36E77619R0028-007.pdf

PDF 136 KB Posted

Attached to
Renovate Radiology - Construct CT Force NRM Minneapolis VAMC Federal contract opportunity
Solicitation number
36E77619R0028
Issued by
Department of Veterans Affairs Headquarters

About this file

36E77619R0028 Attachment 6 - J_A - Brand Name Items.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Radiology - Construct CT Force NRM Minneapolis VAMC, newest first.
File Type Posted
36E77619C0041-000.docx DOCX document
36E77619R0028-0004000.docx DOCX document
36E77619R0028-0003001.docx DOCX document
36E77619R0028-0003000.docx DOCX document
36E77619R0028-0002002.pdf PDF
36E77619R0028-0002000.docx DOCX document
36E77619R0028-0002004.doc DOC document
36E77619R0028-0002003.pdf PDF
36E77619R0028-0002001.docx DOCX document
36E77619R0028-0002005.pdf PDF
36E77619R0028-0001000.docx DOCX document
36E77619R0028-0001001.pdf PDF
36E77619R0028-008.pdf PDF
36E77619R0028-002.pdf PDF
36E77619R0028-003.pdf PDF
36E77619R0028-004.pdf PDF
36E77619R0028-009.pdf PDF
36E77619R0028-011.docx DOCX document
36E77619R0028-005.pdf PDF
36E77619R0028-006.pdf PDF
36E77619R0028-001.docx DOCX document
36E77619R0028-010.pdf PDF
36E77619R0028-000.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

Justification and Approval

For

Other Than Full and Open Competition

1. Contracting Activity:

Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC).

The proposed procurement, for the Construct CT Force project at the Minneapolis VA Medical Center.

2. Nature and/or Description of the Action Being Processed:

This justification is to support the Construct CT Force project at the Minneapolis VA Medical Center, that will be awarded as a firm-fixed price contract. This justification is for other than full and open competition for the procurement of certain construction materials. The use of a particular brand name for the items listed below accommodates standardization of these items throughout the facility.

a. Stanley Magic Force Door Operators

i. Stanley

b. Door Closers

i. LCN Brand

c. Schlage “L” series Mortised Door Locksets

i. Schlage

d. Electrical Distribution Panelboard

i. Cutler-Hammer

e. Rauland Responder 1 Nurse Call Code Blue Stations

i. Rauland

f. Panduit RJ45 data jacks, face plates, patch cords and patch panels

i. Panduit

g. Automatic Transfer Switch

i. ASCO

h. Ceiling Mounted Patient Lifts

i. MedCare

3. Description of Supplies/Services Required to Meet the Agency’s Needs:

Construct CT Force project at the Minneapolis VA Medical Center. The scope includes everything necessary to construct a functional building that meets the requirements of the Department of Veterans Affairs. There are eight (8) brand name items listed for which the VA is not able to accept equal or alternate items. The value of these items is listed below and the VAAR Construction magnitude for the entire project is between $1,000,000.00 and $2,000,000.00.

ii. Value:

iii. Description: The Stanley Magic-Force swing door operators meets the full energy ANSI 156.10 (motion activated) or low energy ANSI 156.19 (knowing-act activated) standards. The Minneapolis VAMC currently has approximately 100 swing door operators installed in the hospital in various locations. The VA maintenance staff stocks parts and extra closers for repair of the existing door closers and is trained on their replacement.

ii. Value:

iii. Description: This project will be installing new door closers in the procedure rooms that match our existing closers. The facility currently has several thousand closers installed in the hospital. The VA carpenter shop keeps parts and extra closers in stock for repair and/or replacement of our existing door closers.

c. Schlage “L” series Mortised Door Locksets

ii. Value:

iii. Description: This project will be installing new locksets on the new doors in the procedure rooms that are the same brand and quality as the existing mortised locksets in the medical center and at the medical center out-buildings. The medical center has approximately 3,000 Schlage “L” Series mortised locksets installed in doors at the medical center with another 200-300 installed in doors in the out-buildings. The medical center currently stocks parts and extra locksets for only the Schlage “L” series mortised locks. The medical center locksmith is trained to service these locksets and maintain them in working condition.

d. Electrical Distribution Panelboard and Circuit Breakers

i. Cutler-Hammer

ii. Value:

iii. Description: This item is to match the existing electrical distribution panels and circuit breaker in substations in the medical center and the out-buildings. The medical center currently has approximately 700 electrical distribution panels and another 100 in the out- buildings that are the Cutler-Hammer brand. The medical center electrical staff stocks parts for the Cutler-Hammer brand. The intent is to provide new electrical panels that match our building standard and avoid stocking parts for other brands of electrical distribution panels.

e. Rauland Responder 2 Nurse Call Code Blue Stations

ii. Value:

iii. Description: The project involves a remodel of the radiology department at the Minneapolis VAMC where new nurse call code blue station will be required. System will include the connection to an existing main master nurse call controller station.

