36E77618R0053-005.pdf

PDF 17 MB Posted

Attached to
Sioux Falls- Renovate 5th Floor Surgery Federal contract opportunity
Solicitation number
36E77618R0053
Issued by
Department of Veterans Affairs Headquarters

About this file

36E77618R0053 ATTACHMENT 3 - FINAL CONSTRUCTION DRAWINGS.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Sioux Falls- Renovate 5th Floor Surgery, newest first.
File Type Posted
36E77618R0053-00004001.docx DOCX document
36E77618R0053-00004000.docx DOCX document
36E77618R0053-00003001.docx DOCX document
36E77618R0053-00003000.docx DOCX document
36E77618R0053-00002001.pdf PDF
36E77618R0053-00002002.pdf PDF
36E77618R0053-00002000.docx DOCX document
36E77618R0053-00001000.docx DOCX document
36E77618R0053-00001001.pdf PDF
36E77618R0053-001.docx DOCX document
36E77618R0053-006.pdf PDF
36E77618R0053-002.pdf PDF
36E77618R0053-008.pdf PDF
36E77618R0053-009.docx DOCX document
36E77618R0053-010.docx DOCX document
36E77618R0053-007.pdf PDF
36E77618R0053-003.pdf PDF
36E77618R0053-004.pdf PDF
36E77618R0053-000.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTH

scale

MEMORIAL PARKING #1

PARKING #7

PARKING #6

PARKING #2A

PARKING

T15

T

T13

T11 th

S T

HOLLYELMWOODLINCOLN

P A R K

IN

G

PARKING #4

26th STREET

TEMPORARY

#5

PRKG.

G A R F

IE

L D

A V E N U E

HOLLYLINCOLN

22nd STREET

SIGN

VETERANS

16 15

STATION GARAGE9

CHILD DAYCARET15

PAD MOUNT TRANSFORMER29

feet 50 250200150100500

SIOUX FALLS, SOUTH DAKOTA

V.A.M.R.O.C. SITE PLAN

RESEARCH BUILDING

ELECTRICAL SWITCHGEAR

STORAGE BUILDING

STORAGE BUILDING

STORAGE BUILDING

T13

T12

T11

COOLING TOWER PAD44

PAD MOUNT TRANSFORMER

PAD MOUNT TRANSFORMER

PAD MOUNT TRANSFORMER

PAD MOUNT TRANSFORMER

45,46

42,43

40,41

OXYGEN STORAGE PAD

REGIONAL OFFICE BUILDING

A/C PAD - I.C.U.

PAD MOUNT TRANSFORMER

PAD MOUNT TRANSFORMER

PAD MOUNT TRANSFORMER

SALT STORAGE BASIN31

PAD MOUNT TRANSFORMER25

AUXILIARY POWER UNIT24

RECREATION SHELTER - N.H.C.U.22

RECREATION SHELTER - HOSPITAL21

GAS METER HOUSE19

GARAGE18

ENGINEERING and A & MM17

MENTAL HEALTH & BLDG. MGMT.16

HOPTEL BUILDING15

FLAGPOLE14

BOILER PLANT11

WATER TANK10

SEPT., 2001

BUILDING SCHEDULE

LAUNDRY8

UTILITY SHOPS7

HOSPITAL BUILDING5

N.H.C.U.1

BUILDINGSNO.

WEST

PLAINS

ENGINEERING.

INC.

WWW.WESTPLAINSENGINEERING.COM

RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,

ND

R

TAT

S

DE

TI

N

U ACIREMAFOSE

A

IR

S

D E

PA

ETERANS

AFFTM

EN

T

OF

V

Office of Construction and Facilities Management

Department of Veterans Affairs

ARCHITECT:CONSULTANTS:

Revisions: Date

VA FORM 08 -- 6231

Project Number

Building Number

Drawing Number

Dwg. of

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

TELE: (605) 332-7850 FAX: (605) 332-3539

SIOUX FALLS, SOUTH DAKOTA 57104-4873

625 S. MINNESOTA AVENUE, SUITE 204 -

PROJECT LOCATION DRAWING SHEET INDEX

4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106

PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759

V.A. HEALTH CARE SYSTEM

SIOUX FALLS, SOUTH DAKOTA

438−15−201

RENOVATE 5TH FLOOR SURGERY

October 11, 2017

438−15−201

AADDGS

GI000

100% CONSTRUCTION

DRAWINGS

1 60

SIOUX FALLS, SOUTH DAKOTA

V.A. HEALTH CARE SYSTEM

RENOVATE 5TH FLOOR SURGERYCOVER SHEET

SHEET

NUMBER SHEET NAME PAGE NUMBER OF

MECHANICAL

5 - MD101 DEMOLITION HVAC VENTILATION PLAN - FOURTH FLOOR 36 60

5 - MD102 DEMOLITION HVAC VENTILATION PLAN - FIFTH FLOOR 37 60

5 - MD103 DEMOLITION HVAC VENTILATION PLAN - PENTHOUSE 38 60

5 - MD104 DEMOLITION HVAC PIPING PLAN - FIFTH FLOOR 39 60

5 - MD105 DEMOLITION HVAC PIPING PLAN - PENTHOUSE 40 60

5 - MH001 MECHANICAL SYMBOLS SHEET 41 60

5 - MH002 MECHANICAL ABBREVIATIONS AND GENERAL NOTES 42 60

5 - MH101 HVAC VENTILATION PLAN - FOURTH FLOOR 43 60

5 - MH102 HVAC VENTILATION PLAN - FIFTH FLOOR 44 60

5 - MH103 HVAC VENTILATION PLAN - PENTHOUSE 45 60

5 - MH501 MECHANICAL DETAILS 46 60

5 - MH502 MECHANICAL DETAILS 47 60

5 - MH601 HVAC SCHEDULES 48 60

5 - MP101 HVAC PIPING PLAN - FOURTH FLOOR 49 60

5 - MP102 HVAC PIPING PLAN - FIFTH FLOOR 50 60

5 - MP103 HVAC PIPING PLAN - PENTHOUSE 51 60

5 - MP501 HVAC PIPING DETAILS 52 60

ELECTRICAL

5 - ED100 DEMOLITION CEILING PLAN - FOURTH FLOOR 53 60

5 - ED101 DEMOLITION ELECTRICAL PLAN - FIFTH FLOOR 54 60

5 - EL101 LIGHTING PLAN - FIFTH FLOOR 55 60

5 - EL500 LIGHTING DETAILS AND SCHEDULES 56 60

5 - EP101 POWER PLAN - FIFTH FLOOR 57 60

5 - EP102 COMMUNICATIONS PLAN - FIFTH FLOOR 58 60

5 - EP500 POWER AND COMMUNICATIONS DETAILS 59 60

5 - EP601 POWER AND COMMUNICATIONS SCHEDULES 60 60

SHEET

NUMBER SHEET NAME PAGE NUMBER OF

GENERAL

5 - GI000 COVER SHEET 1 60

5 - GI001 PHASING PLANS 2 60

STRUCTURAL

5 - S1 EXISTING ROOF FRAMING PLAN AT FIFTH FLOOR 3 60

ARCHITECTURAL

5 - AD100 FOURTH FLOOR DEMOLITION PLANS 4 60

5 - AD101 FIFTH FLOOR DEMOLITION PLAN 5 60

5 - AD102 FIFTH FLOOR REFLECTED CEILING DEMOLITION PLAN 6 60

5 - AI100 FIFTH FLOOR CODE PLAN 7 60

5 - AI101 FOURTH FLOOR PLANS 8 60

5 - AI102 FIFTH FLOOR REMODEL PLAN 9 60

5 - AI103 FIFTH FLOOR REFLECTED CEILING PLAN 10 60

5 - AI104 ENLARGED FLOOR PLANS 11 60

5 - AI200 INTERIOR ELEVATIONS 12 60

5 - AI201 INTERIOR ELEVATIONS 13 60

5 - AI300 BUILDING SECTIONS 14 60

5 - AI500 CASEWORK DETAILS 15 60

5 - AI501 MISCELLANEOUS DETAILS 16 60

5 - AI502 DOOR SCHEDULE, DOOR AND WINDOW FRAMES AND

DETAILS

17 60

5 - AI503 WINDOW FRAME ELEVATIONS AND DETAILS 18 60

5 - AF100 FIFTH FLOOR FINISH PLAN 19 60

5 - AF600 FINISH SCHEDULE 20 60

5 - IF101 EQUIPMENT PLAN 21 60

FIRE PROTECTION

5 - FD101 DEMOLITION FIRE PROTECTION PLAN - FIFTH FLOOR 22 60

5 - FA101 FIRE PROTECTION LEGEND AND DETAILS 23 60

5 - FA102 FIRE PROTECTION PLAN - FIFTH FLOOR 24 60

PLUMBING

5 - PD101 DEMOLITION PLUMBING PLAN - FOURTH FLOOR 25 60

5 - PD102 DEMOLITION PLUMBING PLAN - FIFTH FLOOR 26 60

5 - PD103 DEMOLITION PLUMBING PLAN - PENTHOUSE 27 60

5 - PD104 DEMOLITION MEDICAL GAS PLAN - FIFTH FLOOR 28 60

5 - PD105 DEMOLITION MEDICAL GAS PLAN - PENTHOUSE 29 60

5 - PL001 MECHANICAL PLUMBING SYMBOLS AND ABBREVIATIONS 30 60

5 - PL101 PLUMBING PLAN - FOURTH FLOOR 31 60

5 - PL102 PLUMBING PLAN - FIFTH FLOOR 32 60

5 - PL103 MEDICAL GAS PLAN - FIFTH FLOOR 33 60

5 - PL501 PLUMBING DETAILS 34 60

5 - PL601 PLUMBING SCHEDULES 35 60

PROJECT

AREA

PROJECT AREA EXISTIN

G ATTIC

SPACE

EXISTING ATTIC

SPACE

5TH FLOOR

RAMP UP

PHASE 1 NOTES:

- BEGIN CONSTRUCTION ON THIS AREA WHEN GIVEN NOTICE TO

PROCEED.

- MAINTAIN HVAC, POWER, PLUMBING, AND FIRE SPRINKLER SYSTEMS

TO ALL OTHER PORTIONS OF THE HOSPITAL THROUGHOUT THE

WORK OF THIS PHASE.

- PROVIDE TEMPORARY COOLING IN THE ELEVATOR LOBBY AREA

DURING THE WORK OF THIS PHASE.

