36E77618R0053-005.pdf
PDF 17 MB Posted
- Attached to
- Sioux Falls- Renovate 5th Floor Surgery Federal contract opportunity
- Solicitation number
- 36E77618R0053
About this file
36E77618R0053 ATTACHMENT 3 - FINAL CONSTRUCTION DRAWINGS.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36E77618R0053-00004001.docx | DOCX document | |
| 36E77618R0053-00004000.docx | DOCX document | |
| 36E77618R0053-00003001.docx | DOCX document | |
| 36E77618R0053-00003000.docx | DOCX document | |
| 36E77618R0053-00002001.pdf | ||
| 36E77618R0053-00002002.pdf | ||
| 36E77618R0053-00002000.docx | DOCX document | |
| 36E77618R0053-00001000.docx | DOCX document | |
| 36E77618R0053-00001001.pdf | ||
| 36E77618R0053-001.docx | DOCX document | |
| 36E77618R0053-006.pdf | ||
| 36E77618R0053-002.pdf | ||
| 36E77618R0053-008.pdf | ||
| 36E77618R0053-009.docx | DOCX document | |
| 36E77618R0053-010.docx | DOCX document | |
| 36E77618R0053-007.pdf | ||
| 36E77618R0053-003.pdf | ||
| 36E77618R0053-004.pdf | ||
| 36E77618R0053-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH
scale
MEMORIAL PARKING #1
PARKING #7
PARKING #6
PARKING #2A
PARKING
T15
T
T13
T11 th
S T
HOLLYELMWOODLINCOLN
P A R K
IN
G
PARKING #4
26th STREET
TEMPORARY
#5
PRKG.
G A R F
IE
L D
A V E N U E
HOLLYLINCOLN
22nd STREET
SIGN
VETERANS
16 15
STATION GARAGE9
CHILD DAYCARET15
PAD MOUNT TRANSFORMER29
feet 50 250200150100500
SIOUX FALLS, SOUTH DAKOTA
V.A.M.R.O.C. SITE PLAN
RESEARCH BUILDING
ELECTRICAL SWITCHGEAR
STORAGE BUILDING
STORAGE BUILDING
STORAGE BUILDING
T13
T12
T11
COOLING TOWER PAD44
PAD MOUNT TRANSFORMER
PAD MOUNT TRANSFORMER
PAD MOUNT TRANSFORMER
PAD MOUNT TRANSFORMER
45,46
42,43
40,41
OXYGEN STORAGE PAD
REGIONAL OFFICE BUILDING
A/C PAD - I.C.U.
PAD MOUNT TRANSFORMER
PAD MOUNT TRANSFORMER
PAD MOUNT TRANSFORMER
SALT STORAGE BASIN31
PAD MOUNT TRANSFORMER25
AUXILIARY POWER UNIT24
RECREATION SHELTER - N.H.C.U.22
RECREATION SHELTER - HOSPITAL21
GAS METER HOUSE19
GARAGE18
ENGINEERING and A & MM17
MENTAL HEALTH & BLDG. MGMT.16
HOPTEL BUILDING15
FLAGPOLE14
BOILER PLANT11
WATER TANK10
SEPT., 2001
BUILDING SCHEDULE
LAUNDRY8
UTILITY SHOPS7
HOSPITAL BUILDING5
N.H.C.U.1
BUILDINGSNO.
WEST
PLAINS
ENGINEERING.
INC.
WWW.WESTPLAINSENGINEERING.COM
RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,
ND
R
TAT
S
DE
TI
N
U ACIREMAFOSE
A
IR
S
D E
PA
ETERANS
AFFTM
EN
T
OF
V
Office of Construction and Facilities Management
Department of Veterans Affairs
ARCHITECT:CONSULTANTS:
Revisions: Date
VA FORM 08 -- 6231
Project Number
Building Number
Drawing Number
Dwg. of
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
TELE: (605) 332-7850 FAX: (605) 332-3539
SIOUX FALLS, SOUTH DAKOTA 57104-4873
625 S. MINNESOTA AVENUE, SUITE 204 -
PROJECT LOCATION DRAWING SHEET INDEX
4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106
PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759
V.A. HEALTH CARE SYSTEM
SIOUX FALLS, SOUTH DAKOTA
438−15−201
RENOVATE 5TH FLOOR SURGERY
October 11, 2017
438−15−201
AADDGS
GI000
100% CONSTRUCTION
DRAWINGS
1 60
SIOUX FALLS, SOUTH DAKOTA
V.A. HEALTH CARE SYSTEM
RENOVATE 5TH FLOOR SURGERYCOVER SHEET
SHEET
NUMBER SHEET NAME PAGE NUMBER OF
MECHANICAL
5 - MD101 DEMOLITION HVAC VENTILATION PLAN - FOURTH FLOOR 36 60
5 - MD102 DEMOLITION HVAC VENTILATION PLAN - FIFTH FLOOR 37 60
5 - MD103 DEMOLITION HVAC VENTILATION PLAN - PENTHOUSE 38 60
5 - MD104 DEMOLITION HVAC PIPING PLAN - FIFTH FLOOR 39 60
5 - MD105 DEMOLITION HVAC PIPING PLAN - PENTHOUSE 40 60
5 - MH001 MECHANICAL SYMBOLS SHEET 41 60
5 - MH002 MECHANICAL ABBREVIATIONS AND GENERAL NOTES 42 60
5 - MH101 HVAC VENTILATION PLAN - FOURTH FLOOR 43 60
5 - MH102 HVAC VENTILATION PLAN - FIFTH FLOOR 44 60
5 - MH103 HVAC VENTILATION PLAN - PENTHOUSE 45 60
5 - MH501 MECHANICAL DETAILS 46 60
5 - MH502 MECHANICAL DETAILS 47 60
5 - MH601 HVAC SCHEDULES 48 60
5 - MP101 HVAC PIPING PLAN - FOURTH FLOOR 49 60
5 - MP102 HVAC PIPING PLAN - FIFTH FLOOR 50 60
5 - MP103 HVAC PIPING PLAN - PENTHOUSE 51 60
5 - MP501 HVAC PIPING DETAILS 52 60
ELECTRICAL
5 - ED100 DEMOLITION CEILING PLAN - FOURTH FLOOR 53 60
5 - ED101 DEMOLITION ELECTRICAL PLAN - FIFTH FLOOR 54 60
5 - EL101 LIGHTING PLAN - FIFTH FLOOR 55 60
5 - EL500 LIGHTING DETAILS AND SCHEDULES 56 60
5 - EP101 POWER PLAN - FIFTH FLOOR 57 60
5 - EP102 COMMUNICATIONS PLAN - FIFTH FLOOR 58 60
5 - EP500 POWER AND COMMUNICATIONS DETAILS 59 60
5 - EP601 POWER AND COMMUNICATIONS SCHEDULES 60 60
SHEET
NUMBER SHEET NAME PAGE NUMBER OF
GENERAL
5 - GI000 COVER SHEET 1 60
5 - GI001 PHASING PLANS 2 60
STRUCTURAL
5 - S1 EXISTING ROOF FRAMING PLAN AT FIFTH FLOOR 3 60
ARCHITECTURAL
5 - AD100 FOURTH FLOOR DEMOLITION PLANS 4 60
5 - AD101 FIFTH FLOOR DEMOLITION PLAN 5 60
5 - AD102 FIFTH FLOOR REFLECTED CEILING DEMOLITION PLAN 6 60
5 - AI100 FIFTH FLOOR CODE PLAN 7 60
5 - AI101 FOURTH FLOOR PLANS 8 60
5 - AI102 FIFTH FLOOR REMODEL PLAN 9 60
5 - AI103 FIFTH FLOOR REFLECTED CEILING PLAN 10 60
5 - AI104 ENLARGED FLOOR PLANS 11 60
5 - AI200 INTERIOR ELEVATIONS 12 60
5 - AI201 INTERIOR ELEVATIONS 13 60
5 - AI300 BUILDING SECTIONS 14 60
5 - AI500 CASEWORK DETAILS 15 60
5 - AI501 MISCELLANEOUS DETAILS 16 60
5 - AI502 DOOR SCHEDULE, DOOR AND WINDOW FRAMES AND
DETAILS
17 60
5 - AI503 WINDOW FRAME ELEVATIONS AND DETAILS 18 60
5 - AF100 FIFTH FLOOR FINISH PLAN 19 60
5 - AF600 FINISH SCHEDULE 20 60
5 - IF101 EQUIPMENT PLAN 21 60
FIRE PROTECTION
5 - FD101 DEMOLITION FIRE PROTECTION PLAN - FIFTH FLOOR 22 60
5 - FA101 FIRE PROTECTION LEGEND AND DETAILS 23 60
5 - FA102 FIRE PROTECTION PLAN - FIFTH FLOOR 24 60
PLUMBING
5 - PD101 DEMOLITION PLUMBING PLAN - FOURTH FLOOR 25 60
5 - PD102 DEMOLITION PLUMBING PLAN - FIFTH FLOOR 26 60
5 - PD103 DEMOLITION PLUMBING PLAN - PENTHOUSE 27 60
5 - PD104 DEMOLITION MEDICAL GAS PLAN - FIFTH FLOOR 28 60
5 - PD105 DEMOLITION MEDICAL GAS PLAN - PENTHOUSE 29 60
5 - PL001 MECHANICAL PLUMBING SYMBOLS AND ABBREVIATIONS 30 60
5 - PL101 PLUMBING PLAN - FOURTH FLOOR 31 60
5 - PL102 PLUMBING PLAN - FIFTH FLOOR 32 60
5 - PL103 MEDICAL GAS PLAN - FIFTH FLOOR 33 60
5 - PL501 PLUMBING DETAILS 34 60
5 - PL601 PLUMBING SCHEDULES 35 60
PROJECT
AREA
PROJECT AREA EXISTIN
G ATTIC
SPACE
EXISTING ATTIC
SPACE
5TH FLOOR
RAMP UP
PHASE 1 NOTES:
- BEGIN CONSTRUCTION ON THIS AREA WHEN GIVEN NOTICE TO
PROCEED.
- MAINTAIN HVAC, POWER, PLUMBING, AND FIRE SPRINKLER SYSTEMS
TO ALL OTHER PORTIONS OF THE HOSPITAL THROUGHOUT THE
WORK OF THIS PHASE.
- PROVIDE TEMPORARY COOLING IN THE ELEVATOR LOBBY AREA
DURING THE WORK OF THIS PHASE.
