36E77619R0028-005.pdf

PDF 21 MB Posted

Attached to
Renovate Radiology - Construct CT Force NRM Minneapolis VAMC Federal contract opportunity
Solicitation number
36E77619R0028
Issued by
Department of Veterans Affairs Headquarters

About this file

36E77619R0028 Attachment 4 - Final Dwgs CD Issued-VAMC Minneapolis CT 2-11-19.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Radiology - Construct CT Force NRM Minneapolis VAMC, newest first.
File Type Posted
36E77619C0041-000.docx DOCX document
36E77619R0028-0004000.docx DOCX document
36E77619R0028-0003001.docx DOCX document
36E77619R0028-0003000.docx DOCX document
36E77619R0028-0002002.pdf PDF
36E77619R0028-0002000.docx DOCX document
36E77619R0028-0002004.doc DOC document
36E77619R0028-0002001.docx DOCX document
36E77619R0028-0002005.pdf PDF
36E77619R0028-0002003.pdf PDF
36E77619R0028-0001001.pdf PDF
36E77619R0028-0001000.docx DOCX document
36E77619R0028-008.pdf PDF
36E77619R0028-002.pdf PDF
36E77619R0028-003.pdf PDF
36E77619R0028-004.pdf PDF
36E77619R0028-006.pdf PDF
36E77619R0028-001.docx DOCX document
36E77619R0028-010.pdf PDF
36E77619R0028-007.pdf PDF
36E77619R0028-011.docx DOCX document
36E77619R0028-009.pdf PDF
36E77619R0028-000.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROJECT NAME:

SITE ADDRESS:

VA PROJECT NUMBER:

OWNER AND CONSULTANTS:

VICINITY MAP:

AE PROJECT NUMBER:

SITE MAP:

C

R e v it P ro je c ts

\1

B

L D

G

M in n e a p o lis s t F lo o r_ R a d io lo g y

C T

R g b a rb a ri a e

-m n

.c o m .r v t

/1

/2

:1

:0

P

M

1354-GI000

COVER SHEET RENOVATE RADIOLOGY:

CONSTRUCT CT FORCE

618-16-102

1/10/2019 GJB

RENOVATE RADIOLOGY - CONSTRUCT CT FORCE

1 VETERANS DRIVE, MINNEAPOLIS, MN 55417

618-16-102

14721

VA COR:

CONTACT:

ADDRESS:

PHONE:

Mark Angell or Thomas Jennings

1 VETERANS DRIVE

MINNEAPOLIS, MN 55417

612-467-2653 or 612-467-5805

ARCHITECT:

NAME:

ADDRESS:

CONTACT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

XXXX

PHONE: 763-412-4000

STRUCTURAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

PHONE:

MECH/ELEC/PLUMB//ELECTRICAL/FIRE ENGINEER:

NAME:

ADDRESS:

CONTACT:

Dunham Engineering

50 South 6th Street, Suite 1100 Minneapolis, MN 55402

PHONE:

AST ENGINEERING

7301 OHMS LANE, SUITE 215

EDINA, MN 55439

ZACHARY CRAIG

952-854-9302

JASON GOTTWALT (M) / CURT BARLAGE (E)

612-465-7648 / 612-465-7641

Revisions: Date:

BUILDING 9

CONFRENCE ROOM

I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the state of Minnesota.

Signature:

Name: Tom Olesak

Date: 01/10/2019 License Number: 18157

█ ISSUED

NOT ISSUED

ISSUED FOR REFERENCE ONLY

ISSUED AS NOTED

R

N

SHEET ABBREVIATION AND NUMBERING

AE 1 1 1 - 01

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

FL

O

O R

LE

VE

L

SH

EE

T G

RO

UP

IN

G

ZO

NE

N

UM

BE

R

AE 111-01

ARCHITECTURAL ELEMENTS, PLAN, FIRST FLOOR, FLOOR PLAN, ZONE 1

QH 1 1 0 - 01

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

FL

O

O R

LE

VE

L

SH

EE

T G

RO

UP

IN

G

ZO

NE

N

UM

BE

R

QH110-01

EQUIPMENT HOSPITAL, PLAN, FIRST FLOOR, FLOOR PLAN, ZONE 1

DISCIPLINE

DESIGNATOR

SHEET TYPE

DESIGNATOR

FLOOR

LEVEL

SHEET

GROUPING

GC - GENERAL CONTRACT

GI - GENERAL INFORMATION

AC - ARCHITECTURAL RCP

AD- ARCHITECTURAL DEMOLITION

AS-ARCHITECTURAL SITE

AE-ARCHITECTURAL ELEMENTS

AF-ARCHTECTURAL FINISHES

AC-REFLECTED CEILING PLANS

IF-INTERIOR FURNISHINGS

QC-EQUIPMETN LAUNDRY

QF-EQUIPMENT FOOD SERVICE

QH-EQUIPMENT HOSPITAL

QL-EQUIPMENT LABORATORY

0 - GENERAL

1 - PLANS

2 - ELEVATIONS

3 - SECTIONS

4 - LARGE SCALE VIEWS

5 - DETAILS

6 - SCHEDULES & DIAGRAMS

0 - LOWER LEVEL

1 - FIRST FLOOR

2 - SECOND FLOOR

3 - THIRD FLOOR

4 - FOURTH FLOOR

GENERAL:

00-10 - TITLE SHEET, NOTES,

ABBREVIATIONS, SYMBOLS,

SCHEDULES

PLANS:

1 - FLOOR PLAN

2 - DIMENSION PLAN

ELEVATIONS:

01-10 - EXTERIOR ELEVATIONS

11-19 - INTERIOR ELEVATION

SECTIONS:

01-10 - BUILDING SECTIONS

11-19 - WALL SECTIONS

20-29 - STAIR SECTIONS & PLANS

DETAILS:

01-19 - EXTERIOR PLAN DETAILS

20-29 - EXTERIOR SECTION DETAILS

30-39 - ROOF DETAILS

40-49 - INTERIOR PLAN DETAILS

50-59 - INTERIOR SECTION DETAILS

60-69 - CEILING DETAILS

PLANS ONLY

AE 5 1 2

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

SH

EE

T G

RO

UP

IN

G

AE 501

ARCHITECTURAL ELEMENTS, EXTERIOR PLAN DETAILS

AF 6 7 0

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

SH

EE

T G

RO

UP

IN

G

AF 670

ARCHITECTURAL FINISHES, FINISH SCHEDULE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE PROJECT NUMBER:

C

R e v it P ro je c ts

\1

B

L D

G

M in n e a p o lis s t F lo o r_ R a d io lo g y

C T

R g b a rb a ri a e

-m n

.c o m .r v t

/1

/2

:1

:0

P

M

1354-GI001

SHEET INDEX RENOVATE RADIOLOGY:

CONSTRUCT CT FORCE

618-16-102

1/10/2019 GJB14721

SHEET INDEX - GENERAL

SHEET NO. SHEET TITLE S

D

IS

SU

E

IS

SU

E

9/

/1

D D

IS

SU

E

/0 2/

0%

C D

RE

VI

EW

1/

/2

CD

IS

SU

E

GI000 COVER SHEET █ █ █

GI001 SHEET INDEX █ █ █

GI002 ABBREVIATIONS █ █ █

GI003 GENERAL NOTES AND SYMBOLS █ █ █

GI010 1ST FLOOR LIFE SAFETY PLAN █ █

GI020 INFECTION CONTROL & PHASING PLAN - BLDG 9 & AREA F █ █ █

GI021 INFECTION CONTROL & PHASING PLAN - AREA M █ █ █

SHEET INDEX - ARCHITECTURAL

SHEET NO. SHEET TITLE S

D

IS

SU

E

IS

SU

E

9/

/1

D D

IS

SU

E

/0 2/

0%

C D

RE

VI

EW

1/

/2

CD

IS

SU

E

AD111 FIRST FLOOR DEMOLITION PLAN - AREA M █ █ █

AE101 BLDG 9 - LOWER LEVEL DEMO, FLOOR &

EQUIPMENT/FURNITURE PLAN

AE111.1 FIRST FLOOR PLAN - AREA M █ █ █

AE112.1 FIRST FLOOR DIMENSION PLAN - AREA M █ █ █

AE111.2 CONFERENCE ROOM DEMO, FLOOR&EQUIPMENT

PLAN-AREA F

AC111.1 FIRST FLOOR REFLECTED CEILING PLAN - AREA M █ █ █

AE211 INTERIOR ELEVATIONS █ █ █

AE540 INTERIOR DETAILS █ █

AE560 CEILING DETAILS █ █ █

AE601 INTERIOR PARTITION TYPES AND DETAILS █ █ █

AE602 DOOR SCHEDULE & ELEVATIONS AND MOUNTING HEIGHTS █ █ █

SHEET INDEX - INTERIOR

SHEET NO. SHEET TITLE S

D

IS

SU

E

IS

SU

E

9/

/1

D D

IS

SU

E

/0 2/

0%

C D

RE

VI

EW

1/

/2

CD

IS

SU

E

AF111.1 FIRST FLOOR FINISH PLAN - AREA M █ █ █

AF111.2 FIRST FLOOR FINISH PLAN - AREA - F & BUILDING 9 █ █ █

AF600 MATERIAL AND ROOM FINISH SCHEDULE █ █ █

AW601 WAYFINDING MESSAGE SCHEDULES & SIGNAGE DETAILS █ █ █

IF110 FIRST FLOOR FURNITURE PLAN - AREA M R R R

SHEET INDEX - EQUIPMENT

SHEET NO. SHEET TITLE S

D

IS

SU

E

IS

SU

E

9/

/1

D D

IS

SU

E

/0 2/

0%

C D

RE

VI

EW

1/

/2

CD

IS

SU

E

QH110 FIRST FLOOR EQUIPMENT PLAN - AREA M █ █ █

SHEET INDEX - MECHANICAL

SHEET NO. SHEET TITLE D

D

IS

SU

E 9/

/1

0%

C D

RE

VI

EW

1/

/2

CD

IS

SU

E

1354-M000 MECHANICAL TITLE SHEET █ █

1354-MD111 FIRST FLOOR HVAC & HYDRONIC DEMOLITION PLAN █ █

1354-MD113 FIRST FLOOR INTERSTITIAL HYDRONIC DEMOLITION PLAN █ █

1354-MD112 FIRST FLOOR INTERSTITIAL HVAC DEMOLITION PLAN █ █

1354-MD114 BLDG 9 MECHANICAL DEMOLITION PLANS █ █

1354-M111 FIRST FLOOR HVAC & HYDRONIC PLAN █ █

1354-M113 FIRST FLOOR INTERSTITIAL HYDRONIC PLAN █ █

1354-M112 FIRST FLOOR INTERSTITIAL HVAC PLAN █ █

1354-M101 BASEMENT INTERSTITIAL HYDRONIC PLANS █ █

1354-M114 BLDG 9 MECHANICAL PLANS █ █

1354-M500 MECHANICAL DETAILS █ █

1354-M600 MECHANICAL ELECTRICAL SCHEDULES █ █

SHEET INDEX - ELECTRICAL

SHEET NO. SHEET TITLE D

D

IS

SU

E 5/

/1

0%

C D

RE

VI

EW

1/

/2

CD

IS

SU

E

1354-E000 ELECTRICAL TITLE SHEET █

1354-E100 ELECTRICAL ORIENTATION PLAN

1354-E101 ELECTRICAL ZONING PLAN

1354-E111 DEMOLITION FIRST FLOOR LIGHTING PLAN █

1354-E112 DEMOLITION FIRST FLOOR POWER PLAN █

1354-E113 DEMOLITION FIRST FLOOR SYSTEMS PLAN █

1354-E114 DEMOLITION BLDG 9 PLAN

1354-E121 FIRST FLOOR LIGHTING PLAN █

1354-E122 FIRST FLOOR POWER PLAN █

1354-E123 FIRST FLOOR SYSTEMS PLAN █

1354-E124 BLDG 9 ELECTRICAL PLAN

1354-E130 FIRST FLOOR INTERSTITIAL PLAN

1354-E300 ENLARGED PLANS

1354-E400 ELECTRICAL DETAILS

1354-E500 ELECTRICAL SCHEDULES

1354-E501 ELECTRICAL SCHEDULES █

1354-E600 ELECTRICAL RISER █

1354-E601 ELECTRICAL RISER

SHEET INDEX - STRUCTURAL

SHEET NO. SHEET TITLE S

D

IS

SU

E

IS

SU

E

9/

/1

D D

IS

SU

E

/0 2/

0%

C D

RE

VI

EW

1/

/2

CD

IS

SU

E

S100 TITLE SHEET X X

S200 STRUCTURAL PLANS X X

S201 STRUCTURAL PLANS X X

S300 STRUCTURAL SECTIONS AND DETAILS X X

Revisions: Date:

CONSTRUCTION

DOCUMENTS

ARCHITECTURAL ABBREVIATIONS

A/C

A/C UNIT

A/E

AAMA

AAP

AB

ABC

ACI

ACS DR

ACS FLR

ACS PNL

ACST

AD

ADA

ADC

ADDL

ADDN

ADH

ADJ

ADMIN

AFF

AFG

AFS

AGC

AGGR

AHJ

AHR

AHU

AIA

AISC

ALT

ALT NO

ALUM

AMT

ANOD

ANSI

ANT

AP

APA

APC

APPD

APPROX

AR

ARCH

ASB

ASI

ASKLR

ASPH

ASSN

ASTM

AT

ATCH

ATM

AUTO

AUX

AV

AVG

AW

AWI

AWPA

AWS

B PL

BAT

BD

BD FT

BEV

BHMA

BI FLD DR

BITUM

BKG

BLD

BLDG

BM

BOT

BRCG

BRDG

BRDG JST

BRG

BRG PL

BRKT

BRZ

BSMT

BTWN

BUR

C CONC

C TO C

CAB

CAC

CB

CBB

CCD

CCTV

CCW

CD

CEM

CEM PLAS

CER

CF

CF/CI

CF/OI

CFLG

CFMF

CG

CGSFU

CH

CHEM

CHFR

CHK

CI

CIP

CIR

CIRC

CJ

CL

CLDG

CLG

CLR

CM

CMU

AIR CONDITION

AIR CONDITIONING UNIT

ARCHITECT/ENGINEER

AMERICAN ARCHITECTURAL MANUFACTURERS ASSN

ALARM ANNUNCIATOR PANEL

ANCHOR BOLT

AGGREGATE BASE COURSE

AMERICAN CONCRETE INSTITUTE

ACCESS DOOR

ACCESS FLOOR

ACCESS PANEL

ACOUSTIC

AREA DRAIN

AMERICANS WITH DISABILITIES ACT

AUTOMATIC DOOR CLOSER

ADDITIONAL

ADDITION

ADHESIVE

ADJACENT, ADJOINING, OR ADJUSTABLE

ADMINISTRATION

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ABOVE FINISHED SLAB

ASSOCIATED GENERAL CONTRACTORS

AGGREGATE

AUTHORITY HAVING JURISDICTION

ANCHOR

AIR HANDLING UNIT

AMERICAN INSTITUTE OF ARCHITECTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALTERNATE

ALTERNATE NUMBER

ALUMINUM

AMOUNT

ANODIZE

AMERICAN NATIONAL STANDARDS INSTITUTE

ANTENNA

ACCESS PANEL

AMERICAN PLYWOOD ASSOCIATION

ARCHITECTURAL PRECAST CONCRETE

APPROVED

APPROXIMATE

AS REQUIRED

ARCHITECT

ASBESTOS

ARCHITECT'S SUPPLEMENTAL INSTRUCTION

AUTOMATIC SPRINKLER

ASPHALT

ASSOCIATION

AMERICAN SOCIETY FOR TESTING AND MATERIALS

ACOUSTICAL CEILING TILE

ATTACHMENT

AUTOMATIC TELLER MACHINE

AUTOMATIC

AUXILIARY

AUDIO VISUAL

AVERAGE

ACID WASTE

ARCHITECTURAL WOODWORKING INSTITUTE

AMERICAN WOOD PRESERVERS' ASSOCIATION

AMERICAN WELDING SOCIETY

BASE PLATE

BATTEN

BOARD

BOARD FEET (FOOT)

BEVEL

BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BIFOLDING DOORS

BITUMINOUS

BACKING

BUILD

BUILDING

BEAM OR BENCHMARK

BOTTOM

BRACING

BRIDGING

BRIDGING JOIST

BEARING

BEARING PLATE

BRACKET

BRONZE

BASEMENT

BETWEEN

BUILT-UP ROOFING

CAST CONCRETE

CENTER TO CENTER

CABINET

CEILING ATTENUATION CLASS

CATCH BASIN OR CORNER BEAD

CEMENTITIOUS (BACKER) BOARD

CONSTRUCTION CHANGE DIRECTIVE

CLOSED CIRCUIT TELEVISION

COUNTERCLOCKWISE

CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS

CEMENT

CEMENT PLASTER

CERAMIC

CONTRACTOR FURNISHED

CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CONTRACTOR FURNISHED/OWNER INSTALLED

COUNTERFLASHING

COLD-FORMED METAL FRAMING

CORNER GUARD

CERAMIC GLAZED STRUCTURAL FACING UNITS

COAT HOOK

CHEMICAL

CHAMFER

CHECK

CAST IRON

CAST-IN-PLACE

CIRCLE

CIRCULAR

CONSTRUCTION JOINT OR CONTROL JOINT

CENTER LINE

CLADDING

CEILING

CLEAR

CONSTRUCTION MANAGEMENT

CONCRETE MASONRY UNIT

CNR

CNTR

CRTP

CO

CO2

COL

COM

COMB

COMM

COMP

CONC

CONC FLR

COND

CONF

CONN

CONSTR

CONT

CONTR

COORD

CORR

CPM

CPRS

CR

CRS

CRSI

CSB

CSG

CSI

CSK

CSMT

CSWK

CTG

CTR

CTRL

CTV

CU FT

CU IN

CU YD

CURT

CYL

CYL L

D

DAT

DBL

DBL GLZ

DCS

DP

DEG

DEL

DEMO

DEPT

DET

DF

DIA

DIAG

DIFF

DIM

DIR

DISP

DIST

DIV

DL

DOC

DR

DR CL

DR FR

DR OPNG

DS

DSGN

DW

DWG

E

EA

EFF

EFS

EIFS

EJ

EL

ELAST

ELEC

ELEC DR OP

ELEV

EMER

EMER SHR

ENCL

ENGR

ENVIR

EO

EPA

EPDM

EPO

EPS

EQ

EQL SP

EQUIP

EQUIV

ERD

ESC

ESMT

ESP

EST

ETC

EW

EWC

EWS

EXH

EXIST

EXP

EXP BT

EXST GR

EXT

EXT GR

CORNER

COUNTER

COUNTERTOP

CARBON MONOXIDE

CARBON DIOXIDE

COLUMN

COMMON

COMBINATION, COMBINED

COMMUNICATION

COMPONENT

CONCRETE

CONCRETE FLOOR

CONDENSER OR CONDITION

CONFERENCE

CONNECT

CONSTRUCTION

CONTINUE

CONTRACTOR

COORDINATE

CORRIDOR

CRITICAL PATH METHOD

COMPRESSIBLE

CRASH RAIL

COLD ROLLED STEEL

CONCRETE REINFORCING STEEL INSTITUTE

CONCRETE SPLASH BLOCK

CASING

CONSTRUCTION SPECIFICATIONS INSTITUTE

COUNTER SUNK

CASEMENT

CASEWORK

COATING

CENTER

CONTROL

CABLE TELEVISION

CUBIC FEET

CUBIC INCH

CUBIC YARD

CURTAIN

CYLINDER

CYLINDER LOCK

DEPTH OR PENNY (NAIL)

