DFCM Construction - Prequalified Mechanical Stage II - Davis Technical College - IDF HVAC Replacement - Project #27050220
Solicitation number
CS27010
Issued by
Utah

About this file

This is a Stage II Invitation to Bid document issued by the State of Utah Division of Facilities Construction and Management (DFCM) for construction services at Davis Technical College in Kaysville, Utah. The project involves the removal and replacement of existing data room split systems in the Main Building and the Barlow Building, with a total of 2 split systems to be replaced or installed. The scope includes new controls, electrical, piping, roofing, and equipment stand installations. The solicitation was posted on July 23, 2026, with a mandatory bidders meeting scheduled for August 5, 2026, at the Davis Technical College facilities conference room (550 E 300 S, Kaysville, Utah) and virtually via teleconference. The questions deadline is August 13, 2026, with addenda posted by August 17, 2026. Bids and bid bonds are due by August 25, 2026, and subcontractor lists must be submitted by August 26, 2026. The substantial completion date is December 1, 2026, with liquidated damages assessed at $150.00 per day. Only contractors prequalified under Stage I of DFCM's prequalification process for mechanical contractors are eligible to bid on this project.

The construction budget is $60,000.00, with bids to be submitted via the U3P website. A bid bond equal to 5% of the bid amount, properly executed on the AIA Document A310-2010 form or equivalent, must accompany each bid submission. The project is tax-exempt and does not include additive alternates or mandatory bidder qualification requirements beyond Stage I prequalification status. Award will be made to the lowest responsive and responsible bidder. Contractors must comply with State of Utah license laws and are responsible for obtaining all required permits, including fugitive dust plans from the Utah Division of Air Quality and SWPPP requirements from the Utah Department of Environmental Quality. Performance ratings received on this project may affect a contractor's prequalified status and eligibility for future DFCM contracts, with contractors required to maintain an overall performance rating of 4.0 or greater to retain prequalification status.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of FaciliƟes ConstrucƟon and Management Taylorsville State Office Building 4315 South 2700 West, 3rd Floor

Taylorsville, Utah 84129 dfcm.utah.gov | 801.957.7270

Stage II Invitation to Bid for Stage I Prequalified Mechanical Contractors

Low Bid Procurement for Construction Services Project budgets up to $3.5M

July 23, 2026

IDF HVAC Replacement Davis Technical College

Kaysville, Utah

DFCM Project #27050220 U3P Reference # CS27010

Project design provided by WHW Engineering LLC

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 5.15.2026 2

SolicitaƟon Summary The State of Utah Division of FaciliƟes ConstrucƟon and Management (DFCM) is requesƟng bids from Stage II Prequalified Mechanical Contractors for ConstrucƟon services for the following project. Contractors not prequalified through the Stage I Request for Statement of QualificaƟons process are not eligible to bid on this project.

IDF HVAC Replacement Davis Technical College Kaysville, Utah DFCM Project #27050220 | U3P Reference # CS27010

CommunicaƟon during the selecƟon process shall be directed to the DFCM RepresentaƟves below only.

DFCM Project Manager: Mike Smith mikesmith@utah.gov 801-870-3420 Brief Project DescripƟon: This project removes and replaces the exisƟng data room split systems in the Main Building and the Barlow Building.

SubstanƟal CompleƟon Date: December 1, 2026 Liquidated Damages: $150.00 per day ConstrucƟon Budget: $60,000.00 Tax Exempt: Yes ☒ No ☐ Energy IncenƟves: Yes ☐ No ☒

SolicitaƟon Schedule Event Date Time LocaƟon

SolicitaƟon PosƟng Thursday, July 23, 2026 3:00 PM U3P

Mandatory MeeƟng Wednesday, August 5, 2026 8:00 AM

☒In person: DTC – 550 E 300 S, Kaysville, Utah – Meet in the faciliƟes conference rm.

☐Virtual:

QuesƟons Deadline Thursday, August 13, 2026 3:00 PM U3P

Addendum Deadline Monday, August 17, 2026 3:00 PM U3P

Bid and Bid Bond Deadline Tuesday, August 25, 2026 3:00 PM U3P

Subcontractor Lists Deadline Wednesday, August 26, 2026 3:00 PM Email to:

dfcmcontracts@utah.gov

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 5.15.2026 3

Project Details Detailed Project DescripƟon/Base Bid:

This project removes and replaces the exisƟng data room split systems in the Main Building and the Barlow Building. A total of 2 split systems will be replaced or installed. New controls, electrical, piping, roofing and equipment stand shall be provided within the project.

AddiƟve Alternates:

N/A

Mandatory Bidder QualificaƟon Requirements (if applicable):

N/A

Project Requirements:

- DFCM Approved Fabricator List

- DFCM Design Management Documents

- DFCM Roofing Design Requirements

- State of Utah High Performance Building Standard and all appendixes

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 5.15.2026 4

Solicitation Documents The solicitation documents consist of all documents listed below and referenced within this solicitation.

Solicitation Documents and Forms The following project specific documents and forms can be accessed in the U3P project for this solicitation.

