45579.pdf
PDF 2 MB Posted
- Solicitation number
- 45579
- Issued by
- Illinois
About this file
This is a sealed bid solicitation document issued by the City of Chicago Department of Procurement Services (Specification Number 1310005) for Hilti tools replacement parts and services to support the Chicago Department of Transportation (CDOT). The solicitation seeks two primary line items: (1) Hilti replacement parts and tools offered at a discount from Hilti's list price with an estimated quantity of 3,000,000 units, and (2) repair services for Hilti tools and equipment with labor to repair estimated at 1,500 hours. The pre-solicitation conference is scheduled for September 29, 2026, at 11:00 AM Central Time at City Hall, Department of Procurement Services, 121 North LaSalle Street, Room 806, Chicago, Illinois. The deadline for bidder questions is October 6, 2026, at 4:00 PM Central Time. Bids must be submitted electronically through the City's iSupplier portal by 11:00 AM Central Time on October 29, 2026. The contract term is thirty-six (36) months. Award date is not specified. No site visit is required.
This is a Target Market contract restricted to invited suppliers, with special conditions regarding Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) commitment requirements. The contract will be awarded as a Blanket Purchase Agreement with immediate payment terms and FOB freight terms. Bidders must be authorized dealers or distributors of Hilti and provide manufacturer warranties and genuine parts. Funding is provided by the City of Chicago with Fund Number 026-0100-0812020-0157-220157-0000 and various other sources. Bidders are required to submit an Economic Disclosure Statement (EDS), Certificate of Insurance, Sexual Harassment Policy Affidavit, and all required MBE/WBE documentation including Schedule B-2, Schedule C-2, Schedule D-2, and Letters of Certification. Pricing must incorporate all costs including delivery, training, materials, labor, insurance, applicable taxes, warranty, overhead, and profit. No bid deposit or performance bond is specified as required. The solicitation includes multiple statutory bid adjustments and preferences including Chicago Business Preference, Local Goods Incentive, Alternatively Powered Vehicles Bid Incentive, and Veteran-Owned Small Local Business incentives where applicable.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City Of Chicago Solicitation #45579
BRANDON JOHNSON SHARLA ROBERTS
MAYOR CHIEF PROCUREMENT OFFICER
Specification Number: 1310005 Type of Funding:
Title: HILTI TOOLS REPLACEMENT PARTS AND SERVICES (TARGET MARKET)
Work Service Solicitation #45579 (BID)
HILTI TOOLS REPLACEMENT PARTS AND SERVICES (TARGET MARKET)
Specification Number:1310005
Required for use by: CHICAGO DEPARTMENT OF TRANSPORTATION
Bid/Proposal Submittal Date and Time: 11:00 AM Central Time, 29-OCT-2026
Deadline for Questions: 04:00 PM Central Time, 06-OCT-2026 Buyer: DOTSON, WILLIAM Email Address: William.Dotson@cityofchicago.org Phone Number: 3127444924 Pre-Solicitation Conference Date and Time: 11:00 AM Central Time, 29-SEP-2026 Pre-Solicitation Conference Location: CITY HALL, DEPARTMENT OF PROCUREMENT SERVICES, 121 NORTH LASALLE STREET, ROOM 806, CONFERENCE ROOM (B), CHICAGO, IL 60602
Site Visit Date & Time: N/A Site Visit Location: N/A
Please submit your response to:
http://www.cityofchicago.org/eProcurement iSupplier vendor portal registration is required.
Allow 3 business days to complete registration.
Specification Number: 1310005 Page 2 Type of Funding:
Title: HILTI TOOLS REPLACEMENT PARTS AND SERVICES (TARGET MARKET)
Table of Contents
1 Header Information
1.1 General Information
1.2 Terms
1.3 Requirements
1.4 Attachments
1.5 Response Rules
2 Price Schedule
2.1 Line Information
2.2 Line Details
2.2.1 Line 1
2.2.2 Line 2
Specification Number: 1310005 Page 3 Type of Funding:
Title: HILTI TOOLS REPLACEMENT PARTS AND SERVICES (TARGET MARKET)
1 Header Information
1.1 General Information
Title HILTI TOOLS REPLACEMENT PARTS AND SERVICES (TARGET
MARKET)
Description HILTI TOOLS REPLACEMENT PARTS AND SERVICES (TARGET
MARKET)
Preview Date 16-SEP-2026 10:00:00 Open Date 16-SEP-2026 10:00:00
Close Date 11:00 AM Central Time, 29-OCT-2026
Award Date Not Specified
Time Zone Central Time Buyer DOTSON, WILLIAM Quote Style Sealed Email William.
Dotson@cityofchicago.org Event Work Service Outcome Blanket Purchase Agreement
1.2 Terms
Effective Start Date Not Specified Effective End Date Not Specified
Ship-To Address 084- CDOT RM-1100
ADMINISTRATION
2 N. LASALLE ST.
RM 1100
Chicago, IL 60602 United States
Bill-To Address 084- CDOT RM400
30 N. LA SALLE ST.
ROOM 400
Chicago, IL 60602 United States
Payment Terms IMMEDIATE Carrier FOB Freight Terms
Total Agreement Amount (USD)
Not Specified Minimum Release Amount (USD)
Not Specified
1.3 Requirements
<B>KEY SOLICITATION PARAMETERS</B>
CITY BUSINESS PREFERENCE:
Type No Response Required
LOCAL MANUFACTURE PREFERENCE:
Type No Response Required
ALTERNATIVE FUEL VEHICLE PREFERENCE:
Type No Response Required
CONTRACT SPECIFIC GOALS: NON STATED GOALS
Type No Response Required
FUNDING SOURCE: CITY
Type No Response Required
FUND NUMBER: 026-0100-0812020-0157-220157-0000 AND VARIOUS
Type No Response Required
DPS UNIT: GOODS & SERVICES
Type No Response Required
EXHIBITS: FIVE (5)
Type No Response Required
Specification Number: 1310005 Page 4 Type of Funding:
Title: HILTI TOOLS REPLACEMENT PARTS AND SERVICES (TARGET MARKET)
<B>KEY SOLICITATION PARAMETERS</B>
Value Type Numeric Value only
CONTRACT TERM: NUMBER MONTHS - THIRTYSIX (36) MONTHS
Type No Response Required
PRE-BID/PRE-PROPOSAL CONFERENCE:
Type No Response Required
<B>BIDDER EXCEPTIONS</B>
Any deviations from or exceptions to any provisions or requirements of the bidding documents, including but not limited to the specifications of the goods and/or services to be provided, must be noted here or in an attachment, with the exact nature of the change outlined in sufficient detail, and as provided in the contract terms and conditions "Trade Names and Substitutions," as applicable. Bidder must provide the reason for which deviations were made. Failure of a bidder to comply with the terms of this paragraph may be cause for rejection of its bid.