All nurse call throughout the facility is Rauland Responder 4 and/or 5. New nurse call components must tie into the existing system, and only Rauland components are compatible.

ii. Value:

iii. Description: Panduit cables and faceplates are required for maintenance purposes and labeling consistency. The Panduit patch cords, faceplates, and outlets are required so IT staff can identify which components are which, and what each is supposed to connect to in the IT closet. This is consistent throughout the hospital, so using other types would cause confusion and potential for misconnections, which would be a major risk on a security system, telephone systems and IT systems.

g. ASCO Transfer Switch and 5790 PowerQuest monitoring and controls.

i. ASCO

ii. Value:

iii. Description: Required to provide emergency power during a normal power failure.

Switch monitors normal power. When normal power is lost, the emergency generators start.

When full emergency power is available, switch transfers from normal power to emergency power.

ii. Value:

iii. Description: The patient lifts are mounted on rails at the ceiling of patient care areas including ICUs, CTs, patient beds and exam rooms. The lifts are used to transfer patients onto surgical beds, exam tables, toilets and patient beds. The lifts are rated to 1000 pounds.

There are currently over 300 MedCare Ceiling Mounted Patient Lift Systems installed at the MVAMC. In addition to the unique Structural components, there are over 300 manufacturer specific lift motors. As well as over 800 manufacture specific patient support slings. These items are not interchangeable with other manufactures systems.

4. Statutory Authority Permitting Other than Full and Open Competition:

(X) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy

Agency Requirements per FAR 6.302-1; 41 USC §253(c)(1) ( ) (2) Unusual and Compelling Urgency per FAR 6.302-2;

( ) (3) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert Services per FAR 6.302-3;

( ) (4) International Agreement per FAR 6.302-4 ( ) (5) Authorized or Required by Statute FAR 6.302-5;

( ) (6) National Security per FAR 6.302-6;

( ) (7) Public Interest per FAR 6.302-7;

5. Demonstration that the Contractor’s Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority):

These items have been standardized throughout the Minneapolis VA Medical Center. Installing a different manufacturer’s system will create significant duplication in cost for the facility, and in most cases the equipment will not function properly. The specific impacts for not using the brand name items are listed below:

ii. Impact: No other door closer was found that meets the Minneapolis VAMC requirements, including matching the existing swing door while also being ANSI compliant. Additionally, the swing door operators have a unique appearance that makes it impossible to match with other brand name openers.

ii. Impact: The VA locksmith currently maintains the existing door closers. Adding a new brand of door closer would cause additional training for VA staff, maintenance time, and cost to stock parts. The VA carpenter shop keeps parts and extra closers in stock for repair and/or replacement of our existing door closers.

c. Schlage “L” series Mortised Door Lockset

ii. Impact: If a different lockset would be introduced into the medical center it would cause confusion for maintenance staff, contractors and would require the medical center to stock parts for different manufacturers at additional cost to the medical center.

d. Electrical Distribution Panelboard and Circuit Breakers

i. Cutler-Hammer

ii. Impact: The addition of another repair part that would need to be stocked would not only result in additional costs associated with the repair parts but also require VA labor to contract, order, stock, and inventory the additional repair parts. The Cutler-Hammer brand of electrical distribution equipment allows the electrical staff to respond to these electrical panels in an emergency without having to decide which brand of panel needs to be repaired and avoid the electricians from having to locate several brands of parts during emergency repairs. The emergency repair of these panels could result in patient safety during a malfunction if the correct repair parts are not available for installation.

e. Rauland Responder 1 Nurse Call Code Blue Stations

ii. Impact: All nurse call throughout the facility is Rauland Responder 4 and/or 5. New nurse call components must tie into the existing system, and only Rauland components are compatible. Having multiple nurse call systems within the facility is not cost effective or practical for patient safety. The facility does not have the correct headend or master stations to work with other nurse call brands. In addition, medical center staff is currently trained in the maintenance and operation of the Rauland system, and spare parts for that system are kept on hand. If other systems are brought into the facility, patient safety will be at risk because the staff may not understand how to respond to multiple systems. Repairs will also take longer.

ii. Impact: The Panduit system was selected because the face plate and outlet are of optimal shape and orientation. Other types have been tried, but they have been more susceptible to damage and harder to work with. IT staff must frequently access these when they’re behind desks or above ceiling tiles, so the specified make and model saves a great deal of time and prevent unintentional damage. IT now keeps these components in stock, so bringing in others would cause excess maintenance time and require excessive additional components to be kept in stock.