- MAINTAIN TEMPORARY PARTITION AND TEMPORARY DOOR
THROUGHOUT THIS PHASE OF CONSTRUCTION.
1 3
RAMP UP
PHASE 2 NOTES:
- BEGIN CONSTRUCTION ON THIS AREA 14 CALENDAR DAYS AFTER
FINAL COMPLETION OF PHASE 1.
- MAINTAIN HVAC, POWER, PLUMBING, AND FIRE SPRINKLER SYSTEMS
TO ALL OTHER PORTIONS OF THE HOSPITAL THROUGHOUT THE
WORK OF THIS PHASE.
- PROVIDE TEMPORARY COOLING IN THE ELEVATOR LOBBY AREA
DURING THE WORK OF THIS PHASE.
- MAINTAIN TEMPORARY PARTITION AND TEMPORARY DOOR
THROUGHOUT THIS PHASE OF CONSTRUCTION.
RAMP UP PHASE THREE NOTES:
- PHASE THREE WORK - FINAL FLOOR, WALL AND CEILING FINISHES
THROUGHOUT THIS AREA.
- PHASE THREE WORK MAY BEGIN AS SOON AS PHASE TWO CONSTRUCTION IS
COMPLETED AND TEMPORARY WALL AND DOOR HAS BEEN REMOVED.
- PHASE THREE WORK WILL REQUIRE CLOSE COORDINATION WITH THE VA DUE
TO ONGOING OPERATIONS THROUGHOUT THIS FLOOR.
- CONTRACTOR IS REQUIRED TO WORK AFTER NORMAL BUSINESS HOURS
AND/OR ON WEEKENDS WHEN PERFORMING ALL DEMOLITION WORK AND
PRELIMINARY AND FINAL FLOOR, WALL, AND CEILING FINISHES THROUGOUT
THIS AREA.
WEST
PLAINS
ENGINEERING.
INC.
WWW.WESTPLAINSENGINEERING.COM
RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,
ND
Office of Construction and Facilities Management
Department of Veterans Affairs
Project Number
Building Number
Drawing Number
Dwg. of
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT:CONSULTANTS:
Revisions: Date
VA FORM 08 -- 6231
on e e ig ht h in ch on e fo ot on e q ua rte r th re ei gh th s ha lf i nc f oo t th q ua rs o ne on e i f oo t on e a nd es th
6"
6"
6"
6"
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
TELE: (605) 332-7850 FAX: (605) 332-3539
SIOUX FALLS, SOUTH DAKOTA 57104-4873
625 S. MINNESOTA AVENUE, SUITE 204
KEYNOTES:
GENERAL NOTES:
KEY PLAN:
SEAL:
4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106
PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759
OCTOBER 11,
438−15−201
AuthorChecker
PHASING PLANS
100% CONSTRUCTION
DRAWINGS
2 60
SIOUX FALLS, SOUTH DAKOTA
V.A. HEALTH CARE SYSTEM
RENOVATE 5TH FLOOR SURGERY
GI0015
SCALE: 1/8" = 1'-0"
PHASE ONE PLAN
SCALE: 1/8" = 1'-0"
PHASE TWO PLAN
SCALE: 1/8" = 1'-0"
PHASE THREE PLAN
TEMPORARY 1 HOUR FIRE RATED CONSTRUCTION PARTITION. REMOVE
PARTITION AT COMPLETION OF PHASE 1
TEMPORARY 1 HOUR FIRE RATED CONSTRUCTION PARTITION. REMOVE
PARTITION AT COMPLETION OF PHASE 2
TEMPORARY 1 HOUR FIRE RATED DOOR
A. CONTRACTOR SHALL BE ABLE TO ACCESS THE PROJECT VIA ONLY ONE
ELEVATOR. COORDINATE WITH THE VA REGARDING WHICH ELEVATOR WILL BE
ALLOWED ACCESS TO THE 5TH FLOOR DURING CONSTRUCTION. THREE OF THE
FOUR ELEVATORS WILL HAVE 5TH FLOOR ACCESS ELIMINATED DURING
CONSTRUCTION.
B. DAMAGE TO THE ELEVATOR USED FOR CONSTRUCTION SHALL BE REPAIRED BY
THE CONTRACTOR PRIOR TO SUBSTANTIAL COMPLETION.
C. PROVIDE TEMPORARY COOLING IN THE ELEVATOR LOBBY DURING BOTH PHASE 1
AND PHASE 2 CONSTRUCTION.
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to COR and Contractor, as follows:
RENOVATE 5th FLOOR SURGERY – PHASING SCHEDULE Standard work hours for the medical center are Monday–Friday, 7:00 a.m. to 4:30 p.m. After hours work may be required by the contractor pending noise, vibration or other construction impacts that would limit care to patients.
Phase I:
1. This Project is divided into THREE SEPARATE PHASES. Phase 1 work shall be completed prior to commencing Phase 2 work. Phase 2 work shall be completed prior to commencing Phase 3 work. The contractor shall provide adequate work forces to complete all work in each Phase within the contracted time frame.
2. Coordinate with Contracting Officers Representative (COR) to assure that all items to be removed or relocated from the spaces by the VA have been so removed.
3. Construct required construction barriers. Construct 1 hour fire barrier and temporary fire door as indicated prior to beginning demolition and asbestos abatement.
4. Perform Phase 1 asbestos and demolition activities. After hours work may be required by the contractor pending noise, vibration or other construction impacts that limits care to patients.
5. After demolition and asbestos abatement activities are completed for Phase 1, convene a meeting with Contracting Officers Representative (COR) and Architect/Engineer to review conflicts.
6. Install new walls, doors, ceilings, casework, and equipment in an order most workable to the General Contractor for Phase 1 Area.
7. Coordinate installation of plumbing, electrical and mechanical equipment for Phase 1 Area.
8. Complete wall and floor finishes within individual work areas for Phase 1 Area.
9. Remove temporary construction barriers and doors at completion of Phase 1 work.
10. For each Phase and Area, complete final cleanup for final inspection by Contracting Officers Representative (COR) and Architect/Engineer.
11. After Phase I activities are completed convene a meeting with Contracting Officers Representative (COR) and Architect/Engineer to review conflicts.
Phase II:
12. Provide 14 calendar day window between final completion of Phase 1 and the beginning of Phase 2 for the VA to move out of the Phase 2 Area.
13. Coordinate with Contracting Officers Representative (COR) to assure that all items to be removed or relocated from the spaces by the VA have been so removed.
14. Construct required construction barriers. Construct 1 hour fire barrier and temporary fire door as indicated on Sheet GI001 Phasing Plans prior to beginning demolition and asbestos abatement.
15. Perform Phase 2 asbestos abatement and demolition activities. After hours work may be required by the contractor pending noise, vibration or other construction impacts that limits care to patients.
16. After demolition and asbestos abatement activities are completed for Phase 2, convene a meeting with Contracting Officers Representative (COR) and Architect/Engineer to review conflicts.
17. Install new walls, doors, ceilings, casework, and equipment in an order most workable to the General Contractor for Phase 2 Area.
18. Coordinate installation of plumbing, electrical and mechanical equipment for Phase 2 Area.
19. Complete wall and floor finishes within individual work areas for Phase 2 Area.
20. Remove temporary construction barriers and doors at completion of Phase 2 work.
21. For each Phase and Area, complete final cleanup for final inspection by Contracting Officers Representative (COR) and Architect/ Engineer.
22. After Phase 2 activities are completed, convene a meeting with Contracting Officers Representatives (COR) and Architect/Engineer to review conflicts.
Phase III:
23. Demolition may proceed in Phase 3 in an order most suitable to the General Contractor, however Phase 1 and 2 shall be 100% complete prior to any work on Phase 3.
24. Work for Phase 3 will need to occur in conjunction with continued hospital operations. The contractor shall coordinate work during this phase closely with the VA and provide protection for VA employees and patients during this phase. After hours work may be required by the contractor pending noise, vibration or other construction impacts that limits care to patients.
25. After demolition activities are completed for Phase 3, convene a meeting with Contracting Officers Representative (COR) and Architect/Engineer to review conflicts.
26. Install new walls, doors, ceilings, casework, and equipment in an order most workable to the General Contractor, for Phase 3 Area.
27. Coordinate installation of plumbing, electrical and mechanical equipment for Phase 3 items.
28. Complete wall and floor finishes within individual work areas for Phase 3 items.
29. For each Phase and Area, complete final cleanup for final inspection by Contracting Officers Representative (COR) and Architect/ Engineer.
PHASING NOTES:
34 36 135
B
C
I
F
D
3 4
1B 4B
1A35A
S1
EXIST. HORIZ. DIAGONAL
BRACING ABOVE CEILING
TO REMAIN.
2x12 RAFTERS
OMITTED FOR CLARITY.
12'-0"
9' -2
2x12 RAFTERS
OMITTED FOR CLARITY.
TYP.
10'-0"
TYP.
10'-0"
EXIST. W12x25
(TYP.)
EXIST. W12x25
(TYP.)
V E
R
IF
Y
7' -4
/2
S1
11'-0"
ASTERISKS REPRESENT
EXISTING DIAGONAL
BRACING TO BE REMOVED
(SEE 2/5-S1) & REPLACED
WITH GUSSET PLATES (SEE
3/5-S1). (7 FRAMES THUS).
S1
Sim
RAMP
S1
S1
NEW SURGICAL
LIGHT SUPPORT.
8' -0
1'-6" 1'-6"
S1
S1
PROVIDE NEW CONC.
SLAB ON RIGID INSUL.
IN THIS AREA - REF.
DETAIL.
EXIST. STEEL FRAMES -
SEE 2/S1. (TYP.)
P
U
N
IS
T R
U T
P
U
N
IS
T R
U T
S1
S1
S1
S1
W x2
E
X
IS
T
W x2
E
X
IS
T
P
U
N
IS
T R
U T
P
U
N
IS
T R
U T
L3x3x3/8"x1'-2"
EA. END
(TYP.)
NORTH
PROJECT AREA E
XIS
TIN
G A
TTIC
S
PA
C
EE
XISTIN
G
ATTIC
S
PA
C E
Attic Slab T/ Struct.
60'-4"
B C IF
'-4
/2
EXIST. W12x28
E X
IS
T
W x2
E X
IS
T
W x2
S1
S1
REMOVE L3x2 1/2x5/16"
DIAGONAL BRACING &
CONN. PLATES @
LOCATIONS NOTED ON
PLAN THUS (*).
SEE PLAN
3/8"
3/8"
5/16"
COL.
3"x3/8" WEB STIFFENERS ALIGNED w/ COL. FLANGES
BOTH SIDES OF BEAM.
1/2" GUSSET PL.
CTR'D. ON BEAM.6" 1'-2"
6" 8"
COPE GUSSET PL. FOR
EXIST. CONN. ANGLE -
FIELD VERIFY SIZE.
FIN. FLOOR
FIN. FLOOR
1"
11'-0"
2'-8" 2'-8" 3'-0"
2" RIGID INSUL.4" RIGID INSUL.
REMOVE EXISTING
1" TOPPING SLAB.
CONCRETE RAMP w/
FIBERMESH REINF.3"
M
IN
#3@12" O.C. EA. WAY.
4"
#3x10" DOWEL BAR
16" O.C. - 4" EMBED
DEPTH TO EXIST.
CONC. - DRILL &
POUND.
TOOL JOINT &
FILL w/ SEALANT.
TOOL JOINT &
FILL w/ SEALANT.
M
IN
1/
2" S
O F
F
IT
S
E E
A R
C H
'-1
/8
1/4" 2@3"
EXIST. W12x28
+10'-4 1/2"
VERIFY HSS 5x5x3/8" w/ 11"x3/4"x11"
TOP PL.
12 1/2"x3/4"x12 1/2" PL.
3/4" DIA. THR'D. RODS.
SURGICAL LIGHT
MOUNTING PLATE.
B
C
I
G
H
ASTERISKS REPRESENT
EXISTING DIAGONAL
BRACING TO BE REMOVED
(SEE 2/5-S1) & REPLACED w/
GUSSET PLATES (SEE 3/5-S1)
(3 FRAMES THUS).
S1
Sim
EXIST.
BEAM.
P1001 UNISTRUT .
3/8"
1/4"
L3x3x3/8"x0'-4"
L3x3x3/8"x1'-2"
PATIENT LIFT RAIL
5 7/8"
FIN. FLOOR
RAMP AS
OCCURS.
6"
4"
6" RIGID INSUL.
#3@12" O.C. EA. WAY.
EXIST.
FLR. LINE.
EXIST. W12
BEAM.
UNISTRUT P2867A
BEAM CLAMP.
P1001
UNISTRUT
WEST
PLAINS
ENGINEERING. INC.
WWW.WESTPLAINSENGINEERING.COM
RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK, ND
Office of Construction and Facilities Management
Department of Veterans Affairs
Project Number
Building Number
Drawing Number
Dwg. of
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT:CONSULTANTS:
Revisions: Date
VA FORM 08 )) 6231
o n e e ig i n c t o n e q u a rt t th ig h i t o lf i n e f o o t th u a rt e f o o t o n e i n e f o o t o n e a d e h h t th h t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
TELE: (605) 332-7850 FAX: (605) 332-3539
SIOUX FALLS, SOUTH DAKOTA 57104-4873
625 S. MINNESOTA AVENUE, SUITE 204
KEY PLAN:
SEAL:
4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106
PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759
OCTOBER 17, 2017
438−15−201
KMSKAQ
EXISTING ROOF FRAMING PLAN AT
FIFTH FLOOR
100% CONSTRUCTION
DRAWINGS
3 60
SIOUX FALLS, SOUTH DAKOTA
V.A. HEALTH CARE SYSTEM
RENOVATE 5TH FLOOR SURGERY
S15
1/8" = 1'-0"
EXISTING ROOF FRAMING PLAN AT FIFTH FLOOR -
SOUTH END
1/4" = 1'-0"
EXISTING ATTIC FRAMING SECTION
1" = 1'-0"
BRACE DETAIL
1" = 1'-0"
RAMP SECTION
PLAN
NORTH
1" = 1'-0"
SURGICAL LIGHT SUPPORT
1/8" = 1'-0"
EXISTING ROOF FRAMING PLAN AT FIFTH FLOOR -
NORTH END
PLAN
NORTH
1 1/2" = 1'-0"
CONN. DETAIL w/ ANGLE
GENERAL CONTRACTOR SHALL VERIFY
EXISTING DIMENSIONS & ELEVATIONS
NOTED ON STRUCTURAL PLAN. NOTIFY A/E
IMMEDIATELY OF ANY DESCREPANCIES.
1" = 1'-0"
RAISED FLOOR DETAIL
1 1/2" = 1'-0"
CONN. DETAIL @ BEAM
10' - 4"
8' - 6"
8' - 6"
8' - 6"
9' - 0"
8' - 10"
8' - 0"
9' - 0" 8' - 1"
7' - 11"
8' - 0" 8' - 0"
8' - 0"
8' - 0"
8' - 4"
8' - 0"
8' - 2"8' - 2"8' - 0" 7' - 0"
1 3
3 3
1 1
2 1
2 18' - 2" 8' - 2"
7' - 8"
8' - 2"8' - 0"
9' - 0"
7' - 2"
7' - 2"
8' - 4"
8' - 2"
BREAK
477I
STORAGE
477H
RECOVERY
SPACE
477G
RECOVERY
SPACE
477F
RECOVERY
SPACE
477E
RECOVERY
SPACE
477D
RECOVERY
SPACE
477C
RECOVERY
SPACE
477B
RECOVERY
SPACE
477A
RECOVERY
SPACE478
WORK ROOM
SAME DAY
SURGERY
RECEPTION
CHECK-IN
OFFICE
WAITING
ROOM
VISION
404A
VISION
EXAM
EXAM
CORRIDOR
RESTROOM
EXAM
EXAM
EXAM
AUDIOLOGY
LAB
439B
AUDIO
BOOTH
439A
AUDIO
BOOTH
440A
ELEC.
ELEC.
STAIR
LOBBY
RESTROOM
442A
RESTROOM
443B
OFFICE
443B
OFFICE
AUDITORIUM
443A
OFFICE
443D
OFFICE
WAITING
ROOM
446A
MECHANICAL
CORRIDOR
OFFICE
EXAM
447A
EXAM
WOMENS
MENS
EXAM
EXAM
452A
STORAGE
STORAGE
STAIR
WAITING
CORRIDOR
NORTH
PROJECT AREA
4TH FLOOR
443K
STORAGE
443J
OFFICE
443F
BACK STAGE
443L
BACK HALL
443I
OFFICE
AUDITORIUM
443N
STORAGE
STAGE
AD100
T.O. AUDITORIUM
STAGE
50' - 2"
'-4
REMOVE EXISTING SPEAKER
BOX-OUT AND INFILL OPENING
FROM STORAGE ROOM SIDE
REMOVE EXISTING ACCESS
DOOR
'-0
4'
-0
+/- 3'-10"
WITH NEW LADDER
+/- 2'-6" COORDINATE
W
IT
H N
EW
L
AD
D
ER
3'
-8 " C
O O
R D
IN
AT
E
ENLARGE OPENING AS NEEDED
FOR NEW LADDER AND ACCESS
DOOR
ADJUST LOCATION OF EXISTING
SPRINKLER SYSTEM PIPING AS
NEEDED FOR INSTALLATION OF
NEW WALL MOUNTED ACCESS
LADDER AND PLATFORM
ADJUST LOCATION OF EXISTING
FIRE ALARM PANEL AND
CONDUIT AS NEEDED FOR
INSTALLATION OF NEW WALL
MOUNTED ACCESS LADDER
PROVIDE BLOCKING AND
BRACING IN EXISTING WALL AS
REQUIRED FOR INSTALLATION
OF ACCESS LADDER AND
PLATFORM. SEAL ALL
OPENINGS IN WALL WITH
APPROPRIATE FIREPROOFING
ASBESTOS CONTAINING MATERIAL
THE FOLLOWING AREAS ARE KNOWN TO BE ACM AND MUST BE ABATED IF ACM
MATERIALS ARE DISTURBED OR ENCOUNTERED:
• RADIATOR TRANSIT AND PIPE INSULATION AT ALL EXISTING RADIATORS AND
OTHER PIPE AND PIPE FITTING LOCATIONS.
• WALL/CEILING TEXTURE IN ROOM 443.
CONFIRM THESE WITH THE ASBESTOS REPORT INCLUDED IN THE PROJECT
MANUAL.
REMOVAL OF ASBESTOS CONTAINING MATERIAL (ACM) SHALL COMPLY WITH ALL
CITY, STATE, AND FEDERAL REGULATIONS. REMOVAL OF ACM SHALL CONFORM
TO THE LATEST EDITION OF ALL APPLICABLE OSHA AND AHERA REGULATIONS.
ALSO COMPLY WITH SOUTH DAKOTA OF ENVIRONMENTAL AND NATURAL
RESOURCES AND NESHAPS (40 CFR 60 & 62). WORK PRACTICES SHALL CONFORM
TO NIBS GUIDANCE / WORK PRACTICES FOR THE REMOVAL OF ASBESTOS. IF ANY
ADDITIONAL ACM OR POTENTIAL ACM IS IDENTIFIED DURING DEMOLITION OR
CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY. ANY CONFIRMED ACM SHALL BE ABATED BY THE CONTRACTOR
PER THE ABOVE REQUIREMENTS.
WEST
PLAINS
ENGINEERING.
INC.
WWW.WESTPLAINSENGINEERING.COM
RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,
ND
Office of Construction and Facilities Management
Department of Veterans Affairs
Project Number
Building Number
Drawing Number
Dwg. of
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT:CONSULTANTS:
Revisions: Date
VA FORM 08 -- 6231
on e e ig on e q ua th i f oo t th on e i f oo t on e th
6"
6"
6"
6"
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
TELE: (605) 332-7850 FAX: (605) 332-3539
SIOUX FALLS, SOUTH DAKOTA 57104-4873
625 S. MINNESOTA AVENUE, SUITE 204
KEY PLAN:
SEAL:
4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106
PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759
OCTOBER 17,
438−15−201
RTGDGS
FOURTH FLOOR DEMOLITION
PLANS
100% CONSTRUCTION
DRAWINGS
4 60
SIOUX FALLS, SOUTH DAKOTA
V.A. HEALTH CARE SYSTEM
RENOVATE 5TH FLOOR SURGERY
AD1005
SCALE: 1/8" = 1'-0"
FOURTH FLOOR CEILING DEMOLITION PLAN NORTH
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR
TO BEGINNING CONSTRUCTION.
B. ALL SURFACES OR FINISHES DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED AT NO COST TO THE OWNER AND SHALL MATCH
ADJACENT MATERIALS.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
DEMOLITION NOTES.
D. CUT EXISTING CONCRETE FLOOR AS NECESSARY TO ACCOMMODATE NEW
PIPING, CONDUIT, OR OTHER WORK. PATCH BACK TO MATCH.
E. SAW CUT AND REMOVE MASONRY TO ACCOMMODATE NEW OPENINGS. BRACE
OPENING UNTIL NEW LINTELS ARE INSTALLED.
F. WORK ON THIS FLOOR MUST BE CLOSELY COORDINATED WITH THE VA TO ALLOW
FOR CONTINUED OPERATIONS ON THIS FLOOR. (AFTER HOURS WORK MAY BE
REQUIRED)
G. CONTRACTOR SHALL TAKE ALL MEASURES AND PROVIDE ALL MATERIAL
NECESSARY FOR PROTECTING EXISTING EQUIPMENT AND PROPERTY IN
AFFECTED AREAS OF CONSTRUCTION AGAINST DUST AND DEBRIS, SO THAT
EQUIPMENT AND AFFECTED AREAS TO BE USED IN THE MEDICAL CENTERS
OPERATIONS WILL NOT BE HINDERED. CONTRACTOR SHALL PERMIT ACCESS TO
DEPARTMENT OF VETERANS AFFAIRS PERSONNEL AND PATIENTS THROUGH
OTHER CONSTRUCTION AREAS WHICH SERVE AS ROUTES OF ACCESS TO SUCH
AFFECTED AREAS AND EQUIPMENT. THESE ROUTES WHETHER ACCESS OR
EGRESS SHALL BE ISOLATED FROM THE CONSTRUCTION AREA BY TEMPORARY
PARTITIONS AND HAVE WALKING SURFACES, LIGHTING ETC TO FACILITATE
PATIENT AND STAFF ACCESS. COORDINATE ALTERATION WORK IN AREAS
OCCUPIED BY DEPARTMENT OF VETERANS AFFAIRS SO THAT MEDICAL CENTER
OPERATIONS WILL CONTINUE DURING THE CONSTRUCTION PERIOD. COORDINATE
WITH SPECIFICATIONS SECTION 01 0000 - GENERAL REQUIREMENTS AND 01 0100 -
MEDICAL CENTER REQUIREMENTS FOR WORK ON THIS FLOOR.
REMOVE AND SALVAGE ACOUSTIC TILE CEILING IN THIS AREA FOR
REINSTALLATION AFTER ABOVE CEILING WORK IS COMPLETE. COORDINATE
WITH MECHANICAL DRAWINGS FOR EXACT LOCATIONS.
2 REMOVE PORTION OF GYPSUM BOARD CEILING FOR ABOVE CEILING WORK IN
THIS AREA. COORDINATE WITH MECHANICAL DRAWINGS FOR EXACT LOCATIONS.
INDEPENDANTLY SUSPEND EXISTING LIGHTS, DIFFUSERS AND OTHER HVAC
AND ELECTRICAL EQUIPMENT WHILE CEILING SYSTEM IS REMOVED FOR
ABOVE CEILING WORK. RESET IN CEILING GRID WHEN ABOVE CEILING WORK
IS COMPLETE. FIELD VERIFY EXISTING CONDITIONS FOR OTHER CEILING
HUNG EQUIPMENT.
DEMOLITION KEYNOTES:
DEMOLITION GENERAL NOTES:
PHASING NOTE:
WORK ON THIS FLOOR MUST BE CLOSELY COORDINATED WITH THE VA TO ALLOW FOR
CONTINUED OPERATIONS ON THIS FLOOR. (AFTER HOURS WORK MAY BE REQUIRED)
REMOVE AND SALVAGE ADHEARED 12" X 12" CEILING TILE IN THIS AREA FOR
REINSTALLATION AFTER ABOVE CEILING WORK IS COMPLETE. COORDINATE
WITH MECHANICAL DRAWINGS FOR EXACT LOCATIONS.
SCALE: 1/8" = 1'-0"
FOURTH FLOOR AUDITORIUM SPACE DEMO PLAN
SCALE: 1/4" = 1'-0"
WALL LADDER DETAIL
DENOTES PROJECT LIMITS LINE
PROJECT AREA EXISTIN
G ATTIC
SPACE
EXISTING ATTIC
SPACE
5TH FLOOR
OFFICE
506D
OFFICE
506E
OFFICE
506F
OFFICE
506G
TOILET
506H
OFFICE
OFFICE
506A
OFFICE
506B
CONFERENCE
506C
OFFICE
CORRIDOR
STORAGE
H.K.
503ELEC.
508A
TELE.
508B
STORAGE
505A
STAIR
CORRIDOR
CORRIDOR
CORRIDOR
TOILET
510A
MEN
P.A.R.
FIRE VALVE
511A
MECHANICAL
GU ROOM
WASH
516A
WEST O.R.
516B
EAST O.R.
516C
WASH
516E
STERILE
516F
STERILE
CORRIDOR
H.K.
STORAGE
516G
MECHANICAL
518A
MECHANICAL
STORAGE
CORRIDOR
WOMEN
TOILET
521A
H.K.
STORAGE
CHART
BREAK ROOM
CORRIDOR
526A
S
TO
R A
G E
CORRIDOR
STORAGE
530 ROOF HATCH
530A
STORAGE
STORAGE
MECHANICAL
526B
2 2
4 15
4 4
666666
161616161616
101010
10 10
BACK STAIR ENTRY
516H
AD101 1
AD1011
7 7 7 7 7 7 7
AD101
16 716 7
617617617617
16 716 7
AD101
11 11
ASBESTOS CONTAINING MATERIAL
THE FOLLOWING AREAS ARE KNOWN TO BE ACM AND MUST BE ABATED IF ACM
MATERIALS ARE DISTURBED OR ENCOUNTERED:
• RADIATOR TRANSIT AND PIPE INSULATION AT ALL EXISTING RADIATORS AND
OTHER PIPE AND PIPE FITTING LOCATIONS.
CONFIRM THESE WITH THE ASBESTOS REPORT INCLUDED IN THE PROJECT
MANUAL.
REMOVAL OF ASBESTOS CONTAINING MATERIAL (ACM) SHALL COMPLY WITH ALL
CITY, STATE, AND FEDERAL REGULATIONS. REMOVAL OF ACM SHALL CONFORM
TO THE LATEST EDITION OF ALL APPLICABLE OSHA AND AHERA REGULATIONS.
ALSO COMPLY WITH SOUTH DAKOTA OF ENVIRONMENTAL AND NATURAL
RESOURCES AND NESHAPS (40 CFR 60 & 62). WORK PRACTICES SHALL CONFORM
TO NIBS GUIDANCE / WORK PRACTICES FOR THE REMOVAL OF ASBESTOS. IF ANY
ADDITIONAL ACM OR POTENTIAL ACM IS IDENTIFIED DURING DEMOLITION OR
CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY. ANY CONFIRMED ACM SHALL BE ABATED BY THE CONTRACTOR
PER THE ABOVE REQUIREMENTS.
EXISTING WINDOWS
TO REMAIN
NOTE: FIELD VERIFY ALL DIMENSIONS OF EXISTING WINDOWS
AND TRIM. NEW WINDOWS AND TRIM TO MATCH EXISTING.
M
AT
C H
E
XI
ST
IN
G 5'
-1
1/ 2"
SI
LL
H
EI
G H
T M
AT
C
H E
XI
ST
IN
G
MATCH EXISTING
3'-6"
5' -1
1/
2"
3'-6"
16 16
5' -1
1/
2"
3'-6"
SI
LL
H
EI
G H
T M
AT
C
H E
XI
ST
IN
G
NOTE: FIELD VERIFY ALL DIMENSIONS
OF EXISTING WINDOWS AND TRIM. NEW
WINDOWS AND TRIM TO MATCH EXISTING.
WEST
PLAINS
ENGINEERING.
INC.
WWW.WESTPLAINSENGINEERING.COM
RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,
ND
Office of Construction and Facilities Management
Department of Veterans Affairs
Project Number
Building Number
Drawing Number
Dwg. of
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT:CONSULTANTS:
Revisions: Date
VA FORM 08 -- 6231
on e e ig on e q ua th i f oo t th on e i f oo t on e th
6"
6"
6"
6"
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
TELE: (605) 332-7850 FAX: (605) 332-3539
SIOUX FALLS, SOUTH DAKOTA 57104-4873
625 S. MINNESOTA AVENUE, SUITE 204
KEY PLAN:
SEAL:
4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106
PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759
OCTOBER 11,
438−15−201
RTGDGS
FIFTH FLOOR DEMOLITION
PLAN
100% CONSTRUCTION
DRAWINGS
5 60
SIOUX FALLS, SOUTH DAKOTA
V.A. HEALTH CARE SYSTEM
RENOVATE 5TH FLOOR SURGERY
AD1015
DEMOLITION KEYNOTES:
NORTH
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR
TO BEGINNING CONSTRUCTION.
B. ALL SURFACES OR FINISHES DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED AT NO COST TO THE OWNER AND SHALL MATCH
ADJACENT MATERIALS.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
DEMOLITION NOTES.
D. CUT EXISTING CONCRETE FLOOR AS NECESSARY TO ACCOMMODATE NEW
PIPING, CONDUIT, OR OTHER WORK. PATCH BACK TO MATCH.
E. ADJUST STUDS SO THAT FACE OF GYPSUM WALL BOARD WILL ALIGN WITH
ADJACENT WALL.
F. SAW CUT AND REMOVE MASONRY TO ACCOMMODATE NEW OPENINGS. BRACE
OPENING UNTIL NEW LINTELS ARE INSTALLED.
DEMOLITION GENERAL NOTES:
1 REMOVE DOOR, FRAME AND HARDWARE
2 REMOVE WALL
3 REMOVE WATER CLOSETS, SINKS, WATER COOLER, AND ANY ASSOCIATED
ACCESSORIES. SEE PLUMBING DRAWINGS FOR ADDITIONAL DEMOLITION
REMOVE GYPSUM BOARD/PLASTER AND FURRING AROUND COLUMNS4
REMOVE FLOOR COVERING IN THIS AREA
REMOVE WINDOW SILL AND ANY ASSOCIATED TRIM BELOW
DENOTES PROJECT LIMITS LINE
EXTERIOR STONE TRIM TO REMAIN, PROTECT FROM DAMAGE DURING WALL
INFILL DEMOLITION
SCALE: 1/8" = 1'-0"
FLOOR PLAN DEMOLITION
8 REMOVE CONCRETE STEP UP TO ATTIC LANDING AS NEEDED TO INFILL WALL
9 REMOVE PORTION OF WALL FOR NEW OPENING.
REMOVE EXISTING WALL FINISHES, PLASTER AND FRAMING BACK TO
EXISTING CLAY TILE WALL. PREP WALLS FOR NEW SPRAY FOAM INSULATION.