Type Optional Provide your answer below
Enter the EDS number from your EDS Certificate and attach the certificate.
Value Type Numeric Value only Provide your answer below
<B>COMMODITIES/WORK
SERVICES/HEAVY EQUIPMENT/SMALL
ORDERS/CONSTRUCTION/JOC
CHECKLIST</B>
This is a checklist of all supporting documents that must be attached to your bid response. Attach all documents specified below. After attaching, click "YES" to indicate that the attachment was completed.
Type No Response Required
- Proposal Page completed, signed and notarized - (ALL)
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Corporation - (ALL)
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Partnership - (ALL)
Specification Number: 1310005 Page 5 Type of Funding:
Title: HILTI TOOLS REPLACEMENT PARTS AND SERVICES (TARGET MARKET)
<B>COMMODITIES/WORK
SERVICES/HEAVY EQUIPMENT/SMALL
ORDERS/CONSTRUCTION/JOC
CHECKLIST</B>
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Joint Venture - (ALL)
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Sole Proprietor - (ALL)
Circle one from the response values below:
YES
NO
- Bid Execution Page - (ALL)
Circle one from the response values below:
YES
NO
- Request for a reduction or waiver of MBE/WBE goals - (ALL)
Circle one from the response values below:
YES
NO
- Certificate of Filing of Economic Disclosure Statement and Affidavit (EDS) - (ALL)
Circle one from the response values below:
YES
NO
- Certificate of Insurance
Circle one from the response values below:
YES
NO
BID INCENTIVE / PREFERENCE AFFIDAVIT(S)
Type No Response Required
- Local Manufacture Affidavit - (ALL)
Circle one from the response values below:
YES
NO
- Chicago Business Affidavit - (ALL)
Circle one from the response values below:
YES
NO
- Alternatively Powered Vehicles affidavit - (ALL)
Circle one from the response values below:
YES
Specification Number: 1310005 Page 6 Type of Funding:
Title: HILTI TOOLS REPLACEMENT PARTS AND SERVICES (TARGET MARKET)
<B>COMMODITIES/WORK
SERVICES/HEAVY EQUIPMENT/SMALL
ORDERS/CONSTRUCTION/JOC
CHECKLIST</B>
NO
- Copy of current Registration for Authority to Deal in Vehicles issued by the Illinois Secretary of State (Vehicle/Heavy Equipment)
Circle one from the response values below:
YES
NO
- Evidence validating the Contractor’s current status of authorized dealer or distributor of the manufacturer of the proposed vehicles and/or parts (Vehicle/Heavy Equipment)
Circle one from the response values below:
YES
NO
- Literature / Data (i.e. Manufacturer's published literature for the proposed vehicle) (if required) (Vehicle/Heavy Equipment)
Circle one from the response values below:
YES
NO
- Manuals, Certificates, Applications(if required)
Circle one from the response values below:
YES
NO
- Bidder Contact Information - (ALL)
Circle one from the response values below:
YES
NO
- Bidder qualifications and/or certifications, permits, licenses, vehicle stickers, etc. (if required)
Circle one from the response values below:
YES
NO
M/WBE DOCUMENTS: Special Conditions Regarding Minority Business Enterprise Commitment and Women Business Enterprise Commitment For Target Market Contracts
Type No Response Required
- Schedule B.2 - Affidavit of MBE/WBE Target Market Joint Venture
Circle one from the response values below:
YES
NO
- Schedule C-2 - Letter of Intent To Perform As a Subcontractor or Supplier - (ALL)
Circle one from the response values below:
YES
NO
-Schedule D-2 - Letter of Intent to Perform as a Subcontractor, Supplier, or Consultant
Circle one from the response values below:
YES
Specification Number: 1310005 Page 7 Type of Funding:
Title: HILTI TOOLS REPLACEMENT PARTS AND SERVICES (TARGET MARKET)
<B>COMMODITIES/WORK
SERVICES/HEAVY EQUIPMENT/SMALL
ORDERS/CONSTRUCTION/JOC
CHECKLIST</B>
NO
- Letters of Certification for Target Market and MWBE - (ALL)
Circle one from the response values below:
YES
NO
1.4 Attachments
Name Data Type Description
ATTACHMENT 01: SCOPE
OF WORK
File SCOPE OF WORK
1.5 Response Rules
Solicitation is restricted to invited suppliers Suppliers are allowed to view other suppliers' contract terms, notes and attachments Suppliers are allowed to respond to selected lines X Suppliers are allowed to provide multiple responses Buyer may close the solicitation before the Close Date Buyer may manually extend the solicitation while it is open
Specification Number: 1310005 Page 8 Type of Funding:
Title: HILTI TOOLS REPLACEMENT PARTS AND SERVICES (TARGET MARKET)
2 Price Schedule
2.1 Line Information
Display Rank As No indicator displayed
Ranking Price Only Cost Factors None
Line Item, Rev / Job
Target Quantity
Unit Unit Price Amount
1 HILTI
REPLACEMENT
PARTS AND TOOLS
DISCOUNT FROM
HILTI LIST PRICE
3,000,00
Discount From List
2 REPAIR OF HILTI
TOOLS AND
EQUIPMENT -
LABOR TO REPAIR
1,500 Hour
2.2 Line Details
2.2.1 Line 1 HILTI REPLACEMENT PARTS AND TOOLS DISCOUNT FROM HILTI LIST
PRICE
Category 44598.43 Start Price (USD) Not Specified Shopping Category Not Specified Target Price (USD) Not Specified Minimum Release
Amount (USD) Not Specified
Estimated Total Amount (USD)
Not Specified
2.2.2 Line 2 REPAIR OF HILTI TOOLS AND EQUIPMENT - LABOR TO REPAIR Category 93641. Start Price (USD) Not Specified
Shopping Category Not Specified Target Price (USD) Not Specified Minimum Release
Amount (USD) Not Specified
Estimated Total Amount (USD)
Not Specified
Hilti Tools Replacement Parts and Services, CDOT, Specification Number 1310005 Target Market Work Services Form Contract
