ContractPriceFormSF1442Pg3.docx

DOCX document 21 KB Posted

Attached to
CIT FACADE UPGRADE CONSTRUCTION
Solicitation number
47PC0318R0009
Issued by

About this file

PRICING SHEET page 3 of SF 1442

View the file

Other files

File Type Posted
Amendment_6_SF_30.docx DOCX document
Amendment_3.pdf PDF
CIT_site_visit_preproposattendance_list_10-30-18.pdf PDF
SF1442-14b_CIT_10-12-2018_2.pdf PDF
SF24-16.pdf PDF
Attach3PastPerformance.docx DOCX document
New_York_State_Tax_Notice.pdf PDF
Attach1ExperienceSummary.docx DOCX document
GSA_-_527-_Qualification_and_Financial_Information.pdf PDF
Attach2ProjectFactSheet.docx DOCX document
Solicitation.pdf PDF
SF1442-14b_CIT_10-12-2018_3.pdf PDF
DavisBaconWageRate.pdf PDF
DraftGCAgreement.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIT CONSTRUCTION Solicitation No: 47PC03-18-R0009 Page 3 of SF 1442

CONTRACT PRICE FORM FOR:

The Court of International Trade Façade Upgrades Project located at One Federal Plaza, New York, NY 10278.

SOLICITATION NUMBER:

Instructions to Offerors: The provided pricing sheet includes the following:

1) – Lump Sum Base Bid price to complete Fragment Retention Film Installation for interior vision glass at the Lobby and for Floors 2-8 and the Façade Hardening of vulnerable areas on the East, North and West facades, as shown on the Drawings and as specified in the Project Manual.

2) – Option 1: Additional Fragment Retention Film specified in Division 08 Section 088716 “Protective Window Film” for application at Pedestrian Bridge Curtain Wall linking the CIT with the adjacent Federal Office Building, as indicated on the Drawings, labeled “Option No. 1”

Refer to GSA Division One Specification Section 01 24 00 – Options for additional information regarding Options 1-2.

The CIT Façade Upgrades Project

ITEM DESCRIPTION
SUBTOTAL COST
Total Lump Sum Base Bid for all work to install Fragment Retention Film on Vision Glass at CIT and all Façade Hardening at vulnerable areas on three (3) facades, as indicated on Drawings and as specified in the Project Manual (Period of Performance: Substantial completion within 379 calendar days of NTP. Contract Completion within 30 calendar days of Substantial Completion)
$
Add Option No. 1: Pedestrian Bridge Additional Fragment Retention Film Installation (Period of Performance: If exercised, Option No. 1 must be substantially completed within the same substantial completion period of performance as the Base Bid. Option No. 1 must be completed by the same completion date as the Base Bid contract completion date).
$
Total Evaluated Offer –Sum of Lump Sum Base Bid Plus Option 1
$

File details come from the government source that posted it.