- MAINTAIN TEMPORARY PARTITION AND TEMPORARY DOOR

THROUGHOUT THIS PHASE OF CONSTRUCTION.

1 3

RAMP UP

PHASE 2 NOTES:

- BEGIN CONSTRUCTION ON THIS AREA 14 CALENDAR DAYS AFTER

FINAL COMPLETION OF PHASE 1.

- MAINTAIN HVAC, POWER, PLUMBING, AND FIRE SPRINKLER SYSTEMS

TO ALL OTHER PORTIONS OF THE HOSPITAL THROUGHOUT THE

WORK OF THIS PHASE.

- PROVIDE TEMPORARY COOLING IN THE ELEVATOR LOBBY AREA

DURING THE WORK OF THIS PHASE.

- MAINTAIN TEMPORARY PARTITION AND TEMPORARY DOOR

THROUGHOUT THIS PHASE OF CONSTRUCTION.

RAMP UP PHASE THREE NOTES:

- PHASE THREE WORK - FINAL FLOOR, WALL AND CEILING FINISHES

THROUGHOUT THIS AREA.

- PHASE THREE WORK MAY BEGIN AS SOON AS PHASE TWO CONSTRUCTION IS

COMPLETED AND TEMPORARY WALL AND DOOR HAS BEEN REMOVED.

- PHASE THREE WORK WILL REQUIRE CLOSE COORDINATION WITH THE VA DUE

TO ONGOING OPERATIONS THROUGHOUT THIS FLOOR.

- CONTRACTOR IS REQUIRED TO WORK AFTER NORMAL BUSINESS HOURS

AND/OR ON WEEKENDS WHEN PERFORMING ALL DEMOLITION WORK AND

PRELIMINARY AND FINAL FLOOR, WALL, AND CEILING FINISHES THROUGOUT

THIS AREA.

WEST

PLAINS

ENGINEERING.

INC.

WWW.WESTPLAINSENGINEERING.COM

RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,

ND

Office of Construction and Facilities Management

Department of Veterans Affairs

Project Number

Building Number

Drawing Number

Dwg. of

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT:CONSULTANTS:

Revisions: Date

VA FORM 08 -- 6231

on e e ig ht h in ch on e fo ot on e q ua rte r th re ei gh th s ha lf i nc f oo t th q ua rs o ne on e i f oo t on e a nd es th

6"

6"

6"

6"

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

TELE: (605) 332-7850 FAX: (605) 332-3539

SIOUX FALLS, SOUTH DAKOTA 57104-4873

625 S. MINNESOTA AVENUE, SUITE 204

KEYNOTES:

GENERAL NOTES:

KEY PLAN:

SEAL:

4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106

PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759

OCTOBER 11,

438−15−201

AuthorChecker

PHASING PLANS

100% CONSTRUCTION

DRAWINGS

2 60

SIOUX FALLS, SOUTH DAKOTA

V.A. HEALTH CARE SYSTEM

RENOVATE 5TH FLOOR SURGERY

GI0015

SCALE: 1/8" = 1'-0"

PHASE ONE PLAN

SCALE: 1/8" = 1'-0"

PHASE TWO PLAN

SCALE: 1/8" = 1'-0"

PHASE THREE PLAN

TEMPORARY 1 HOUR FIRE RATED CONSTRUCTION PARTITION. REMOVE

PARTITION AT COMPLETION OF PHASE 1

TEMPORARY 1 HOUR FIRE RATED CONSTRUCTION PARTITION. REMOVE

PARTITION AT COMPLETION OF PHASE 2

TEMPORARY 1 HOUR FIRE RATED DOOR

A. CONTRACTOR SHALL BE ABLE TO ACCESS THE PROJECT VIA ONLY ONE

ELEVATOR. COORDINATE WITH THE VA REGARDING WHICH ELEVATOR WILL BE

ALLOWED ACCESS TO THE 5TH FLOOR DURING CONSTRUCTION. THREE OF THE

FOUR ELEVATORS WILL HAVE 5TH FLOOR ACCESS ELIMINATED DURING

CONSTRUCTION.

B. DAMAGE TO THE ELEVATOR USED FOR CONSTRUCTION SHALL BE REPAIRED BY

THE CONTRACTOR PRIOR TO SUBSTANTIAL COMPLETION.

C. PROVIDE TEMPORARY COOLING IN THE ELEVATOR LOBBY DURING BOTH PHASE 1

AND PHASE 2 CONSTRUCTION.

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to COR and Contractor, as follows:

RENOVATE 5th FLOOR SURGERY – PHASING SCHEDULE Standard work hours for the medical center are Monday–Friday, 7:00 a.m. to 4:30 p.m. After hours work may be required by the contractor pending noise, vibration or other construction impacts that would limit care to patients.

Phase I:

1. This Project is divided into THREE SEPARATE PHASES. Phase 1 work shall be completed prior to commencing Phase 2 work. Phase 2 work shall be completed prior to commencing Phase 3 work. The contractor shall provide adequate work forces to complete all work in each Phase within the contracted time frame.

2. Coordinate with Contracting Officers Representative (COR) to assure that all items to be removed or relocated from the spaces by the VA have been so removed.

3. Construct required construction barriers. Construct 1 hour fire barrier and temporary fire door as indicated prior to beginning demolition and asbestos abatement.

4. Perform Phase 1 asbestos and demolition activities. After hours work may be required by the contractor pending noise, vibration or other construction impacts that limits care to patients.

5. After demolition and asbestos abatement activities are completed for Phase 1, convene a meeting with Contracting Officers Representative (COR) and Architect/Engineer to review conflicts.

6. Install new walls, doors, ceilings, casework, and equipment in an order most workable to the General Contractor for Phase 1 Area.

7. Coordinate installation of plumbing, electrical and mechanical equipment for Phase 1 Area.

8. Complete wall and floor finishes within individual work areas for Phase 1 Area.

9. Remove temporary construction barriers and doors at completion of Phase 1 work.

10. For each Phase and Area, complete final cleanup for final inspection by Contracting Officers Representative (COR) and Architect/Engineer.

11. After Phase I activities are completed convene a meeting with Contracting Officers Representative (COR) and Architect/Engineer to review conflicts.

Phase II:

12. Provide 14 calendar day window between final completion of Phase 1 and the beginning of Phase 2 for the VA to move out of the Phase 2 Area.

13. Coordinate with Contracting Officers Representative (COR) to assure that all items to be removed or relocated from the spaces by the VA have been so removed.

14. Construct required construction barriers. Construct 1 hour fire barrier and temporary fire door as indicated on Sheet GI001 Phasing Plans prior to beginning demolition and asbestos abatement.

15. Perform Phase 2 asbestos abatement and demolition activities. After hours work may be required by the contractor pending noise, vibration or other construction impacts that limits care to patients.

16. After demolition and asbestos abatement activities are completed for Phase 2, convene a meeting with Contracting Officers Representative (COR) and Architect/Engineer to review conflicts.

17. Install new walls, doors, ceilings, casework, and equipment in an order most workable to the General Contractor for Phase 2 Area.

18. Coordinate installation of plumbing, electrical and mechanical equipment for Phase 2 Area.

19. Complete wall and floor finishes within individual work areas for Phase 2 Area.

20. Remove temporary construction barriers and doors at completion of Phase 2 work.

21. For each Phase and Area, complete final cleanup for final inspection by Contracting Officers Representative (COR) and Architect/ Engineer.

22. After Phase 2 activities are completed, convene a meeting with Contracting Officers Representatives (COR) and Architect/Engineer to review conflicts.

Phase III:

23. Demolition may proceed in Phase 3 in an order most suitable to the General Contractor, however Phase 1 and 2 shall be 100% complete prior to any work on Phase 3.

24. Work for Phase 3 will need to occur in conjunction with continued hospital operations. The contractor shall coordinate work during this phase closely with the VA and provide protection for VA employees and patients during this phase. After hours work may be required by the contractor pending noise, vibration or other construction impacts that limits care to patients.

25. After demolition activities are completed for Phase 3, convene a meeting with Contracting Officers Representative (COR) and Architect/Engineer to review conflicts.

26. Install new walls, doors, ceilings, casework, and equipment in an order most workable to the General Contractor, for Phase 3 Area.

27. Coordinate installation of plumbing, electrical and mechanical equipment for Phase 3 items.

28. Complete wall and floor finishes within individual work areas for Phase 3 items.

29. For each Phase and Area, complete final cleanup for final inspection by Contracting Officers Representative (COR) and Architect/ Engineer.

PHASING NOTES:

34 36 135

B

C

I

F

D

3 4

1B 4B

1A35A

S1

EXIST. HORIZ. DIAGONAL

BRACING ABOVE CEILING

TO REMAIN.

2x12 RAFTERS

OMITTED FOR CLARITY.

12'-0"

9' -2

2x12 RAFTERS

OMITTED FOR CLARITY.

TYP.

10'-0"

TYP.

10'-0"

EXIST. W12x25

(TYP.)

EXIST. W12x25

(TYP.)

V E

R

IF

Y

7' -4

/2

S1

11'-0"

ASTERISKS REPRESENT

EXISTING DIAGONAL

BRACING TO BE REMOVED

(SEE 2/5-S1) & REPLACED

WITH GUSSET PLATES (SEE

3/5-S1). (7 FRAMES THUS).

S1

Sim

RAMP

S1

S1

NEW SURGICAL

LIGHT SUPPORT.

8' -0

1'-6" 1'-6"

S1

S1

PROVIDE NEW CONC.

SLAB ON RIGID INSUL.

IN THIS AREA - REF.

DETAIL.

EXIST. STEEL FRAMES -

SEE 2/S1. (TYP.)

P

U

N

IS

T R

U T

P

U

N

IS

T R

U T

S1

S1

S1

S1

W x2

E

X

IS

T

W x2

E

X

IS

T

P

U

N

IS

T R

U T

P

U

N

IS

T R

U T

L3x3x3/8"x1'-2"

EA. END

(TYP.)

NORTH

PROJECT AREA E

XIS

TIN

G A

TTIC

S

PA

C

EE

XISTIN

G

ATTIC

S

PA

C E

Attic Slab T/ Struct.

60'-4"

B C IF

'-4

/2

EXIST. W12x28

E X

IS

T

W x2

E X

IS

T

W x2

S1

S1

REMOVE L3x2 1/2x5/16"

DIAGONAL BRACING &

CONN. PLATES @

LOCATIONS NOTED ON

PLAN THUS (*).

SEE PLAN

3/8"

3/8"

5/16"

COL.