Table of Contents i
Table of Contents
BID SUBMITTAL CHECKLIST
Article 1. Requirements for Bidding and Instructions to Bidders
1.1. The Bid Documents
1.2. Obtaining the Bid Documents
1.3. Clarifications and Addenda
1.4. Examination of the Bid Documents and Work Site
1.5. Pre-Bid Conference
1.6. Questions Regarding the Bid Documents; Bidder Inquiry Deadline
1.7. Exceptions
1.8. Taxes Included in Bid Prices
1.9. Bid Prices Must Incorporate All Costs
1.10. Completion of the Bid Documents
1.11. Conflicts of Interest
1.12. Technical Difficulties
1.13. Required Forms and Fees
1.13.1. Certificate of Filing for Online EDS
1.13.2. MBE/WBE: Target Market Contract
1.13.3. Bid Deposits and Bid Bonds
1.13.4. Performance and Payment Bonds
1.13.5. Contractor's Financial Statement
1.13.6. Other Required Forms and Documents
1.14. Trade Names and Substitutions
1.15. Authorized Dealer/Distributor
1.16. Estimated Quantities
1.17. Submission of Bids
1.17.1. Date, Time, and Place
1.17.2. Transparency Website; Trade Secrets
1.18. Withdrawal of Bids
1.19. Bid Opening
1.20. Effective Term of Bid
1.21. Evaluation of Bids
1.21.1. Determination of Responsiveness
1.21.1.1. Must Bid All Line Items
1.21.1.2. Mathematical Calculations
1.21.1.3. Unbalanced Bids
1.21.1.4. Cash Billing Terms
1.21.2. Determination of Responsibility
1.21.2.1. Bidder Debts or Defaults
1.21.2.2. Competency of Bidder
1.22. Rejection of Bids and Waiver of Informalities
1.23. Statutory Adjustments to the Bid
1.23.1. City-based Businesses (Chicago Business Preference)
1.23.2. Locally Manufactured Goods
1.23.3. Alternatively Powered Vehicles Bid Incentive
1.23.3.1. Definitions for Alternatively Powered Vehicles Bid Incentive
Table of Contents ii
1.23.3.2. Eligibility for Alternatively Powered Vehicles Bid Incentive
1.23.4. Bid Incentives for Veteran-Owned Small Local Businesses and Eligible Joint Ventures ... 12
1.23.4.1. Definitions
1.23.4.2. Bid Incentive
1.23.5. Business Enterprises Owned By People With Disabilities (BEPD) Commitment
1.23.5.1. Policy and Terms
1.23.5.2. Definitions
1.23.5.3. Commitments
1.23.5.4. Records and Reports
1.23.6. Mentoring Program Bid Preference (MCC 2-92-535)
1.23.7. Child Support Arrearage
1.23.8. Bid Incentive to Encourage Diverse Management and Workforce (MCC 2-92-407)
1.23.9. MacBride Principles Ordinance
1.24. Consideration of Bids
1.25. Bid Protests
1.26. Award of Contract; Notice of Award
1.27. Title VI Solicitation Notice
1.28. Policy Prohibiting Sexual Harassment (MCC 2-92-612)
1.29. Policy Regarding Non-Disclosure of Salary History (MCC 2-92-385)
Article 2. Incorporation of Exhibits Article 3. Standard Terms And Conditions
3.1. General Provisions
3.1.1. Definitions
3.1.2. Interpretation of Contract
3.1.2.1. Order of Precedence
3.1.2.2. Interpretation and Rules
3.1.2.3. Severability
3.1.2.4. Entire Contract
3.1.3. Subcontracting and Assignment
3.1.3.1. No Assignment of Contract
3.1.3.2. Subcontracts
3.1.3.3. No Pledging or Assignment of Contract Funds Without City Approval
3.1.3.4. City’s Right to Assign
3.1.3.5. Assigns
3.1.4. Contract Governance
3.1.4.1. Governing Law and Jurisdiction
3.1.4.2. Consent to Service of Process
3.1.4.3. Cooperation by Parties and between Contractors
3.1.4.4. No Third Party Beneficiaries
3.1.4.5. Independent Contractor
3.1.4.6. Authority
3.1.4.7. Joint and Several Liability
3.1.4.8. Notices
3.1.4.9. Amendments
3.1.4.10. No Waiver of Legal Rights
3.1.4.11. Non-appropriation of Funds
3.1.4.12. Participation By Other Government Agencies
3.1.5. Confidentiality
Table of Contents iii
3.1.6. Indemnity
3.1.7. Non-Liability of Public Officials
3.1.8. Contract Extension For Continuity of Services
3.2. Compensation Provisions
3.2.1. Ordering, Invoices, and Payment
3.2.1.1. Purchase Orders
3.2.1.2. Invoices
3.2.1.3. Payment
3.2.1.4. Electronic Ordering and Invoices
3.2.1.5. City Right to Offset
3.2.1.6. Records
3.2.1.7. Audits
3.2.1.7.1. City’s Right to Conduct Audits
3.2.1.7.2. Recovery for Over-Billing
3.2.2. Subcontractor Payment Reports
3.2.3. Prompt Payment to Subcontractors
3.2.3.1. Incorporation of Prompt Payment Language in Subcontracts
3.2.3.2. Payment to Subcontractors Within Seven Days
3.2.3.2.1. Reporting Failures to Promptly Pay
3.2.3.2.2. Whistleblower Protection
3.2.3.3. Liquidated Damages for Failure to Promptly Pay
3.2.3.4. Action by the City
3.2.3.5. Direct Payment to Subcontractors By City
3.2.4. General Price Reduction – Automatic Eligibility for General Price Reductions
3.3. Compliance With All Laws
3.3.1. General
3.3.1.1. General Civil Rights Provisions
3.3.2. Certification of Compliance with Laws
3.3.3. Federal Affirmative Action
3.3.4. Civil Rights Act of 1964, Title VI, Compliance With Nondiscrimination Requirements
3.3.4.1. Title VI List of Pertinent Non-Discrimination Acts and Authorities
3.3.4.2. Compliance with Nondiscrimination Requirements
3.3.5. Other Non-Discrimination Requirements
3.3.5.1. Illinois Human Rights Act
3.3.5.1.1. Generally
3.3.5.1.2. State of Illinois Duties of Public Contractors (44 Ill. Admin. Code 750 et seq.)
3.3.5.1.3. State of Illinois Equal Employment Opportunity Clause
3.3.5.2. Chicago Human Rights Ordinance MCC Ch. 6-10 (formerly Ch. 2-160)
3.3.5.3. City of Chicago Equal Employment Opportunity Goals MCC 2-92-390
3.3.5.4. Business Enterprises Owned by People With Disabilities (BEPD)
3.3.6. Wages
3.3.7. Economic Disclosure Statement and Affidavit and Appendix A ("EDS")
3.3.7.1. Business Relationships With Elected Officials MCC Sect. 2-156-030(b)
3.3.7.2. MCC 1-23 and 720 ILCS 5/33E Bribery, Debts, and Debarment Certification
