4.3.1 S3155-cost-schedule.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
On Call HVAC- Eastern Region
Solicitation number
70CNR-S3174
Issued by
Nevada

About this file

This is a cost schedule template (form S3155) that provides a structure for vendors to submit pricing proposals. The schedule contains 16 numbered line items where vendors must complete shaded areas with their proposed pricing, though the specific descriptions for lines 1-15 are not visible in the provided content.

The schedule includes provisions for travel costs as a billable expense, which must be calculated using current GSA rates. Line 16 specifically addresses estimated travel costs per year with a multiplier of 4. The template includes automatic calculation fields for extended costs and total estimated project value, with vendors being responsible for ensuring all calculations are correct.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost schedule

S3155 cost schedule
Vendor
Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct.
LineDescription and termTypePriceEst. UsageExtended
1$ - 0
2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
8$ - 0
9$ - 0
10$ - 0
11$ - 0
12$ - 0
13$ - 0
14$ - 0
15$ - 0
16Estimated travel costsper year4$ - 0
Estimated project value$ - 0
Travel is allowed as a billable costs of this contract, at then current GSA rates.
gsa.gov

&"Times New Roman,Italic"&10Page &P of &N http://www.gsa.gov/

File details come from the government source that posted it. Updated .