DATUM

DOUBLE

DOUBLE GLAZE

DIAPER CHANGING STATION

DECORATIVE PANEL

DEGREE

DELETE

DEMOLITION

DEPARTMENT

DETAIL

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIFFERENCE OR DIFFUSER

DIMENSION

DIRECTION

DISPENSER

DISTANCE

DIVIDE OR DIVISION

DEAD LOAD

DOCUMENT

DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DOOR CLOSER

DOOR FRAME

DOOR OPENING

DOWNSPOUT

DESIGN

DISHWASHER

DRAWING

EAST

EACH

EFFICIENCY

EXTERIOR FINISH SYSTEM

EXTERIOR INSULATION AND FINISH SYSTEM

EXPANSION JOINT

ELEVATION

ELASTOMERIC

ELECTRIC

ELECTRIC DOOR OPENER

ELEVATOR

EMERGENCY

EMERGENCY SHOWER

ENCLOSURE

ENGINEER

ENVIRONMENT

ELECTRICAL OUTLET

ENVIRONMENTAL PROTECTION AGENCY

ETHYLENE PROPYLENE DIENE MONOMER

EMERGENCY POWER OFF

EXPANDED POLYSTYRENE BOARD (INSULATION)

EQUAL

EQUALLY SPACED

EQUIPMENT

EQUIVALENT

EXISTING ROOF DRAIN

ESCAPE OR ESCUTCHEON

EASEMENT

ESPECIALLY

ESTIMATE

AND SO FORTH OR ET CETERA

EACH WAY

ELECTRIC WATER COOLER

EYE WASH STATION

EXHAUST

EXISTING

EXPANSION OR EXPOSED

EXPANSION BOLT

EXISTING GRADE

EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXTERIOR GRADE

F

FA

FAB

FAC

FACIL

FAS

FAS BD

FCU

FCO

FCTY

FD

FDC

FDTN

FE

FEC

FF

FF EL

FF&E

FHC

FHP

FIG

FIL

FIN

FIN FLR

FIN GR

FIN WD

FIXT

FL

FLASH

FLDG

FLEX

FLG

FLR

FLR FIN

FLR SK

FLUOR

FLUOR FIX

FM

FM-G

FO

FOC

FOF

FOM

FOS

FOUNT

FOW

FP

FR

FR SNK

FREQ

FRMG

FRP

FRZ

FS

FSB

FSTNR

FT

FTG

FURG

FURN

FUT

FVC

GA

GAL

GALV

GALV STL

GB

GC

GD

GDR

GEN

GFRC

GFRG

GFRP

GI

GL

GL BLK

GLU LAM

GP

GR FL

GRAN

GRTG

GSB

GSM

GSU

GT

GUAR

GUT

GYP

GYP BD

GYP PLAS

H

HAZ MAT

HB

HC

HCWD

HDBD

HDO

HDR

HDW

HDWD

HEPA

HEX

HGR

HM

HMD

HMDF

HMF

HNDRL

HO

HORIZ

HOSP

HP

HPD

HPDL

HQ

HS

HSE

HSKPG

FAHRENHEIT OR FEMALE

FIRE ALARM

FABRIC

FACTOR

FACILITY

FASCIA

FASCIA BOARD

FAN COIL UNIT

FLOOR CLEANOUT

FACTORY

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FACE

FINISH FLOOR ELEVATION

FURNITURE, FIXTURE, AND EQUIPMENT

FIRE HOSE CABINET

FULL HEIGHT PARTITION

FIGURE

FILLET

FINISH

FINISH FLOOR

FINISH GRADE

FINISH WOOD

FIXTURE

FLOORLINE

FLASHING

FOLDING

FLEXIBLE

FLOORING

FLOOR

FLOOR FINISH

FLOOR SINK

FLUORESCENT

FLUORESCENT FIXTURE

FACTORY MUTUAL

FACTORY MUTUAL GLOBAL

FINISHED OPENING

FACE OF CONCRETE OR FACE OF CURB

FACE OF FINISH

FACE OF MASONRY

FACE OF SLAB OR FACE OF STUD

FOUNTAIN

FACE OF WALL

FIRE PROTECTION OR FIREPROOF

FIRE RATING, FIRE RESISTANT, OR FRAME

FLUSHING RIM SINK

FREQUENCY

FRAMING

FIBERGLASS REINFORCED PLASTIC

FREEZER

FEDERAL SPECIFICATION

FOLDING SHOWER BENCH

FASTENER

FEET OR FOOT

FOOTING

FURRING

FURNISH OR FURNITURE

FUTURE

FIRE VALVE CABINET

GAGE OR GYPSUM ASSOCIATION

GALLON

GALVANIC OR GALVANIZED

GALVANIZED STEEL

GRAB BAR

GENERAL CONTRACTOR

GUARD

GUARD RAIL

GENERAL OR GENERATOR

GLASS-FIBER-REINFORCED CONCRETE

GLASS-FIBER-REINFORCED GYPSUM

GLASS-FIBER-REINFORCED PLASTIC

GALVANIZED IRON

GLASS

GLASS BLOCK

GLUED LAMINATED WOOD

GRAB BAR

GROUND FLOOR

GRANITE

GRATING

GYPSUM SHEATHING BOARD

GALVANIZED SHEET METAL

GLAZED STRUCTURAL UNIT

GROUT

GUARANTEE

GUTTER

GYPSUM

GYPSUM BOARD

GYPSUM PLASTER

HIGH OR HUMIDISTAT

HAZARDOUS MATERIALS

HOSE BIBB

HOLLOW CORE

HOLLOW CORE WOOD DOOR

HARDBOARD

HIGH DENSITY OVERLAY

HEADER

HARDWARE

HARDWOOD

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEXAGON

HANGER

HOLLOW METAL

HOLLOW METAL DOOR

HOLLOW METAL DOOR AND FRAME

HOLLOW METAL FRAME

HANDRAIL

HOLD OPEN

HORIZONTAL

HOSPITAL

HIGH PRESSURE

HYGIENE PRODUCT DISPOSAL

HIGH PRESSURE DECORATIVE LAMINATE

HEADQUARTERS

HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HOUSE

HOUSEKEEPING

HST

HSS

HT

HVAC

HVY

HW

HYD

HYDR

IAQ

IBC

IC

ICW

ID

ID NO

ILLUM

INCL

IND

INFO

INSUL

INT

INTL

IWH

JAN

KD

KIT

KO

KPL

L

LAB

LAD

LAM

LAM GL

LAU

LAV

LBR

LBS

LCS

LD BRG

LDR

LED

LF

LIB

LIN

LIQ

LKR

LKR RM

LL

LMST

LRG

LRV

LT

LT GA

LT SW

LT WT

LTG

LTNG

LVD

LVR

LWC

LWIC

LYR

MACH

MACH RM

MAINT

MAN

MATL

MATV

MAX

MBD

MCB

MD

ME

MEAS

MECH

MECH RM

MED

MEK

MEMB

MEMO

MEZZ

MF

MFD

MFG

MFR

MFR REC

MGT

MIC

MID

MIL STD

MIN

MIR

MISC

MIT

MKR

ML

MLDG

MLWK

mm

MO

MOD

MOD BIT

MON

MOPR

MR

MS

MTD

MTG

MTL

MULL

MW

MWP

HOIST

HOLLOW STRUCTURAL STEEL

HEIGHT

HEATING, VENTILATING, AND AIR CONDITIONING

HEAVY

HOT WATER

HYDRANT

HYDRAULIC

INDOOR AIR QUALITY

INTERNATIONAL BUILDING CODE

INFECTION CONTROL

INFECTION CONTROL WALL

INSIDE DIAMETER

IDENTIFICATION NUMBER

ILLUMINATION

INCLUDED

INDEPENDENT OR INDUSTRIAL

INFORMATION

INSULATION

INTERIOR

INTERNATIONAL

INSTANTANEOUS WATER HEATER

JANITOR

KILN DRIED OR KNOCKED DOWN

KITCHEN

KNOCKOUT

KICKPLATE

ANGLE

LABORATORY

LADDER

LAMINATE

LAMINATED GLASS

LAUNDRY

LAVATORY

LUMBER

POUND

LOCKABLE CHARTING STATION/MED CABINET

LOAD-BEARING

LEADER

LIGHT EMITTING DIODE

LINEAR FEET (FOOT)