3.3.7.3. Federal Terrorist (No-Business) List
3.3.7.4. Governmental Ethics Ordinance 2-156
3.3.7.5. Lobbyists
3.3.8. Restrictions on Business Dealings
Table of Contents iv
3.3.8.1. Prohibited Interests in City Contracts
3.3.8.2. Conflicts of Interest
3.3.8.3. Prohibition on Certain Contributions, Mayoral Executive Order 2011-4
3.3.9. Debts Owed to the City; Anti-Scofflaw, MCC Sect. 2-92-380
3.3.10. Other City Ordinances and Policies
3.3.10.1. False Statements
3.3.10.2. MacBride Principles Ordinance, MCC Sect. 2-92-580
3.3.10.3. City Hiring Plan Prohibitions
3.3.10.4. Inspector General
3.3.10.5. Duty to Report Corrupt Activity
3.3.10.6. Electronic Mail Communication
3.3.10.7. Participation By Other Local Government Agencies
3.3.10.8. Policy Prohibiting Sexual Harassment (MCC 2-92-612)
3.3.10.9. Policy on Non-Disclosure of Salary History (MCC 2-92-385)
3.3.10.10. Business Diversity Program Reporting
3.3.10.10.1. Policy
3.3.10.10.2. Definitions
3.3.10.10.3. Business Diversity Program Reports
3.3.10.10.4. Applicability
3.3.11. COVID-19 Vaccination Policy
3.3.12. Compliance with Environmental Laws and Related Matters
3.3.12.1. Definitions
3.3.12.2. Joint Ventures
3.3.12.3. Compliance With Environmental Laws
3.3.12.4. Costs
3.3.12.5. Proof of Noncompliance; Authority; Cure
3.3.12.6. Copies of Notices and Reports; Related Matters
3.3.12.7. Requests for Documents and Information
3.3.12.8. Environmental Claims and Related Matters
3.3.12.9. Preference for Recycled Materials
3.3.12.10. No Waste Disposal in Public Way MCC 11-4-1600(E)
3.4. Contract Disputes
3.4.1. Procedure for Bringing Disputes to the Department
3.4.2. Procedure for Bringing Disputes before the CPO
3.5. Events of Default and Termination
3.5.1. Events of Default
3.5.2. Cure or Default Notice
3.5.3. Remedies
3.5.4. Non-Exclusivity of Remedies
3.5.5. City Reservation of Rights
3.5.6. Early Termination
3.6. Department-specific Requirements
3.6.1. Department of Aviation Standard Requirements
3.6.1.1. Confidentiality of Airport Security Data
3.6.1.2. Aviation Security
3.6.1.3. Airport Security Badges
3.6.1.4. General Requirements Regarding Airport Operations
3.6.1.4.1. Priority of Airport Operations
Table of Contents v
3.6.1.4.2. Interruption of Airport Operations
3.6.1.4.3. Safeguarding of Airport Property and Operations
3.6.1.4.4. Work on the Airfield
3.6.1.4.5. Parking Restrictions
3.6.1.5. General Civil Rights (Airport and Airway Improvement Act of 1982, Section 520) .. 54
3.6.1.6. Firearms and Other Weapons Prohibited
3.6.2. Emergency Management and Communications (OEMC) Security Requirements
3.6.2.1. Identification of Workers and Vehicles
3.6.2.2. Access to Facilities
3.6.2.3. Security Badges and Vehicle Permits
3.6.2.4. Gates and Fences
3.6.2.5. Hazardous or Illegal Materials
3.6.3. Chicago Police Department Security Requirements
3.6.4. Department of Water Management ("DOWM") Security Requirements
3.6.4.1. Identification of Workers and Vehicles
3.6.4.2. Access to Facilities
3.6.4.3. Security Badges and Vehicle Permits
3.6.4.4. Gates and Fences
3.6.4.5. Hazardous or Illegal Materials
Article 4. Terms for Work Services Contracts
4.1. The Services
4.1.1. Scope of Services
4.1.2. Estimated Quantities/Level of Service
4.1.3. Unspecified Services
4.2. Performance of the Services
4.2.1. Standard of Performance
4.2.2. Standard Working Hours
4.2.3. Character of Workers
4.2.4. Quality of Materials and Inspection
4.2.5. Manufacturer's Warranty and Product Information
4.2.6. Contractor's Warranties
4.2.6.1. Correction or Re-Performance of Services
4.2.6.2. Timeliness
4.2.6.3. Delay
4.2.7. Public Convenience
4.2.8. Clean Up
4.2.9. Work Performed on City Property
4.2.10. Work In Progress
4.3. Compensation
4.4. Submission of Invoices
4.5. Clean Diesel Fleet MCC 2-92-595
Article 5. Scope of Work and Detailed Specifications
5.1. General
5.2. Intent
5.3. Basis of Award
5.4. Illinois Prevailing Wage Act
5.5. Funding
5.6. Contract Term
Table of Contents vi
5.7. Contract Extension Option
5.8. Authorized Dealer
5.9. Manufacturer’s Warranty & Product Information
5.10. Price Lists/Catalogs (Line Item 1)
5.11. Price Adjustments
5.11.1. Price Adjustment Line Item 1
5.11.2. Price Adjustment Line Item 2)
5.12. Bid Line Items
5.13. Tools, Parts, and Accessories
5.14. Misshipment or Defective Merchandise
5.15. Acceptance of Tools, Parts and Repaired Equipment
5.16. Shop Facilities
5.17. Repair Proposals
5.18. City of Chicago Facilities
5.19. Proposal Pricing Repair Service Labor Rate
Article 6. Special Conditions Regarding Minority Business Enterprise Commitment and Women Business Enterprise Commitment For Target Market Contracts
6.1. Policy and Terms
6.2. Definitions
6.3. Eligibility
6.4. Procedure to Determine Bid Compliance
6.4.1. Schedule D-2
6.4.2. Schedule C-2
6.4.3. Letters of Certification
6.4.4. Target Market Joint Venture Agreements
6.5. Reporting Requirements During The Term Of The Contract
6.6. Advances and Expedited Payments
6.7. Compliance
6.8. Arbitration
6.9. Equal Employment Opportunity
6.10. Resource Agencies
Article 7. Insurance Requirements
7.1. Insurance Required from Contractor
7.1.1. Workers’ Compensation and Employer’s Liability (Primary and Umbrella)
7.1.2. Commercial General Liability
7.1.3. Automobile Liability
7.1.4. Umbrella or Excess
7.1.5. Valuable Papers (when applicable)
7.1.6. Blanket Crime (when applicable)
7.1.7. Garage Liability (when applicable)
7.1.8. Property (when applicable)
7.1.9. Builders Risk (when applicable)
7.1.10. Miscellaneous Medical Professional Liability (when applicable)
7.1.11. Railroad Protective Liability (when applicable)
7.1.12. Marine Protection & Indemnity (when applicable)
7.2. Additional Requirements
Article 8. Economic Disclosure Statement and Affidavit (EDS)
8.1. Online EDS Filing Required Prior To Bid Opening
Table of Contents vii
8.2. Online EDS Web Link
8.3. Online EDS Number
8.4. Online EDS Certification of Filing
8.5. Preparation Checklist for Registration
8.6. Preparation Checklist for EDS Submission
8.7. EDS Frequently Asked Questions
Article 9. PROPOSAL PAGES Article 10. Bidder Contact Information City-Based Business Affidavit Local Manufacturing Affidavit Eligible Business For Bid Incentive For Alternatively Powered Vehicles Affidavit Veteran-Owned Small Local Businesses And Eligible Joint Ventures Affidavit Bidder's Commitment To Utilize Business Enterprises Owned By People With Disabilities (BEPD) Mentoring Program Bid Preference Affidavit Diverse Management and Workforce Bid Incentives Affidavit ARTICLE 11. Execution And Acceptance Pages
11.1. Bid Execution By a Corporation
11.2. Bid Execution By A Joint Venture
11.3. Bid Execution By A Partnership
11.4. Bid Execution By a Sole Proprietor
11.5. Bid Acceptance by City
EXHIBITS
Exhibit 1: Insurance Certificate of Coverage Exhibit 2: SEXUAL HARASSMENT POLICY AFFIDAVIT (SECTION 2-92-612) Exhibit 3: MY COI Exhibit 4: Bid Spreadsheet Exhibit 5: Detailed Diverse Management Sheet
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 1
BID SUBMITTAL CHECKLIST
Missing Information, Documents, and/or Bonds May Invalidate Your Bid.
To help ensure that you are submitting a complete bid, place an "X" next to each item below after completing and incorporating the item into your bid package. Write “N/A” if an item does not apply to your bid.
1. _____ Bid Submittal Checklist
2. _____ Insurance Certificate of Coverage
3. _____ MBE/WBE Compliance Plan
a. _____ Schedule B-2 – Affidavit of MBE/WBE Target Market Joint Venture– (only if bidder is a joint venture)
b. _____ Schedule C-2: Letter(s) of Intent to Perform as Sub-contractor, Supplier or Consultant (if applicable).
c. _____ Schedule D-2: Affidavit of Target Market Prime Contractor (if applicable).
4. _____ Certificate of Filing of Economic Disclosure Statement and Affidavit (EDS)
5. _____ Bid incentive/preference affidavit(s): Chicago Business, Local Manufacture, Alternatively Powered Vehicles, Veteran-Owned Small Local Business or Eligible Joint Venture, Utilization of Veteran-Owned Subcontractors, Mentoring Program, Commitment Regarding BEPD, and/or Diverse Management and Workforce (if applicable)
6. _____ Proposal Page(s) (Schedule of Prices)
7. _____ Bid Execution Page
8. _____ Bid Deposit (if required)
9. _____ Sexual Harassment Policy Affidavit
10. _____ Documentation which validates its current status as manufacturer, authorized dealer or distributor
11. _____ Review of Section 5.3. Basis of Award for instructions on how to enter the discount percentage bid for bid line 1
NOTE: Each page requiring a signature must be signed by the person with proper authority and sworn before a Notary Public where noted.
NOTE: Each Bidder must acknowledge the receipt of a full set of Bid Documents and any and all Addenda at the top of the Bid Execution Page.
12.___ Article 10. Bidders Contact Information
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 2
ARTICLE 1. REQUIREMENTS FOR BIDDING AND INSTRUCTIONS TO BIDDERS
Read this carefully before preparing your bid.
1.1. The Bid Documents
This is an eProcurement Bid. Bids are to be submitted through the City’s “iSupplier” system, the City’s eProcurement computer system for electronic bidding and providing Contractors with access to contract, ordering and payment information for their City contracts.
The Bid Documents means all the documents issued by the Chief Procurement Officer, or referenced by the Chief Procurement Officer as being available in the iSupplier system and incorporated by such reference, in connection with an invitation for bids or proposals and include the various components of the solicitation which include the Cover Page, Legal Advertisement Notice, these Contract Terms and Conditions, the Detailed Specifications, Plans and Drawings (if any), Insurance Requirements, and all other attachments as listed in the iSupplier Header Information, “Attachments” section, and any and all Clarifications and Addenda issued by the City. Bid Proposal Pages, Requirements for Bidding and Instructions for bidding and the following provisions apply to this bid. Upon the award and execution of a contract pursuant to the Bid Documents, the Bid Documents become the Contract Documents.
1.2. Obtaining the Bid Documents
Bidders are solely responsible for obtaining all Bid Documents, including Clarifications and Addenda.
Documents may be downloaded from the Department of Procurement Services (“DPS”) website at the following URL:
http://www.cityofchicago.org/eProcurement
Click on “Current Bids”
In order to receive notice of clarifications and addenda, Bidders be registered for and log-in to iSupplier, search for the solicitation number, open the solicitation for review, accept the disclaimer. This will sign Bidders up for notifications.
Bid Document Holders are listed on the Bid & Bond Room Opportunity Take Out List. The Opportunity Take Our List is public information and is posted to the DPS web site at www.cityofchicago.org/TOL. To find Opportunity Take Out lists go to “Get Started Online” and search by the specification number.
