall Mounted Electric Heaters (Mechanical X-23 2 Semiannual

Canopy N/A Ground Water Hydrants -

Self Draining (Hose) H-16 2 Annual Canopy N/A Fans, Live-stock cooling A-16 4 Semiannual

Location Equipment

Number Equipment PM Guide Qty Frequency

Mechanical Room N/A

Hot Water Heater - Lochinvar 240V, 6 gals, Model JR(A)006 H-2 1 Annual

Mechanical Room N/A Hot Water Expansion Tank, Model PLT-12 T-1 1 Every 3 Yrs.

Outside (north side of bldg.-underground) N/A

Oil Seperator, 500 gal., Proceptor, Model - OMC- S-16 1 Monthly

Mechanical Room N/A Air Seperator Enhanced, Model - EASB N/A 1 N/A

USDA Canopy UPDATED: April 2018

Gantry Building Equipment Inventory: April 2018

Number Description PM Guide Number QTY FREQ

Restroom N/A Valve, Lavatory

Tempering, Powers, Model N/A 1 N/A

Roof N/A Exhaust Fan, Centrifugal, (For garage inspection F-27 1 Annual

Roof N/A

Firestone Redstone TPO 60 mil. Membrane, 6200 SqFt., Installed 10/2012 R-2B 62 SemiAnnual

Rest Room N/A Exhaust Fan, 110V, Gemini, Model - 200 Series F-48 1 Annual Rest Room N/A Sink N/A 1 N/A Rest Room N/A Toliet N/A 1 N/A

Outside N/A Battery

Charger/Generator, B-1 1 Quarterly Outside N/A Batteries, Generator, E-43 2 Quarterly

Outside N/A Condensing Unit -

Mitsubishi, Model - PUY- C-24 1 Annual

Outside N/A Disconnect 30A, Siemans -

For condensing unit E-34 1 Annual

Outside N/A

Emergency Generator, 150KW, Cummins, Model -

GGLB-7965841 E-40 1 Annual

Outside N/A A/C Unit, 3.5 Ton, Model -

4TTA3042D3000CA A-6 1 Annual

Outside N/A Water Pump 10EN Series

1/2 HP P-4 3 Annual

Outside N/A Electrical Panel - Hinge-cover Medium Type 3 R E-34 2 Annual

Outside N/A Disconnect 30A, 220V Siemans - For A/C Unit E-34 1 Annual

Outside N/A Meter/Gas Roots, Model -

2M175 N/A 1 N/A

Outside N/A Regulator/Gas, Model -

243-12 N/A 1 N/A Outside N/A Downspouts N/A 7 N/A

Outside N/A Spigots, Model - Z1321-C N/A 3 N/A Outside N/A Exterior Doors, Steel D-5 3 SemiAnnual

Outside N/A Simplex Punch Locks (On exterior steel doors) N/A 3 N/A

Office Area N/A Disconnect 30A, 480V, Siemans - For exhaust fan E-34 1 Annual

Mechanical Room N/A

Boiler/Gas, Larrs, Model - NTH150NXX24 (For snow melting system) Man Specs 1 Annual

Mechanical Room N/A

Furnace, 110V, 100,000 btu, Trane, Model - TVH1C100A94818A H-6 1 Annual

Number Description PM Guide Number QTY FREQ

Mechanical Room N/A

Furnace Condenser, 3.5 Ton, Tyler, Model - 4TXCC043BC3HCBA Man Specs 1 Annual

Mechanical Room N/A Injector, Glymatic, Model - G6, Snow Melting Sytem Man Specs 1 Annual

Mechanical Room N/A

Fiberglass Pressure Blower Series 42 Type F - 10"

Direct, Rotatable Housing M-3 1 Annual

Mechanical Room N/A Circulating Pumps, B&G, Model - P1-36 M-3 2 Annual

Mechanical Room N/A Backflow Preventer, Apollo, Model - RP4ASB1 V-9 1 Annual

Mechanical Room N/A

Valve, Pressure Regulator 1 1/4", Apollo, Model -

406 V-3 1 Annual

Mechanical Room N/A Expansion Tank, B&G, Model - HFT-90 T-1 1 Every 3 Yrs.

Mechanical Room N/A Valve Mixing, 1 1/4" x

3/4", B&G N/A 1 N/A

Mechanical Room N/A Expansion Tank, Potable

Water, Watts, Model PLT-5 T-1 1 Every 3 Yrs.

Mechanical Room N/A Controller, Snow Melting System, Tekmar, Model - Man Specs 1 Annual

Mechanical Room N/A Faucet, Slop Sink, Chicago N/A 1 N/A Throughout N/A Interior Doors N/A 5 N/A Throughout N/A Occupancy Sensors N/A 11 N/A

Waiting Room N/A

Mini-Split #2 A/C Unit, 220V, Mitsubishi, Model -

PKA-A24KA4 A-5 1 Annual

Waiting Room N/A

Condensate Pump, 110V, Beckett, Model - CB151UL

(For mini-split unit #2) C-7 1 Annual

Garage Inspection Bay N/A

Automatic Transfer Switch, 480V, Cummins, Model -

OTECB-1210775 E-36 1 SemiAnnual

Garage Inspection Bay N/A Generator Annunciator

Panel, Power Command, N/A 1 N/A

Garage Inspection Bay N/A Electrical Panel, 200A, 480/277V, Siemans E-27 1 Every 3 Yrs.

Garage Inspection Bay N/A Electrical Panel, 200A, 120/220V, Siemans E-27 2 Every 3 Yrs.

Garage Inspection Bay N/A

Disconnect 200A, 220V, Siemans - (For X-Ray

Machine) E-34 1 Annual Garage Inspection Bay N/A Louvers, Intake F-36 2 Annual

Number Description PM Guide Number QTY FREQ

Garage Inspection Bay N/A Manifold, Snow Melting

System, Mr. Pex ManufSpecs 1 Annual

Garage Inspection Bay N/A

Transformer 112KVA, General Electric, 480/120V, Model - 9T83B3875 E-57 1 Every 3 Yrs.

Garage Inspection Bay N/A Lighting, MHT Induction, 300W, Model - HVA-300E N/A 10 N/A

Bldg. Name Area

Description Original Description Qty New Description Lighting Installed Date

CIF Broker Bldg VESTIBULE 6 In. Downlight Fixture w/ (2) 26w Pin-base Lamps & Elec. Ballast

Downlight LED

Retrofit Kit, 26w, 6 In.

3/15/2017

CIF Broker Bldg

WAITING

ROOM

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg

WAITING

ROOM

4 Ft. Ice Tray Fixture w/

(2) F32T8 Lamps & (1)

NP Elec. Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg

WAITING

ROOM

Exit Sign w/ LED and battery backup

No Retrofit Proposed

4/11/2017

CIF Broker Bldg MENS

1x4 Flanged Recessed Fixture w/ (2) F32T8 Lamps & (1) NP Elec.

Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg MENS 4' Strip Fixture w/ (2)

F32T8 Lamps & (1) Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg WOMENS

1x4 Flanged Recessed Fixture w/ (2) F32T8 Lamps & (1) NP Elec.

Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/1/2017

Cargo Facility Lighting Updated - April 23, 2018

Number Description PM Guide Number QTY FREQ

CIF Broker Bldg WOMENS 4' Strip Fixture w/ (2)

F32T8 Lamps & (1) Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg

DHL

GLOBAL

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg LAN 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

No Retrofit Proposed

4/19/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

No Retrofit Proposed

4/19/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

Number Description PM Guide Number QTY FREQ

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

CIF Broker Bldg CHB OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

CIF Broker Bldg

LIVINGSTON

OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

CIF Broker Bldg

MAINTENA

NCE

4' Industrial Fixture w/

(2) F32T8 Lamps & (1)

Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32

Number Description PM Guide Number QTY FREQ

CIF Broker Bldg ELECTRICAL 4' Industrial Fixture w/

(2) F32T8 Lamps & (1)

Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg

CONFERENC

E ROOM

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

CIF Broker Bldg

RECYCLE

ROOM

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

2/7/2017

CIF Broker Bldg OFFICE 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg HALLWAY 2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg HALLWAY Exit Sign w/ LED 6 No Retrofit Proposed

4/11/2017

CIF Broker Bldg

REAR

VESTIBULE

6 In. Downlight Fixture w/ (2) 26w Pin-base

Lamps & Elec. Ballast

Downlight LED Retrofit Kit, 26w, 6

In.

3/15/2017

CIF Broker Bldg MENS 1'x4' Recessed Troffer w/ (2) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32

Number Description PM Guide Number QTY FREQ

CIF Broker Bldg MENS 4' Strip Fixture w/ (2)

F32T8 Lamps & (1) Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg WOMENS 1'x4' Recessed Troffer w/ (2) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg WOMENS 4' Strip Fixture w/ (2)

F32T8 Lamps & (1) Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/1/2017

CIF Broker Bldg HALL

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED

Lamps, (1) 1/32 &

(1) 2/32 Elec. NP

Ballasts, Dual Switched

4/18/2017

CIF Broker Bldg HALL Exit Sign w/ LED 1 No Retrofit Proposed

4/11/2017

CIF Broker Bldg

MECH

ROOM

4' Industrial Fixture w/

(2) F32T8 Lamps & (1)

Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/6/2017

CIF Broker Bldg

SHOWER

ROOM

1x4 Flanged Recessed Fixture w/ (2) F32T8 Lamps & (1) NP Elec.

Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/6/2017

CIF Broker Bldg

SHOWER

ROOM

6" Downlight w/ (1) 26w Compact Fluorescent Lamp & Elec Ballast

Downlight LED

Retrofit Kit, 14w, 6 In.

4/18/2017

CIF Broker Bldg JANITORIAL 4' Industrial Fixture w/

(2) F32T8 Lamps & (1)

Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/6/2017

CIF Broker Bldg

ELECTRICAL

ROOM

4' Industrial Fixture w/

(2) F32T8 Lamps & (1)

Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32

3/9/2017

Number Description PM Guide Number QTY FREQ

CIF Broker Bldg

PHONE

ROOM

4' Industrial Fixture w/

(2) F32T8 Lamps & (1)

Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/9/2017

CIF Broker Bldg FASTOFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

4/18/2017

CIF Broker Bldg FASTOFFICE 2x4 Recessed Fixture w/

(3) F32T8 Lamps & (1) Dimmable Elec. Ballast

2X4 Relamp w/ (3) 4

Ft. TLED Lamps 4/18/2017

CIF Broker Bldg

WAITING

AREA

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

4/24/2017

CIF Broker Bldg FASTOFFICE Exit Sign w/ LED 2 No Retrofit Proposed

4/11/2017

CIF Broker Bldg

PHONE

CLOSET

4' Industrial Fixture w/

(2) F32T8 Lamps & (1)

Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/9/2017

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(2) Electronic Ballasts, Dual Switched, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED

Lamps, (1) 1/32 &

(1) 2/32 Elec. NP

Ballasts, Dual Switched

3/9/2017

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(2) Electronic Ballasts, Dual Switched, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED

Lamps, (1) 1/32 &

(1) 2/32 Elec. NP

Ballasts, Dual Switched

3/9/2017

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(2) Electronic Ballasts, Dual Switched, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED

Lamps, (1) 1/32 &

(1) 2/32 Elec. NP

Ballasts, Dual Switched

3/3/2017

Number Description PM Guide Number QTY FREQ

CIF Broker Bldg

PORT

OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(2) Electronic Ballasts, Dual Switched, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED

Lamps, (1) 1/32 &

(1) 2/32 Elec. NP

Ballasts, Dual Switched

3/3/2017

CIF Broker Bldg

PORT

OFFICE

2x4 Recessed Fixture w/

(3) F32T8 Lamps & (1) Dimmable Elec. Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. Dimmable

Ballast

3/3/2017

CIF Broker Bldg

PORT

OFFICE

Exit Sign w/ LED 1

No Retrofit Proposed

4/11/2017

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(2) Electronic Ballasts, Dual Switched, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED

Lamps, (1) 1/32 &

(1) 2/32 Elec. NP

Ballasts, Dual Switched

3/3/2017

CIF Broker Bldg MAIL ROOM

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/3/2017

CIF Broker Bldg

SUPPLY

ROOM

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(2) Electronic Ballasts, Dual Switched, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED

Lamps, (1) 1/32 &

(1) 2/32 Elec. NP

Ballasts, Dual Switched

3/3/2017

CIF Broker Bldg

CAROL

ROOM

1'x4' Recessed Troffer w/ (2) F32T8 Lamps &

(1) Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/3/2017

CIF Broker Bldg

BREAK

ROOM

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(2) Electronic Ballasts, Dual Switched, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED

Lamps, (1) 1/32 &

(1) 2/32 Elec. NP

Ballasts, Dual Switched

3/3/2017

CIF Broker Bldg VESTIBULE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(2) Electronic Ballasts, Dual Switched, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED

Lamps, (1) 1/32 &

(1) 2/32 Elec. NP

Ballasts, Dual

3/3/2017

Number Description PM Guide Number QTY FREQ

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

2X4 Relamp w/ (3) 4

Ft. TLED Lamps 4/18/2017

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

2X4 Relamp w/ (3) 4

Ft. TLED Lamps 4/18/2017

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

2X4 Relamp w/ (3) 4

Ft. TLED Lamps 4/18/2017

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

2X4 Relamp w/ (3) 4

Ft. TLED Lamps 4/18/2017

CIF Broker Bldg

CONFERENC

E ROOM

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

2X4 Relamp w/ (3) 4

Ft. TLED Lamps 4/18/2017

CIF Broker Bldg VESTIBULE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(2) Electronic Ballasts, Dual Switched, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED

Lamps, (1) 1/32 &

(1) 2/32 Elec. NP

Ballasts, Dual Switched

4/18/2017

CIF Broker Bldg HALLWAY

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(2) Electronic Ballasts, Dual Switched, Parabolic Lens

Relamp & Reballast w/ (3) 4 Ft. TLED

Lamps, (1) 1/32 &

(1) 2/32 Elec. NP

Ballasts, Dual Switched

3/3/2017

CIF Broker Bldg HALLWAY 2x4 Recessed Fixture w/

(3) F32T8 Lamps & (1) Dimmable Elec. Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. Dimmable

Ballast

3/3/2017

CIF Broker Bldg HALLWAY Exit Sign w/ LED 2 No Retrofit Proposed

4/11/2017

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

2X4 Relamp w/ (3) 4

Ft. TLED Lamps 4/18/2017

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

2X4 Relamp w/ (3) 4

Ft. TLED Lamps 4/18/2017

Number Description PM Guide Number QTY FREQ

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

2X4 Relamp w/ (3) 4

Ft. TLED Lamps 4/18/2017

CIF Broker Bldg OFFICE

2'x4' Recessed Troffer w/ (3) F32T8 Lamps &

(1) Electronic Ballasts, Parabolic Lens

2X4 Relamp w/ (3) 4

Ft. TLED Lamps 4/18/2017

CIF Broker Bldg

EXTERIOR

PERIMETER

HID Wallpack Fixture w/

(1) 70w High Pressure Sodium Lamp & Ballast

New LED Wall Pack

Fixture, 26w 4/18/2017

CIF Broker Bldg

EXTERIOR

VESTIBULE

Downlight Fixture w/ 50w HPS Lamp & Ballast

Downlight LED

Retrofit Kit, 18w, 10 In.

3/16/2017

CIF Xray Facility

MECH

ROOM

4' Industrial Fixture w/

(2) F32T8 Lamps & (1)

Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/7/2017

CIF Xray Facility

XRAY

ROOM

HID High Bay Fixture w/

(1) 400w Metal Halide

Lamp & Ballast

New LED High Bay Fixture, 150w

3/7/2017

CIF Xray Facility

XRAY

ROOM

Exit Sign w/ LED 3

No Retrofit Proposed

4/11/2017

CIF Xray Facility

INSPECTION

BOOTH

4' Wrap Fixture w/ (2) F32T8 Lamps & (1) Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

3/7/2017

CIF Xray Facility

DRIVER

WAITING

ROOM

2x4 Surface Mount Fixture w/ (3) F32T8 Lamps & (1) NP Elec.

Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/7/2017

CIF Xray Facility BATHROOM

2x4 Surface Mount Fixture w/ (3) F32T8 Lamps & (1) NP Elec.

Ballast

Relamp & Reballast w/ (3) 4 Ft. TLED Lamps & (1) 3/32 Elec. NP Ballast

3/7/2017

CIF Xray Facility

EXTERIOR

PERIMETER

Wall Pack Fixture w/ 400w HPS Lamp &

Ballast

New LED Wall Pack Fixture, 104w

3/16/2017

CIF Xray Facility

GANTRY

BUILDING

Induction Wallpack Fixture w/ (1) 100W

Induction Lamp

No Retrofit Proposed

4/11/2017

Number Description PM Guide Number QTY FREQ

CIF Xray Facility OFFICE 2x4 Recessed Fixture w/

(2) F28T5 Lamps & (1) Elec. Ballast

Relamp & Reballast w/ (2) 41 In. TLED

Lamps & Elec.

Ballast

4/12/2017

CIF Xray Facility OFFICE Exit Sign w/ LED and battery backup

No Retrofit Proposed

4/11/2017

CIF Xray Facility

JANITORIAL

MECHANIC

AL ROOM

4' Industrial Fixture w/

(2) F32T8 Lamps & (1)

Electronic Ballast

Relamp & Reballast w/ (2) 4 Ft. TLED Lamps & (1) 2/32 Elec. NP Ballast

4/12/2017

CIF Xray Facility CLOSET 2x4 Recessed Fixture w/

(2) F28T5 Lamps & (1) Elec. Ballast

Relamp & Reballast w/ (2) 4 Ft.

This is the start of the file's text. The full file is on GovTribe.