LIBRARY

LINEAR

LIQUID

LOCKER

LOCKER ROOM

LEAD LINED

LIMESTONE

LARGE

LOUVERED ROOF VENT

LIGHT

LIGHT GAGE

LIGHT SWITCH

LIGHTWEIGHT

LIGHTING

LIGHTNING

LOUVERED

LOUVER

LIGHTWEIGHT CONCRETE

LIGHTWEIGHT INSULATING CONCRETE

LAYER

MACHINE

MACHINE ROOM

MAINTENANCE

MANUAL

MATERIAL

MASTER ANTENNA TELEVISION SYSTEM

MAXIMUM

MARKER BOARD

METAL CORNER BEAD

DECK

MECHANICAL ENGINEER

MEASURE

MECHANICAL

MECHANICAL ROOM

MEDICAL, MEDIUM

METHYL ETHYL KETONE

MEMBRANE

MEMORANDUM

MEZZANINE

MILL FINISH

MANUFACTURED

MANUFACTURING

MANUFACTURER

MANUFACTURER'S RECOMMENDATION

MANAGEMENT

MICROPHONE

MIDDLE

MILITARY STANDARD

MINIMUM

MIRROR

MISCELLANEOUS

MITER

MARKER

METAL LATH

MOLDING (MOULDING)

MILLWORK

MILLIMETER

MASONRY OPENING

MODEL, MODIFY OR MODULE

MODIFIED BITUMEN

MONITOR

MOP RACK

MOISTURE RESISTANT

MOP SINK

MOUNTED

MOUNTING

METAL

MULLION

MICROWAVE

MEMBRANE WATERPROOFING

N

NA

NAT

NATL

NC

NCOMBL

NEC

NEG

NEMA

NEUT

NFC

NFPA

NIC

NO

NOM

NR

NRC

NRCA

NRP

NS

NUM

O/O O

OA

OC

OCC

OCT

OD

OD

OF/CI

OFD

OFF

OF/OI

OH

OH DR

OPH

OPNG

OPP

OPR

OPT

OR

ORD

ORG

ORIG

ORN

OSHA

OUT

OZ

P

PAR

PARA

PART

PAT

PB

PBD

PC

PCA

PCC

PCCP

PCD

PCF

PCP

PCT

PED

PEN

PEND

PERF

PERIM

PERP

PHAR

PHOTO

PKG

PL

PL GL

PLAM

PLAS

PLBG

PLYWD

PMTL

PNEU

PNL

PO

POLY

PP

PR

PRCST

PREFAB

PREFIN

PRELIM

PREP

PRESS

PREV

PRKG

PRMLD

PROJ

PROP

PSF

PSI

PT

PTD

PTN

PTS

PVC

PVG

PWR

QA

QC

QRY

QTR

QTY

QUAD

QUAL

R

RA

RAD

RBM

RBR

NORTH

NOT APPLICABLE

NATURAL

NATIONAL

NOISE CRITERIA OR NURSE CALL

NONCOMBUSTIBLE

NATIONAL ELECTRICAL CODE

NEGATIVE

NATIONAL ELECTRICAL MANUFACTURERS ASSN

NEUTRAL

NATIONAL FIRE CODE

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NUMBER

NOMINAL

NOISE REDUCTION

NOISE REDUCTION COEFFICIENT

NATIONAL ROOFING CONTRACTORS ASSOCIATION

NONREMOVABLE

NARROW STILE

NUMERAL

OUT TO OUT

OXYGEN

OUTSIDE AIR OR OVERALL

ON CENTER

OCCUPY

OCTAGON

OUTSIDE DIAMETER, OUTSIDE DIMENSION

OUTSIDE DIAMETER/OUTSIDE DIMENSION

OWNER FURNISHED/CONTRACTOR INSTALLED

OVERFLOW DRAIN

OFFICE

OWNER FURNISHED/OWNER INSTALLED

OVERHANG

OVERHEAD (COILING) DOOR

OPPOSITE HAND

OPENING

OPPOSITE

OPERABLE

OPTIONAL

OPERATING ROOM OR OUTSIDE RADIUS

ORDNANCE OR OVERFLOW ROOF DRAIN

ORGANIC

ORIGINAL

ORNAMENTAL

OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION

OUTLET

OUNCE

PAINT

PARALLEL OR PARAPET

PARAGRAPH

PARTIAL

PATTERN

PUSHBUTTON

PARTICLEBOARD

PIECE, POLYCARBONATE OR PORTLAND CEMENT

PORTLAND CEMENT ASSOCIATION

PRECAST CONCRETE

CONCRETE PAVEMENT

PAPER CUP DISPENSER

POUNDS PER CUBIC FOOT

PORTLAND CEMENT PLASTER

PRIVACY CURTAIN TRACK

PEDESTAL

PENETRATE

PENDANT

PERFORATED

PERIMETER

PERPENDICULAR

PHARMACY

PHOTOGRAPH

PACKAGE

PROPERTY LINE

PLATE GLASS

PLASTIC LAMINATE

PLASTER OR PLASTIC

PLUMBING

PLYWOOD

PAINTED METAL

PNEUMATIC

PANEL

POST OFFICE, PURCHASE ORDER

POLYETHYLENE (PLASTIC)

PUSH PLATE

PAIR

PRECAST

PREFABRICATE

PREFINISH

PRELIMINARY

PREPARATION

PRESSURE

PREVIOUS

PARKING

PREMOLDED

PROJECT

PROPERTY

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

PORCELAIN TILE OR PRESSURE TREATED

PAPER TOWEL DISPENSER

PARTITION

PNEUMATIC TUBE STATION

POLYVINYL CHLORIDE (PLASTIC)

PAVING

POWER

QUALITY ASSURANCE

QUALITY CONTROL

QUARRY

QUARTER

QUANTITY

QUADRANT

QUALITY

RADIUS OR RISER

RETURN AIR

RADIATOR

REINFORCED BRICK MASONRY

RUBBER

RC

RCP

RCVR

RD

REC

RECD

RECPT

RECT

REF

REFR

REG

REINF

REP

REPL

REQ

REQD

RET

REV

RFG

RFI

RFP

RFS

RL

RLG

RM

RM LT

RND

RO

ROW

RS

RSV

RT

RV

RVS

RWL

SA

SALV

SAMP

SAN

SB

SBS

SBSTR

SC

SCH

SCHED

SCHEM

SCP

SCRN

SCT

SCWD

SD

SDG

SECT

SEG

SEL

SEP

SF

SFTWD

SGD

SGL

SHR

SHR HD

SHRD

SHT

SHTHG

SHV

SIM

SJ

SJI

SK

SKLT

SLDG

SLNT

SM

SMK

SND INS

SPEC

SPKLR

SPKR

SPLY

SPR

SQ

SQ IN

SQ YD

SSF

SST

ST

STC

STD

STIF

STL JST

STL LNTL

STL PL

STL RF DK

STL TB

STL TR

STNLS

STOR

STR

STRUCT

STRUCT STL

SUB

SURF

SUSP

SUSP CLG

SW

SWDR

SYM

SYNTH

SYS

REMOTE CONTROL

REFLECTED CEILING PLAN

RECEIVER

ROAD OR ROOF DRAIN

RECESSED

RECEIVED

RECEPTACLE

RECTANGLE

REFERENCE OR REFRIGERATOR

REFRACTORY, REFRIGERATION

REGISTER

REINFORCE

REPAIR

REPLACE

REQUIRE

REQUIRED

RETURN

REVISION

ROOFING

REQUEST FOR INFORMATION

REQUEST FOR PROPOSAL

ROOM FINISH SCHEDULE

ROOF LEADER

RAILING

ROOM

NURSE CALL LIGHT/ROOM LIGHT

ROUND

ROUGH OPENING

RIGHT OF WAY

ROUGH SAWN

RESILIENT SHEET VINYL

RIGHT

ROOF VENT

REVERSE

RAIN WATER LEADER

SUPPLY AIR

SALVAGE

SAMPLE

SANITARY

SPLASH BLOCK

STYRENE BUTADIEN STYRENE

SUBSTRATE

SHARPS CONTAINER

SCHOOL

SCHEDULE

SCHEMATIC

SCUPPER

SCREEN

SHOWER CURTAIN TRACK

SOLID CORE WOOD DOOR

SMOKE DETECTOR/SOAP DISPENSER

SIDING

SECTION

SEGMENT

SELECT

SEPARATE

SQUARE FOOT (FEET)

SOFTWOOD

SLIDING GLASS DOOR

SINGLE

SHOWER

SHOWER HEAD

SHOWER DRAIN

SHEET

SHEATHING

SHELVING

SIMILAR

SCORED JOINT

STEEL JOIST INSTITUTE

SKETCH

SKYLIGHT

SLIDING

SEALANT

SHEET METAL

SMOKE

SOUND INSULATION

SPECIFICATION

SPRINKLER

SPEAKER

SUPPLY

SINGLE PLY ROOF SYSTEM

SQUARE

SQUARE INCH

SQUARE YARD

SOLID SURFACE

STAINLESS STEEL

STAIRS OR STREET

SOUND TRANSMISSION CLASS

STANDARD

STIFFENER

STEEL JOIST

STEEL LINTEL

STEEL PLATE

STEEL ROOF DECK

STEEL TUBE

STEEL TRUSS

STAINLESS

STORAGE

STRINGERS

STRUCTURAL

STRUCTURAL STEEL

SUBSTITUTE

SURFACE

SUSPEND

SUSPENDED CEILING

SWITCH

SWING DOOR

SYMBOL

SYNTHETIC

SYSTEM

T T&M

TB

TBD

TECH

TEL

TEMP

THERM

THK

THRES

THRU

THRUOUT

TMPD

TMPD GL

TN

TO

TO FDN

TOB

TOM

TOP

TOS

TOW

TPD

TRANS

TRTD

TS

TSTAT

TV

TYP

U

UC

UGND

UL

ULT

UNFIN

UNO

UPS

UR

UTIL

UV

VAC

VAR

VEH

VENT

VERT

VEST

VFD

VIC

VID

VIF

VNR

VOC

VOL

VR

VTR

W/ W/O

WBL

WC

WD

WDW

WF

WFR

WFS

WH

WHSE

WP

WPM

WR

WS

WSCT

WT

X BRACE

XPS

YD

TREAD OR THERMOSTAT

TIME AND MATERIALS

TOWEL BAR

TACK BOARD

TECHNICAL

TELEPHONE

TEMPERATURE OR TEMPORARY

THERMAL

THICKNESS

THRESHOLD

THROUGH

THROUGHOUT

TEMPERED

TEMPERED GLASS

TRUE NORTH

TOP OF ___

TOP OF FOUNDATION

TOP OF BEAM

TOP OF MASONRY

TOP OF PARAPET

TOP OF STEEL

TOP OF WALL

TOILET PAPER DISPENSER

TRANSOM

TREATED

TUBE STEEL

THERMOSTAT

TELEVISION

TYPICAL

HEAT TRANSFER COEFFICIENT

UNDERCUT

UNDERGROUND

UNDERWRITERS LABORATORIES

ULTIMATE

UNFINISH

UNLESS NOTED OTHERWISE

UNINTERRUPTIBLE POWER SUPPLY

URINAL

UTILITY

ULTRAVIOLET

VACUUM

VARIES

VEHICLE

VENTILATION

VERTICAL

VESTIBULE

VARIABLE FREQUENCY DRIVE

VICINITY

VIDEO

VERIFY IN FIELD

VENEER

VOLATILE ORGANIC COMPOUND

VOLUME

VAPOR RETARDER

VENT THROUGH ROOF

WITH

WITHOUT

WOOD BLOCKING

WATER CLOSET

WOOD

WINDOW

WIDE FLANGE

WOOD FRAME

WOOD FURRING STRIPS

WATER HEATER

WAREHOUSE

WATERPROOFING

WATERPROOF MEMBRANE

WEATHER RESISTANT

WEATHERSTRIP OR WALL SCONCE

WAINSCOT

WEIGHT OR WINDOW TREATMENT

CROSS BRACE

EXTRUDED POLYSTYRENE BOARD

YARD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE PROJECT NUMBER:

C

R e v it P ro je c ts

\1

B

L D

G

M in n e a p o lis s t F lo o r_ R a d io lo g y

C T

R g b a rb a ri a e

-m n

.c o m .r v t

/1

/2

:1

:0

P

M

1354-GI002

ABBREVIATIONS RENOVATE RADIOLOGY:

CONSTRUCT CT FORCE

618-16-102

1/10/2019 GJB14721Revisions: Date:

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF

CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.

INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL

DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING

ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS

CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK

REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO

ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH

THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT

AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS

PRIOR TO DEMOLITION AND CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF

ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY

DISCREPANCIES. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED

PARTITIONS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM

THE HOLE IS CUT TO PATCH AND REPAIR ANY OPENING TO MAINTAIN THE

INTEGRITY OF THE FIRE RATING.

4. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES

AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL

CONTRACTOR PRIOR TO PROCEEDING WITH REMODELING.

5. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE

FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL

CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.

6. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY,

VERIFY SIZE WITH MANUFACTURER.

7. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR

EQUIPMENT SHALL BE VERIFIED WITH THE RESPECTIVE TRADE.

8. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING

CONDITIONS SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE

AND PREPARE FOR SCHEDULED FINISH APPLICATION. COORDINATE WORK WITH

GENERAL CONTRACTOR PRIOR TO PROCEEDING.

9. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES

WITH TRADES WHICH REQUIRE THEM AND SPECIFICATIONS SECTION 08 31 13 ACCESS

DOORS AND FRAMES.

10. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS

REQUIRED BY MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

11. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY

DIFFER FROM ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR

DEFINITIONS.

12. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT

PLYWOOD BACKING BEHIND ALL SURFACE MOUNTED FIXTURES AND

EQUIPMENT, UNLESS NOTED OTHERWISE.

13. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY

SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE

AS REQUIRED. ALL FIRE RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF

MATERIALS / ASSEMBLIES MEETING THE RATING INDICATED, TERMINATE AT THE

DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS

SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE

CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT

THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS

SHALL BE SEALED WITH FIRE CAULK.

14. ALL HAMMER DRILLING AND NOISE PRODUCING ACTIVITIES SHALL OCCUR AFTER 5:00

PM AND BE COMPLETED BEFORE 6:00 AM.

15. ALL SHUT DOWNS AFFECTING PATIENT CARE SHALL OCCUR BETWEEN 8:00 PM AND

5:00 AM.

DEMOLITION GENERAL NOTES

1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING AND

SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING

PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING PURPOSES

ONLY, UNLESS NOTED OTHERWISE.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL

TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.

3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG

WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,

SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO

STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.

4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO FLOOR

SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED FINISHES WITHIN

AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH SCHEDULE FOR

EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.

5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING

SUSPENSION SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND

ELECTRICAL ITEMS, UNLESS NOTED OTHERWISE. SEE MECHANICAL AND

ELECTRICAL DRAWINGS FOR EXTENT OF CONDUIT, PIPING AND DUCTWORK

DEMOLITION WITHIN AREA TO BE REMODELED.

6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND PREPARE

THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR FINISHES.

7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY DEMOLITION

WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.

8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH AS:

DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.

9. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR

REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.

10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS COLUMNS,

BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE PERMANENT OR

TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL MEMBERS SHALL BE

ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL ENGINEER.

11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED

DEMOLITION AND PREP WORK.

12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,

SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE

REMOVED, UNLESS NOTED OTHERWISE.

13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL, OR

CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING FINISHES

DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS LOCATED WITHIN

THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL SUBSTRATES TO RECEIVE

SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION, SEE KEYNOTED ITEMS, FINISH

PLANS AND/OR SCHEDULES, STRUCTURAL, MECHANICAL AND ELECTRICAL.

1. REFER TO AF600 MATERIAL AND ROOM FINISH SCHEDULE FOR SPECIFIC PRODUCT

SELECTION BASIS OF DESIGN AND OTHER REQUIREMENTS

2. FIELD FINISH VENTS, GRILLES, ACCESS PANELS, PLUG STRIP, BASEBOARD RADIATION

ENCLOSURES, ELECTRICAL PANEL BOARDS (IN FINISHED SPACES) TO MATCH SURFACE

ON WHICH THEY OCCUR UNLESS OTHERWISE INDICATED. EXCEPTION: ITEMS WITH

FACTORY WHITE FINISH, OCCURRING ON WHITE ACT OR WHITE GYPSUM BOARD CEILING

SHALL NOT BE PAINTED. STAINLESS STEEL ITEMS SHALL NOT BE PAINTED.

3. FIELD VERIFY ALL NEW CONDITIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR

TO INSTALLATION

4. LOCATE CHANGES IN FLOOR FINISH MATERIAL UNDER CENTERLINE OF CLOSED DOOR

UNLESS OTHERWISE INDICATED

5. PROVIDE CLEAR SILICONE SEALANT AT PERIMETER OF PLUMBING FLOOR DRAINS, CLEAN

OUTS, ETC IN RESILIENT AND CERAMIC TILE FLOORS

6. PROVIDE SEALANT TO HORIZONTAL AND VERTICAL INTERIOR CERAMIC TILE CORNERS,

COLOR TO MATCH GROUT COLOR

7. PROVIDE SEALANT AT JOINT BETWEEN COUNTER TOP, BACK OR SIDE SPLASH AND

WALLS

8. PROVIDE CLEAR SILICONE SEALANT AT THE BASE OF DOOR FRAME TO RESILIENT AND

CT FLOORING, TYP. SEE PLANS AND ROOM FINISH SCHEDULE FOR FLOOR FINISH

LOCATIONS

9. HOLLOW METAL DOORS AND FRAMES TO BE PAINTED P-5, UNLESS NOTED OTHERWISE

IN THE ROOM OPENING SCHEDULE

10. WOOD: PRE-FINISHED TO MATCH BUILDING STANDARD, REFER TO SPECIFICATION

11. CEILING HEIGHTS AND MATERIALS/FINISHES CALLED OUT IN ROOM FINISH SCHEDULE

ARE FOR ENTIRE CEILING OR MAJORITY OF THAT ROOM, UNLESS OTHERWISE

INDICATED. SEE REFLECTED CEILING PLAN FOR CHANGES IN CEILING MATERIAL AND

CEILING HEIGHT. PAINT ALL SURFACES OF SOFFIT SAME COLOR AS INDICATED

12. COLOR SELECTIONS ARE BASED ON USE OF PRODUCTS INDICATED IN THE PROJECT

MANUAL SPECIFICATION. IF MANUFACTURERS OTHER THAN THOSE INDICATED ARE

USED, ARCHITECT MAY REVISE COLOR SELECTIONS OF OTHER FINISHES TO ENSURE

PROPER COORDINATION

13. PAINT ALL FIRE EXTINGUISHER CABINETS TO MATCH COLOR OF THE ADJACENT WALLS

14. CEILING HEIGHTS ARE MEASURED FROM FINISH FLOOR

15. FOR FLOOR FINISH MATERIALS AND PATTERN, SEE ALSO INT FINISH PLAN

16. SEE INTERIOR ELEVATIONS FOR MORE FINISH INFO

17. ALL GYP BD CEILINGS & SOFFITS TO BE P-3 UNLESS NOTED OTHERWISE.

FINISH PLAN GENERAL NOTES

RCP GENERAL NOTES

1. GENERAL CONTRACTOR TO COORDINATE ALL CEILING MOUNTED EQUIPMENT

SUPPORT REQUIREMENTS, LOCATIONS, DIMENSIONS, ETC WITH EQUIPMENT

SUPPLIER AND OWNER, PRIOR TO INSTALLATION.

2. ALL CEILING MOUNTED ITEMS SUCH AS LIGHT FIXTURES, GRILLES, DIFFUSERS,

SPEAKERS, EXIT LIGHTS, ETC SHALL BE LOCATED IN THE CENTER OF ACT/AT

PANELS, GPBD SOFFITS AND/OR PLASTER SOFFIT BAYS, UNLESS NOTED

OTHERWISE. COORDINATE WITH MECHANICAL AND ELECTRICAL DRAWINGS.

3. FINISHED GPBD SOFFITS SHALL EXTEND 1" BEYOND FACE AND EXPOSED ENDS OF

WALL CABINETS, FULL-HEIGHT CABINETS, ETC UNLESS NOTED OTHERWISE.

COORDINATE CABINET DIMENSIONS WITH SUPPLIER. GPBD FASCIA/SOFFIT

DETAILS ARE REFERENCED FROM THE REFLECTED CEILING PLAN.

4. SEE MECHANICAL DRAWINGS FOR SPRINKLER HEAD TYPES AND LOCATIONS.

CENTER ALL HEADS IN ACT OR ACB UNLESS NOTED OTHERWISE.

5. AT REMODELING WORK IN EXISTING ACT SUSPENSION SYSTEM, REMOVE EXISTING

PANELS, CUT AS REQUIRED FOR CONSTRUCTION AND RE-INSTALL.

REPLACE ALL DAMAGED AND / OR EXTREMELY SOILED PANELS WITH ACT TO MATCH

EXISTING.

DEMOLITION PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

DE1 REMOVE FLOOR FINISH IN ITS ENTIRETY. PATCH & PREP CONCRETE FLOOR

SLAB FOR NEW FINISH.

DE2 REMOVE CEILING IN ITS ENTIRETY. INCLUDING ALL MECHANICAL &

ELECTRICAL ITEMS. SEE MECHANICAL / ELECTRICAL.

DE3 REMOVE GYP BD ON ONE SIDE OF PARTITION AS REQUIRED. SEE PLANS

AND MECHANICAL FOR ADDITIONAL INFORMATION

DE4 REMOVE HAND RAIL, BRACKETS AND END CAPS. SALVAGE FOR

REINSTALLATION AS REQUIRED.

DE5 REMOVE ACT, GRID TO REMAIN. SEE PLAN FOR ADDITIONAL INFORMATION

DE6 CUT OPENING IN PARTITION AS REQUIRED FOR INSTALLATION OF DOOR

AND FRAME AS SCHEDULED. SEE PLAN

DE7 REMOVE PORTION OF CEILING AS REQUIRED FOR WORK. SALVAGED

CEILING TILE. SEE PLAN

DE8 CUT OPENING IN PARTITION AS REQUIRED. SEE PLAN

DE9 REMOVE 6" HIGH CONCRETE HOUSEKEEPING PAD

DE10

FINISH PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

FN1

FN2

FN3

PATCH VINYL WALLCOVERING TO MATCH EXISTING AS NECESSARY, VA TO

PROVIDE. CONTRACTOR TO PROVIDE LABOR AND OTHER MATERIALS

NECESSARY FOR INSTALLATION.

PATCH FLOORING THIS AREA TO MATCH EXISTING AS NECESSARY, VA TO

PROVIDE. CONTRACTOR TO PROVIDE LABOR AND OTHER MATERIALS

NECESSARY FOR INSTALLATION.

INSTALL SALVAGED HANDRAIL, IF ADDITIONAL PARTS AND PIECES ARE NEEDED,

MATCH EXISTING. VA TO SUPPLY, CONTRACTOR TO INSTALL.

REFLECTED CEILING KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

RC1 PATCH CONCRETE BEAM. PREP FOR FINISH AS SCHEDULED

RC2 SUSPENDED ACT CEILING CLOUDS WITH TRIM EDGE.

RC3 PAINT ALL ITEMS ABOVE CEILING CLOUDS "BLACK -FLAT FINISH",

INCLUDING STRUCTURE AND MECHANICAL / ELECTRICAL ITEMS.

RC4 MODIFY CEILING IN THIS AREA AS REQUIRED. REPLACE ANY DAMAGED OR

SOILED CEILING TILE, THROUGHOUT ROOM, WITH SALVAGED TILE

RC5 CUBICAL CURTAIN TRACK

RC6 CEILING MOUNTED BOOM. SEE STRUCTURAL, MECHANICAL AND VENDOR

DRAWINGS FOR ADDITIONAL INFORMATION

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR

AND FRAME TO

REMAIN

DOOR

INTERIOR

BORROWED LIGHT

101B

101A

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR

ELEVATION

INDICATOR TAG

2B

AE2O1

EXTERIOR

ELEVATION

INDICATOR TAG

1A

203 EQUIPMENT TAG

100 FLOOR ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG

1A

AE2O1

INTERIOR SECTION

REFERENCE TAG

1A

KEY NOTE

A

GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

REFLECTED CEILING PLAN SYMBOLS

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

GBPD

CEILING /

SOFFIT

ACT CEILING

SYSTEM

EXISTING

ACT CEILING

SYSTEM

IV TRACK

CUBICLE

CURTAIN

TRACK

ACCESS

PANEL

2'-0" x 4'-0"

LIGHT FIXTURE

2'-0" x 2'-0"

LIGHT FIXTURE

PENDANT STRIP

LIGHT FIXTURE

PENDANT STRIP

LIGHT FIXTURE

RECESSED

LIGHT FIXTURE

MECHANICAL

SUPPLY GRILL

MECHANICAL

RETURN GRILL

WALL SCONCE

LIGHT FIXTURE

MECHANICAL

LINEAR SUPPLY

GRILL

CEILING

ELEVATION AND

FINISH

9'-0" AFF

ACT

DEMOLITION PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL OR

PARTITION TO BE

REMOVED

EXISTING DOOR

AND FRAME TO

REMAIN

KEY NOTE

A

GRIDLINE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

DE10

EXISTING DOOR

AND FRAME TO BE

DEMOLISHED

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

SOUTH WALL FINISH

NORTH WALL FINISH

WEST WALL FINISH

EAST WALL FINISH

CEILING FINISH

FLOOR FINISH

BASE

REMARKS

ACT ACOUSTICAL CEILING TILE

CT CERAMIC TILE

CPT MODULAR CARPET TILE

GWB (SC) GYPSUM WALLBACK SYSTEMS (SPECIAL COATING)

LVT LUXURY VINYL TILE

LN LINOLEUM

P PAINT

PT PORCELAIN TILE (FLOOR AND BASE)

RB RESILIENT BASE

RES RESINOUS EPOXY FLOORING

RES-W RESINOUS/EPOXY WALL/CEILING

RF RUBBER FLOORING

S SOLID SURFACE

SC SPECIAL COATING

SP SPECIAL FACED

WSF WELDED SEAM SHEET FLOORING (HEAT WELDED

WITH ROD)

ROOM FINISH LEGEND &

ABBREVIATIONS

MATERIAL INSTALL

DIRECTION

AF01 KEYNOTECORNER GUARD

WALL

PROTECTION

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

CG

VCTCPT

ACT-2

VSF-1

RB-1

P-1

P-2 P-1 P-1

FLOOR PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

FL1

INSTALL BLOCKING FOR WALL HUNG EQUIPMENT AND/OR ELECTRICAL

ITEMS. SEE EQUIPMENT PLAN AND MECHANICAL / ELECTRICAL. PATCH &

PREP GP BD AS REQUIRED

FL2

PROVIDE ACT-1 IN EXISTING CEILING GRID. RE-INSTALL MECH & ELEC

ITEMS AS REQUIRED, IN SAME LOCATION UNO SEE MECHANICAL &

ELECTRICAL

FL3 PATCH WALL AS REQUIRED FROM DEMOLITION, MECHANICAL / ELECTRICAL

INSTALLATION. SEE MECHANICAL / ELECTRICAL

FL4 PROVIDE 5/8" LEAD LINED GYP BD ONE SIDE OF WALL. SEE SPEC FOR LEAD

THICKNESS

FL5 24" x 24" ACCESS PANEL. COORDINATE LOCATION WITH MECHANICAL AND

SPECIFICATIONS SECTION 08 31 13

FL6

CORE DRILL AS REQUIRED FOR EQUIPMENT / MEP. COORDINATE WITH

EQUIPMENT DRAWINGS, EQUIPMENT SUPPLIER, STRUCTURAL AND MEP

DRAWINGS

FL7 WIRE MESH CHAIN LINK FENCE TO 6'-6" AFF

FL8 PROVIDE COAT ROD AND SELF AT STANDARD AND ACCESSIBLE HEIGHT.

SEE PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE PROJECT NUMBER:

C

R e v it P ro je c ts

\1

B

L D

G

M in n e a p o lis s t F lo o r_ R a d io lo g y

C T

R g b a rb a ri a e

-m n

.c o m .r v t

/1

/2

:1

:1

P

M

1354-GI003

GENERAL NOTES AND SYMBOLS RENOVATE RADIOLOGY:

CONSTRUCT CT FORCE

618-16-102

1/10/2019 GJB14721Revisions: Date:

M M

TA

B

LE

LIFE SAFETY SYMBOLS

SMOKE BARRIER

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

3 HOUR FIRE

BARRIER

1 HOUR FIRE &

SMOKE BARRIER

2 HOUR FIRE &

SMOKE BARRIER

3 HOUR FIRE &

SMOKE BARRIER

HE

TRAVEL DISTANCE

100'-10"

TRAVEL DISTANCE

EA

EDEXIT EXIT

HORIZONTAL EXIT

EXIT DISCHARGE

EXIT ACCESS

FIRE EXTINGUISHERFE

FIRE EXTINGUISHER

CABINETFEC

LIMITS OF

CONSTRUCTION

SMOKE

COMPARTMENT

BOUNDARY

HEALTH CARE SUITE

NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN

OCCUPANCY

SEPARATION

SHAFT

ADJACENT SYMBOLS SHOW PARTITION RATING

AND DAMPER REQUIREMENTS

HAZARDOUS USE

ADJACENT SYMBOLS SHOW PARTITION RATING AND DAMPER

REQUIREMENTS. OPENINGS REQUIRE GASKET, CLOSER &

LATCH

EXIT PASSAGEWAY

RATE AS STAIR

ALL OPENINGS TO BE RATED AS STAIR SHAFT

CORRIDOR

WALLS TO LIMIT THE TRANSFER OF SMOKE

ADJUNCT CORRIDOR or PSYCHIATRIC AREA or

CONSTRUCTED WITH MIN. 4'-0" CLEAR WITH (PER

CHAPTER 19)

NOYES

APPLICABLE REGULATIONS

GENERAL TYPE OF PROJECT

NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)

2018 FGI GUIDELINES

2015 NFPA 101 (LIFE SAFETY CODE)

ABA STANDARDS (2015) (ABAAS)

2012 IBC

REMODEL

ADDITION

NEW BUILDING

PROJECT DESCRIPTION

CODE SUMMARY

CONSTRUCT NEW CT ROOM WITH CONTROL AND EQUIPMENT ROOM

AND NEW ULTRA SOUND MINOR PROCEDURE ROOM. REMODELING OF

LOUNGE TO CONFERENCE ROOM AND MOVING CLASS ROOM TO

BUILDING 9 AND REMODELING SPACE.

VA BARRIER FREE DESIGN STANDARD (PG-18-13)

NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)

THE JOINT COMMISSION (TJC)

CENTER FOR MEDICARE/MEDICAID SERVICES (CMS)

NOYES

TESTRATING (HRS)

NOYES

(IBC Chapter 6)

(Section 8.3)

CHANGE OF OCCUPANCY?

FIRE RESISTIVE CORRIDORS?

IBC I-A

HEALTHCARE

SHAFTS AND EXIT PASSAGEWAYS

OTHER

ROOF CONSTRUCTION

PRIME & SEC. FLOOR BEAMS, JOISTS

FLOOR/CEILING ASSEMBLY

FLOOR CONSTRUCTION

INTERIOR

NON-BEARING WALLS AND PARTITIONS

BEARING WALLS

COLUMNS

GIRDERS

TRUSSES

ROOF/CEILING ASSEMBLY

PRIME & SEC. ROOF BEAMS, JOISTS

EXTERIOR

INTERIOR BEARING WALLS

EXTERIOR BEARING WALLS

STRUCTURAL FRAME

SEPARATED OCCUPANCIES?

AREA SEPARATIONS / FIRE WALLS

FIRE BARRIER RATING(S)

SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)

INCIDENTAL USE AREA RATING(S)

FIRE-RESISTIVE REQUIREMENTS

SEE LIFE SAFETY PLANS

SEE PLANS

OCCUPANCY CLASSIFICATION(S)

TYPE(S) OF CONSTRUCTION

OCCUPANCIES

CONSTRUCTION TYPE(S)

MISCELLANEOUS

(If Remodeling)

2015 LSC (TABLE 6.1.14.1)

SEE LIFE SAFETY PLANS

See Life Safety Plans

3 ASTM E 119

NA NA

1.5

NA NA

INTERIOR FINISHES CLASSIFICATION

A or B

(LSC CH 12-42)

(LSC Chapter 18/19) LSC I (322)

OSHA STANDARDS

VA SEISMIC DESIGN REQUIREMENTS H-18-8

NATIONAL ELECTRIC CODE (NEC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR

DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN

INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPAct)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW

FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL

BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS

433,434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:

MEMORANDUM OF UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL,

ENERGY, AND TRANSPORTATION MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE

GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER

CONSTRUCTION SPECIFICATION

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE

STANDARD 62.1-2004

SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD 15

-2007

VA FIRE PROTECTION DESIGN MANUAL

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL

CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE

TECHNICAL INFORMATION LIBRARY (TIL)

WALL & CEILING

I or IIFLOOR

ASTM E 119

ASTM E 119

ASTM E 119

ASTM E 119

ASTM E 119

ASTM E 119

ASTM E 119

ASTM E 119

1Q-117D

ELECTRICAL

1Q-116

IT

C1-137

COORIDOR

STAIR

1Q-115

OFFICE/

READING

1Q-114

OFFICE/

READING

1Q-113

OFFICE/

READING

1Q-119

US MINOR

PROCEDURE

1Q-117A

IT 1Q-117B

ELECTRICAL

1V-100A Room

1V-100B Room

1V-100C Room

1V-100D Room

1V-100E Room

C1-155 Room

1V-135 Room

1V-134 Room 1V-133

Room 1V-132 Room

1V-101 Room

1V-129 Room

1V-102 Room

C1-156 Room

1V-127 Room

1V-103 Room

1V-124 Room

1V-103A Room

1V-131 Room

1V-130 Room

1V-128 Room

1V-125 Room

1V-146 Room

1V-146A Room

C1-175 Room

C1-174 Room

1V-140 Room

1V-139 Room

1V-138 Room

1V-137 Room

1R-138 Room

1V-100H Room

1V-100G Room

1V-100F Room

C1-173 Room

C1-171 Room

1V-145 Room

1V-142 Room

C1-184A

CORRIDOR

C1-184

CORRIDOR

1V-141 Room

1V-150A Room

1V-149 Room

1V-150 Room

1V-148 Room

1V-147 Room

1S-1 Room

1T-108 Room

1T-107 Room

C1-185A

CORRIDOR

C1-136

EXIT

1R-113 Room

1R-110 Room

1R-111 Room

1T-106

TOILET

1T-105

TOILET

1T-103 Room

1T-104 Room

1R-109 Room

1R-108 Room

1S-143 Room

1S-142 Room

1S-144 Room

1S-141 Room

1S-2 Room

C1-139

CORRIDOR

C1-143 Room

C1-142

CHANGING

C1-141

CHANGING

CA-140

CHANGING

1R-125

GENERAL

RAD RM 3

1R-125A

CONTROL

1R-126

GENERAL

RAD RM 2

1R-132

GENERAL

RAD RM 4

1R-134

GENERAL

RAD RM 5

1R-136

IR 7

EQUIPMENT

1R-139

IR NEURO

ROOM 7

1R-141A

SUPERVISOR

OFFICE

1R-141

READING

1R-142

IR

VASCULAR

ROOM 8

1R-158

IR 8

EQUIPMENT

1R-140

CONTROL

1Q-112

OFFICE/

READING

1Q-111

OFFICE/

READING

1Q-110

OFFICE/

READING

1Q-109

OFFICE/

READING

1Q-107

OFFICE/

READING

C1-129B

CORRIDOR

1R-143A

WOMANS

LOCKER

1R-143

WOMANS

TOILET

1R-145

BREAK

1R-146

MENS

TOILET

C1-133

HALLWAY

PACS

C1-132

VESTIBLUE

1R-133

OFFICE

1R-131

OFFICE

C1-131

HALLWAY

1R-127

GENERAL

RAD RM 1

C1-130

ALCOVE

1R-135 Room 1R-128A

TOILET

1R-128

WAITING

C1-144 Room

1R-117 Room

1R-118 Room

1R-119 Room

1R-120 Room

1R-121 Room

1R-122 Room

1R-123 Room

1R-124 Room

C1-145

CORRIDOR

C1-194

CORRIDOR

C1-194A Room

M-10

OR

ELEVATOR

1Q-100F

TOILET

1Q-100G

ULTRASOUND

1Q-100E

DRESSING

1Q-100H

MAMMOGRAPHY

1R-137B

PACS

OFFICE

1R-137C

TECH FILE

1Q-124

CT

1Q-123

OFFICE

1Q-118 Room

1Q-117

MECHANICAL

1Q-117C Room

C1-152

CORRIDOR

STAIR

1Q-125 Room

1V-107A Room 1V-107B

Room 1V-108 Room

1V-109 Room

1V-110 Room

1V-111 Room

C1-165 Room

1V-105 Room

1V-107 Room

1V-121 Room

1V-122 Room

1V-123 Room

1V-107P Room

1V-100 Room

1V-107J Room

1V-113 Room

1V-114 Room

1V-151 Room

1V-120 Room

1V-118 Room

1V-112 Room

1V-116 Room

C1-164 Room

C1-169 Room

C1-170 Room

1V-117 Room

1V-117A Room

C1-176A Room

C1-177 Room

C1-178 Room

C1-179 Room

C1-180 Room

1V-119 Room

C1-166 Room

C1-176 Room

C1-183

LOBBY

C1-181 Room

M-5

SHAFT

C1-154A Room

1V-156 Room

C1-182 Room

C1-183A

LOBBY

E D

ED

E X

IT

E

X

IT

E D

EXIT

E X

IT

E

X

IT

ED

ED

E D

E D

E X

IT

EXIT EXIT

LIMITS OF CONSTRUCTION

FEC

1Q-139B

PATIENT

PREP

MSCZ-1-M

6479 SF

PATIENT CARE NON SLEEPING SUITE

4444 SF

PATIENT CARE NON SLEEPING SUITE

8961 SF

NON PATIENT

CARE SUITE

6215 SF

PATIENT CARE

NON SLEEPING

SUITE

744 SFTRAVEL DISTANCE

141'-3"

1Q-124A

CONTROL

1Q-128A

ALCOVE

TRAVEL DISTANCE

76'-5"

T R

A V

E L

D

IS

T A

N C

E

T R

A V

E L

D

IS

T A

N C

E

C O

M M

O N

P A

T H

O F

T R

A V

E L

C O

M M

O N

P A

T H

O F

T R

A V

E L

1C-135

CORRIDOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE PROJECT NUMBER:

C

R e v it P ro je c ts

\1

B

L D

G

M in n e a p o lis s t F lo o r_ R a d io lo g y

C T

R g b a rb a ri a e

-m n

.c o m .r v t

/1

/2

:1

:1

P

M

1354-GI010

1ST FLOOR LIFE SAFETY PLAN RENOVATE RADIOLOGY:

CONSTRUCT CT FORCE

618-16-102

1/10/2019 GJB14721

3/32" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN

Revisions: Date:

CLASSROOM

1A

MECHANICAL

STAIR

HW1

HALLWAY

1C-139G

CRAWL

SPACE

LIMITS OF CONSTRUCTION

PHASE 2

PHASE 1

PHASE 1

LIMITS OF CONSTRUCTION

1H-123

CONFERENCE

ROOM1G-117

Room

1G-121 Room

1G-118 Room 1G-119

Room

1G-120

HAC

1H-119 Room

1H-120 Room

1G-106 Room

C1-203

ATRIUM

PHASE 1

PHASE 2

C1-64

HALLWAY

INFECTION CONTROL GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND

PARTICULATE MATTER TO THE CONSTRUCTION

AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED

COMPLETELY WITH MIN 4 MIL POLY AND DUCT TAPE DURING

CLASS II, III, OR IV OPERATIONS.

3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CLASS III OR

CLASS IV CONSTRUCTION OPERATIONS. EACH AREA TO BE UNDER

NEGATIVE PRESSURE (0.02"WC) DURING THESE OPERATIONS.

MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN

CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS

DIRECTED BY VA.

4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,

PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION

PERMIT" TO THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION,

PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST

10 WORKING DAYS NOTICE FOR EACH PERMIT.

5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER

FROM FLOOR TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER

IS ADJACENT SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION

WHICH WILL NOT BE DEMOLISHED AND TERMINATES TO FLOOR

OR DECK ABOVE, THEN CONSTRUCT IC BARRIER FROM FLOOR

TO ABOVE CORRIDOR CEILING WITH 4 MIL POLY BEING SEALED

ON ALL EDGES: FLOOR, TOP OF WALL, SIDES, AND ALL PENETRATIONS.

SEE DETAILS THIS SHEET. TAPE, MUD, SAND JOINTS AND PAINT ON NON-

CONSTRUCTION SIDE OF BARRIER.

6. GENERAL CONTRACTOR SHALL PROVIDE NEW CONSTRUCTION

ACCESS DOORS AT ALL BARRIERS. MAINTAIN ALL INFECTION CONTROL

STANDARDS. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY

BEFORE 7:00 A.M. AND AFTER 8:00 P.M.

7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA

PROVIDE NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS

LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF

AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND

10000 SF. EGRESS IS TO BE MAINTAINED AT ALL TIMES.

8. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES

TO COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR

ACTUAL TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE

THE NUMBER OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING

THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING

THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT

TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR

CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE

FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.

9. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS, CONSTRUCT

NEW SMOKE BARRIER/APPROPRIATE FIRE RATED WALLS PER NEW PLANS

OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER.

INFECTION CONTROL RISK ASSESSMENT (ICRA) BY PROJECT AREA USE AND PHASE

PHASE 1 & 2: AREA F

CONSTRUCTION PROJECT ACTIVITY TYPE - C

PATIENT RISK GROUP - LOW RISK

CONTROL PROCEDURE CLASS - II

PHASE 1 & 2: BUILDING 9 LOWER LEVEL

CONSTRUCTION PROJECT ACTIVITY TYPE - C

PATIENT RISK GROUP - LOW RISK

CONTROL PROCEDURE CLASS - II

PHASE 3, 4, 5, 6 & 7:

CONSTRUCTION PROJECT ACTIVITY TYPE - C

PATIENT RISK GROUP - HIGH RISK

CONTROL PROCEDURE CLASS - III

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE PROJECT NUMBER:

C

R e v it P ro je c ts

\1

B

L D

G

M in n e a p o lis s t F lo o r_ R a d io lo g y

C T

R g b a rb a ri a e

-m n

.c o m .r v t

/1

/2

:1

:2

P

M

1354-GI020

INFECTION CONTROL & PHASING

PLAN - BLDG 9 & AREA F

RENOVATE RADIOLOGY:

CONSTRUCT CT FORCE

618-16-102

1/10/201914721

3/16" = 1'-0"

BASEMENT FLOOR COTRUCION BARRIER & PHASING PLAN - BUILDING 9

3/16" = 1'-0"

FIRST FLOOR COTRUCION BARRIER & PHASING PLAN - AREA F

KEYPLAN

OVERALL

AREA M AREA A

AREA

C

AREA B

AREA F

AREA

E

AREA

N

AREA L

AREA K

AREA J AREA G

AREA

H

AREA D

Revisions: Date:

0M

M

TA

B

LE

1Q-117D

ELECTRICAL

1Q-116

IT

C1-137

COORIDOR

STAIR

1Q-115

OFFICE/

READING

1Q-114

OFFICE/

READING

1Q-113

OFFICE/

READING

1Q-119

US MINOR

PROCEDURE

1Q-117A

IT

1Q-117B

ELECTRICAL

1V-100A Room

1V-100B Room

1V-100C Room

1V-100D Room

1V-100E Room

C1-155 Room

1V-135 Room

1V-134 Room

1V-101 Room

1V-102 Room

C1-156 Room

1V-103 Room

1V-103A Room

1R-138 Room1V-100H

Room1V-100G Room

1V-100F Room

C1-136

EXIT

C1-141

CHANGING

CA-140

CHANGING

1R-136

IR 7

EQUIPMENT

1R-139

IR NEURO

ROOM 7

1R-142

IR

VASCULAR

ROOM 8

1R-140

CONTROL

1Q-112

OFFICE/

READING

1Q-124

CT

1Q-123

OFFICE

1Q-117

MECHANICAL

E X

IT

E

X

IT

E D

EXIT

LIMITS OF CONSTRUCTION

B3b

B3b

B3b

B3b

PHASE 3

PHASE 6

PHASE 6

PHASE 7

PHASE 6

PHASE 4

PHASE 5

1Q-139B

PATIENT

PREP

PORTION OF CONSTRUCTION BARRIER TO REMAIN AS FINAL PARTITION

REMOVAL OF THIS PORTION OF PARTITION TO OCCUR ONLY

AFTER ALL OTHER PARTITIONS HAVE BEEN COMPLETED.

INFECTION CONTROL RISK ASSESSMENT (ICRA) BY PROJECT AREA USE AND PHASE

PHASE 1 & 2: AREA F

CONSTRUCTION PROJECT ACTIVITY TYPE - C

PATIENT RISK GROUP - LOW RISK

CONTROL PROCEDURE CLASS - II

PHASE 1 & 2: BUILDING 9 LOWER LEVEL

CONSTRUCTION PROJECT ACTIVITY TYPE - C

PATIENT RISK GROUP - LOW RISK

CONTROL PROCEDURE CLASS - II

PHASE 3, 4, 5, 6 & 7:

CONSTRUCTION PROJECT ACTIVITY TYPE - C

PATIENT RISK GROUP - HIGH RISK

CONTROL PROCEDURE CLASS - III

INFECTION CONTROL GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND

PARTICULATE MATTER TO THE CONSTRUCTION

AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED

COMPLETELY WITH MIN 4 MIL POLY AND DUCT TAPE DURING

CLASS II, III, OR IV OPERATIONS.

3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CLASS III OR

CLASS IV CONSTRUCTION OPERATIONS. EACH AREA TO BE UNDER

NEGATIVE PRESSURE (0.02"WC) DURING THESE OPERATIONS.

MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN

CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS

DIRECTED BY VA.

4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,

PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION

PERMIT" TO THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION,

PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST

10 WORKING DAYS NOTICE FOR EACH PERMIT.

5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER

FROM FLOOR TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER

IS ADJACENT SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION

WHICH WILL NOT BE DEMOLISHED AND TERMINATES TO FLOOR

OR DECK ABOVE, THEN CONSTRUCT IC BARRIER FROM FLOOR

TO ABOVE CORRIDOR CEILING WITH 4 MIL POLY BEING SEALED

ON ALL EDGES: FLOOR, TOP OF WALL, SIDES, AND ALL PENETRATIONS.

SEE DETAILS THIS SHEET. TAPE, MUD, SAND JOINTS AND PAINT ON NON-

CONSTRUCTION SIDE OF BARRIER.

6. GENERAL CONTRACTOR SHALL PROVIDE NEW CONSTRUCTION

ACCESS DOORS AT ALL BARRIERS. MAINTAIN ALL INFECTION CONTROL

STANDARDS. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY

BEFORE 7:00 A.M. AND AFTER 8:00 P.M.

7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA

PROVIDE NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS

LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF

AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND

10000 SF. EGRESS IS TO BE MAINTAINED AT ALL TIMES.

8. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES

TO COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR

ACTUAL TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE

THE NUMBER OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING

THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING

THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT

TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR

CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE

FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.

9. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS, CONSTRUCT

NEW SMOKE BARRIER/APPROPRIATE FIRE RATED WALLS PER NEW PLANS

OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.