3"x3/8" WEB STIFFENERS ALIGNED w/ COL. FLANGES

BOTH SIDES OF BEAM.

1/2" GUSSET PL.

CTR'D. ON BEAM.6" 1'-2"

6" 8"

COPE GUSSET PL. FOR

EXIST. CONN. ANGLE -

FIELD VERIFY SIZE.

FIN. FLOOR

FIN. FLOOR

1"

11'-0"

2'-8" 2'-8" 3'-0"

2" RIGID INSUL.4" RIGID INSUL.

REMOVE EXISTING

1" TOPPING SLAB.

CONCRETE RAMP w/

FIBERMESH REINF.3"

M

IN

#3@12" O.C. EA. WAY.

4"

#3x10" DOWEL BAR

16" O.C. - 4" EMBED

DEPTH TO EXIST.

CONC. - DRILL &

POUND.

TOOL JOINT &

FILL w/ SEALANT.

TOOL JOINT &

FILL w/ SEALANT.

M

IN

1/

2" S

O F

F

IT

S

E E

A R

C H

'-1

/8

1/4" 2@3"

EXIST. W12x28

+10'-4 1/2"

VERIFY HSS 5x5x3/8" w/ 11"x3/4"x11"

TOP PL.

12 1/2"x3/4"x12 1/2" PL.

3/4" DIA. THR'D. RODS.

SURGICAL LIGHT

MOUNTING PLATE.

B

C

I

G

H

ASTERISKS REPRESENT

EXISTING DIAGONAL

BRACING TO BE REMOVED

(SEE 2/5-S1) & REPLACED w/

GUSSET PLATES (SEE 3/5-S1)

(3 FRAMES THUS).

S1

Sim

EXIST.

BEAM.

P1001 UNISTRUT .

3/8"

1/4"

L3x3x3/8"x0'-4"

L3x3x3/8"x1'-2"

PATIENT LIFT RAIL

5 7/8"

FIN. FLOOR

RAMP AS

OCCURS.

6"

4"

6" RIGID INSUL.

#3@12" O.C. EA. WAY.

EXIST.

FLR. LINE.

EXIST. W12

BEAM.

UNISTRUT P2867A

BEAM CLAMP.

P1001

UNISTRUT

WEST

PLAINS

ENGINEERING. INC.

WWW.WESTPLAINSENGINEERING.COM

RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK, ND

Office of Construction and Facilities Management

Department of Veterans Affairs

Project Number

Building Number

Drawing Number

Dwg. of

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT:CONSULTANTS:

Revisions: Date

VA FORM 08 )) 6231

o n e e ig i n c t o n e q u a rt t th ig h i t o lf i n e f o o t th u a rt e f o o t o n e i n e f o o t o n e a d e h h t th h t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

TELE: (605) 332-7850 FAX: (605) 332-3539

SIOUX FALLS, SOUTH DAKOTA 57104-4873

625 S. MINNESOTA AVENUE, SUITE 204

KEY PLAN:

SEAL:

4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106

PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759

OCTOBER 17, 2017

438−15−201

KMSKAQ

EXISTING ROOF FRAMING PLAN AT

FIFTH FLOOR

100% CONSTRUCTION

DRAWINGS

3 60

SIOUX FALLS, SOUTH DAKOTA

V.A. HEALTH CARE SYSTEM

RENOVATE 5TH FLOOR SURGERY

S15

1/8" = 1'-0"

EXISTING ROOF FRAMING PLAN AT FIFTH FLOOR -

SOUTH END

1/4" = 1'-0"

EXISTING ATTIC FRAMING SECTION

1" = 1'-0"

BRACE DETAIL

1" = 1'-0"

RAMP SECTION

PLAN

NORTH

1" = 1'-0"

SURGICAL LIGHT SUPPORT

1/8" = 1'-0"

EXISTING ROOF FRAMING PLAN AT FIFTH FLOOR -

NORTH END

PLAN

NORTH

1 1/2" = 1'-0"

CONN. DETAIL w/ ANGLE

GENERAL CONTRACTOR SHALL VERIFY

EXISTING DIMENSIONS & ELEVATIONS

NOTED ON STRUCTURAL PLAN. NOTIFY A/E

IMMEDIATELY OF ANY DESCREPANCIES.

1" = 1'-0"

RAISED FLOOR DETAIL

1 1/2" = 1'-0"

CONN. DETAIL @ BEAM

10' - 4"

8' - 6"

8' - 6"

8' - 6"

9' - 0"

8' - 10"

8' - 0"

9' - 0" 8' - 1"

7' - 11"

8' - 0" 8' - 0"

8' - 0"

8' - 0"

8' - 4"

8' - 0"

8' - 2"8' - 2"8' - 0" 7' - 0"

1 3

3 3

1 1

2 1

2 18' - 2" 8' - 2"

7' - 8"

8' - 2"8' - 0"

9' - 0"

7' - 2"

7' - 2"

8' - 4"

8' - 2"

BREAK

477I

STORAGE

477H

RECOVERY

SPACE

477G

RECOVERY

SPACE

477F

RECOVERY

SPACE

477E

RECOVERY

SPACE

477D

RECOVERY

SPACE

477C

RECOVERY

SPACE

477B

RECOVERY

SPACE

477A

RECOVERY

SPACE478

WORK ROOM

SAME DAY

SURGERY

RECEPTION

CHECK-IN

OFFICE

WAITING

ROOM

VISION

404A

VISION

EXAM

EXAM

CORRIDOR

RESTROOM

EXAM

EXAM

EXAM

AUDIOLOGY

LAB

439B

AUDIO

BOOTH

439A

AUDIO

BOOTH

440A

ELEC.

ELEC.

STAIR

LOBBY

RESTROOM

442A

RESTROOM

443B

OFFICE

443B

OFFICE

AUDITORIUM

443A

OFFICE

443D

OFFICE

WAITING

ROOM

446A

MECHANICAL

CORRIDOR

OFFICE

EXAM

447A

EXAM

WOMENS

MENS

EXAM

EXAM

452A

STORAGE

STORAGE

STAIR

WAITING

CORRIDOR

NORTH

PROJECT AREA

4TH FLOOR

443K

STORAGE

443J

OFFICE

443F

BACK STAGE

443L

BACK HALL

443I

OFFICE

AUDITORIUM

443N

STORAGE

STAGE

AD100

T.O. AUDITORIUM

STAGE

50' - 2"

'-4

REMOVE EXISTING SPEAKER

BOX-OUT AND INFILL OPENING

FROM STORAGE ROOM SIDE

REMOVE EXISTING ACCESS

DOOR

'-0

4'

-0

+/- 3'-10"

WITH NEW LADDER

+/- 2'-6" COORDINATE

W

IT

H N

EW

L

AD

D

ER

3'

-8 " C

O O

R D

IN

AT

E

ENLARGE OPENING AS NEEDED

FOR NEW LADDER AND ACCESS

DOOR

ADJUST LOCATION OF EXISTING

SPRINKLER SYSTEM PIPING AS

NEEDED FOR INSTALLATION OF

NEW WALL MOUNTED ACCESS

LADDER AND PLATFORM

ADJUST LOCATION OF EXISTING

FIRE ALARM PANEL AND

CONDUIT AS NEEDED FOR

INSTALLATION OF NEW WALL

MOUNTED ACCESS LADDER

PROVIDE BLOCKING AND

BRACING IN EXISTING WALL AS

REQUIRED FOR INSTALLATION

OF ACCESS LADDER AND

PLATFORM. SEAL ALL

OPENINGS IN WALL WITH

APPROPRIATE FIREPROOFING

ASBESTOS CONTAINING MATERIAL

THE FOLLOWING AREAS ARE KNOWN TO BE ACM AND MUST BE ABATED IF ACM

MATERIALS ARE DISTURBED OR ENCOUNTERED:

• RADIATOR TRANSIT AND PIPE INSULATION AT ALL EXISTING RADIATORS AND

OTHER PIPE AND PIPE FITTING LOCATIONS.

• WALL/CEILING TEXTURE IN ROOM 443.

CONFIRM THESE WITH THE ASBESTOS REPORT INCLUDED IN THE PROJECT

MANUAL.

REMOVAL OF ASBESTOS CONTAINING MATERIAL (ACM) SHALL COMPLY WITH ALL

CITY, STATE, AND FEDERAL REGULATIONS. REMOVAL OF ACM SHALL CONFORM

TO THE LATEST EDITION OF ALL APPLICABLE OSHA AND AHERA REGULATIONS.

ALSO COMPLY WITH SOUTH DAKOTA OF ENVIRONMENTAL AND NATURAL

RESOURCES AND NESHAPS (40 CFR 60 & 62). WORK PRACTICES SHALL CONFORM

TO NIBS GUIDANCE / WORK PRACTICES FOR THE REMOVAL OF ASBESTOS. IF ANY

ADDITIONAL ACM OR POTENTIAL ACM IS IDENTIFIED DURING DEMOLITION OR

CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER

IMMEDIATELY. ANY CONFIRMED ACM SHALL BE ABATED BY THE CONTRACTOR

PER THE ABOVE REQUIREMENTS.

WEST

PLAINS

ENGINEERING.

INC.

WWW.WESTPLAINSENGINEERING.COM

RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,

ND

Office of Construction and Facilities Management

Department of Veterans Affairs

Project Number

Building Number

Drawing Number

Dwg. of

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT:CONSULTANTS:

Revisions: Date

VA FORM 08 -- 6231

on e e ig on e q ua th i f oo t th on e i f oo t on e th

6"

6"

6"

6"

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

TELE: (605) 332-7850 FAX: (605) 332-3539

SIOUX FALLS, SOUTH DAKOTA 57104-4873

625 S. MINNESOTA AVENUE, SUITE 204

KEY PLAN:

SEAL:

4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106

PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759

OCTOBER 17,

438−15−201

RTGDGS

FOURTH FLOOR DEMOLITION

PLANS

100% CONSTRUCTION

DRAWINGS

4 60

SIOUX FALLS, SOUTH DAKOTA

V.A. HEALTH CARE SYSTEM

RENOVATE 5TH FLOOR SURGERY

AD1005

SCALE: 1/8" = 1'-0"

FOURTH FLOOR CEILING DEMOLITION PLAN NORTH

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR

TO BEGINNING CONSTRUCTION.

B. ALL SURFACES OR FINISHES DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED AT NO COST TO THE OWNER AND SHALL MATCH

ADJACENT MATERIALS.

C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

DEMOLITION NOTES.

