36E77619R0048-012.docx

DOCX document 49 KB Posted

Attached to
523A4-CSI-211 SPECT/CT (Rm. 2C-118) Site Preparation
Solicitation number
36E77619R0048
Issued by

About this file

36E77619R0048 S02 - Attachment K - VHA Master Specifications.docx

View the file

Other files

File Type Posted
36E77619C0086-000.docx DOCX document
36E77619R0048-A00003000.docx DOCX document
36E77619R0048-A00003001.doc DOC document
36E77619R0048-A00002000.docx DOCX document
36E77619R0048-A00002001.doc DOC document
36E77619R0048-A00001000.docx DOCX document
36E77619R0048-A00001001.docx DOCX document
36E77619R0048-008.docx DOCX document
36E77619R0048-002.doc DOC document
36E77619R0048-013.doc DOC document
36E77619R0048-010.pdf PDF
36E77619R0048-001.docx DOCX document
36E77619R0048-007.docx DOCX document
36E77619R0048-005.docx DOCX document
36E77619R0048-014.pdf PDF
36E77619R0048-003.docx DOCX document
36E77619R0048-009.pdf PDF
36E77619R0048-006.pdf PDF
36E77619R0048-011.pdf PDF
36E77619R0048-004.pdf PDF
36E77619R0048-000.docx DOCX document
36E77619R0048-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-01-14 636-19-305 Convert Dental Conference Room to Patient Rooms – Omaha, NE 04-24-19

VHA MASTER SPECIFICATIONS

SPEC SECTION 00 01 10

DIVISION 00 – SPECIAL SECTIONS

00 01 10
Table of Contents
00 01 15
List of Drawing Sheets
07-15
00 11 21
Request for Proposal to Design Build
11-15

DIVISION 01 GENERAL REQUIREMENTS

01 00 00
General Requirements
10-17
01 32 16.17
Project Schedules (Small Projects – Design/Build)
04-11
01 33 23
Shop Drawings, Product Data, and Samples
05-17
01 33 24
Electronic Submittal Requirements
01 35 26
Safety Requirements
02-17
01 42 19
Reference Standards
05-16
01 45 00
Quality Control
01 45 29
Testing Laboratory Services
08-17
01 57 19
Temporary Environmental Controls
01 74 19
Construction Waste Management
09-13
01 81 13
Sustainable Construction Requirements
10-17
01 91 00
General Commissioning Requirements
10-15

DIVISION 02 – EXISTING CONDITIONS

02 21 13
Site Surveys
08-16
02 41 00
Demolition
08-17

DIVISION 03 – CONCRETE

03 30 53
(Short-Form) Cast-in-Place Concrete
02-16
03 41 13
Precast Concrete Hollow Core Planks
03 45 00
Precast Architectural Concrete
10-15

DIVISION 05 – METALS

05 12 00
Structural Steel Framing
02-16
05 21 00
Steel Joist Framing
05 31 00
Steel Decking
02-16
05 40 00
Cold-Formed Metal Framing
05-16
05 50 00
Metal Fabrications
04-18
05 51 00
Metal Stairs
10-15

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00
Rough Carpentry
10-17
06 16 63
Cementitious Sheathing
02-16
06 20 00
Finish Carpentry
08-16

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 08 00
Facility Exterior Closure Commissioning
16-11
07 21 13
Thermal Insulation
10-17
07 22 00
Roof and Deck Insulation
02-16
07 53 23
EPDM Roofing
16-02
07 54 23
Thermoplastic Polyolefin (TPO) Roofing
10-15
07 71 00
Roof Specialties
10-15
07 72 00
Roof Accessories
10-15
07 84 00
Firestopping
02-16
07 92 00
Joint Sealants
10-17
07 95 13
Expansion Joint Cover Assemblies
02-16

DIVISION 08 OPENINGS

08 11 13
Hollow Metal Doors and Frames
08-16
08 14 00
Interior Wood Doors
02-16
08 31 13
Access Doors and Frames
02-16
08 51 13
Aluminum Windows
02-16
08 71 00
Door Hardware
01-16
08 71 13
Automatic Door Operators
02-16
08 80 00
Glazing
10-15

DIVISION 09 – FINISHES

09 05 16
Subsurface Preparation for Floor Finishes
02-15
09 06 00
Schedule for Finishes
04-15
09 22 16
Non-Structural Metal Framing
05-16
09 29 00
Gypsum Board
11-14
09 30 13
Ceramic/Porcelain Tiling
10-15
09 51 00
Acoustical Ceilings
12-16
09 65 13
Resilient Base and Accessories
02-16
09 65 16
Resilient Sheet Flooring
05-18
09 65 19
Resilient Tile Flooring
05-18
09 6 13
Portland Cement Terrazzo Flooring
10-15
09 68 00
Carpeting
10-15
09 91 00
Painting
01-16