11 REMOVE STRUCTURAL CROSS BRACING (SEE STRUCTURAL DRAWINGS)
12 REMOVE AND SALVAGE METAL LOCKERS FOR OWNER
13 REMOVE AND SALVAGE MEDICAL EQUIPMENT FOR OWNER
SCALE: 1/4" = 1'-0"
TYPICAL OPENING DEMOLITION ELEVATION
14 EXISTING WALL TO REMAIN
15 REMOVE CASEWORK AND COUNTERTOP
16 REMOVE WALL INFILL FOR INSTALLATION OF NEW WINDOWS
SCALE: 1/4" = 1'-0"
TYPICAL INFILL DEMOLITION ELEVATION
17 REMOVE GLAZING IN WINDOW AT THIS LOCATION. TO BE REPLACED WITH
NEW FROSTED OBSCURED GLAZING.
18 EXISTING LAUNDRY CHUTE TO REMAIN
19 REMOVE WINDOW GLAZING AND FRAME
20 REMOVE AND SALVAGE ALL AV EQUIPMENT IN THIS ROOM. TURN ALL
EQUIPMENT OVER THE VA FOR FUTURE INSTALLATION IN THE NEW
CONFERENCE ROOM.
1 1
1 1
3 3
3 3
2 2
OFFICE
506D
OFFICE
506E
OFFICE
506F
OFFICE
506G
TOILET
506H
OFFICE
OFFICE
506A
OFFICE
506B
CONFERENCE
506C
OFFICE
CORRIDOR
STORAGE
H.K.
503ELEC.
508ATELE.
508B
STORAGE
505A
STAIR
CORRIDOR
CORRIDOR
509 CORRIDOR
TOILET
510A
MEN
P.A.R.
FIRE VALVE
511A
MECHANICAL
GU ROOM
WASH
516A
WEST O.R.
516B
EAST O.R.
516C
WASH
516E
STERILE
516FSTERILE
CORRIDOR
H.K.
STORAGE
516G
MECHANICAL
518A
MECHANICAL
519STORAGE
CORRIDOR
WOMEN
TOILET
521A
H.K.
STORAGE
CHART
BREAK ROOM
CORRIDOR
526A
S
TO
R A
G E
CORRIDOR
STORAGE
ROOF HATCH
530A
STORAGE
STORAGE
MECHANICAL
526B
BACK STAIR ENTRY
516H
NORTH
PROJECT AREA EXISTIN
G ATTIC
SPACE
EXISTING ATTIC
SPACE
5TH FLOOR
WEST
PLAINS
ENGINEERING.
INC.
WWW.WESTPLAINSENGINEERING.COM
RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,
ND
Office of Construction and Facilities Management
Department of Veterans Affairs
Project Number
Building Number
Drawing Number
Dwg. of
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT:CONSULTANTS:
Revisions: Date
VA FORM 08 -- 6231
on e e ig on e q ua th i f oo t th on e i f oo t on e th
6"
6"
6"
6"
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
TELE: (605) 332-7850 FAX: (605) 332-3539
SIOUX FALLS, SOUTH DAKOTA 57104-4873
625 S. MINNESOTA AVENUE, SUITE 204
KEY PLAN:
SEAL:
4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106
PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759
OCTOBER 11,
438−15−201
RTGDGS
FIFTH FLOOR REFLECTED
CEILING DEMOLITION PLAN
100% CONSTRUCTION
DRAWINGS
6 60
SIOUX FALLS, SOUTH DAKOTA
V.A. HEALTH CARE SYSTEM
RENOVATE 5TH FLOOR SURGERY
AD1025
SCALE: 1/8" = 1'-0"
FIFTH FLOOR CEILING DEMOLITION PLAN NORTH
DEMOLITION KEYNOTES:
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR
TO BEGINNING CONSTRUCTION.
B. ALL SURFACES OR FINISHES DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED AT NO COST TO THE OWNER AND SHALL MATCH
ADJACENT MATERIALS.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
DEMOLITION NOTES.
D. FLOOR SURFACES DAMAGED OR BENEATH EXISTING CASEWORK TO BE REMOVED
SHALL BE PATCHED TO MATCH SURROUNDING FLOOR SURFACES.
E. CUT EXISTING CONCRETE FLOOR AS NECESSARY TO ACCOMMODATE NEW
PIPING, CONDUIT, OR OTHER WORK. PATCH BACK TO MATCH.
F. ADJUST STUDS SO THAT FACE OF GYPSUM WALL BOARD WILL ALIGN WITH
ADJACENT WALL.
G. SAW CUT AND REMOVE MASONRY TO ACCOMMODATE NEW OPENINGS. BRACE
OPENING UNTIL NEW LINTELS ARE INSTALLED.
DEMOLITION GENERAL NOTES:
1 REMOVE ACOUSTIC TILE CEILING.
2 REMOVE GYPSUM BOARD CEILING
DENOTES PROJECT LIMITS LINE
3 SEE MECHANICAL AND ELECTRICAL PLANS FOR LIGHTS, DIFFUSERS, AND
OTHER ITEMS LOCATED ON CEILINGS. TYPICAL
4 REMOVE AND SALVAGE OPERATING ROOM LIGHTS FOR REINSTALLATION AT
NEW MINOR PROCEDURE ROOMS.
UP
M G
285 SF
MINOR
PROCEDURE OR 1
285 SF
MINOR
PROCEDURE OR 2
159 SF
EQUIPMENT
STORAGE
146 SF
OFFICE 176 SF
OFFICE
137 SF
OFFICE 130 SF
OFFICE
127 SF
OFFICE
131 SF
OFFICE
126 SF
OFFICE
125 SF
OFFICE
132 SF
OFFICE
107 SF
COMPUTER
134 SF
OFFICE
123 SF
OFFICE
124 SF
OFFICE
124 SF
OFFICE
122 SF
OFFICE
105 SF
TOILET
60 SF
TOILET
122 SF
OFFICE
94 SF
JANITOR
168 SF
OFFICE
100 SF
OFFICE
100 SF
OFFICE
348 SF
CONFERENCE
ROOM
201 SF
RECEPTION
69 SF
TOILET
174 SF
WAITING ROOM
105 SF
502A
WORKROOM
523 SF
500B
CLEAN CORE
24 SF
MECHANICAL/
ELECTRICAL
6 SF
500F
FIRE VALVE
281 SF
STAFF LOUNGE
RAMP UP
262 SF
501A
CORRIDOR
772 SF
ENTRY LOBBY
908 SF
500C
CORRIDOR
197 SF
500A
STAIR
130 SF
EXAM ROOM
108 SF
EXAM ROOM
88 SF
CLEAN ROOM
105 SF
STERILE STORAGE
72 SF
MEDICATION
ROOM
70 SF
SOILED ROOM
40 SF
500D
CRASH CART
ALCOVE
17 SF
DATA
98 SF
510C
MEN'S LOCKER
ROOM
98 SF
510D
MEN'S TOILET
123 SF
CORRIDOR
102 SF
510B
WOMEN'S TOILET
75 SF
PATIENT INTAKE
6 SF
500E
LINEN ALCOVE
42" 40.5"
32"
42"
40.5"
32"
113 SF
534B
BACK STAIR
87'
24'
81' 53'
45'
34' 44'
33' 11'
38' 36'
29'
FE
FE
36 SF
ELECTRICAL
34 SF
LINEN ALCOVE7
-T
H1
1/2A H1
2T
H1
1/2T H1
2T
H1
AI104
SEE ENLARGED
PLAN FOR WALL
TYPES
AI104
SEE ENLARGED
PLAN FOR WALL
TYPES
AI104
SEE ENLARGED PLAN
FOR WALL TYPES
1A
H1
-U
H1
1/2A H1
-A
H1
-U
H19 -U
H19 -U
H1
H3 1 1/2A H1
-A
H1
-U
H1
-A
H1
1/2A H1
-A
H1
-U
H1 9 -U
H1
-A
H1
-U
H1
H34
H3 4
H3
1/2A H1
-U
H19 -U
H1 9 -U
H19 -U
H1
-A
H1
-U
H1
H3
H3
H3
1T
H2
H3
H1
H1
1T
H16 1T
H1
2T H1
H2
2T
H1
2T
H1
1A
H1
-A
H1
-U
H1
-A
H1
1A
H1 4
H3 4
H34
H3
-U
H1
-U H1
H31
H3
-A
H1
-U
H1
-A
H1
-A
H1
-U
H1
-A
H1
H34
H34
H31 1A
H1
-U
H1 9 -U
H19 -U
H19 -U
H1
-U H19 -U
H1 9 -U
H19 -U
H1
-A
H1
1A
H1 4
H34
H3
H3
-U
H1
H119
H1
H1
1A
H1
H1
1A H1
1A
H1
1A
H1
-U
H1
1/2A H1
H1
-U
H19 -U
H1
-U
H19 -U
H1
-A H1
H13
H1 3
H1
-A
H1
-A
H1
-A
H13 -A
H1
-A
H1 3 -A
H1
-A
H1
1/2A H1
-A
H1
-A
H1
-A
H1
-U
H1 9 -U
H19 -U
H19 -U
H1
-U
H1
-U
H1
-A
H1
-U
H1
-A
H1
1/2A H1
-U
H1
-A
H1
1/2A H1
-U
H19 -U
H19 -U
H19 -U
H1
-U
H1
-U
H1
1/2A H1
53 SF
STRETCHER
CLOSET
2T
H1
H34
H3 4
H3
NOTE: THIS RAMP DOES NOT COMPLY WITH CODE
REQUIREMENTS FOR CONTINUITY OF HANDRAILS
ON BOTH SIDES NFPA 101 - 7.2.2.4.2. HANDRAILS ON
ONE SIDE ARE INTERRUPTED BY DOORS TO DATA
AND ELECTRICAL ROOMS. THE VA HAS INDICATED
THAT THIS NON-COMPLIANT CODE CONDITION IS
ACCEPTABLE.