1.3. Clarifications and Addenda
The City will send an email notification to suppliers who have indicated intent in a Bid that an addendum or clarification has been issued. The Clarifications and Addenda incorporated into the electronic bid document available at the following URL:
https://www.cityofchchicago.org/eProcurement
Suppliers that have indicated interest in a Bid will receive email notification that an addendum or clarification has been issued. There may be multiple Clarifications and Addenda. Failure to obtain Clarifications and/or Addenda, for whatever cause, will not relieve a Bidder from the obligation to bid accordingly to and comply with any changed or additional terms and conditions contained in the Clarifications and Addenda.
Electronic Acknowledgement of Clarifications and/or Addenda is mandatory to submit an electronic Bid. Any harm to the bidder resulting from failure to obtain all necessary documents, for whatever cause, will not be valid grounds for a protest against award(s) made under this bid Solicitation.
1.4. Examination of the Bid Documents and Work Site
Bidders are required to carefully examine all of the Bid Documents before completing the forms and submitting a Bid. If the specification calls for work to be performed onsite, Bidders are also required to inspect the site of the work to be performed, and familiarize itself with the conditions at the site that will affect the work.
http://www.cityofchicago.org/eProcurement http://www.cityofchicago.org/TOL https://www.cityofchchicago.org/eProcurement
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 3
A Bidder that is awarded a contract will be solely responsible for all costs arising from and associated with that Bidder’s (i) failure to comply with the requirements of the Bid Documents, including, without limitation, this requirement to inspect the Bid Documents and site of the work, and (ii) failure to include any costs or expense attributable to site conditions that could have reasonably been discovered through a site inspection or examination of the Bid Documents.
1.5. Pre-Bid Conference
The City will hold a Pre-Bid Conference at City Hall, Department of Procurement Services, 121 North LaSalle Street, Room 806, Conference Room (B), Chicago, Illinois, 60602, 11:00 a.m. Central Time on September 29, 2026 All parties interested in responding to this Specification are encouraged to attend in person.
All interested Attendees are encouraged to register in advance of the Pre-Proposal Conference. Attendees should send an e-mail to william.dotson@cityofchicago.org.
E-mail Subject line must read: enter Specification Title.
The City will answer questions and clarify the terms of the Specification at the Pre-Bid Conference. The City may respond both to questions posed on the day of the conference and to questions sent via online discussion in iSupplier prior to the conference
1.6. Questions Regarding the Bid Documents; Bidder Inquiry Deadline All inquiries regarding the Bid Documents or procurement process must be directed to the Procurement Specialist/Senior Procurement Specialist via online discussion in iSupplier or via the address listed on the front cover of the Bid Documents.
The Bidder Inquiry Deadline is listed on the front cover of the Bid Documents under “Deadline for Questions.” Inquiries received after the Bidder Inquiry Deadline will not be answered except at the discretion of the Chief Procurement Officer.
Bidders may only rely on written answers in a Clarification or in an Addendum duly issued by the Chief Procurement Officer. Bidders cannot rely on oral or informal responses; such answers will not be binding upon the City.
1.7. Exceptions
Any deviations from or exceptions to any provisions or requirements of the Bidding documents, including but not limited to the specifications of the goods and/or services to be provided, must be noted on the Proposal Page(s) or attached thereto, with the exact nature of the change outlined in sufficient detail, and as provided below under “Trade Names and Substitutions,” as applicable. Bidder must provide the reason for which deviations were made. Failure of a Bidder to comply with the terms of this paragraph may be cause for rejection of its Bid.
If a Bidder takes exception to or deviates from any provision or requirement, the Chief Procurement Officer shall reject the Bid as non-responsive in the event that the Chief Procurement Officer, in his or her sole opinion, determines such exception(s) or deviations to be material.
1.8. Taxes Included in Bid Prices
With few exceptions, materials purchased by the City of Chicago are not subject to the Federal Excise Tax.
The Illinois Retailers’ Occupation Tax, Use Tax, and Municipal Retailers’ Occupation Tax do not apply to materials or services purchased by the City of Chicago.
Bidders shall include all other applicable federal, state and local taxes, direct or indirect, in their Bid Prices.
1.9. Bid Prices Must Incorporate All Costs
Bid pricing must incorporate any/all peripheral costs including, but not limited to the costs of products/services, delivery/transportation charges, training, materials, labor, insurance, applicable taxes, warranty, overhead and profit, etc. that are required by the Bid Documents.
1.10. Completion of the Bid Documents
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 4
Bids for this Specification must be submitted electronically through iSupplier. Each Bidder must complete all of the forms listed on the Bid Submittal Checklist (with the exception of the Proposal Pages) in the Requirements section and scan and upload them as attachments to the electronic bid submission via iSupplier. Bidders may not change any of the Bid Documents. Any changes made by a Bidder to the Bid Documents may result in rejection of the Bid, and will not be binding upon the City.
Bidders must submit their pricing electronically by filling out bid lines in the electronic Price Schedule in the iSupplier system.
Bidders must use the Bid Execution Page that is appropriate for their form of business organization (e.g. sole proprietorship, corporation, partnership, or joint venture). The individual(s) that sign the Bid Execution Page on behalf of the Bidder, by their signature, represents and warrants to the City that such individual is authorized to execute bids and contracts on behalf of the Bidder, and that the Bidder agrees and shall be bound to all of the terms and conditions of the Bid Documents and, upon execution by the City, the Contract Documents, Signatures must be sworn before a Notary Public. The form must be printed, signed, notarized and scanned then uploaded as an attachment to the electronic bid submission.
1.11. Conflicts of Interest
If any Bidder (or any partner in a joint venture or partnership or any member of the limited liability company if the Bidder is a joint venture, partnership, LLP, or LLC) has assisted the City in the preparation of these Bidding Documents such that provision of such assistance would give Bidder an unfair advantage or otherwise impair the integrity of the procurement process, or if Bidder has an organizational conflict of interest that might compromise Bidder’s ability to perform the contract, that Bidder may be disqualified from bidding. If applicable, Bidder must provide a statement and information disclosing its participation with respect to the Bid Documents and/or potential organizational conflicts of interest.
1.12. Technical Difficulties
The bidder is solely responsible for ensuring timely submission of their electronic solicitation response.
Failure to allow adequate time prior to the Bid Opening to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the bidder and their response at risk of not being accepted on time. The bidder is advised that the iSupplier system requires acknowledgement of a disclaimer and an electronic signature before a solicitation response is accepted. The bidder is further advised that the iSupplier system checks for the completion of system-required fields before allowing the bidder to electronically sign and submit their response electronically. Bidders who wait until nearly the time of Bid Opening may not be allowed to sign and submit their document due to missing required fields.
Should the bidder encounter technical difficulty with their bid submission, the bidder must contact the City’s eProcurement Help Desk at 312-744-HELP or customersupport@cityofchicago.org, Monday through Friday, 8:30 a.m. to 4:30 p.m., excluding City holidays.
1.13. Required Forms and Fees
1.13.1. Certificate of Filing for Online EDS
Bidders must complete an online EDS prior to the bid due date. A Bidder who does not file an electronic EDS prior to the bid due date may be found non-responsive and its bid rejected. If you are unable to complete the EDS online and print a Certificate of Filing prior to the response due date, the City will accept a paper EDS provided written justification is provided explaining the Bidders good faith efforts to complete it before the response due date and the reasons why it could not be completed. Refer to the Instructions for Completing Economic Disclosure Statement and Affidavit On-Line.
1.13.2. MBE/WBE: Target Market Contract
This contract has been issued under the Target Market Program. The rules, regulations and requirements of the program are set out in "Target Market Special Conditions Regarding (MBE/WBE) Minority Business Enterprise and Women Business Enterprise Commitment Non-Construction Service/General Equipment & Supplies" (“M/WBE Special Conditions”).
• Schedule B-2: Affidavit of MBE/WBE Target Market Joint Venture
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 5
• Schedule C-2: Letter of Intent from Subcontractor, Supplier and/or Consultant to Perform
• Schedule D-2: Affidavit of Target Market Subcontractors
1.13.3. Bid Deposits and Bid Bonds
If a bid deposit is required, it will be indicated on the front cover of the Bid Documents.
When submitting an electronic bid, scan and upload a copy of your bid deposit with your submittal documents. The 1st and 2nd apparent low bidders will be required to deliver their original and properly executed bid deposit to the Bid and Bond Room within two business days following the Bid Opening Date.
1.13.4. Performance and Payment Bonds
If a performance and payment bond is required, failure to provide the required bond within the required time period when requested will result in rejection of the bid and forfeit of the bid deposit, if a deposit was required. The forfeiture shall not limit any other City remedies against the Bidder. Performance and payment bonds must be in the form specified by the City, a specimen of which will be attached to the Bid Documents as an exhibit or available from the Bid & Bond Room.
MCC Section 2-92-040 requires that the surety be listed as a certified surety in the current edition of U.S.
Treasury Department Circular 570 and have an underwriting limitation in that publication in an amount greater than the amount bid. Circular 570 is available at www.fms.treas.gov/c570. Co-sureties may be accepted in the sole discretion of the CPO, but each co-security must individually meet the requirement.
Reinsurance may not be used to achieve a sufficient underwriting limitation.
If a performance and payment bond is required to be provided prior to contract award, it will be indicated on the front cover of the Bid Documents.
1.13.5. Contractor's Financial Statement
If requested by the Chief Procurement Officer, Bidder must file a "Contractor's Statement of Experience and Financial Condition" dated not earlier than the end of Bidder's last fiscal year period. The "Contractor's Statement of Experience and Financial Condition" will be kept on file as a representative statement for one year. The "Contractor's Statement of Experience and Financial Condition" forms are available in the Bid & Bond Room, City Hall Room 103, Chicago, IL 60602, or may be downloaded at https://www.chicago.gov/dam/city/depts/dps/ContractAdministration/StandardFormsAgreements/cont ractorsstatementexperiencefinancialcondition.pdf. Failure to provide a "Contractor's Statement of Experience and Financial Condition" if requested may be cause for rejection of the Bid.
1.13.6. Other Required Forms and Documents
Other forms required to be provided with the Bid include:
• Insurance Certificate of Coverage
• Sexual Harassment Policy Affidavit
• Economic Disclosure Statement and Affidavit (“EDS”)
• DBE or MBE/WBE compliance forms as applicable
• Proposal Page(s) (Schedule of Prices)
• Bid Execution Page
1.14. Trade Names and Substitutions
Reference to a specific manufacturer or trade name in this solicitation is intended to be descriptive (but not restrictive) and to indicate to prospective bidders those product(s) that have been deemed by the City to be satisfactory. The Bidder must, if awarded the Contract, provide the product(s) specified, unless equivalent alternatives have been proposed as described below and found acceptable to the Chief Procurement Officer.
A Bidder that chooses to respond to this solicitation for bids with alternate product(s) from those specified in the solicitation, must identify such alternate items with its Bid with a detailed explanation and
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 6 documentation in support of how the alternate items proposed by the Bidder can perform as well as or better than those specified. Unless an alternate item is so identified, it is understood that the Bidder proposes, and will be required to provide, the specific item described in the specifications. No substitution of specified items will be allowed thereafter except as otherwise provided for in the specifications.
Documentation in support of alternate items includes:
1) Complete data substantiating compliance of proposed alternate items with requirements stated in the solicitation, including:
a) Product identification, including manufacturer's name and address.
b) Manufacturer's literature identifying:
i) Product description
ii) Reference standards
iii) Performance and test data
c) Samples, as applicable
d) Name and address of similar projects on which the product has been used, and date of usage.
2) Itemized comparison of the proposed alternate item with product or service specified; listing of significant variations.
A Bidder warrants and represents that in making a formal request for substitution with alternate items that:
1) The proposed alternate item is equivalent to or superior in all respects to the product specified, and
2) The same warranties and guarantees will be provided for the alternate item as for the product specified.
The CPO may, in his or her sole discretion, accept an alternate item for a specified item, provided the alternate item so bid is, in the CPO’s sole opinion, the equivalent of the item specified in the solicitation. An alternate item that the CPO determines not to be equivalent to the specified item shall render the bid non-responsive and the CPO shall reject the bid.
1.15. Authorized Dealer/Distributor
For bids involving the furnishing of equipment or other goods that are subject to manufacturer warranties that require sale or installation by authorized dealers or distributors, the Contractor must be the manufacturer or an authorized dealer/distributor of the proposed manufacturer and be capable of providing genuine parts, assemblies and/or accessories as supplied by the manufacturer. Further, the Contractor must be capable of furnishing original product warranty and manufacturers related services such as product information, product recall notices, etc. The Bid Documents will typically ask the Bidder to certify that it is an authorized dealer/distributor when this requirement is applicable. The Bidder's compliance with these requirements will be determined by the CPO, whose decision will be binding.
1.16. Estimated Quantities
Unless explicitly stated to the contrary in the Scope of Work, Detailed Specifications, or Proposal pages, any quantities shown on the Proposal Pages represent estimated usage and as such are for bid canvassing purposes only. The City reserves the right to increase or decrease quantities ordered. Nothing herein will be construed as intent on the part of the City to procure any goods or services beyond those determined by the City to be necessary to meet its needs.
The City will only be obligated to order and pay for such quantities as are from time to time ordered, performed and accepted on Blanket Releases issued directly by the Department.
1.17. Submission of Bids
1.17.1. Date, Time, and Place
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 7
Bids are to be submitted electronically to the Department of Procurement on the date and prior to the time stated on the Cover Page of the Bid Documents, or any issued by the City to change such Bid Opening Date. No bid will be accepted after the Bid Opening Date. The time of the receipt of the bid will be determined solely by the “Time of Quote” generated by the iSupplier system. PAPER BIDS WILL NOT
BE ACCEPTED.
1.17.2. Transparency Website; Trade Secrets
Consistent with the City's practice of making available all information submitted in response to a public procurement, all bids, any information and documentation contained therein, any additional information or documentation submitted to the City as part of this solicitation, and any information or documentation presented to City as part of negotiation of a contract or other agreement may be made publicly available through the City's Internet website.
However, Bidders may designate those portions of a Bid which contain trade secrets or other proprietary data ("Data") which Bidder desires remain confidential.
To designate portions of a Bid as confidential, Bidder must:
A. Mark the cover page as follows: "This bid includes trade secrets or other proprietary data.”
B. Mark each sheet or Data to be restricted with the following legend: "Confidential: Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this bid."
C. Upload into iSupplier a redacted copy of the entire bid or submission in .pdf format for posting on the City's website. Bidder is responsible for properly and adequately redacting any Data which Bidder desires remain confidential. If entire pages or sections are removed, they must be represented by a page indicating that the page or section has been redacted. Failure to provide a CD-ROM with a redacted copy may result in the posting of an un-redacted copy.
D. Provide a written explanation of the basis under which each redacted item has been deemed confidential, making reference to the Illinois Freedom of Information Act (5 ILCS 140/1 et seq.).
Indiscriminate labeling of material as "Confidential" may be grounds for deeming a bid as non-responsive.
All Bids submitted to the City are subject to the Freedom of Information Act. The City will make the final determination as to whether information, even if marked "confidential," will be disclosed pursuant to a request under the Freedom of Information Act, valid subpoena, or other legal requirement. Bidder agrees not to pursue any cause of action against the City with regard to disclosure of information.
1.18. Withdrawal of Bids
Bidders may withdraw their Bid at any time prior to the date and time for Bid opening. Requests for withdrawal must be made in writing on the Bidder’s letterhead to the Bid & Bond Room. Bidders must make their own arrangements for the return of their Bids.
1.19. Bid Opening
Bids will be opened and read publicly in the Bid & Bond Room by the Department of Procurement Services immediately after the deadline for the submission of Bids has passed. Announcement of the Bids and the apparent low Bidder are neither final nor binding. All Bids and Bid Documents are subject to review by the Department of Procurement Services to determine the lowest responsive and responsible bidder and whether a contract will be awarded.
Bid tabulations are public information and are posted on the City's website www.cityofchicago.org/BidTab.
URL is case sensitive. Select “Get Started Online” and search by specification number.
1.20. Effective Term of Bid
Unless a Bid is expressly rejected by the Chief Procurement Officer, all Bids will remain in effect for ninety
(90) days subsequent to the Bid opening. The City may request that Bidders extend the effective period of their Bids. Such requests shall be in writing, and will require the Bidders’ written consent to the extension.
City-Funded: Requirements for Bidding and Instructions for Bidders (non-construction) 03.29.2022 8
Bidder may not withdraw or cancel or modify its Bid for a period of ninety (90) calendar days after the advertised closing time for the receipt of Bids. The City reserves the right to withhold and deposit, as liquidated damages, the bid deposit of any bidder requesting withdrawal, cancellation or modification of its Proposal prior to the ninety (90) day period.
1.21. Evaluation of Bids
1.21.1. Determination of Responsiveness
DPS will review Bids to determine whether they conform to the requirements of the Bid Documents.
1.21.1.1. Must Bid All Line Items
The Bidder must bid all Line Items set forth on the Proposal Pages, except to the extent that the Specification expressly allows otherwise. Bids submitted to the contrary will be considered incomplete and as a result, will be rejected as being non-responsive to this requirement.
Per the Basis of Award, if Contract(s) will be awarded per Group, Bidders must bid all items within a Group, except to the extent that the Specification expressly allows otherwise, but Bidders are not required to bid all Groups. Bids submitted to the contrary will be considered incomplete and as a result, will be rejected as being non-responsive to this requirement.
1.21.1.2. Mathematical Calculations
The Chief Procurement Officer reserves the right to make corrections, after receiving the bids, to any clerical error apparent on the face of the bid, including but not limited to obviously incorrect units or misplaced decimal points, or arithmetic errors. In the event that comparison of the Bidder's "Unit Price" and "Total Price" submitted for any line item reveals a calculation error, the Unit Price will prevail.
1.21.1.3. Unbalanced Bids
The Chief Procurement Officer reserves the right to reject any Bid that, in his or her sole discretion and authority, determines is materially unbalanced.
1.21.1.4. Cash Billing Terms
Cash billing discounts offered will not be considered in the evaluation of bids.
1.21.2. Determination of Responsibility
The determination of the responsibility of a Bidder is within the sole discretion and authority of the Chief Procurement Officer.
The Chief Procurement Officer may request any Bidder to submit such additional information pertaining to the Bidder’s responsibility as the Chief Procurement Officer deems necessary. Failure to comply with any such request will result in a finding of non-responsibility and rejection of the Bid.
1.21.2.1. Bidder Debts or Defaults
The Chief Procurement Officer reserves the right to refuse to award a Contract to any bidder that is in arrears or is in default to the City upon any debt or contract, or that is a defaulter, as surety or otherwise, upon any obligation to the City, or has failed to perform faithfully any previous contract with the City.
1.21.2.2. Competency of Bidder
The Bidder, if requested, must present within a reasonable time, as determined by the Chief Procurement Officer, evidence satisfactory to the Chief Procurement Officer of ability to perform the Contract and possession of necessary facilities, pecuniary resources and adequate insurance to comply with the terms of these specifications and contract documents.
1.22. Rejection of Bids and Waiver of Informalities
The Chief Procurement Officer, in his/her sole discretion and authority, may determine that it is in the best interest of the City to reject any or all Bids submitted in response to any Invitation for Bids.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .