4-25-235 BID SCHEDULE WORKSHEET.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- IFB - DESERT COLOR PARKWAY & SR-7 TRAFFIC SIGNAL
- Solicitation number
- 25-235
- Issued by
- Washington County, Utah
About this file
This document is a Bid Schedule Worksheet for the City of St. George, Utah, related to the Desert Color Parkway & SR-7 Traffic Signal construction project. The bid schedule details 23 base bid line items and 5 alternate bid line items, covering infrastructure improvements including mobilization, traffic control, utility potholing, concrete removal and replacement, roadway excavation, base course installation, hot mix asphalt paving, curb and gutter work, sidewalk construction, pedestrian ramps, pavement markings, and traffic signal system installation. The base bid includes quantities such as 160 linear feet of concrete curb and gutter removal, 155 linear feet of standard curb and gutter installation, 765 square feet of standard sidewalk, 8 corner pedestrian ramp single crossings, and 1 traffic signal system.
The bid requires a 5% bid bond naming the City of St. George as obligee, to be issued by a surety company licensed in Utah. A 100% performance and labor/materials bond will be required for the awarded project. The City reserves the right to reject any or all proposals or waive formalities. While the bid schedule worksheet shows placeholder values of $0 for each line item, it provides a comprehensive breakdown of anticipated quantities and work elements, allowing potential contractors to price the project components. The alternate bid section includes additional quantities for items like valve and manhole adjustments, roadway excavation, base course, and hot mix asphalt, suggesting potential expanded scope or optional project elements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 23-235 BID SCHEDULE WORKSHEET | |||||
| ITEM #+A2:F26B2A2:F27 | Description | Quantity | Unit | COST | TOTAL |
| 1 | Mobilization | 1 | Lump Sum | $ - 0 | |
| 2 | Traffic Control | 1 | Lump Sum | $ - 0 | |
| 3 | Survey | 1 | Each | $ - 0 | |
| 4 | Pothole Utility | 5 | Each | $ - 0 | |
| 5 | Remove Concrete Curb and Gutter | 160 | Linear Feet | $ - 0 | |
| 6 | Remove Concrete Curb | 35 | Linear Feet | $ - 0 | |
| 7 | Remove Concrete Sidewalk | 170 | Square Yard | $ - 0 | |
| 8 | Remove Pavement Marking Paint | 1915 | Linear Feet | $ - 0 | |
| 9 | Remove Traffic Sign | 1 | Each | $ - 0 | |
| 10 | Reset Right of Way Marker | 1 | Each | $ - 0 | |
| 11 | Roadway Excavation (Plan Quantity) | 42 | Cubic Yard | $ - 0 | |
| 12 | Untreated Base Course (Plan Quantity) | 28 | Cubic Yard | $ - 0 | |
| 13 | HMA - 3/4 Inch | 27 | Ton | $ - 0 | |
| 14 | Standard Curb and Gutter | 155 | Linear Feet | $ - 0 | |
| 15 | Standard Sidewalk | 765 | Square Feet | $ - 0 | |
| 16 | Corner Pedestrian Ramp Single Crossing | 8 | Each | $ - 0 | |
| 17 | Relocate Traffic Sign | 1 | Each | $ - 0 | |