Project specific documents:

- Invitation to Bid Solicitation

- Approved Plans

- Approved Specifications

- Hazmat Survey

Standard documents and forms:

- DFCM General Conditions

- DFCM Subcontractor List Form & Instructions

- Health Insurance Statement of Compliance

DFCM Construction Management Standard Reference Documents All DFCM standard documents referenced in this solicitation can be accessed by visiting the DFCM Construction Management – Standard Documents page of the DFCM website.

DFCM General Conditions The DFCM General Conditions (“General Conditions”) and all Supplemental General Conditions (“also referred to as General Conditions”) are available on the DFCM Construction Management – Standard Documents page of the DFCM website and made part of this solicitation by reference.

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 5.15.2026 5

Procurement Process

ONLY Contractors prequalified through the Stage I Request for Statement of Qualifications are allowed to bid on this Stage II Invitation to Bid.

Prequalified Contractors are ONLY authorized to bid on Stage II Prequalified projects within the discipline that they are prequalified under.

The current lists of Stage I Prequalified Contractors can be found on the DFCM website.

For questions regarding prequalification or eligibility, please email dfcm_vbs@utah.gov.

1. Mandatory Meeting A mandatory meeting will be held on the date and time and at the location specified on the Solicitation Schedule. All prime Contractors wishing to bid on this project must attend and sign in. Contractors not in attendance at this meeting are ineligible to bid on this project. Subcontractors and suppliers are invited to attend this meeting, but it is not mandatory.

During the mandatory meeting, a presentation will be made describing the overall scope of work and intended project schedule. Interested Contractors may ask questions and request clarification about the project and the procurement process.

2. Requests for Information, Questions and Addendum All project related requests for information, clarifications, and questions must be submitted to DFCM via the U3P website no later than the time and date specified on the Solicitation Schedule. An addendum in response will be posted on the U3P website no later than the time and date specified on the Solicitation Schedule. All addenda issued shall become part of the solicitation, and any changes or additional requirements shall be incorporated into the Contractor’s proposal and/or bid.

a) Interpretation of Drawings and Specifications If any person or entity contemplating submitting a proposal or bid is in doubt as to the meaning of any part of the drawings, specifications or other contract documents, such person shall submit a request for an interpretation to DFCM via the U3P website no later than the time and date specified on the Solicitation Schedule. Any interpretation of the proposed documents will be made only by addenda posted on the U3P website. Neither DFCM nor A/E will be responsible for any other explanations or interpretations of the proposed documents. The A/E is deemed to be the architect or engineer hired by DFCM as the A/E or Consultant for the project.

b) Product Approvals Where reference is made to one or more proprietary products in the contract documents, but restrictive descriptive materials of one or more manufacturer(s) is referred to in the contract documents, the products of other manufacturers will be accepted, provided they equal or exceed the standards set forth in the drawings and specifications and are compatible with the intent and purpose of the design, subject to the written approval of the A/E. Such written approval must occur prior to the time and date specified on the Solicitation Schedule for the final addendum. The A/E’s written approval will be issued in an addendum. If the descriptive material is not restrictive, the products of other manufacturers specified will be accepted without prior approval provided they are compatible with the intent and purpose of the design as determined by the A/E.

3. Bidding, Bid Deadline, and Bid Bonds Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule.

Contractors attempting to submit a bid through U3P website after the bid deadline has passed will not be successful and therefore disqualified from consideration of award of this project. It is the sole responsibility of the Contractor to confirm their bid is successfully submitted into U3P prior to the bid deadline. Technical questions related to bidding in U3P should be directed to u3padmin@utah.gov.

After the bid deadline listed on the Solicitation Schedule has passed, the bid tabulation will be available in U3P and the Contract award will go to the Contractor submitting the lowest responsive and responsible bid.

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 5.15.2026 6

Before submitting a bid, the Contractor shall carefully examine the solicitation; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in their bid the cost of all items required by the solicitation. If the Contractor observes that portions of the Contract Documents are at variance with applicable laws, building codes, rules, regulations or contain obvious erroneous or uncoordinated information, the Contractor shall promptly notify the DFCM Project Manager, and the necessary changes shall be accomplished by addendum.

By submitting a bid, in any format, the Bidder / Offeror / Vendor certifies that: (1) no product to be supplied by the Bidder / Offeror / Vendor in connection with this Solicitation is a “forced labor product” as that term is defined in Utah Code 63G-6a-121; and (2) to the extent, if any, that this Solicitation involves technology, or technology services, networks or systems, the Bidder / Offeror / Vendor is not a “restricted foreign entity” as that term is defined in Utah Code 63G-6a-121.

a) Bid Bonds A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form in the amount of 5% of the bid, or equivalent, must accompany the bid submitted within U3P. If the bid bond is not provided with the bid, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.

