461A003.pdf

PDF 1016 KB Posted

Attached to
B50 Cooling Tower Fan Assembly Replacement
Solicitation number
1412212678
Issued by
Florida

About this file

This is a Scope of Work document for the Florida state contract opportunity B50 Cooling Tower Fan Assembly Replacement at Brandy Branch Generating Station. The project involves the removal and disposal of ten existing FRP fan hub assemblies from a Marley F499A-4.0-10B cooling tower and the installation of ten new fan hub assemblies, including blades, hub plates, blade clamps, hardware, and fan seal discs. The contractor must provide all labor, materials, equipment, and supervision necessary to complete the work while protecting the cooling tower structure throughout removal and installation activities. A mandatory pre-response meeting is scheduled for August 31, 2026 at 10:00 AM, with responses due by September 22, 2026.

The document specifies technical requirements for the fan assembly components and installation procedures to ensure proper fit and function of the replacement assemblies on the existing cooling tower. The contractor must adhere to safety protocols and operational standards during all work activities to prevent damage to the cooling tower infrastructure. Additional details regarding pricing terms, performance specifications, warranty requirements, and any specific material certifications or testing standards are contained within the full scope of work documentation.

View the file

Other files

File Type Posted
M01-1139B.pdf PDF
461A002.pdf PDF
1412212678 Solicitation.pdf PDF
1412212678 JEA Bid Bond.pdf PDF
1412212678 Appendix B- Subcontractor Form.xlsx XLSX spreadsheet
1412212678 Appendix B - Bid Forms.pdf PDF
1412212678 - Appendix A - Technical Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .