36E77618R0063-0002000.docx
DOCX document 27 KB Posted
- Attached to
- Parking Garage - WR (VACAA) Construction
- Solicitation number
- 36E77618R0063
About this file
36E77618R0063 0002 36E77618R0063 0002.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619C0004-000.docx | DOCX document | |
| 36E77618R0063-0007000.docx | DOCX document | |
| 36E77618R0063-0006000.docx | DOCX document | |
| 36E77618R0063-0005001.pdf | ||
| 36E77618R0063-0005000.docx | DOCX document | |
| 36E77618R0063-0004000.docx | DOCX document | |
| 36E77618R0063-0004001.pdf | ||
| 36E77618R0063-0003000.docx | DOCX document | |
| 36E77618R0063-0001001.docx | DOCX document | |
| 36E77618R0063-0001000.docx | DOCX document | |
| 36E77618R0063-001.docx | DOCX document | |
| 36E77618R0063-013.docx | DOCX document | |
| 36E77618R0063-010.pdf | ||
| 36E77618R0063-004.pdf | ||
| 36E77618R0063-007.pdf | ||
| 36E77618R0063-003.pdf | ||
| 36E77618R0063-005.pdf | ||
| 36E77618R0063-011.pdf | ||
| 36E77618R0063-008.pdf | ||
| 36E77618R0063-012.docx | DOCX document | |
| 36E77618R0063-002.pdf | ||
| 36E77618R0063-006.pdf | ||
| 36E77618R0063-009.pdf | ||
| 36E77618R0063-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-05-2018 523-400
PCAC
Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131
PCAC
Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131 To all Offerors/Bidders
36E77618R0063 06-12-2018
X X X X The purpose of this amendment is as follows:
- Provide a response to technical questions received. Please see section I on the continuation sheet for details.
Scott Elias Contracting Officer
CONTINUATION PAGE
Continuation Sheet, Section I, Government Response to Contractor Technical Questions: Amendment 36E77618R0063, 0002 provides the Government’s response to contractor technical questions. Please see Government responses provided below.
ITEM
NO.
| QUESTION |
| GOVERNMENT RESPONSE |
| 1 |
| Is this Solicitation capped at $10,000,000.00? |
| The minor construction program threshold was increased from 10 million to $20 million on June 6, 2018 through enactment of the VA MISSION Act of 2018 (Pub. L. 115‐182). Note, the solicitation requires contractors to price out all CLINS. Please ensure you do so. The total evaluated price will be determined by the Offeror's price for CLIN 0001, Base Bid, and the Deduct Alternates (in order of priority listed in the pricing schedule providing the most features of the work within the funds determined by the Government to be available. |
| 2 |
| Are proposals to be mailed or will you accept emailed proposals? |
| Submit proposals via email to scott.elias@va.gov. Emails are limited to five (5) MB. |
Submit the original of the Bid Guarantee by mail to:
Scott Elias Department of Veterans Affairs Program Contracting Activity Central (VA-PCAC) 6150 Oaktree Blvd., Suite 300 Independence, OH 44131 Note, the solicitation attachment 1 document provides detailed information on proposal submission requirements.
| 3 |
| Specification 071800 (Traffic coating) is present but drawing do not indicate application areas. Question, is traffic coating to be applied to all elevated decks or just above occupied space on elevated decks? Also, referencing the question below is it the intent to apply penetrating sealer or traffic coating to the Slab On Grade deck? |
| Traffic membrane to be installed over elevator machine and mechanical rooms only. See drawing SS102. |
| 4 |
| Specification 071900 (Penetrating sealers) appears to be missing. This is typically applied to the Slab On Grade portion of the parking deck and may be applied to vertical surfaces to reduce water penetration and thereby preserving embedded reinforcement. It has been a standard specification in all VA garage projects we have bid. Question, will this be an added specification TBA? |
| Penetrating Sealer is specified in section 033000, 2.2 N. Use on all CIP slabs and toppings on garage ramps and decks. |
| 5 |
| Specification 079500 (Expansion joint cover assemblies) Typically an expansion joint similar to the Watson Bowman ME-225 of ME-300 is installed at the Slab on Grade Ramp to Elevated Deck transition. This specification and drawing detail seems to be missing currently. Question, will this specification and corresponding drawing be issued as part of the bid documents? |
| See detail A/SF103. Specification to be provided. |
| 6 |
| Standardized spacing of Contraction joints seem to be missing from the drawings as are other waterproofing details. Question will a sheet of waterproofing details be forthcoming? |
| Control joints are noted on CIP slab, see SF101. All typical control joint and construction joints are shown on SF102. |
| 7 |
| What labor category does the VA place a worker who applies penetrating sealers, installs expansion joints, applies traffic coating on decks and caulks? |
| The VA incorporates Davis Bacon Wage Determinations published by the United States Department of Labor for the county where construction services are being performed into our construction contract documents. Labor categories and rates applicable to this project can be found in the Davis Bacon Wage Determinations for Suffolk County. Please see solicitation 36E77618R0063 attachment 9, Davis Bacon Wage Rates Suffolk County. Any questions regarding interpretation of their documents should be clarified with the DOL at www.dol.gov/whd/ govcontracts. |
| 8 |
| This structure is adjacent to ocean environment and freeze thaw cycles. There does not appear to be a specification 071900 penetrating sealer. Is it the intent to leave these decks untreated and subject to deicing salt contamination? |
| The precast structure is to conform with ACI durability requirements for Zone 3, reference specification section 034133, 1.7.A. |
| 9 |
| Please confirm project is tax exempt & provide tax exempt ID/certificate |
| Reference FAR clause 52.229-3 included in the solicitation. Contractors shall include all applicable federal, state and local taxes in their proposal submission. |
| 10 |
| Please confirm badging and/or background checks will not be required for workers on site. |
| See §01 00 00 1.4 B. Badging is required. |
| 11 |
| Please confirm Notice to Proceed will be issued within the next 6 months |
| Confirmed. |
| 12 |
| Please confirm work for all phases (1-4) should be included in this proposal, reference sheet G003 |
| CLIN 0001, Base Bid includes all work and all phases. |
| 13 |
| Please confirm fireproofing will not be required on the project, whether it be SFRM or Intumescent fireproofing |
| Building design is Type II B, non-combustible with no fire resistance rating. PDT confirm. |
| 14 |
| Please confirm both underslab & insulation against foundation walls will only be required at heated spaces & not at the entire extent of the foundation. |
| Confirmed. |
| 15 |
| Please confirm that perimeter drain will not be required on the project despite being shown on SF103 |
| The Civil Drawings do not show/indicate a perimeter drain. |
| 16 |
| Please confirm email bid will be accepted & hard copies will not be required |
| Submit proposals via email to scott.elias@va.gov. Emails are limited to five (5) MB. |
Submit the original of the Bid Guarantee by mail to:
Scott Elias Department of Veterans Affairs Program Contracting Activity Central (VA-PCAC) 6150 Oaktree Blvd., Suite 300 Independence, OH 44131 Note, the solicitation attachment 1 document provides detailed information on proposal submission requirements.
| 17 |
| Will a freestanding or advanced (not to be left as part of the work) mock up be required for any finishes? If so please issue a mock up panel drawing. |
| Mockup is not required. |
| 18 |
| Please clarify whether the requirements set forth in the VA BIM Standards (https://www.cfm.va.gov/til/projReq.asp) and VA BIM Manual v2.2 are to be maintained on this project. The Specifications define but do not outline the requirements for the following: |
Building Information Modeling (BIM) Construction Operations Building Information Exchange (COBie) See §01 00 00 1.31 G; Photographic documentation shall have parametric data to interface with BIM industry standards. See §01 91 00 The GC’s Commissioning Agent may request certain information of the GC be presented with COBie parametric data imbedded Projects.
| 19 |
| Would it be possible to get a copy of the Revit files from the design? |
| Available electronic copies of files will be made available to the successful bidder. Format to be what is available. |
| 20 |
| In regards to the off-site parking requirement. We have not yet been able to find a lot large enough in the area for the temporary parking. In the interest of time would the VA consider taking this responsibility on themselves? Or could there be an allowance for all contractors for this due to the lack of available space for this requirement? Please advise. |
| VA will not remove the requirement for temporary offsite parking. The VA will not incorporate an allowance for temporary parking. |