D. CUT EXISTING CONCRETE FLOOR AS NECESSARY TO ACCOMMODATE NEW

PIPING, CONDUIT, OR OTHER WORK. PATCH BACK TO MATCH.

E. SAW CUT AND REMOVE MASONRY TO ACCOMMODATE NEW OPENINGS. BRACE

OPENING UNTIL NEW LINTELS ARE INSTALLED.

F. WORK ON THIS FLOOR MUST BE CLOSELY COORDINATED WITH THE VA TO ALLOW

FOR CONTINUED OPERATIONS ON THIS FLOOR. (AFTER HOURS WORK MAY BE

REQUIRED)

G. CONTRACTOR SHALL TAKE ALL MEASURES AND PROVIDE ALL MATERIAL

NECESSARY FOR PROTECTING EXISTING EQUIPMENT AND PROPERTY IN

AFFECTED AREAS OF CONSTRUCTION AGAINST DUST AND DEBRIS, SO THAT

EQUIPMENT AND AFFECTED AREAS TO BE USED IN THE MEDICAL CENTERS

OPERATIONS WILL NOT BE HINDERED. CONTRACTOR SHALL PERMIT ACCESS TO

DEPARTMENT OF VETERANS AFFAIRS PERSONNEL AND PATIENTS THROUGH

OTHER CONSTRUCTION AREAS WHICH SERVE AS ROUTES OF ACCESS TO SUCH

AFFECTED AREAS AND EQUIPMENT. THESE ROUTES WHETHER ACCESS OR

EGRESS SHALL BE ISOLATED FROM THE CONSTRUCTION AREA BY TEMPORARY

PARTITIONS AND HAVE WALKING SURFACES, LIGHTING ETC TO FACILITATE

PATIENT AND STAFF ACCESS. COORDINATE ALTERATION WORK IN AREAS

OCCUPIED BY DEPARTMENT OF VETERANS AFFAIRS SO THAT MEDICAL CENTER

OPERATIONS WILL CONTINUE DURING THE CONSTRUCTION PERIOD. COORDINATE

WITH SPECIFICATIONS SECTION 01 0000 - GENERAL REQUIREMENTS AND 01 0100 -

MEDICAL CENTER REQUIREMENTS FOR WORK ON THIS FLOOR.

REMOVE AND SALVAGE ACOUSTIC TILE CEILING IN THIS AREA FOR

REINSTALLATION AFTER ABOVE CEILING WORK IS COMPLETE. COORDINATE

WITH MECHANICAL DRAWINGS FOR EXACT LOCATIONS.

2 REMOVE PORTION OF GYPSUM BOARD CEILING FOR ABOVE CEILING WORK IN

THIS AREA. COORDINATE WITH MECHANICAL DRAWINGS FOR EXACT LOCATIONS.

INDEPENDANTLY SUSPEND EXISTING LIGHTS, DIFFUSERS AND OTHER HVAC

AND ELECTRICAL EQUIPMENT WHILE CEILING SYSTEM IS REMOVED FOR

ABOVE CEILING WORK. RESET IN CEILING GRID WHEN ABOVE CEILING WORK

IS COMPLETE. FIELD VERIFY EXISTING CONDITIONS FOR OTHER CEILING

HUNG EQUIPMENT.

DEMOLITION KEYNOTES:

DEMOLITION GENERAL NOTES:

PHASING NOTE:

WORK ON THIS FLOOR MUST BE CLOSELY COORDINATED WITH THE VA TO ALLOW FOR

CONTINUED OPERATIONS ON THIS FLOOR. (AFTER HOURS WORK MAY BE REQUIRED)

REMOVE AND SALVAGE ADHEARED 12" X 12" CEILING TILE IN THIS AREA FOR

REINSTALLATION AFTER ABOVE CEILING WORK IS COMPLETE. COORDINATE

WITH MECHANICAL DRAWINGS FOR EXACT LOCATIONS.

SCALE: 1/8" = 1'-0"

FOURTH FLOOR AUDITORIUM SPACE DEMO PLAN

SCALE: 1/4" = 1'-0"

WALL LADDER DETAIL

DENOTES PROJECT LIMITS LINE

PROJECT AREA EXISTIN

G ATTIC

SPACE

EXISTING ATTIC

SPACE

5TH FLOOR

OFFICE

506D

OFFICE

506E

OFFICE

506F

OFFICE

506G

TOILET

506H

OFFICE

OFFICE

506A

OFFICE

506B

CONFERENCE

506C

OFFICE

CORRIDOR

STORAGE

H.K.

503ELEC.

508A

TELE.

508B

STORAGE

505A

STAIR

CORRIDOR

CORRIDOR

CORRIDOR

TOILET

510A

MEN

P.A.R.

FIRE VALVE

511A

MECHANICAL

GU ROOM

WASH

516A

WEST O.R.

516B

EAST O.R.

516C

WASH

516E

STERILE

516F

STERILE

CORRIDOR

H.K.

STORAGE

516G

MECHANICAL

518A

MECHANICAL

STORAGE

CORRIDOR

WOMEN

TOILET

521A

H.K.

STORAGE

CHART

BREAK ROOM

CORRIDOR

526A

S

TO

R A

G E

CORRIDOR

STORAGE

530 ROOF HATCH

530A

STORAGE

STORAGE

MECHANICAL

526B

2 2

4 15

4 4

666666

161616161616

101010

10 10

BACK STAIR ENTRY

516H

AD101 1

AD1011

7 7 7 7 7 7 7

AD101

16 716 7

617617617617

16 716 7

AD101

11 11

ASBESTOS CONTAINING MATERIAL

THE FOLLOWING AREAS ARE KNOWN TO BE ACM AND MUST BE ABATED IF ACM

MATERIALS ARE DISTURBED OR ENCOUNTERED:

• RADIATOR TRANSIT AND PIPE INSULATION AT ALL EXISTING RADIATORS AND

OTHER PIPE AND PIPE FITTING LOCATIONS.

CONFIRM THESE WITH THE ASBESTOS REPORT INCLUDED IN THE PROJECT

MANUAL.

REMOVAL OF ASBESTOS CONTAINING MATERIAL (ACM) SHALL COMPLY WITH ALL

CITY, STATE, AND FEDERAL REGULATIONS. REMOVAL OF ACM SHALL CONFORM

TO THE LATEST EDITION OF ALL APPLICABLE OSHA AND AHERA REGULATIONS.

ALSO COMPLY WITH SOUTH DAKOTA OF ENVIRONMENTAL AND NATURAL

RESOURCES AND NESHAPS (40 CFR 60 & 62). WORK PRACTICES SHALL CONFORM

TO NIBS GUIDANCE / WORK PRACTICES FOR THE REMOVAL OF ASBESTOS. IF ANY

ADDITIONAL ACM OR POTENTIAL ACM IS IDENTIFIED DURING DEMOLITION OR

CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER

IMMEDIATELY. ANY CONFIRMED ACM SHALL BE ABATED BY THE CONTRACTOR

PER THE ABOVE REQUIREMENTS.

EXISTING WINDOWS

TO REMAIN

NOTE: FIELD VERIFY ALL DIMENSIONS OF EXISTING WINDOWS

AND TRIM. NEW WINDOWS AND TRIM TO MATCH EXISTING.

M

AT

C H

E

XI

ST

IN

G 5'

-1

1/ 2"

SI

LL

H

EI

G H

T M

AT

C

H E

XI

ST

IN

G

MATCH EXISTING

3'-6"

5' -1

1/

2"

3'-6"

16 16

5' -1

1/

2"

3'-6"

SI

LL

H

EI

G H

T M

AT

C

H E

XI

ST

IN

G

NOTE: FIELD VERIFY ALL DIMENSIONS

OF EXISTING WINDOWS AND TRIM. NEW

WINDOWS AND TRIM TO MATCH EXISTING.

WEST

PLAINS

ENGINEERING.

INC.

WWW.WESTPLAINSENGINEERING.COM

RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,

ND

Office of Construction and Facilities Management

Department of Veterans Affairs

Project Number

Building Number

Drawing Number

Dwg. of

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT:CONSULTANTS:

Revisions: Date

VA FORM 08 -- 6231

on e e ig on e q ua th i f oo t th on e i f oo t on e th

6"

6"

6"

6"

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

TELE: (605) 332-7850 FAX: (605) 332-3539

SIOUX FALLS, SOUTH DAKOTA 57104-4873

625 S. MINNESOTA AVENUE, SUITE 204

KEY PLAN:

SEAL:

4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106

PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759

OCTOBER 11,

438−15−201

RTGDGS

FIFTH FLOOR DEMOLITION

PLAN

100% CONSTRUCTION

DRAWINGS

5 60

SIOUX FALLS, SOUTH DAKOTA

V.A. HEALTH CARE SYSTEM

RENOVATE 5TH FLOOR SURGERY

AD1015

DEMOLITION KEYNOTES:

NORTH

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR

TO BEGINNING CONSTRUCTION.

B. ALL SURFACES OR FINISHES DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED AT NO COST TO THE OWNER AND SHALL MATCH

ADJACENT MATERIALS.

C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

DEMOLITION NOTES.

D. CUT EXISTING CONCRETE FLOOR AS NECESSARY TO ACCOMMODATE NEW

PIPING, CONDUIT, OR OTHER WORK. PATCH BACK TO MATCH.

E. ADJUST STUDS SO THAT FACE OF GYPSUM WALL BOARD WILL ALIGN WITH

ADJACENT WALL.

F. SAW CUT AND REMOVE MASONRY TO ACCOMMODATE NEW OPENINGS. BRACE

OPENING UNTIL NEW LINTELS ARE INSTALLED.

DEMOLITION GENERAL NOTES:

1 REMOVE DOOR, FRAME AND HARDWARE

2 REMOVE WALL

3 REMOVE WATER CLOSETS, SINKS, WATER COOLER, AND ANY ASSOCIATED

ACCESSORIES. SEE PLUMBING DRAWINGS FOR ADDITIONAL DEMOLITION

REMOVE GYPSUM BOARD/PLASTER AND FURRING AROUND COLUMNS4

REMOVE FLOOR COVERING IN THIS AREA

REMOVE WINDOW SILL AND ANY ASSOCIATED TRIM BELOW

DENOTES PROJECT LIMITS LINE

EXTERIOR STONE TRIM TO REMAIN, PROTECT FROM DAMAGE DURING WALL

INFILL DEMOLITION

SCALE: 1/8" = 1'-0"

FLOOR PLAN DEMOLITION

8 REMOVE CONCRETE STEP UP TO ATTIC LANDING AS NEEDED TO INFILL WALL

9 REMOVE PORTION OF WALL FOR NEW OPENING.

REMOVE EXISTING WALL FINISHES, PLASTER AND FRAMING BACK TO

EXISTING CLAY TILE WALL. PREP WALLS FOR NEW SPRAY FOAM INSULATION.

