36E77619R0028-0002005.pdf
PDF 12 MB Posted
- Attached to
- Renovate Radiology - Construct CT Force NRM Minneapolis VAMC Federal contract opportunity
- Solicitation number
- 36E77619R0028
About this file
36E77619R0028 0002 STARC Containment SAMPLE.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36E77619C0041-000.docx | DOCX document | |
| 36E77619R0028-0004000.docx | DOCX document | |
| 36E77619R0028-0003000.docx | DOCX document | |
| 36E77619R0028-0003001.docx | DOCX document | |
| 36E77619R0028-0002001.docx | DOCX document | |
| 36E77619R0028-0002003.pdf | ||
| 36E77619R0028-0002002.pdf | ||
| 36E77619R0028-0002000.docx | DOCX document | |
| 36E77619R0028-0002004.doc | DOC document | |
| 36E77619R0028-0001000.docx | DOCX document | |
| 36E77619R0028-0001001.pdf | ||
| 36E77619R0028-009.pdf | ||
| 36E77619R0028-006.pdf | ||
| 36E77619R0028-001.docx | DOCX document | |
| 36E77619R0028-010.pdf | ||
| 36E77619R0028-007.pdf | ||
| 36E77619R0028-011.docx | DOCX document | |
| 36E77619R0028-005.pdf | ||
| 36E77619R0028-008.pdf | ||
| 36E77619R0028-002.pdf | ||
| 36E77619R0028-003.pdf | ||
| 36E77619R0028-004.pdf | ||
| 36E77619R0028-000.docx | DOCX document |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Eliminates the Disruption of Renovation
CHRIS MACKENZIE
chris@starcsystems.com
The Leader in Temporary Wall Containment starcsystems.comMade in USA
That’s
STARC
with a “C”
Simple Fast installation/takedown
Telescopic From 6’10” to 10’3”
Airtight Contains dust, reduces noise
Reusable Pays for itself in 3-5 uses
Containment Complete system with real wall appearance
The Opportunity
• 85% of 2025 Healthcare facilities already built as of 20141
• $2.5B/Month Healthcare Renovation: +6% - +8%2
• 45% of healthcare executives say revamping the patient experience is one of the of their organization’s top three priorities over the next 5 years and 86% denoting patient satisfaction as “very important” when considering design changes to facilities and services. 3
• More than 50% of healthcare executives are implementing noise-reduction construction material to boost patient experience. 4
• 5,400 Hospitals
• Reimbursement = Patient Satisfaction
• HAI’s = 98,000+ Deaths/Year
1. ASHE 2. Department of Commerce 3. Becker’s Hospital Review 4. Becker’s Hospital Review https://www.beckershospitalreview.com/facilities-management/12-statistics-on-construction-design-patient-experience-is-paramount.html https://www.beckershospitalreview.com/facilities-management/12-statistics-on-construction-design-patient-experience-is-paramount.html https://www.beckershospitalreview.com/facilities-management/12-statistics-on-construction-design-patient-experience-is-paramount.html
Exceeds ICRA Class IV requirements when installed properly.
Exceeds Class A (ASTM E-84) fire and smoke rating.
What is Temporary Containment?
Ugly, Dirty, and Ineffective
Wasteful and Environmentally Unfriendly
What is Temporary Containment?