g. ASCO Transfer Switch and 5790 PowerQuest monitoring and controls.

i. ASCO

ii. Impact: The facility currently has 60 transfer switches. All of the switches are the same brand and controlled by the same existing software. The existing engineering staff are trained to maintain and operate these switches. These switches provide power to multiple patient care environments including surgery and intensive care units. The facility stocks parts for these switches and when repairs are required they typically occur during an emergency. If another product were introduced it could cause confusion on which brand of switch was in fault and resulting in longer repair duration which could result in patient safety.

ii. Impact: There are currently over 300 MedCare Ceiling Mounted Patient Lift

Systems installed at the MVAMC. In addition to the unique Structural components, there are over 300 manufacturer specific lift motors. As well as over 800 manufacture specific patient support slings. These items are not interchangeable with other manufactures systems.

To change Vendors at this time will cause compatibility issues for VA Staff that are maintaining the existing lift equipment. Any other Vendors that would continue future project installations cannot provide a 100% interchangeable lift motor with the existing installed infrastructure at the MVAHCS, thus limiting our ability to immediately change a lift motor in a patient care area that has malfunctioned. If motor exchange is required, the entire track infrastructure must be changed to match another vendor’s lift equipment. This would be an extremely invasive process within a patient care environment and disrupt the continuity of patient care, particularly within an intensive care unit. Using other Vendors equipment requires additional staff training to maintain, inspect, test, and repair. Additional parts inventory and spare motors will be required beyond what is currently stocked at the Medical Center. Currently annual lift testing is contracted with the Vendor. Adding a different Vendor would require a testing contract with another Vendor, which adds another level of complexity for the Safe Patient Handling Coordinator to manage. Lastly several other Vendors require the use of their specific Vendor supplied patient slings and will not accept responsibility for VA use of another manufacturer’s products. This alone would create unnecessary hardship for the VA Laundry Service to launder and SPS Service to stock over 800 additional slings for an additional manufacturer. Additionally, the possibility of the VA nursing staff using a different manufacturers’ sling on another manufactures’ lift motor would create unnecessary risks to patient safety.

6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable:

In accordance with the Competition in Contracting Act (CICA), the components listed above are identified as brand name; however, the overall procurement will be competed as a Service-Disabled Veteran-Owned Small-Business (SDVOSB) Set-Aside. This Justification for Other Than Full and Open Competition will be posted to Federal Business Opportunities with the solicitation.

7. Determination by the Contracting Officer that the Anticipated Cost to the Government will be Fair and Reasonable:

The design was completed by Anderson Engineering, Inc. Anderson Engineering, Inc. provided a complete government estimate. The anticipated price to the Government for the items requested to be brand name is approximately

The items for which brand name approval is being requested are subsequent components to the overall construction project. This procurement will be competed and based on competition; the Contracting Officer will make a determination of fair and reasonable pricing prior to award.

8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons

Market Research Was Not Conducted:

The market research for the design and equipment was conducted by Anderson Engineering, Inc. to secure prices for the government estimate, and was shared with the Contracting Officer for further review. The Contracting Officer and Contracting Officer’s Representative (COR) were in concurrence with information provided in the estimate that supported the brand name items. These sources have been identified by Anderson Engineering, Inc. as a result of the contract to design and build this project. Approval of the items as brand name only is critical for the overall efficiency of the completed project and the facility as a whole.

9. Any Other Facts Supporting the Use of Other than Full and Open Competition:

All the specifications and drawings associated with this project have been developed identifying the brand name items as a requirement for the project. Standardization of most facility systems according to the preponderance of long term industry data results in substantially reduced costs for parts as well as maintenance and repair labor that far outweigh the potential savings to be had by full and open competition.

10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition:

Not applicable. It is the responsibility of the offerors and the general contractor awarded the project to locate suppliers and obtain pricing for all materials and components, including the items listed in this justification.

11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to

Competition before Making subsequent acquisitions for the supplies or services required:

There will be competition for the overall procurement. It will be the responsibility of the offerors to obtain pricing from the suppliers of the items and to submit a competitive proposal for the project.

12. Requirements Certification: I certify that the requirement outlined in this justification is a Bona

Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.

Andrew L. Jansma Date Contracting Offer’s Representative Minneapolis VA HCS

13. Approvals in accordance with FAR 6.304

a. Contracting Officer's Certification (required): I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Donald A. Marsh III Date Contracting Officer VHA Program Contracting Activity Central (PCAC)

Andrew L. Jansma 469010 Digitally signed by Andrew L. Jansma 469010 Date: 2019.02.21 08:35:27 -06'00'

Donald A. Marsh 1489406 Digitally signed by Donald A. Marsh 1489406 Date: 2019.02.22 07:41:11 -05'00'

File details come from the government source that posted it.