11 REMOVE STRUCTURAL CROSS BRACING (SEE STRUCTURAL DRAWINGS)

12 REMOVE AND SALVAGE METAL LOCKERS FOR OWNER

13 REMOVE AND SALVAGE MEDICAL EQUIPMENT FOR OWNER

SCALE: 1/4" = 1'-0"

TYPICAL OPENING DEMOLITION ELEVATION

14 EXISTING WALL TO REMAIN

15 REMOVE CASEWORK AND COUNTERTOP

16 REMOVE WALL INFILL FOR INSTALLATION OF NEW WINDOWS

SCALE: 1/4" = 1'-0"

TYPICAL INFILL DEMOLITION ELEVATION

17 REMOVE GLAZING IN WINDOW AT THIS LOCATION. TO BE REPLACED WITH

NEW FROSTED OBSCURED GLAZING.

18 EXISTING LAUNDRY CHUTE TO REMAIN

19 REMOVE WINDOW GLAZING AND FRAME

20 REMOVE AND SALVAGE ALL AV EQUIPMENT IN THIS ROOM. TURN ALL

EQUIPMENT OVER THE VA FOR FUTURE INSTALLATION IN THE NEW

CONFERENCE ROOM.

1 1

1 1

3 3

3 3

2 2

OFFICE

506D

OFFICE

506E

OFFICE

506F

OFFICE

506G

TOILET

506H

OFFICE

OFFICE

506A

OFFICE

506B

CONFERENCE

506C

OFFICE

CORRIDOR

STORAGE

H.K.

503ELEC.

508ATELE.

508B

STORAGE

505A

STAIR

CORRIDOR

CORRIDOR

509 CORRIDOR

TOILET

510A

MEN

P.A.R.

FIRE VALVE

511A

MECHANICAL

GU ROOM

WASH

516A

WEST O.R.

516B

EAST O.R.

516C

WASH

516E

STERILE

516FSTERILE

CORRIDOR

H.K.

STORAGE

516G

MECHANICAL

518A

MECHANICAL

519STORAGE

CORRIDOR

WOMEN

TOILET

521A

H.K.

STORAGE

CHART

BREAK ROOM

CORRIDOR

526A

S

TO

R A

G E

CORRIDOR

STORAGE

ROOF HATCH

530A

STORAGE

STORAGE

MECHANICAL

526B

BACK STAIR ENTRY

516H

NORTH

PROJECT AREA EXISTIN

G ATTIC

SPACE

EXISTING ATTIC

SPACE

5TH FLOOR

WEST

PLAINS

ENGINEERING.

INC.

WWW.WESTPLAINSENGINEERING.COM

RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,

ND

Office of Construction and Facilities Management

Department of Veterans Affairs

Project Number

Building Number

Drawing Number

Dwg. of

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT:CONSULTANTS:

Revisions: Date

VA FORM 08 -- 6231

on e e ig on e q ua th i f oo t th on e i f oo t on e th

6"

6"

6"

6"

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

TELE: (605) 332-7850 FAX: (605) 332-3539

SIOUX FALLS, SOUTH DAKOTA 57104-4873

625 S. MINNESOTA AVENUE, SUITE 204

KEY PLAN:

SEAL:

4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106

PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759

OCTOBER 11,

438−15−201

RTGDGS

FIFTH FLOOR REFLECTED

CEILING DEMOLITION PLAN

100% CONSTRUCTION

DRAWINGS

6 60

SIOUX FALLS, SOUTH DAKOTA

V.A. HEALTH CARE SYSTEM

RENOVATE 5TH FLOOR SURGERY

AD1025

SCALE: 1/8" = 1'-0"

FIFTH FLOOR CEILING DEMOLITION PLAN NORTH

DEMOLITION KEYNOTES:

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR

TO BEGINNING CONSTRUCTION.

B. ALL SURFACES OR FINISHES DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED AT NO COST TO THE OWNER AND SHALL MATCH

ADJACENT MATERIALS.

C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

DEMOLITION NOTES.

D. FLOOR SURFACES DAMAGED OR BENEATH EXISTING CASEWORK TO BE REMOVED

SHALL BE PATCHED TO MATCH SURROUNDING FLOOR SURFACES.

E. CUT EXISTING CONCRETE FLOOR AS NECESSARY TO ACCOMMODATE NEW

PIPING, CONDUIT, OR OTHER WORK. PATCH BACK TO MATCH.

F. ADJUST STUDS SO THAT FACE OF GYPSUM WALL BOARD WILL ALIGN WITH

ADJACENT WALL.

G. SAW CUT AND REMOVE MASONRY TO ACCOMMODATE NEW OPENINGS. BRACE

OPENING UNTIL NEW LINTELS ARE INSTALLED.

DEMOLITION GENERAL NOTES:

1 REMOVE ACOUSTIC TILE CEILING.

2 REMOVE GYPSUM BOARD CEILING

DENOTES PROJECT LIMITS LINE

3 SEE MECHANICAL AND ELECTRICAL PLANS FOR LIGHTS, DIFFUSERS, AND

OTHER ITEMS LOCATED ON CEILINGS. TYPICAL

4 REMOVE AND SALVAGE OPERATING ROOM LIGHTS FOR REINSTALLATION AT

NEW MINOR PROCEDURE ROOMS.

UP

M G

285 SF

MINOR

PROCEDURE OR 1

285 SF

MINOR

PROCEDURE OR 2

159 SF

EQUIPMENT

STORAGE

146 SF

OFFICE 176 SF

OFFICE

137 SF

OFFICE 130 SF

OFFICE

127 SF

OFFICE

131 SF

OFFICE

126 SF

OFFICE

125 SF

OFFICE

132 SF

OFFICE

107 SF

COMPUTER

134 SF

OFFICE

123 SF

OFFICE

124 SF

OFFICE

124 SF

OFFICE

122 SF

OFFICE

105 SF

TOILET

60 SF

TOILET

122 SF

OFFICE

94 SF

JANITOR

168 SF

OFFICE

100 SF

OFFICE

100 SF

OFFICE

348 SF

CONFERENCE

ROOM

201 SF

RECEPTION

69 SF

TOILET

174 SF

WAITING ROOM

105 SF

502A

WORKROOM

523 SF

500B

CLEAN CORE

24 SF

MECHANICAL/

ELECTRICAL

6 SF

500F

FIRE VALVE

281 SF

STAFF LOUNGE

RAMP UP

262 SF

501A

CORRIDOR

772 SF

ENTRY LOBBY

908 SF

500C

CORRIDOR

197 SF

500A

STAIR

130 SF

EXAM ROOM

108 SF

EXAM ROOM

88 SF

CLEAN ROOM

105 SF

STERILE STORAGE

72 SF

MEDICATION

ROOM

70 SF

SOILED ROOM

40 SF

500D

CRASH CART

ALCOVE

17 SF

DATA

98 SF

510C

MEN'S LOCKER

ROOM

98 SF

510D

MEN'S TOILET

123 SF

CORRIDOR

102 SF

510B

WOMEN'S TOILET

75 SF

PATIENT INTAKE

6 SF

500E

LINEN ALCOVE

42" 40.5"

32"

42"

40.5"

32"

113 SF

534B

BACK STAIR

87'

24'

81' 53'

45'

34' 44'

33' 11'

38' 36'

29'

FE

FE

36 SF

ELECTRICAL

34 SF

LINEN ALCOVE7

-T

H1

1/2A H1

2T

H1

1/2T H1

2T

H1

AI104

SEE ENLARGED

PLAN FOR WALL

TYPES

AI104

SEE ENLARGED

PLAN FOR WALL

TYPES

AI104

SEE ENLARGED PLAN

FOR WALL TYPES

1A

H1

-U

H1

1/2A H1

-A

H1

-U

H19 -U

H19 -U

H1

H3 1 1/2A H1

-A

H1

-U

H1

-A

H1

1/2A H1

-A

H1

-U

H1 9 -U

H1

-A

H1

-U

H1

H34

H3 4

H3

1/2A H1

-U

H19 -U

H1 9 -U

H19 -U

H1

-A

H1

-U

H1

H3

H3

H3

1T

H2

H3

H1

H1

1T

H16 1T

H1

2T H1

H2

2T

H1

2T

H1

1A

H1

-A

H1

-U

H1

-A

H1

1A

H1 4

H3 4

H34

H3

-U

H1

-U H1

H31

H3

-A

H1

-U

H1

-A

H1

-A

H1

-U

H1

-A

H1

H34

H34

H31 1A

H1

-U

H1 9 -U

H19 -U

H19 -U

H1

-U H19 -U

H1 9 -U

H19 -U

H1

-A

H1

1A

H1 4

H34

H3

H3

-U

H1

H119

H1

H1

1A

H1

H1

1A H1

1A

H1

1A

H1

-U

H1

1/2A H1

H1

-U

H19 -U

H1

-U

H19 -U

H1

-A H1

H13

H1 3

H1

-A

H1

-A

H1

-A

H13 -A

H1

-A

H1 3 -A

H1

-A

H1

1/2A H1

-A

H1

-A

H1

-A

H1

-U

H1 9 -U

H19 -U

H19 -U

H1

-U

H1

-U

H1

-A

H1

-U

H1

-A

H1

1/2A H1

-U

H1

-A

H1

1/2A H1

-U

H19 -U

H19 -U

H19 -U

H1

-U

H1

-U

H1

1/2A H1

53 SF

STRETCHER

CLOSET

2T

H1

H34

H3 4

H3

NOTE: THIS RAMP DOES NOT COMPLY WITH CODE

REQUIREMENTS FOR CONTINUITY OF HANDRAILS

ON BOTH SIDES NFPA 101 - 7.2.2.4.2. HANDRAILS ON

ONE SIDE ARE INTERRUPTED BY DOORS TO DATA

AND ELECTRICAL ROOMS. THE VA HAS INDICATED

THAT THIS NON-COMPLIANT CODE CONDITION IS

ACCEPTABLE.

FE

6'-6"

1A

H1

1A

H1

H3

NOTE: DEAD END CORRIDOR

IS APPROXIMATELY 80' LONG.

THE V.A. HAS INDICATED THAT

THIS CONDITION IS ACCEPTABLE.

