4-25-235 BID SCHEDULE WORKSHEET.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
IFB - DESERT COLOR PARKWAY & SR-7 TRAFFIC SIGNAL
Solicitation number
25-235
Issued by
Washington County, Utah

About this file

This document is a Bid Schedule Worksheet for the City of St. George, Utah, related to the Desert Color Parkway & SR-7 Traffic Signal construction project. The bid schedule details 23 base bid line items and 5 alternate bid line items, covering infrastructure improvements including mobilization, traffic control, utility potholing, concrete removal and replacement, roadway excavation, base course installation, hot mix asphalt paving, curb and gutter work, sidewalk construction, pedestrian ramps, pavement markings, and traffic signal system installation. The base bid includes quantities such as 160 linear feet of concrete curb and gutter removal, 155 linear feet of standard curb and gutter installation, 765 square feet of standard sidewalk, 8 corner pedestrian ramp single crossings, and 1 traffic signal system.

The bid requires a 5% bid bond naming the City of St. George as obligee, to be issued by a surety company licensed in Utah. A 100% performance and labor/materials bond will be required for the awarded project. The City reserves the right to reject any or all proposals or waive formalities. While the bid schedule worksheet shows placeholder values of $0 for each line item, it provides a comprehensive breakdown of anticipated quantities and work elements, allowing potential contractors to price the project components. The alternate bid section includes additional quantities for items like valve and manhole adjustments, roadway excavation, base course, and hot mix asphalt, suggesting potential expanded scope or optional project elements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

23-235 BID SCHEDULE WORKSHEET
ITEM #+A2:F26B2A2:F27DescriptionQuantityUnitCOSTTOTAL
1Mobilization1Lump Sum$ - 0
2Traffic Control1Lump Sum$ - 0
3Survey1Each$ - 0
4Pothole Utility5Each$ - 0
5Remove Concrete Curb and Gutter160Linear Feet$ - 0
6Remove Concrete Curb35Linear Feet$ - 0
7Remove Concrete Sidewalk170Square Yard$ - 0
8Remove Pavement Marking Paint1915Linear Feet$ - 0
9Remove Traffic Sign1Each$ - 0
10Reset Right of Way Marker1Each$ - 0
11Roadway Excavation (Plan Quantity)42Cubic Yard$ - 0
12Untreated Base Course (Plan Quantity)28Cubic Yard$ - 0
13HMA - 3/4 Inch27Ton$ - 0
14Standard Curb and Gutter155Linear Feet$ - 0
15Standard Sidewalk765Square Feet$ - 0
16Corner Pedestrian Ramp Single Crossing8Each$ - 0
17Relocate Traffic Sign1Each$ - 0
18Corner Pedestrian Ramp Single Crossing1Each$ - 0
19Pavement Markings - 4" Paint1500Linear Feet$ - 0
20Pavement Markings - 8" Paint185Linear Feet$ - 0
21Pavement Markings - 12" Paint (Stopline, Crosswalk)690Linear Feet$ - 0
22Pavement Message, Preformed Thermoplastic7Each$ - 0
23Traffic Signal System1Lump Sum$ - 0
BASE BID SUB TOTAL$ - 0
BID SCHEDULE - ALTERNATE 1 (additional quantities)
Item #DescriptionQuantityUnitCOSTTOTAL
1Adjust Valve Box to Grade4Each$ - 0
2Adjust Sewer Manhole to Grade1Each$ - 0
3Roadway Excavation (Plan Quantity)794Cubic Yard$ - 0
4Untreated Base Course (Plan Quantity)529Cubic Yard$ - 0
5HMA - 3/4 Inch511Ton$ - 0
ALTERNATE 1 - SUB TOTAL$ - 0
BID TOTAL - BASE+ALTERNATE 1$ - 0

Sheet2

23-235 BID SCHEDULE WORKSHEET
ITEM #+A2:F26B2A2:F27DescriptionQuantityUnitCOSTTOTAL
1Mobilization1Lump Sum$ - 0
2Traffic Control1Lump Sum$ - 0
3Survey1Each$ - 0
4Pothole Utility5Each$ - 0
5Remove Concrete Curb and Gutter160Linear Feet$ - 0
6Remove Concrete Curb35Linear Feet$ - 0
7Remove Concrete Sidewalk170Square Yard$ - 0
8Remove Pavement Marking Paint1915Linear Feet$ - 0
9Remove Traffic Sign1Each$ - 0
10Reset Right of Way Marker1Each$ - 0
11Roadway Excavation (Plan Quantity)42Cubic Yard$ - 0
12Untreated Base Course (Plan Quantity)28Cubic Yard$ - 0
13HMA - 3/4 Inch27Ton$ - 0
14Standard Curb and Gutter155Linear Feet$ - 0
15Standard Sidewalk765Square Feet$ - 0
16Corner Pedestrian Ramp Single Crossing8Each$ - 0
17Relocate Traffic Sign1Each$ - 0
18Corner Pedestrian Ramp Single Crossing1Each$ - 0
19Pavement Markings - 4" Paint1500Linear Feet$ - 0
20Pavement Markings - 8" Paint185Linear Feet$ - 0
21Pavement Markings - 12" Paint (Stopline, Crosswalk)690Linear Feet$ - 0
22Pavement Message, Preformed Thermoplastic7Each$ - 0
23Traffic Signal System1Lump Sum$ - 0
BASE BID SUB TOTAL$ - 0
BID SCHEDULE - ALTERNATE 1 (additional quantities)
TOTAL
1Page 2 of 2ERROR:#VALUE!
2Adjust Sewer Manhole to Grade$ - 0
3Roadway Excavation (Plan Quantity)794$ - 0
4Untreated Base Course (Plan Quantity)529$ - 0
5511$ - 0
ALTERNATE 1 - SUB TOTALERROR:#VALUE!
BID TOTAL - BASE+ALTERNATE 1ERROR:#VALUE!

File details come from the government source that posted it. Updated .