| 18 | Corner Pedestrian Ramp Single Crossing | 1 | Each | $ - 0 | |
| 19 | Pavement Markings - 4" Paint | 1500 | Linear Feet | $ - 0 | |
| 20 | Pavement Markings - 8" Paint | 185 | Linear Feet | $ - 0 | |
| 21 | Pavement Markings - 12" Paint (Stopline, Crosswalk) | 690 | Linear Feet | $ - 0 | |
| 22 | Pavement Message, Preformed Thermoplastic | 7 | Each | $ - 0 | |
| 23 | Traffic Signal System | 1 | Lump Sum | $ - 0 | |
| BASE BID SUB TOTAL | $ - 0 |
| BID SCHEDULE - ALTERNATE 1 (additional quantities) | |||||
| Item # | Description | Quantity | Unit | COST | TOTAL |
| 1 | Adjust Valve Box to Grade | 4 | Each | $ - 0 | |
| 2 | Adjust Sewer Manhole to Grade | 1 | Each | $ - 0 | |
| 3 | Roadway Excavation (Plan Quantity) | 794 | Cubic Yard | $ - 0 | |
| 4 | Untreated Base Course (Plan Quantity) | 529 | Cubic Yard | $ - 0 | |
| 5 | HMA - 3/4 Inch | 511 | Ton | $ - 0 | |
| ALTERNATE 1 - SUB TOTAL | $ - 0 | ||||
| BID TOTAL - BASE+ALTERNATE 1 | $ - 0 |
Sheet2
| 23-235 BID SCHEDULE WORKSHEET | |||||
| ITEM #+A2:F26B2A2:F27 | Description | Quantity | Unit | COST | TOTAL |
| 1 | Mobilization | 1 | Lump Sum | $ - 0 | |
| 2 | Traffic Control | 1 | Lump Sum | $ - 0 | |
| 3 | Survey | 1 | Each | $ - 0 | |
| 4 | Pothole Utility | 5 | Each | $ - 0 | |
| 5 | Remove Concrete Curb and Gutter | 160 | Linear Feet | $ - 0 | |
| 6 | Remove Concrete Curb | 35 | Linear Feet | $ - 0 | |
| 7 | Remove Concrete Sidewalk | 170 | Square Yard | $ - 0 | |
| 8 | Remove Pavement Marking Paint | 1915 | Linear Feet | $ - 0 | |
| 9 | Remove Traffic Sign | 1 | Each | $ - 0 | |
| 10 | Reset Right of Way Marker | 1 | Each | $ - 0 | |
| 11 | Roadway Excavation (Plan Quantity) | 42 | Cubic Yard | $ - 0 | |
| 12 | Untreated Base Course (Plan Quantity) | 28 | Cubic Yard | $ - 0 | |
| 13 | HMA - 3/4 Inch | 27 | Ton | $ - 0 | |
| 14 | Standard Curb and Gutter | 155 | Linear Feet | $ - 0 | |
| 15 | Standard Sidewalk | 765 | Square Feet | $ - 0 | |
| 16 | Corner Pedestrian Ramp Single Crossing | 8 | Each | $ - 0 | |
| 17 | Relocate Traffic Sign | 1 | Each | $ - 0 | |
| 18 | Corner Pedestrian Ramp Single Crossing | 1 | Each | $ - 0 | |
| 19 | Pavement Markings - 4" Paint | 1500 | Linear Feet | $ - 0 | |
| 20 | Pavement Markings - 8" Paint | 185 | Linear Feet | $ - 0 | |
| 21 | Pavement Markings - 12" Paint (Stopline, Crosswalk) | 690 | Linear Feet | $ - 0 | |
| 22 | Pavement Message, Preformed Thermoplastic | 7 | Each | $ - 0 | |
| 23 | Traffic Signal System | 1 | Lump Sum | $ - 0 | |
| BASE BID SUB TOTAL | $ - 0 |
| BID SCHEDULE - ALTERNATE 1 (additional quantities) | |||
| TOTAL | |||
| 1 | Page 2 of 2 | ERROR:#VALUE! | |
| 2 | Adjust Sewer Manhole to Grade | $ - 0 | |
| 3 | Roadway Excavation (Plan Quantity) | 794 | $ - 0 |
| 4 | Untreated Base Course (Plan Quantity) | 529 | $ - 0 |
| 5 | 511 | $ - 0 | |
| ALTERNATE 1 - SUB TOTAL | ERROR:#VALUE! | ||
| BID TOTAL - BASE+ALTERNATE 1 | ERROR:#VALUE! |
File details come from the government source that posted it. Updated .