STORAGE

-A

H1

MECHANICAL

136 SF

510A

WOMEN'S LOCKER

ROOM

FE

NOTE: A SIGN SHALL BE

INSTALLED AT THIS DOOR

THAT STATES "THIS

DOOR IS NOT AN EXIT."

NOTE: A SIGN SHALL BE

INSTALLED AT THIS DOOR

THAT STATES "THIS DOOR

IS NOT AN EXIT."

AI300

• 5/8" GYPSUM BOARD EACH SIDE

• INSTALL GYPSUM BOARD UP 1/2"

OFF CONCRETE SUBFLOOR

• ACOUSTIC BATT INSULATION

WHERE INDICATED

• 3 5/8" METAL STUDS

• STC RATING OF 45-49 PER

GA. # WP1072

• 1 HR. FIRE AND SMOKE RATED

(WHERE INDICATED)

UL U419

• 1/2 HR. FIRE & SMOKE RATED

(WHERE INDICATED)

UL U407

• 5/8" GYPSUM BOARD EACH SIDE

• INSTALL GYPSUM BOARD UP 1/2"

OFF CONCRETE SUBFLOOR

• VAPOR RETARDER ON WARM SIDE

(AT THERMAL INSULATION)

• ACOUSTIC OR THERMAL BATT

INSULATION WHERE INDICATED

• 6" METAL STUDS

• STC RATING OF 45-49 PER

GA. # WP1072

• 1 HR. FIRE AND SMOKE RATED

(WHERE INDICATED)

UL U419

WALL TYPE SCHEDULE

2 -

3 -

4 -

5 -

6 -

• 5/8" GYPSUM BOARD ONE SIDE

• INSTALL GYPSUM BOARD UP 1/2"

OFF CONCRETE SUBFLOOR

• ACOUSTIC BATT INSULATION

WHERE INDICATED

• 1 1/2" METAL STUD FURRING

• EXISTING WALL OR COLUMN

• 1/2 HR. FIRE & SMOKE RATED

(WHERE INDICATED)

UL U407

• 5/8" GYPSUM BOARD EACH SIDE

• INSTALL GYPSUM BOARD UP 1/2"

OFF CONCRETE SUBFLOOR

• ACOUSTIC BATT INSULATION

• 8" METAL STUDS

• STC RATING OF 45-49 PER

GA. # WP1072

• 1 HR. FIRE AND SMOKE RATED

(WHERE INDICATED)

UL U419

(SEE WALL TAG FOR INSULATION AND FIRE RATING)

• 5/8" GYPSUM BOARD ONE SIDE

• INSTALL GYPSUM BOARD UP 1/2"

OFF CONCRETE SUBFLOOR

• ACOUSTIC BATT INSULATION

WHERE INDICATED

• 3 5/8" METAL STUDS

• 1/2 HR. FIRE & SMOKE RATED

(WHERE INDICATED)

UL U407

• 1 HR. FIRE AND SMOKE RATED

(WHERE INDICATED)

UL U419

• 5/8" GYPSUM BOARD ONE SIDE

• INSTALL GYPSUM BOARD UP 1/2"

OFF CONCRETE SUBFLOOR

• VAPOR RETARDER ON WARM SIDE

• THERMAL BATT INSULATION

WHERE INDICATED

• 6" METAL STUDS

• 1 HR. FIRE AND SMOKE RATED

(WHERE INDICATED)

UL U419

• 1/2 HR. FIRE & SMOKE RATED

(WHERE INDICATED)

UL U407

• 2 LAYERS 5/8" TYPE X GYPSUM

BOARD EACH SIDE

• VAPOR RETARDER ON WARM SIDE

• INSTALL GYPSUM BOARD UP 1/2"

OFF CONCRETE SUBFLOOR

• ACOUSTIC BATT INSULATION

WHERE INDICATED

• 6" METAL STUDS

• 2 HR. FIRE AND SMOKE RATED

UL U411

8 -

11 -

• CERAMIC TILE

• THIN SET MORTAR

• WATERPROOF MEMBRANE AT

SHOWERS

• 5/8" TILE BACKER (EXTEND TO

TILE HEIGHT) 5/8" GYPSUM

WALL BOARD ABOVE

• ACOUSTIC BATT INSULATION

WHERE INDICATED

• 3-5/8" METAL STUD FRAMING AT

16" O.C.

• 5/8" GYPSUM WALL BOARD

• 1 HR. FIRE AND SMOKE RATED

(WHERE INDICATED)

UL U419

• 30 MIN. FIRE & SMOKE RATED

(WHERE INDICATED)

UL U407

• 5/8" GYPSUM BOARD ONE SIDE

• INSTALL GYPSUM BOARD UP 1/2"

OFF CONCRETE SUBFLOOR

• 2 1/2" METAL STUDS

• 1" METAL STUD OFFSET FROM

EXISTING WALL

• R-21 SPRAY URETHANE INSULATION

ENCAPSULATES BACK OF METAL

STUD TO CREATE THERMAL BREAK

• EXISTING EXTERIOR WALL

GYPSUM BOARD MUST EXTEND FROM

FLOOR TO ROOF DECK TO

COMPLETELY COVER URETHANE

INSULATION

1/

2" 1"

• CERAMIC TILE

• THIN SET MORTAR

• 5/8" TILE BACKER (EXTEND TO

TILE HEIGHT) 5/8" GYPSUM

WALL BOARD ABOVE

• ACOUSTIC BATT INSULATION

WHERE INDICATED

• 3-5/8" METAL STUD FRAMING AT

16" O.C.

• 5/8" TILE BACKER (EXTEND TO

TILE HEIGHT) 5/8" GYPSUM

WALL ABOVE

• THIN SET MORTAR

• CERAMIC TILE

12 -

• CERAMIC TILE

• THIN SET MORTAR

• WATERPROOF MEMBRANE AT

SHOWERS

• 5/8" TILE BACKER (EXTEND TO TILE

HEIGHT) 5/8" GYPSUM WALL BOARD

ABOVE

• ACOUSTIC BATT INSULATION WHERE

INDICATED

• 6" METAL STUD FRAMING AT 16" O.C.

• 5/8" TILE BACKER (EXTEND TO TILE

HEIGHT) 5/8" GYPSUM WALL BOARD

ABOVE

• THIN SET MORTAR

• CERAMIC TILE

• 1 HR. FIRE AND SMOKE RATED

(WHERE INDICATED) UL U419

13 -

14 -

15 -

16 -

• CERAMIC TILE

• THIN SET MORTAR

• 5/8" TILE BACKER, EXTEND TO

TILE HEIGHT, 5/8" GYPSUM

WALL BOARD ABOVE, ONE SIDE

ONLY

• ACOUSTIC BATT INSULATION

WHERE INDICATED

• 3-5/8" METAL STUD FRAMING AT

16" O.C.

• CERAMIC TILE

• THIN SET MORTAR

• 5/8" TILE BACKER, EXTEND TO

TILE HEIGHT, 5/8"GYPSUM WALL

BOARD ABOVE

• 1-1/2" METAL STUD FURRING

• EXISTING WALL OR COLUMN

• CERAMIC TILE

• THIN SET MORTAR

• 5/8" TILE BACKER, EXTEND TO TILE

HEIGHT, 5/8"GYPSUM WALL BOARD

ABOVE

• 2 1/2" METAL STUDS

• 1" METAL STUD OFFSET FROM

EXISTING WALL

• R-21 SPRAY URETHANE INSULATION

ENCAPSULATES BACK OF METAL

STUD TO CREATE THERMAL BREAK

• EXISTING EXTERIOR WALL

GYPSUM BOARD MUST EXTEND FROM

FLOOR TO ROOF DECK TO

COMPLETELY COVER URETHANE

INSULATION

1"

• CERAMIC TILE

• THIN SET MORTAR

• 5/8" TILE BACKER (EXTEND TO

TILE HEIGHT) 5/8" GYPSUM

WALL BOARD ABOVE

• ACOUSTIC BATT INSULATION

WHERE INDICATED

• 6" METAL STUD FRAMING AT 16"

O.C.

• 5/8" GYPSUM WALL BOARD

• 5/8" GYPSUM BOARD ONE SIDE

• INSTALL GYPSUM BOARD UP 1/2"

OFF CONCRETE SUBFLOOR

• 2 1/2" METAL STUD FURRING

• EXISTING WALL OR COLUMN

• STONE TILE VENEER

• THIN SET MORTAR

• EXISTING WALL OR COLUMN

• STONE TILE VENEER

• THIN SET MORTAR

• 5/8" TILE BACKER BOARD

• 1 1/2" METAL STUD FURRING

(3 5/8" METAL STUD FURRING AT

WATER COOLER)

• EXISTING WALL OR COLUMN

• 1" X 24" GYPSUM SHAFT LINER

PANELS.

• 2 1/2" METAL CT STUDS AT 24" O.C.

• ACOUSTIC BATT INSULATION

WHERE INDICATED

• 2 LAYERS 5/8" TYPE X IMPACT

RESISTANT GYPSUM WALL BOARD.

• 2 HR. FIRE RATED BARRIER

WALL: UL U497

SHAFTWALL

• 5/8" GYPSUM BOARD EACH SIDE

• INSTALL GYPSUM BOARD UP 1/2"

OFF CONCRETE SUBFLOOR

• PLYWOOD BACKING BOARD ONE

SIDE TO SUPPORT 250 LB 85"

SMARTBOARD

• ACOUSTIC BATT INSULATION

WHERE INDICATED

• 3 5/8" METAL STUDS

• ADDITIONAL BLOCKING IN WALL AS

NEEDED FOR SMARTBOARD

• STC RATING OF 45-49 PER

GA. # WP1072

• 1/2 HR. FIRE & SMOKE RATED

(WHERE INDICATED)

UL U407

NORTH

PROJECT AREA EXISTIN

G ATTIC

SPACE

EXISTING ATTIC

SPACE

5TH FLOOR

1. WHERE MORE THAN ONE WALL TYPE IS SHOWN, THE MOST RESTRICTIVE

REQUIREMENTS OF THE WALLS ARE REQUIRED (FOR EXAMPLE, A FIRE BARRIER MAY BE

COMBINED WITH A SMOKE BARRIER - 2 HOUR F.R. CONSTRUCTION WITH 1 1/2 HOUR F.R.

DOORS, COMBINATION FIRE/ SMOKE DAMPERS, 2 HOUR PENETRATIONS).