85% Reorder Rate
Healthcare Contractors Other Verticals
Customer Satisfaction Scores
Interactions & communications prior to purchase 9.5
Quoting & buying experience 9.5
Order arrive by promise date 9.9
Panel conditions upon arrival 9.7
“Ease of use” & simplicity in installation 9.8
Overall quality of components 9.6
Appearance & aesthetics 9.9
Post-sales customer service 9.8
Would you order again 10.0
Overall Level of Satisfaction 9.9
42” 32” 24” 18” 12”
Panels
Panel Construction (Front)
Top Gasket Low profile closed cell foam making it more durable, easily cleaned, and are replaceable
Tongue & Groove Seal Integrated Spline & Groove provides air tight seal between vertical frame elements
Floor Gasket Dual closed cell foam gaskets are more durable, easily cleaned, and are replaceable
Anodized Aluminum Frame
• Clean, durable surface
• Integrated seal elements
White Fiberglass Front More resistant to dents and scratches, 10% lighter than aluminum
Urethane Foam Core Eliminates up to 50% of renovation noise
Panel Construction (Back)
Ceiling Grid Attachment Options
• Standard clips available for 15/16” & 9/16” flush & recessed tile systems
• Integrate with our track system for superior ceiling connection & support
360° T-Slot Anchoring System Allows for 360 degree anchoring to ceiling panel grids
360° Seal – Inter Panel
• Duel seals between upper & lower panels provide an air-tight barrier
Concealed Height Locks
• Duel locks provide secure adjustment & load bearing for the upper panel
• Infinite adjustability
• Integral lower limit safety stops
Galvanized Steel Back
• Rugged surface & provides secure safety barrier
• Slightly reflective – helps brighten the workspace
See How Easy it is To Setup
Doors
Swing (42” and 54”)
Sliding (42” and 54”)
Easily Adjusted Swing doors can be quickly and easily adjusted right/left and in/out once installed
Self-Closing STARC has the only self-closing sliding door on the market
Adjustable Threshold Both doors have adjustable thresholds/sweep to accommodate uneven floor surfaces
Same Construction Both doors feature the same construction as the panels
Exceptionally Durable Frames Both door frames are designed to withstand the everyday worksite abuse
Vision Kits
Door Handle Options
Mechanical Keypad (hinged doors)
Electronic Keypad (hinged doors)
Electronic Keypad (sliding doors)
Conventional Handle (hinged doors)
Accessories
Negative Air Panels
New Duct Collar Assembly
(with integrated shutter)
Integrated Pressure Ports
(connects to any monitor)
Digital Pressure Monitor
(monitor optional)
Preassembled at the factory
Wall Interface
Wall Interface Allows for creating an airtight seal of 2” to 4” against the wall
Filler Panel Allows for creating an airtight seal around wall irregularity like a handrail
Wall Interface
Flexible Corners Corners can accommodate 15 to 90 degrees
Transport
Panel Cart (empty)
Accessory Cart Dust CoverPanel Cart (loaded)
Additional Ceiling Attachments
Above The Panel
STARC Systems Outperforms All Other Containment Options
States and
Provinces
Healthcare St. Mary’s Health System
Healthcare Maine Medical Center
Corporate Pfizer
Education Northwestern
Airports LaGuardia Airport
Well-Positioned for Expansion
STARC Options
Buy Maximum Cost Savings
Rent to Own Try Before You Buy
Purchasing maximizes your savings while STARC rental provides additional options and flexibility.
Rental Project Based
Key Benefits
Sound Attenuating Fast Installation Superior Durability
Exceeds Class IV ICRA Requirements
Class A Fire & Smoke Rated
Cost Savings
Real Wall Appearance Reusable & Waste Reducing
Easily Disinfected
Thank You
888-387-3175 | www.starcsystems.com
| Slide Number 1 |
| That’s �STARC�with a�“C” |
| Simple Fast installation/takedown�Telescopic From 6’10” to 10’3”�Airtight Contains dust, reduces noise�Reusable Pays for itself in 3-5 uses�Containment Complete system with real wall appearance |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| 85% Reorder Rate |
| Customer Satisfaction Scores |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| 46�States and�3�Provinces |
| Slide Number 30 |
| Slide Number 31 |
| Slide Number 32 |
| Slide Number 33 |
| Slide Number 34 |
| Well-Positioned for�Expansion |
| Slide Number 36 |
| Slide Number 37 |
| Slide Number 38 |
File details come from the government source that posted it.