The bid bond must be submitted on the AIA document A310 – 2010 Bid Bond Form, or equivalent, to be accepted unless only one bid is received by DFCM, or the failure to comply with the bid bond requirements is determined by the Director of DFCM to be immaterial based on the following:

1. the bid bond is submitted on a form other than the AIA Document A310 – 2010 Bid Bond form, or equivalent, and the bid bond meets all other requirements including being issued by a surety firm authorized to do business in the State of Utah and be listed in the U.S. Department of the Treasury Circular 570, Companies Holding Certificates of Authority as Acceptable Securities on Federal Bonds and as Acceptable Reinsuring Companies for an amount not less than the amount of the bond to be issued. A co-surety may be utilized to satisfy this requirement; and

2. the Contractor provides a bid bond properly signed by a qualified surety and on the AIA Document A310 – 2010 Bid Bond form, or equivalent, by the close of business of the next business day after DFCM notifies the Contractor of the defective bid bond.

4. Termination and Debarment By submitting a bid, the Contractor certifies that neither it nor its principals, including project nor site managers, have been, or are under consideration for, debarment or suspension, or any action that would exclude such from participation in a construction Contract by any governmental department or agency. If the Contractor cannot certify this statement, provide a detailed written explanation to dfcmcontracts@utah.gov by the time and date specified as the bid deadline on the Solicitation Schedule. DFCM reserves the right to reject the Contractor’s explanation and disqualify them from the selection process.

5. Listing of Subcontractors All Contractors are required to submit their DFCM Subcontractors List Form to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule. The DFCM Subcontractors List Form & Instructions can be found on the DFCM website – Construction Management - Standard Documents page and is also posted in U3P.

If the DFCM Subcontractors List Form is not provided by the time and date specified on the Solicitation Schedule, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.

DFCM retains the right to audit or take other steps necessary to confirm compliance with requirements for the listing and changing of subcontractors. Any Contractor who is found incompliant with these requirements is subject to a debarment hearing and may be debarred from consideration for award of DFCM contracts for a period not to exceed three years.

6. Withdrawal of Bids Bids may be withdrawn on written request received from bidder prior to the time fixed for opening. Negligence on the part of the bidder in preparing the bid confers no right for the withdrawal of the bid after it has been opened.

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 5.15.2026 7

7. DFCM Reservation of Rights The Division of Facilities Construction and Management reserves the right to reject any or all proposals or bids or to waive any formality or technicality in any proposal or bid in the best interest of the State.

8. Contract DFCM intends to enter into a ConstrucƟon Contract with the Contractor submitting the lowest responsive and responsible bid. A copy of the ConstrucƟon Contract can be found on the DFCM website – ConstrucƟon Management - Standard Documents page.

9. Health Insurance Statement of Compliance Form The Health Insurance Statement of Compliance Form applies to: (i) a prime Contractor (and design professional) if the prime contract (or design professional contract) is in the aggregate amount of $2,000,000 or greater; and (ii) applies to a subcontractor (and subconsultant of design professional) if the subcontract is in the aggregate amount of $1,000,000 or greater. For benchmark informaƟon, please visit Health Insurance Statement of Compliance Benchmark InformaƟon.

If applicable to this project, the awarded Contractor must submit the Health Insurance Statement of Compliance Form to DFCM via email at dfcmcontracts@utah.gov before the ConstrucƟon Contract NoƟce to Proceed will be issued. The form can be found on the DFCM website – ConstrucƟon Management - Standard Documents page and is also posted in U3P.

10. Licensure The Contractor shall comply with and require all subcontractors to comply with the license laws as required by the State of Utah.

11. Permits In concurrence with the requirements for permitting in the General Conditions, it is the responsibility of the Contractor to obtain the fugitive dust plan requirements from the Utah Division of Air Quality and the SWPPP requirements from the Utah Department of Environmental Quality, submit the completed forms, and pay any permit fee that may be required for this specific project. Failure to obtain the required permit may result in Work stoppage and fines from the regulating authority that will be the sole responsibility of the Contractor. Any delay to the project because of failure to obtain the permit, or noncompliance with the permit, shall not be eligible for extension in the Contract Time.

12. Financial Responsibility of Contractors, Subcontractors and Sub-subcontractors Contractors shall respond promptly to any inquiry in writing by DFCM to any concern of financial responsibility of the Contractor, Subcontractor or Sub-subcontractor.

13. DFCM Contractor Performance Rating and Retaining Prequalified Status At the completion of each project, DFCM will evaluate Contractor’s performance on the project. The performance rating the Contractor receives on this project may affect their prequalified status and their ability to obtain future Contracts with DFCM. Contractors retain their prequalified status provided the following:

(a) They receive an overall performance rating of 4.0 or greater on each DFCM project. Contractors that receive an overall rating of less than 4.0 on any single project may be removed from the Prequalified Contractors list for a period of at least one year before they are eligible to reapply. Contractors receiving a performance rating of less than 4.0 may be given the opportunity to meet with DFCM to develop a performance improvement plan for requalification that would require successful completion before the Contractor is placed back on to the prequalified list;

(b) They are not suspended for failure to comply with requirements of their contract;

(c) The Contractor has not undergone a significant reorganization involving the loss of key personnel (site superintendents, project managers, owners, etc.) to a degree such that the Contractor no longer meets the prequalification requirements outlined in Stage I;

(d) The financial viability of the Contractor has not significantly changed, and

(e) The Contractor is not otherwise disqualified by DFCM.