FE
6'-6"
1A
H1
1A
H1
H3
NOTE: DEAD END CORRIDOR
IS APPROXIMATELY 80' LONG.
THE V.A. HAS INDICATED THAT
THIS CONDITION IS ACCEPTABLE.
STORAGE
-A
H1
MECHANICAL
136 SF
510A
WOMEN'S LOCKER
ROOM
FE
NOTE: A SIGN SHALL BE
INSTALLED AT THIS DOOR
THAT STATES "THIS
DOOR IS NOT AN EXIT."
NOTE: A SIGN SHALL BE
INSTALLED AT THIS DOOR
THAT STATES "THIS DOOR
IS NOT AN EXIT."
AI300
• 5/8" GYPSUM BOARD EACH SIDE
• INSTALL GYPSUM BOARD UP 1/2"
OFF CONCRETE SUBFLOOR
• ACOUSTIC BATT INSULATION
WHERE INDICATED
• 3 5/8" METAL STUDS
• STC RATING OF 45-49 PER
GA. # WP1072
• 1 HR. FIRE AND SMOKE RATED
(WHERE INDICATED)
UL U419
• 1/2 HR. FIRE & SMOKE RATED
(WHERE INDICATED)
UL U407
• 5/8" GYPSUM BOARD EACH SIDE
• INSTALL GYPSUM BOARD UP 1/2"
OFF CONCRETE SUBFLOOR
• VAPOR RETARDER ON WARM SIDE
(AT THERMAL INSULATION)
• ACOUSTIC OR THERMAL BATT
INSULATION WHERE INDICATED
• 6" METAL STUDS
• STC RATING OF 45-49 PER
GA. # WP1072
• 1 HR. FIRE AND SMOKE RATED
(WHERE INDICATED)
UL U419
WALL TYPE SCHEDULE
2 -
3 -
4 -
5 -
6 -
• 5/8" GYPSUM BOARD ONE SIDE
• INSTALL GYPSUM BOARD UP 1/2"
OFF CONCRETE SUBFLOOR
• ACOUSTIC BATT INSULATION
WHERE INDICATED
• 1 1/2" METAL STUD FURRING
• EXISTING WALL OR COLUMN
• 1/2 HR. FIRE & SMOKE RATED
(WHERE INDICATED)
UL U407
• 5/8" GYPSUM BOARD EACH SIDE
• INSTALL GYPSUM BOARD UP 1/2"
OFF CONCRETE SUBFLOOR
• ACOUSTIC BATT INSULATION
• 8" METAL STUDS
• STC RATING OF 45-49 PER
GA. # WP1072
• 1 HR. FIRE AND SMOKE RATED
(WHERE INDICATED)
UL U419
(SEE WALL TAG FOR INSULATION AND FIRE RATING)
• 5/8" GYPSUM BOARD ONE SIDE
• INSTALL GYPSUM BOARD UP 1/2"
OFF CONCRETE SUBFLOOR
• ACOUSTIC BATT INSULATION
WHERE INDICATED
• 3 5/8" METAL STUDS
• 1/2 HR. FIRE & SMOKE RATED
(WHERE INDICATED)
UL U407
• 1 HR. FIRE AND SMOKE RATED
(WHERE INDICATED)
UL U419
• 5/8" GYPSUM BOARD ONE SIDE
• INSTALL GYPSUM BOARD UP 1/2"
OFF CONCRETE SUBFLOOR
• VAPOR RETARDER ON WARM SIDE
• THERMAL BATT INSULATION
WHERE INDICATED
• 6" METAL STUDS
• 1 HR. FIRE AND SMOKE RATED
(WHERE INDICATED)
UL U419
• 1/2 HR. FIRE & SMOKE RATED
(WHERE INDICATED)
UL U407
• 2 LAYERS 5/8" TYPE X GYPSUM
BOARD EACH SIDE
• VAPOR RETARDER ON WARM SIDE
• INSTALL GYPSUM BOARD UP 1/2"
OFF CONCRETE SUBFLOOR
• ACOUSTIC BATT INSULATION
WHERE INDICATED
• 6" METAL STUDS
• 2 HR. FIRE AND SMOKE RATED
UL U411
8 -
11 -
• CERAMIC TILE
• THIN SET MORTAR
• WATERPROOF MEMBRANE AT
SHOWERS
• 5/8" TILE BACKER (EXTEND TO
TILE HEIGHT) 5/8" GYPSUM
WALL BOARD ABOVE
• ACOUSTIC BATT INSULATION
WHERE INDICATED
• 3-5/8" METAL STUD FRAMING AT
16" O.C.
• 5/8" GYPSUM WALL BOARD
• 1 HR. FIRE AND SMOKE RATED
(WHERE INDICATED)
UL U419
• 30 MIN. FIRE & SMOKE RATED
(WHERE INDICATED)
UL U407
• 5/8" GYPSUM BOARD ONE SIDE
• INSTALL GYPSUM BOARD UP 1/2"
OFF CONCRETE SUBFLOOR
• 2 1/2" METAL STUDS
• 1" METAL STUD OFFSET FROM
EXISTING WALL
• R-21 SPRAY URETHANE INSULATION
ENCAPSULATES BACK OF METAL
STUD TO CREATE THERMAL BREAK
• EXISTING EXTERIOR WALL
GYPSUM BOARD MUST EXTEND FROM
FLOOR TO ROOF DECK TO
COMPLETELY COVER URETHANE
INSULATION
1/
2" 1"
• CERAMIC TILE
• THIN SET MORTAR
• 5/8" TILE BACKER (EXTEND TO
TILE HEIGHT) 5/8" GYPSUM
WALL BOARD ABOVE
• ACOUSTIC BATT INSULATION
WHERE INDICATED
• 3-5/8" METAL STUD FRAMING AT
16" O.C.
• 5/8" TILE BACKER (EXTEND TO
TILE HEIGHT) 5/8" GYPSUM
WALL ABOVE
• THIN SET MORTAR
• CERAMIC TILE
12 -
• CERAMIC TILE
• THIN SET MORTAR
• WATERPROOF MEMBRANE AT
SHOWERS
• 5/8" TILE BACKER (EXTEND TO TILE
HEIGHT) 5/8" GYPSUM WALL BOARD
ABOVE
• ACOUSTIC BATT INSULATION WHERE
INDICATED
• 6" METAL STUD FRAMING AT 16" O.C.
• 5/8" TILE BACKER (EXTEND TO TILE
HEIGHT) 5/8" GYPSUM WALL BOARD
ABOVE
• THIN SET MORTAR
• CERAMIC TILE
• 1 HR. FIRE AND SMOKE RATED
(WHERE INDICATED) UL U419
13 -
14 -
15 -
16 -
• CERAMIC TILE
• THIN SET MORTAR
• 5/8" TILE BACKER, EXTEND TO
TILE HEIGHT, 5/8" GYPSUM
WALL BOARD ABOVE, ONE SIDE
ONLY
• ACOUSTIC BATT INSULATION
WHERE INDICATED
• 3-5/8" METAL STUD FRAMING AT
16" O.C.
• CERAMIC TILE
• THIN SET MORTAR
• 5/8" TILE BACKER, EXTEND TO
TILE HEIGHT, 5/8"GYPSUM WALL
BOARD ABOVE
• 1-1/2" METAL STUD FURRING
• EXISTING WALL OR COLUMN
• CERAMIC TILE
• THIN SET MORTAR
• 5/8" TILE BACKER, EXTEND TO TILE
HEIGHT, 5/8"GYPSUM WALL BOARD
ABOVE
• 2 1/2" METAL STUDS
• 1" METAL STUD OFFSET FROM
EXISTING WALL
• R-21 SPRAY URETHANE INSULATION
ENCAPSULATES BACK OF METAL
STUD TO CREATE THERMAL BREAK
• EXISTING EXTERIOR WALL
GYPSUM BOARD MUST EXTEND FROM
FLOOR TO ROOF DECK TO
COMPLETELY COVER URETHANE
INSULATION
1"
• CERAMIC TILE
• THIN SET MORTAR
• 5/8" TILE BACKER (EXTEND TO
TILE HEIGHT) 5/8" GYPSUM
WALL BOARD ABOVE
• ACOUSTIC BATT INSULATION
WHERE INDICATED
• 6" METAL STUD FRAMING AT 16"
O.C.
• 5/8" GYPSUM WALL BOARD
• 5/8" GYPSUM BOARD ONE SIDE
• INSTALL GYPSUM BOARD UP 1/2"
OFF CONCRETE SUBFLOOR
• 2 1/2" METAL STUD FURRING
• EXISTING WALL OR COLUMN
• STONE TILE VENEER
• THIN SET MORTAR
• EXISTING WALL OR COLUMN
• STONE TILE VENEER
• THIN SET MORTAR
• 5/8" TILE BACKER BOARD
• 1 1/2" METAL STUD FURRING
(3 5/8" METAL STUD FURRING AT
WATER COOLER)
• EXISTING WALL OR COLUMN
• 1" X 24" GYPSUM SHAFT LINER
PANELS.
• 2 1/2" METAL CT STUDS AT 24" O.C.
• ACOUSTIC BATT INSULATION
WHERE INDICATED
• 2 LAYERS 5/8" TYPE X IMPACT
RESISTANT GYPSUM WALL BOARD.
• 2 HR. FIRE RATED BARRIER
WALL: UL U497
SHAFTWALL
• 5/8" GYPSUM BOARD EACH SIDE
• INSTALL GYPSUM BOARD UP 1/2"
OFF CONCRETE SUBFLOOR
• PLYWOOD BACKING BOARD ONE
SIDE TO SUPPORT 250 LB 85"
SMARTBOARD
• ACOUSTIC BATT INSULATION
WHERE INDICATED
• 3 5/8" METAL STUDS
• ADDITIONAL BLOCKING IN WALL AS
NEEDED FOR SMARTBOARD
• STC RATING OF 45-49 PER
GA. # WP1072
• 1/2 HR. FIRE & SMOKE RATED
(WHERE INDICATED)
UL U407
NORTH
PROJECT AREA EXISTIN
G ATTIC
SPACE
EXISTING ATTIC
SPACE
5TH FLOOR
1. WHERE MORE THAN ONE WALL TYPE IS SHOWN, THE MOST RESTRICTIVE
REQUIREMENTS OF THE WALLS ARE REQUIRED (FOR EXAMPLE, A FIRE BARRIER MAY BE
COMBINED WITH A SMOKE BARRIER - 2 HOUR F.R. CONSTRUCTION WITH 1 1/2 HOUR F.R.
DOORS, COMBINATION FIRE/ SMOKE DAMPERS, 2 HOUR PENETRATIONS).
2. NOTE THAT DUCTS AND PIPE OR CONDUIT PENETRATIONS DO NOT TYPICALLY OCCUR
AT SHAFTS OR STAIR ENCLOSURES BECAUSE THEY ARE PROHIBITED EXCEPT WHERE
THEY ARE SPECIFICALLY SERVING THAT COMPONENT.
(EXISTING)
(EXISTING)
(EXISTING)
RATED WALLS GENERAL NOTES:
DENOTES MINIMUM 1-HOUR FIRE WALL & SMOKE BARRIER WALL:
* WALL EXTENDS FROM FLOOR TO DECK ABOVE
* ALL DUCT PENETRATIONS ARE PROTECTED BY COMBINATION FIRE
AND SMOKE DAMPERS
* SMOKE DAMPERS ARE NOT REQUIRED WHERE ADJACENT SMOKE
COMPARTMENTS ARE PROTECTED BY QUICK RESPONSE
SPRINKLERS THROUGHOUT EACH COMPARTMENT
* ALL PENETRATIONS ARE SEALED WITH MATERIALS. APPROPRIATE
FOR PROTECTING 1-HOUR FIRE AND SMOKE WALL ASSEMBLIES.
* ALL DOORS ARE 3/4-HOUR LABELED, SELF-CLOSING AND
POSITIVE LATCHING. (LSC 18.3.6.3 & 8.3.3.1)
DENOTES 2-HOUR FIRE WALL & SMOKE BARRIER WALL:
* WALL EXTENDS FROM FLOOR TO DECK ABOVE
* ALL DUCT PENETRATIONS ARE PROTECTED BY
COMBINATION FIRE AND SMOKE DAMPERS
* SMOKE DAMPERS ARE NOT REQUIRED WHERE ADJACENT
SMOKE COMPARTMENTS ARE PROTECTED BY QUICK
RESPONSE SPRINKLERS THROUGHOUT EACH
COMPARTMENT
* ALL PENETRATIONS ARE SEALED WITH MATERIALS APPROPRIATE
FOR PROTECTING 2-HOUR FIRE AND SMOKE WALL ASSEMBLIES
* ALL DOORS ARE 1 1/2-HOUR LABELED, SELF-CLOSING AND
POSITIVE LATCHING. (LSC 18.3.6.3 & 8.3.3.1)
DENOTES SUITE SEPARATION/CORRIDOR WALL AND SMOKE PARTITION:
* WALL SHALL BE PERMITTED TO TERMINATE AT THE CEILING
WHERE THE CEILING IS CONSTRUCTED TO LIMIT THE TRANSFER
OF SMOKE.
* 1/2 HOUR FIRE RESISTANCE RATING IS REQUIRED.
* WALL SHALL FORM A BARRIER TO LIMIT THE TRANSFER OF
SMOKE.
* ALL AIR TRANSFER OPENINGS ARE PROTECTED BY SMOKE
DAMPERS (PER LSC 8.4.6.2 & IBC 711.7).
* ALL PENETRATIONS ARE SEALED WITH MATERIALS APPROPRIATE
FOR RESISTING THE PASSAGE OF SMOKE.
* ALL DOORS SHALL BE CONSTRUCTED TO RESIST THE PASSAGE
OF SMOKE AND BE 20 MIN RATED.
* DOORS SHALL BE REQUIRED TO MEET THE REQUIREMENTS FOR
SMOKE AND DRAFT CONTROL DOOR ASSEMBLIES. (TESTED IN
ACCORDANCE WITH UL 1784.) (IBC 711.5.2)
* A CLEARANCE BETWEEN THE BOTTOM OF THE DOOR AND THE
FLOOR COVERING NOT EXCEEDING ONE INCH SHALL BE
PERMITTED.
* DOORS SHALL BE PROVIDED WITH POSITIVE LATCHING
HARDWARE.
* DOORS SHALL NOT BE HELD OPEN BY DEVICES OTHER THAN
THOSE THAT RELEASE WHEN THE DOOR IS PUSHED OR PULLED.
* DOORS SHALL BE SELF OR AUTOMATIC CLOSING. (PER LSC 8.4.3.5
AND IBC 711.5.3)
RATED WALLS:
BUILDING CODE ANALYSIS
BUILDING CODE: 2015 NFPA 101 LIFE SAFETY CODE
VA FIRE PROTECTION DESIGN MANUAL
2015 INTERNATIONAL FIRE CODE
2015 INTERNATIONAL BUILDING CODE
ABA/VA BARRIER FREE DESIGN GUIDE
2012 ANSI 117.1 - ACCESSIBLE AND USABLE
BUILDINGS AND FACILITIES
OCCUPANCY CLASSIFICATION: NFPA 101.6 OCCUPANCY CLASSIFICATIONS:
AMBULATORY HEALTHCARE
BUSINESS
NFPA 101 - 6.14.3 (MIXED OCCUPANCIES)
1 HOUR SEPARATION FROM AMBULATORY
HEALTHCARE TO BUSINESS OCCUPANCIES.
OCCUPANT LOAD: NFPA 101.7.3.1.2
AMBULATORY HEALTHCARE 62
ASSEMBLY UNCONCENTRATED 64
HEALTH CARE TREATMENT AREAS 4
ACCESSORY STORAGE/MECH. 16
TOTAL THIS FLOOR 146
FIRE SPRINKLER SYSTEMS: NFPA 13 SYSTEM THROUGHOUT
MANUAL FIRE EXTINGUISHING NFPA 10.6.2.1
EQUIPMENT: MAXIMUM TRAVEL DISTANCE TO MANUAL
FIRE EXTINGUISHERS SHALL NOT EXCEED 75
FT. FOR CLASS A HAZARDS.
MEANS OF EGRESS: NFPA 101.21.2.3.2
THE CLEAR WIDTH OF ANY CORRIDOR OR
PASSAGEWAY REQUIRED FOR EXIT ACCESS
SHALL NOT BE LESS THAN 44 INCHES: 82
INCH WIDE CORRIDORS MINIMUM ARE
PROVIDE IN ALL PATIENT AREAS. 54 INCH
WIDE CORRIDORS MINIMUM ARE PROVIDED
IN ALL NON-PATIENT AREAS.
NFPA 101.21.2.3.4
THE MINIMUM CLEAR WIDTH FOR DOORS IN
THE MEANS OF EGRESS SHALL NOT BE LESS
THAN 32 INCHES WIDE.
EXITS REQUIRED: 2@ 32.0"
EXITS PROVIDED: 2@ 40.5"
NFPA 101.7.2.13.3
EVERY FLOOR SERVED BY THE ELEVATOR
SHALL HAVE AN ELEVATOR LOBBY. BARRIERS
FORMING THE ELEVATOR LOBBY SHALL HAVE
A MINIMUM 1 HOUR FIRE RESISTANCE
RATING AND SHALL BE ARRANGED AS A
SMOKE BARRIER.
TRAVEL DISTANCES: NFPA 101.21.2.5.2
DEAD END CORRIDORS SHALL NOT EXCEED
50 FEET. ACTUAL MAXIMUM DEAD END
CORRIDOR LENGTH = 80 FEET. SEE NOTE
ON PLAN.
NFPA 101.21.2.5.3.1
COMMON PATH OF TRAVEL SHALL NOT
EXCEED 100 FEET ON A STORY PROTECTED
THROUGHOUT BY AN APPROVED
AUTOMATIC SPRINKLER SYSTEM. ACTUAL
MAXIMUM COMMON PATH OF TRAVEL
DISTANCE = 89 FT.
NFPA 101.21.2.6.2.1 & 101.21.2.6.2.2
THE MAXIMUM TRAVEL DISTANCE BETWEEN
ANY POINT IN A ROOM AND AN EXIT SHALL
NOT EXCEED 200 FEET IF BUILDING IS
PROTECTED THROUGHOUT BY AN
APPROVED AUTOMATIC SPRINKLER SYSTEM.
ACTUAL MAXIMUM TRAVEL DISTANCE = 118
FT.
INTERIOR FINISHES: NFPA 101.10.2 AND 101.21.3.3.2
INTERIOR WALL AND CEILING FINISHES IN
EXITS AND EXIT ACCESS CORRIDORS SHALL
BE CLASS A OR B. IN AREAS OTHER THAN
EXITS INTERIOR WALL AND CEILING
FINISHES SHALL BE CLASS A, B, OR C.
INTERIOR FLOOR FINISHES IN EXIT
ENCLOSURES SHALL BE CLASS I OR CLASS
II.
CORRIDOR SEPARATIONS: NFPA 101.20.3.6.1
WHERE ACCESS TO EXITS IS PROVIDED BY
CORRIDORS, SUCH CORRIDORS SHALL BE
SEPARATED FROM OTHER AREAS BY 1
HOUR FIRE BARRIERS UNLESS THE
BUILDING IS PROTECTED BY AND APPROVED
SUPERVISED AUTOMATIC SPRINKLER
SYSTEM. THIS SPACE WILL BE PROVIDED
WITH A SUPERVISED AUTOMATIC SPRINKLER
SYSTEM. CORRIDOR WALLS ARE DESIGNED
AS SMOKE PARTITIONS WITH 1/2 HOUR FIRE
RESISTANCE RATING.
T 1S
1 H1
TICK INDICATES TOP
(EXTERIOR) SURFACE
AS SHOWN IN WALL
TYPE SCHEDULE
INSULATION DESIGNATION FIRE RESISTANCE DESIGNATION
STUD HEIGHT SCHEDULEWALL TYPE NUMBER
SCHEDULED WALL TYPE
H1 = FLOOR TO BOTTOM OF ROOF OR FLOOR DECK
H2 = INFILL EXISTING OPENING
H3 = FLOOR TO 6" ABOVE CEILING
T = THERMAL INSULATION FILL STUD CAVITY
A = ACOUSTIC INSULATION FILL STUD CAVITY
U = URETHANE SPRAY FOAM THERMAL INSULATION
1 = ONE HOUR & SMOKE SEALED
2 = TWO HOUR & SMOKE SEALED
1/2 = 30 MIN. & SMOKE SEALED
STUD HEIGHT SCHEDULE
INSULATION DESIGNATION
FIRE RESISTANCE DESIGNATION
WALL TYPE LEGEND
(NOTE: GYPSUM BOARD
SHALL RUN TO TOP OF STUD)
(NOTE: INSULATION SHALL
EXTEND FULL HEIGHT OF
WALL)
(NOTE: ALL EXISTING RATED WALLS
REQUIRING INFILL SHALL MATCH THE FIRE
AND SMOKE RATINGS OF THE EXISTING
WALL.)
SYMBOL LEGEND
72" DOOR WIDTH PROVIDED
DIRECTION OF EGRESS
34.5" EXIT WIDTH PROVIDED
32" EXIT WIDTH REQUIRED
ACCESSIBLE ROUTE / PATH OF
TRAVEL
MOST REMOTE ACCESSIBLE
ROUTE / PATH OF TRAVEL
FIRE EXTINGUISHERFE
WEST
PLAINS
ENGINEERING.
INC.
WWW.WESTPLAINSENGINEERING.COM
RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,
ND
Office of Construction and Facilities Management
Department of Veterans Affairs
Project Number
Building Number
Drawing Number
Dwg. of
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT:CONSULTANTS:
Revisions: Date
VA FORM 08 -- 6231
on e e ig on e q ua th i f oo t th on e i f oo t on e th
6"
6"
6"
6"
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
TELE: (605) 332-7850 FAX: (605) 332-3539
SIOUX FALLS, SOUTH DAKOTA 57104-4873
625 S. MINNESOTA AVENUE, SUITE 204
KEY PLAN:
SEAL:
4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106
PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759
OCTOBER 11,
438−15−201
AADDGS
FIFTH FLOOR CODE PLAN
100% CONSTRUCTION
DRAWINGS
7 60
SIOUX FALLS, SOUTH DAKOTA
V.A. HEALTH CARE SYSTEM
RENOVATE 5TH FLOOR SURGERY
AI1005
SCALE: 1/8" = 1'-0"
CODE FLOOR PLAN NORTH
CODE ANALYSIS
NUMBER ROOM NAME USE CLASSIFICATION AREA ** OLF
OCCUPANT
LOAD
TOTAL
EGRESS
WIDTH
NUMBER OF
EXITS
529 OFFICE Business 130 SF 100 SF 1 0.26 1 530 OFFICE Business 127 SF 100 SF 1 0.25 1 531 OFFICE Business 131 SF 100 SF 1 0.26 1 532 OFFICE Business 126 SF 100 SF 1 0.25 1 533 OFFICE Business 125 SF 100 SF 1 0.25 1 534B BACK STAIR Business 113 SF 100 SF 1 0.23 1 535 OFFICE Business 132 SF 100 SF 1 0.26 1 536 COMPUTER Business 107 SF 100 SF 1 0.21 1 537 OFFICE Business 134 SF 100 SF 1 0.27 1 538 OFFICE Business 123 SF 100 SF 1 0.25 1 539 OFFICE Business 124 SF 100 SF 1 0.25 1 540 OFFICE Business 124 SF 100 SF 1 0.25 1 541 OFFICE Business 122 SF 100 SF 1 0.24 1 542 OFFICE Business 122 SF 100 SF 1 0.24 1 543 JANITOR Accessory Storage/Mech. 94 SF 500 SF 1 0.20 1 544 TOILET Accessory Storage/Mech. 105 SF 500 SF 1 0.20 1 545 TOILET Accessory Storage/Mech. 60 SF 500 SF 1 0.20 1
8814 SF 139 24.53
CODE ANALYSIS
NUMBER ROOM NAME USE CLASSIFICATION AREA ** OLF
OCCUPANT
LOAD
TOTAL
EGRESS
WIDTH
NUMBER OF
EXITS
500 ENTRY LOBBY Business 772 SF 100 SF 8 1.54 1 500A STAIR Business 197 SF 100 SF 2 0.39 1 500B CLEAN CORE Ambulatory Healthcare 523 SF 100 SF 5 1.05 1 500C CORRIDOR Business 908 SF 100 SF 9 1.82 1 500D CRASH CART ALCOVE Accessory Storage/Mech. 40 SF 500 SF 1 0.15 1 500E LINEN ALCOVE Accessory Storage/Mech. 6 SF 500 SF 1 0.15 1 500F FIRE VALVE Accessory Storage/Mech. 6 SF 500 SF 1 0.20 1 501 WAITING ROOM Assembly Unconcentrated 174 SF 15 SF 12 1.74 1 501A CORRIDOR Business 262 SF 100 SF 3 0.52 1 502 RECEPTION Business 201 SF 100 SF 2 0.40 1 502A WORKROOM Business 105 SF 100 SF 1 0.21 1 503 TOILET Accessory Storage/Mech. 69 SF 500 SF 1 0.20 1 504 OFFICE Business 168 SF 100 SF 2 0.34 1 505 OFFICE Business 100 SF 100 SF 1 0.20 1 506 OFFICE Business 100 SF 100 SF 1 0.20 1 507 STAFF LOUNGE Assembly Unconcentrated 281 SF 15 SF 19 2.81 1 508 CONFERENCE ROOM Assembly Unconcentrated 348 SF 15 SF 23 3.48 1 509 PATIENT INTAKE Business 75 SF 100 SF 1 0.20 1 510 CORRIDOR Business 123 SF 100 SF 1 0.25 1 510A WOMEN'S LOCKER ROOM Ambulatory Healthcare 136 SF 50 SF 3 0.41 1 510B WOMEN'S TOILET Accessory Storage/Mech. 102 SF 500 SF 1 0.20 1 510C MEN'S LOCKER ROOM Ambulatory Healthcare 98 SF 50 SF 2 0.29 1 510D MEN'S TOILET Accessory Storage/Mech. 98 SF 500 SF 1 0.20 1 511 MINOR PROCEDURE OR 2 Health Care Inpatient Treatment 285 SF 240 SF 1 0.24 1 512 MINOR PROCEDURE OR 1 Health Care Inpatient Treatment 285 SF 240 SF 1 0.24 1 513 SOILED ROOM Accessory Storage/Mech. 70 SF 500 SF 1 0.15 1 514 MEDICATION ROOM Ambulatory Healthcare 72 SF 100 SF 1 0.20 1 516 STERILE STORAGE Accessory Storage/Mech. 105 SF 500 SF 1 0.15 1 517 CLEAN ROOM Accessory Storage/Mech. 88 SF 500 SF 1 0.15 1 518 EXAM ROOM Health Care Inpatient Treatment 108 SF 240 SF 1 0.20 1 519 EXAM ROOM Health Care Inpatient Treatment 130 SF 240 SF 1 0.20 1 520 DATA Accessory Storage/Mech. 17 SF 500 SF 1 0.20 1 521 ELECTRICAL Accessory Storage/Mech. 36 SF 500 SF 1 0.20 1 522 LINEN ALCOVE Accessory Storage/Mech. 34 SF 500 SF 1 0.15 1 523 STRETCHER CLOSET Accessory Storage/Mech. 53 SF 500 SF 1 0.15 1 524 EQUIPMENT STORAGE Accessory Storage/Mech. 159 SF 500 SF 1 0.15 1 525 OFFICE Business 146 SF 100 SF 1 0.29 1 526 OFFICE Business 176 SF 100 SF 2 0.35 1 527 MECHANICAL/ ELECTRICAL Accessory Storage/Mech. 24 SF 500 SF 1 0.20 1 528 OFFICE Business 137 SF 100 SF 1 0.27 1
CODE PLAN KEYNOTES:
1 SEMI-RECESSED FIRE EXTINGUISHER AND CABINET
2 CONTINUE R21 URETHANE INSULATION INSIDE CHASE ON EXTERIOR WALL AND AROUND
STRUCTURAL COLUMNS.
6'-0" W x 8'-0" L PENTHOUSE LIFT ACCESS3
REPAIR ALL PENETRATIONS INTO EXISTING WALLS INDICATED AS FIRE WALLS WITH
APPROPRIATE FIRE STOPPING MATERIALS MEETING THE INDICATED RATINGS4
REMOVABLE RAMP5
AREA OF WORK 10,072 SQFT.
10' - 4"
8' - 6"8' - 6"
8' - 6"
9' - 0"
8' - 10"
8' - 0"
9' - 0"
8' - 1"
7' - 11"
8' - 0" 8' - 0"
8' - 0"
8' - 0"
8' - 4"
8' - 2"8' - 2"8' - 0" 7' - 0"
1 1
3 3
8' - 6"
8' - 0" 8' - 4"
7' - 8"
8' - 2" 8' - 2"
8' - 2"8' - 2"
8' - 2" 8' - 0"
1 2
2 1
3 3 3 3 3 3
7' - 2" 7' - 2" 475
BREAK
477I
STORAGE
477H
RECOVERY
SPACE
477G
RECOVERY
SPACE
477F
RECOVERY
SPACE
477E
RECOVERY
SPACE
477D
RECOVERY
SPACE
477C
RECOVERY
SPACE
477B
RECOVERY
SPACE
477A
RECOVERY
SPACE478
WORK ROOM
SAME DAY
SURGERY
RECEPTION
CHECK-IN
OFFICE
WAITING
ROOM
VISION
404A
VISION
EXAM
EXAM
CORRIDOR
RESTROOM
EXAM
EXAM
EXAM
AUDIOLOGY
LAB
439B
AUDIO
BOOTH
439A
AUDIO
BOOTH
440A
ELEC.
ELEC.
STAIR
LOBBY
RESTROOM
442A
RESTROOM
443B
OFFICE
443B
OFFICE
AUDITORIUM
443A
OFFICE
443D
OFFICE
WAITING
ROOM
446A
MECHANICAL
CORRIDOR
OFFICE
EXAM
447A
EXAM
WOMENS
MENS
EXAM
EXAM
452A
STORAGE
STORAGE
STAIR
WAITING
CORRIDOR
AI501
443K
STORAGE
443J
OFFICE
443F
BACK STAGE
443L
BACK HALL
443I
OFFICE
AUDITORIUM
443N
STORAGE
AI501
STAGE
2A
H2
NORTH
PROJECT AREA
4TH FLOOR
2' x 2' SUSPENDED ACOUSTICAL CEILING GRID
GYPSUM BOARD CEILING / SOFFIT
DIFFUSER
RETURN
2x4 TROFFER LIGHT FIXTURE
CEILING LEGEND
SURFACE MOUNTED LIGHT FIXTURE
RADIENT CEILING PANEL
WEST
PLAINS
ENGINEERING.
INC.
WWW.WESTPLAINSENGINEERING.COM
RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.