2. NOTE THAT DUCTS AND PIPE OR CONDUIT PENETRATIONS DO NOT TYPICALLY OCCUR

AT SHAFTS OR STAIR ENCLOSURES BECAUSE THEY ARE PROHIBITED EXCEPT WHERE

THEY ARE SPECIFICALLY SERVING THAT COMPONENT.

(EXISTING)

(EXISTING)

(EXISTING)

RATED WALLS GENERAL NOTES:

DENOTES MINIMUM 1-HOUR FIRE WALL & SMOKE BARRIER WALL:

* WALL EXTENDS FROM FLOOR TO DECK ABOVE

* ALL DUCT PENETRATIONS ARE PROTECTED BY COMBINATION FIRE

AND SMOKE DAMPERS

* SMOKE DAMPERS ARE NOT REQUIRED WHERE ADJACENT SMOKE

COMPARTMENTS ARE PROTECTED BY QUICK RESPONSE

SPRINKLERS THROUGHOUT EACH COMPARTMENT

* ALL PENETRATIONS ARE SEALED WITH MATERIALS. APPROPRIATE

FOR PROTECTING 1-HOUR FIRE AND SMOKE WALL ASSEMBLIES.

* ALL DOORS ARE 3/4-HOUR LABELED, SELF-CLOSING AND

POSITIVE LATCHING. (LSC 18.3.6.3 & 8.3.3.1)

DENOTES 2-HOUR FIRE WALL & SMOKE BARRIER WALL:

* WALL EXTENDS FROM FLOOR TO DECK ABOVE

* ALL DUCT PENETRATIONS ARE PROTECTED BY

COMBINATION FIRE AND SMOKE DAMPERS

* SMOKE DAMPERS ARE NOT REQUIRED WHERE ADJACENT

SMOKE COMPARTMENTS ARE PROTECTED BY QUICK

RESPONSE SPRINKLERS THROUGHOUT EACH

COMPARTMENT

* ALL PENETRATIONS ARE SEALED WITH MATERIALS APPROPRIATE

FOR PROTECTING 2-HOUR FIRE AND SMOKE WALL ASSEMBLIES

* ALL DOORS ARE 1 1/2-HOUR LABELED, SELF-CLOSING AND

POSITIVE LATCHING. (LSC 18.3.6.3 & 8.3.3.1)

DENOTES SUITE SEPARATION/CORRIDOR WALL AND SMOKE PARTITION:

* WALL SHALL BE PERMITTED TO TERMINATE AT THE CEILING

WHERE THE CEILING IS CONSTRUCTED TO LIMIT THE TRANSFER

OF SMOKE.

* 1/2 HOUR FIRE RESISTANCE RATING IS REQUIRED.

* WALL SHALL FORM A BARRIER TO LIMIT THE TRANSFER OF

SMOKE.

* ALL AIR TRANSFER OPENINGS ARE PROTECTED BY SMOKE

DAMPERS (PER LSC 8.4.6.2 & IBC 711.7).

* ALL PENETRATIONS ARE SEALED WITH MATERIALS APPROPRIATE

FOR RESISTING THE PASSAGE OF SMOKE.

* ALL DOORS SHALL BE CONSTRUCTED TO RESIST THE PASSAGE

OF SMOKE AND BE 20 MIN RATED.

* DOORS SHALL BE REQUIRED TO MEET THE REQUIREMENTS FOR

SMOKE AND DRAFT CONTROL DOOR ASSEMBLIES. (TESTED IN

ACCORDANCE WITH UL 1784.) (IBC 711.5.2)

* A CLEARANCE BETWEEN THE BOTTOM OF THE DOOR AND THE

FLOOR COVERING NOT EXCEEDING ONE INCH SHALL BE

PERMITTED.

* DOORS SHALL BE PROVIDED WITH POSITIVE LATCHING

HARDWARE.

* DOORS SHALL NOT BE HELD OPEN BY DEVICES OTHER THAN

THOSE THAT RELEASE WHEN THE DOOR IS PUSHED OR PULLED.

* DOORS SHALL BE SELF OR AUTOMATIC CLOSING. (PER LSC 8.4.3.5

AND IBC 711.5.3)

RATED WALLS:

BUILDING CODE ANALYSIS

BUILDING CODE: 2015 NFPA 101 LIFE SAFETY CODE

VA FIRE PROTECTION DESIGN MANUAL

2015 INTERNATIONAL FIRE CODE

2015 INTERNATIONAL BUILDING CODE

ABA/VA BARRIER FREE DESIGN GUIDE

2012 ANSI 117.1 - ACCESSIBLE AND USABLE

BUILDINGS AND FACILITIES

OCCUPANCY CLASSIFICATION: NFPA 101.6 OCCUPANCY CLASSIFICATIONS:

AMBULATORY HEALTHCARE

BUSINESS

NFPA 101 - 6.14.3 (MIXED OCCUPANCIES)

1 HOUR SEPARATION FROM AMBULATORY

HEALTHCARE TO BUSINESS OCCUPANCIES.

OCCUPANT LOAD: NFPA 101.7.3.1.2

AMBULATORY HEALTHCARE 62

ASSEMBLY UNCONCENTRATED 64

HEALTH CARE TREATMENT AREAS 4

ACCESSORY STORAGE/MECH. 16

TOTAL THIS FLOOR 146

FIRE SPRINKLER SYSTEMS: NFPA 13 SYSTEM THROUGHOUT

MANUAL FIRE EXTINGUISHING NFPA 10.6.2.1

EQUIPMENT: MAXIMUM TRAVEL DISTANCE TO MANUAL

FIRE EXTINGUISHERS SHALL NOT EXCEED 75

FT. FOR CLASS A HAZARDS.

MEANS OF EGRESS: NFPA 101.21.2.3.2

THE CLEAR WIDTH OF ANY CORRIDOR OR

PASSAGEWAY REQUIRED FOR EXIT ACCESS

SHALL NOT BE LESS THAN 44 INCHES: 82

INCH WIDE CORRIDORS MINIMUM ARE

PROVIDE IN ALL PATIENT AREAS. 54 INCH

WIDE CORRIDORS MINIMUM ARE PROVIDED

IN ALL NON-PATIENT AREAS.

NFPA 101.21.2.3.4

THE MINIMUM CLEAR WIDTH FOR DOORS IN

THE MEANS OF EGRESS SHALL NOT BE LESS

THAN 32 INCHES WIDE.

EXITS REQUIRED: 2@ 32.0"

EXITS PROVIDED: 2@ 40.5"

NFPA 101.7.2.13.3

EVERY FLOOR SERVED BY THE ELEVATOR

SHALL HAVE AN ELEVATOR LOBBY. BARRIERS

FORMING THE ELEVATOR LOBBY SHALL HAVE

A MINIMUM 1 HOUR FIRE RESISTANCE

RATING AND SHALL BE ARRANGED AS A

SMOKE BARRIER.

TRAVEL DISTANCES: NFPA 101.21.2.5.2

DEAD END CORRIDORS SHALL NOT EXCEED

50 FEET. ACTUAL MAXIMUM DEAD END

CORRIDOR LENGTH = 80 FEET. SEE NOTE

ON PLAN.

NFPA 101.21.2.5.3.1

COMMON PATH OF TRAVEL SHALL NOT

EXCEED 100 FEET ON A STORY PROTECTED

THROUGHOUT BY AN APPROVED

AUTOMATIC SPRINKLER SYSTEM. ACTUAL

MAXIMUM COMMON PATH OF TRAVEL

DISTANCE = 89 FT.

NFPA 101.21.2.6.2.1 & 101.21.2.6.2.2

THE MAXIMUM TRAVEL DISTANCE BETWEEN

ANY POINT IN A ROOM AND AN EXIT SHALL

NOT EXCEED 200 FEET IF BUILDING IS

PROTECTED THROUGHOUT BY AN

APPROVED AUTOMATIC SPRINKLER SYSTEM.

ACTUAL MAXIMUM TRAVEL DISTANCE = 118

FT.

INTERIOR FINISHES: NFPA 101.10.2 AND 101.21.3.3.2

INTERIOR WALL AND CEILING FINISHES IN

EXITS AND EXIT ACCESS CORRIDORS SHALL

BE CLASS A OR B. IN AREAS OTHER THAN

EXITS INTERIOR WALL AND CEILING

FINISHES SHALL BE CLASS A, B, OR C.

INTERIOR FLOOR FINISHES IN EXIT

ENCLOSURES SHALL BE CLASS I OR CLASS

II.

CORRIDOR SEPARATIONS: NFPA 101.20.3.6.1

WHERE ACCESS TO EXITS IS PROVIDED BY

CORRIDORS, SUCH CORRIDORS SHALL BE

SEPARATED FROM OTHER AREAS BY 1

HOUR FIRE BARRIERS UNLESS THE

BUILDING IS PROTECTED BY AND APPROVED

SUPERVISED AUTOMATIC SPRINKLER

SYSTEM. THIS SPACE WILL BE PROVIDED

WITH A SUPERVISED AUTOMATIC SPRINKLER

SYSTEM. CORRIDOR WALLS ARE DESIGNED

AS SMOKE PARTITIONS WITH 1/2 HOUR FIRE

RESISTANCE RATING.

T 1S

1 H1

TICK INDICATES TOP

(EXTERIOR) SURFACE

AS SHOWN IN WALL

TYPE SCHEDULE

INSULATION DESIGNATION FIRE RESISTANCE DESIGNATION

STUD HEIGHT SCHEDULEWALL TYPE NUMBER

SCHEDULED WALL TYPE

H1 = FLOOR TO BOTTOM OF ROOF OR FLOOR DECK

H2 = INFILL EXISTING OPENING

H3 = FLOOR TO 6" ABOVE CEILING

T = THERMAL INSULATION FILL STUD CAVITY

A = ACOUSTIC INSULATION FILL STUD CAVITY

U = URETHANE SPRAY FOAM THERMAL INSULATION

1 = ONE HOUR & SMOKE SEALED

2 = TWO HOUR & SMOKE SEALED

1/2 = 30 MIN. & SMOKE SEALED

STUD HEIGHT SCHEDULE

INSULATION DESIGNATION

FIRE RESISTANCE DESIGNATION

WALL TYPE LEGEND

(NOTE: GYPSUM BOARD

SHALL RUN TO TOP OF STUD)

(NOTE: INSULATION SHALL

EXTEND FULL HEIGHT OF

WALL)

(NOTE: ALL EXISTING RATED WALLS

REQUIRING INFILL SHALL MATCH THE FIRE

AND SMOKE RATINGS OF THE EXISTING

WALL.)

SYMBOL LEGEND

72" DOOR WIDTH PROVIDED

DIRECTION OF EGRESS

34.5" EXIT WIDTH PROVIDED

32" EXIT WIDTH REQUIRED

ACCESSIBLE ROUTE / PATH OF

TRAVEL

MOST REMOTE ACCESSIBLE

ROUTE / PATH OF TRAVEL

FIRE EXTINGUISHERFE

WEST

PLAINS

ENGINEERING.

INC.

WWW.WESTPLAINSENGINEERING.COM

RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪ BISMARCK,

ND

Office of Construction and Facilities Management

Department of Veterans Affairs

Project Number

Building Number

Drawing Number

Dwg. of

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT:CONSULTANTS:

Revisions: Date

VA FORM 08 -- 6231

on e e ig on e q ua th i f oo t th on e i f oo t on e th

6"

6"

6"

6"

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

TELE: (605) 332-7850 FAX: (605) 332-3539

SIOUX FALLS, SOUTH DAKOTA 57104-4873

625 S. MINNESOTA AVENUE, SUITE 204

KEY PLAN:

SEAL:

4609 SOUTH TECHLINK CIRCLE ▪ SIOUX FALLS, SD 57106

PHONE: (605) 362-3753 ▪ FAX: (605) 362-3759

OCTOBER 11,

438−15−201

AADDGS

FIFTH FLOOR CODE PLAN

100% CONSTRUCTION

DRAWINGS

7 60

SIOUX FALLS, SOUTH DAKOTA

V.A. HEALTH CARE SYSTEM

RENOVATE 5TH FLOOR SURGERY

AI1005

SCALE: 1/8" = 1'-0"

CODE FLOOR PLAN NORTH

CODE ANALYSIS

NUMBER ROOM NAME USE CLASSIFICATION AREA ** OLF

OCCUPANT

LOAD

TOTAL

EGRESS

WIDTH

NUMBER OF

EXITS

529 OFFICE Business 130 SF 100 SF 1 0.26 1 530 OFFICE Business 127 SF 100 SF 1 0.25 1 531 OFFICE Business 131 SF 100 SF 1 0.26 1 532 OFFICE Business 126 SF 100 SF 1 0.25 1 533 OFFICE Business 125 SF 100 SF 1 0.25 1 534B BACK STAIR Business 113 SF 100 SF 1 0.23 1 535 OFFICE Business 132 SF 100 SF 1 0.26 1 536 COMPUTER Business 107 SF 100 SF 1 0.21 1 537 OFFICE Business 134 SF 100 SF 1 0.27 1 538 OFFICE Business 123 SF 100 SF 1 0.25 1 539 OFFICE Business 124 SF 100 SF 1 0.25 1 540 OFFICE Business 124 SF 100 SF 1 0.25 1 541 OFFICE Business 122 SF 100 SF 1 0.24 1 542 OFFICE Business 122 SF 100 SF 1 0.24 1 543 JANITOR Accessory Storage/Mech. 94 SF 500 SF 1 0.20 1 544 TOILET Accessory Storage/Mech. 105 SF 500 SF 1 0.20 1 545 TOILET Accessory Storage/Mech. 60 SF 500 SF 1 0.20 1

8814 SF 139 24.53

CODE ANALYSIS

NUMBER ROOM NAME USE CLASSIFICATION AREA ** OLF

OCCUPANT

LOAD

TOTAL

EGRESS

WIDTH

NUMBER OF

EXITS

500 ENTRY LOBBY Business 772 SF 100 SF 8 1.54 1 500A STAIR Business 197 SF 100 SF 2 0.39 1 500B CLEAN CORE Ambulatory Healthcare 523 SF 100 SF 5 1.05 1 500C CORRIDOR Business 908 SF 100 SF 9 1.82 1 500D CRASH CART ALCOVE Accessory Storage/Mech. 40 SF 500 SF 1 0.15 1 500E LINEN ALCOVE Accessory Storage/Mech. 6 SF 500 SF 1 0.15 1 500F FIRE VALVE Accessory Storage/Mech. 6 SF 500 SF 1 0.20 1 501 WAITING ROOM Assembly Unconcentrated 174 SF 15 SF 12 1.74 1 501A CORRIDOR Business 262 SF 100 SF 3 0.52 1 502 RECEPTION Business 201 SF 100 SF 2 0.40 1 502A WORKROOM Business 105 SF 100 SF 1 0.21 1 503 TOILET Accessory Storage/Mech. 69 SF 500 SF 1 0.20 1 504 OFFICE Business 168 SF 100 SF 2 0.34 1 505 OFFICE Business 100 SF 100 SF 1 0.20 1 506 OFFICE Business 100 SF 100 SF 1 0.20 1 507 STAFF LOUNGE Assembly Unconcentrated 281 SF 15 SF 19 2.81 1 508 CONFERENCE ROOM Assembly Unconcentrated 348 SF 15 SF 23 3.48 1 509 PATIENT INTAKE Business 75 SF 100 SF 1 0.20 1 510 CORRIDOR Business 123 SF 100 SF 1 0.25 1 510A WOMEN'S LOCKER ROOM Ambulatory Healthcare 136 SF 50 SF 3 0.41 1 510B WOMEN'S TOILET Accessory Storage/Mech. 102 SF 500 SF 1 0.20 1 510C MEN'S LOCKER ROOM Ambulatory Healthcare 98 SF 50 SF 2 0.29 1 510D MEN'S TOILET Accessory Storage/Mech. 98 SF 500 SF 1 0.20 1 511 MINOR PROCEDURE OR 2 Health Care Inpatient Treatment 285 SF 240 SF 1 0.24 1 512 MINOR PROCEDURE OR 1 Health Care Inpatient Treatment 285 SF 240 SF 1 0.24 1 513 SOILED ROOM Accessory Storage/Mech. 70 SF 500 SF 1 0.15 1 514 MEDICATION ROOM Ambulatory Healthcare 72 SF 100 SF 1 0.20 1 516 STERILE STORAGE Accessory Storage/Mech. 105 SF 500 SF 1 0.15 1 517 CLEAN ROOM Accessory Storage/Mech. 88 SF 500 SF 1 0.15 1 518 EXAM ROOM Health Care Inpatient Treatment 108 SF 240 SF 1 0.20 1 519 EXAM ROOM Health Care Inpatient Treatment 130 SF 240 SF 1 0.20 1 520 DATA Accessory Storage/Mech. 17 SF 500 SF 1 0.20 1 521 ELECTRICAL Accessory Storage/Mech. 36 SF 500 SF 1 0.20 1 522 LINEN ALCOVE Accessory Storage/Mech. 34 SF 500 SF 1 0.15 1 523 STRETCHER CLOSET Accessory Storage/Mech. 53 SF 500 SF 1 0.15 1 524 EQUIPMENT STORAGE Accessory Storage/Mech. 159 SF 500 SF 1 0.15 1 525 OFFICE Business 146 SF 100 SF 1 0.29 1 526 OFFICE Business 176 SF 100 SF 2 0.35 1 527 MECHANICAL/ ELECTRICAL Accessory Storage/Mech. 24 SF 500 SF 1 0.20 1 528 OFFICE Business 137 SF 100 SF 1 0.27 1

CODE PLAN KEYNOTES:

1 SEMI-RECESSED FIRE EXTINGUISHER AND CABINET

2 CONTINUE R21 URETHANE INSULATION INSIDE CHASE ON EXTERIOR WALL AND AROUND

STRUCTURAL COLUMNS.

6'-0" W x 8'-0" L PENTHOUSE LIFT ACCESS3

REPAIR ALL PENETRATIONS INTO EXISTING WALLS INDICATED AS FIRE WALLS WITH

APPROPRIATE FIRE STOPPING MATERIALS MEETING THE INDICATED RATINGS4

REMOVABLE RAMP5

AREA OF WORK 10,072 SQFT.

10' - 4"

8' - 6"8' - 6"

8' - 6"

9' - 0"

8' - 10"

8' - 0"

9' - 0"

8' - 1"

7' - 11"

8' - 0" 8' - 0"

8' - 0"

8' - 0"

8' - 4"

8' - 2"8' - 2"8' - 0" 7' - 0"

1 1

3 3

8' - 6"

8' - 0" 8' - 4"

7' - 8"

8' - 2" 8' - 2"

8' - 2"8' - 2"

8' - 2" 8' - 0"

1 2

2 1

3 3 3 3 3 3

7' - 2" 7' - 2" 475

BREAK

477I

STORAGE

477H

RECOVERY

SPACE

477G

RECOVERY

SPACE

477F

RECOVERY

SPACE

477E

RECOVERY

SPACE

477D

RECOVERY

SPACE

477C

RECOVERY

SPACE

477B

RECOVERY

SPACE

477A

RECOVERY

SPACE478

WORK ROOM

SAME DAY

SURGERY

RECEPTION

CHECK-IN

OFFICE

WAITING

ROOM

VISION

404A

VISION

EXAM

EXAM

CORRIDOR

RESTROOM

EXAM

EXAM

EXAM

AUDIOLOGY

LAB

439B

AUDIO

BOOTH

439A

AUDIO

BOOTH

440A

ELEC.

ELEC.

STAIR

LOBBY

RESTROOM

442A

RESTROOM

443B

OFFICE

443B

OFFICE

AUDITORIUM

443A

OFFICE

443D

OFFICE

WAITING

ROOM

446A

MECHANICAL

CORRIDOR

OFFICE

EXAM

447A

EXAM

WOMENS

MENS

EXAM

EXAM

452A

STORAGE

STORAGE

STAIR

WAITING

CORRIDOR

AI501

443K

STORAGE

443J

OFFICE

443F

BACK STAGE

443L

BACK HALL

443I

OFFICE

AUDITORIUM

443N

STORAGE

AI501

STAGE

2A

H2

NORTH

PROJECT AREA

4TH FLOOR

2' x 2' SUSPENDED ACOUSTICAL CEILING GRID

GYPSUM BOARD CEILING / SOFFIT

DIFFUSER

RETURN

2x4 TROFFER LIGHT FIXTURE

CEILING LEGEND

SURFACE MOUNTED LIGHT FIXTURE

RADIENT CEILING PANEL

WEST

PLAINS

ENGINEERING.

INC.

WWW.WESTPLAINSENGINEERING.COM

RAPID CITY, SD ▪ SIOUX FALLS, SD ▪ CASPER, WY ▪ CEDAR RAPIDS, IA ▪…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.