DIVISION 10 – SPECIALTIES

10 11 13
Chalkboards and Markerboards
10 14 00
Signage
10 21 23
Cubicle Curtain Tracks
05-15
10 25 13
Patient Bed Service Walls
05-18
10 26 00
Wall and Door Protection
10-15
10 28 00
Toilet, Bath, and Laundry Accessories
02-16
10 44 13
Fire Extinguisher Cabinets
08-14

DIVISION 11 – EQUIPMENT

11 73 00
Ceiling Mounted Patient Lift System
01-17

DIVISION 12 – FURNISHINGS

12 24 00
Window Shades
12 31 00
Manufactured Metal Casework
05-15
12 32 00
Manufactured Wood Casework
09-15
12 36 00
Countertops
12-15

DIVISION 21- FIRE SUPPRESSION

21 08 00
Commissioning of Fire Suppression Systems
11-16
21 13 13
Wet-Pipe Sprinkler Systems
06-15

DIVISION 22 – PLUMBING

22 05 11
Common Work Results for Plumbing
07-16
22 05 19
Meters and Gages for Plumbing Piping
09-15
22 05 23
General-Duty Valves for Plumbing Piping
09-15
22 07 11
Plumbing Insulation
09-15
22 08 00
Commissioning of Plumbing Systems
11-16
22 11 00
Facility Water Distribution
09-15
22 13 00
Facility Sanitary and Vent Piping
09-15
22 14 00
Facility Storm Drainage
09-15
22 15 00
General Service Compressed-Air System
09-15
22 40 00
Plumbing Fixtures
09-15
22 62 00
Vacuum Systems for Laboratory and Healthcare Facilities
09-15
22 63 00
Gas Systems for Laboratory and Healthcare Facilities
09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 11
Common Work Results for HVAC
08-17
23 05 12
General Motor Requirements for HVAC and Steam Generation Equipment
08-17
23 05 41
Noise and Vibration Control for HVAC Piping and Equipment
02-15
23 05 51
Noise and Vibration Control for Boiler Plant
08-17
23 05 93
Testing, Adjusting, and Balancing for HVAC
02-15
23 07 11
HVAC and Boiler Plant Insulation
02-15
23 08 00
Commissioning of HVAC Systems
11-16
23 09 23
Direct-Digital Control System for HVAC
09-11
23 21 13
Hydronic Piping
08-17
23 22 13
Steam and Condensate Heating Piping
23 23 00
Refrigerant Piping
02-15
23 31 00
HVAC Ducts and Casings
23 34 00
HVAC Fans
23 36 00
Air Terminal Units
02-15
23 37 00
Air Outlets and Inlets
02-15
23 74 13
Packaged, Outdoor, Central-Station Air-Handling Units
23 82 16
Air Coils
04-11

DIVISION 26 – ELECTRICAL

26 05 11
Requirements for Electrical Installations
01-16
26 05 19
Low-Voltage Electrical Power Conductors and Cables
01-17
26 05 26
Grounding and Bonding for Electrical Systems
01-17
26 05 33
Raceway and Boxes for Electrical Systems
01-18
26 08 00
Commissioning of Electrical Systems
11-16
26 09 23
Lighting Controls
01-18
26 11 16
Secondary Unit Substations
01-18
26 24 16
Panelboards
01-18
26 27 26
Wiring Devices
01-18
26 29 21
Enclosed Switches and Circuit Breakers
01-17
26 41 00
Facility Lightning Protection
01-17
26 51 00
Interior Lighting
01-18
26 56 00
Exterior Lighting
01-18

DIVISION 27 – COMMUNICATIONS

27 05 11
Requirements for Communications Installations
06-15
27 05 33
Raceways and Boxes for Communications Systems
06-15
27 08 00
Commissioning of Communications Systems
11-16
27 52 23
Nurse Call and Code Blue Systems
10-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 13
Conductors and Cables for Electronic Safety and Security
09-11
28 05 26
Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33
Conduits and Backboxes for Electronic Safety and Security
09-11
28 31 00
Fire Detection and Alarm
10-11

DIVISION 31-EARTHWORK

31 20 00
Earthwork
07-16
32 20 11
Earthwork (Short form)
31 32 23
Pressure Grouting Soil stabilization
31 62 00
Driven Piles

DIVISION 32-EXTERIOR IMPROVEMENTS

32 05 23
Concrete for Exterior Improvements
08-16
32 84 00
Planting Irrigation
08-16
32 90 00
Planting
08-16

DIVISION 33-UTILITIES

33 08 00
Commissioning of Site Utility Systems
11-16
33 10 00
Water Utilities
03-17
33 30 00
Sanitary Utilities
33 40 00
Storm Sewer Utilities
12-17

NOTE: All Specifications are available at https://www.cfm.va.gov/til/ - Technical Information Library (TIL)

Spec Section 00 01 10 – Specification Table of Contents 5