210727 Riverside 901CM3043 Final Design - 4 of 6.pdf
PDF 14 MB Posted
- Solicitation number
- 36C78621B0013
About this file
This notice provides details for a federal contract solicitation for improvements at the Riverside National Cemetery in Riverside, California. The solicitation number is 36C78621B0013 and will be issued on or about July 15, 2021 for project number 901-043. The acquisition method will be an Invitation for Bid between $2 million and $5 million under NAICS code 237990. This is a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses. Firms must be registered in the System for Award Management and Vendor Information Pages databases. The contracting officer point of contact is Auvorie Benson of the Department of Veterans Affairs National Cemetery Administration. Amendments will be posted to the Contract Opportunities website and acknowledgement is required for firms to be considered for award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RETAINING CONCRETE WALL
MAIN SWITCH
GEAR PANEL
M O
TO
R
C O
N
TR
O L
BR
EA
KE
R
P
AN
EL
SC
E
FE
ED
ER
RETAINING CONCRETE WALL
FE
N
C E
LI
N
E
FE
N
C E
LI
N
E
TRANSFORMER
ACID TANK
ACID TANK
MANHOLE
MANHOLE
FENCE LINE
FENCE LINE
Consulting Engineers and Scientists
1421 EDINGER AVE, SUITE C TUSTIN, CA
PH.949.261.0051 FAX. 949.261.6110
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering HD401
HAZARDOUS MATERIAL DEMOLITION
PLAN - PUMP STATION A
1. REMOVE ASBESTOS CONTAINING FLANGE GASKETS AS
DETERMINED BY FIELD SURVEY SAMPLE TESTING -
TYPICAL, SEE DETAIL F7/HD401.
2. TYPICAL, REMOVE ALL GRAY LEAD PAINT ON ALL METAL
PIPING AT PUMP STATION A, SEE DETAILS D7 & F7/HD401.
KEYED NOTES
GENERAL NOTES
1. DRAWINGS ARE BASED UPON AVAILABLE FLOOR
CONFIGURATION DATA. DRAWINGS MAY DIFFER FROM
ACTUAL FIELD CONDITIONS. VARIATION IN SOME
PARTITION WALLS SHOULD BE EXPECTED, SEE F3/HD401.
2. THE DRAWINGS AND NOTES DEPICTING EXISTING
CONDITIONS ARE INTENDED ONLY AS MEANS OF
PROVIDING A GENERAL SENSE OF EXISTING SITE AND
BUILDING CONDITIONS WHERE ABATEMENT IS REQUIRED.
IT IS THE CONTRACTORS'S RESPONSIBILITY TO
COORDINATE THE ABATEMENT WORK NEEDED WITH ALL
OTHER CONTRACT DOCUMENTS AND FIELD VERIFY THE
SIZE, QUANTITY, LOCATION, CONFIGURATION AND
CONDITIONS WHICH AFFECT THE REMOVAL OF ALL
HAZARDOUS MATERIALS DESCRIBED HEREIN.
3. SEE PRE-DEMOLITION HAZARDOUS MATERIALS SURVEY
REPORT PREPARED BY TERRACON CONSULTANTS, INC.
FOR FURTHER DETAILED INFORMATION PERTAINING TO
ASBESTOS AND LEAD BASED PAINT FIELD INVESTIGATION,
SAMPLE TESTING, FINDINGS, AND LOCATIONS OF
MATERIALS TO BE ABATED. THE SURVEY REPORT IS
INCLUDED IN THE BID DOCUMENTS AS AN ATTACHMENT TO
SPECIFICATION SECTIONS: 02 82 12.41 ASBESTOS
ABATEMENT FOR TOTAL DEMOLITION PROJECT, AND 02 83
33.13 LEAD PAINT REMOVAL.
4. SEE RIVERSIDE NATIONAL CEMETERY ABANDONED WATER
TREATMENT PLAN PROCEDURE 5 WORK PLAN PREPARED
BY TERRACON CONSULTANS, INC. FOR INFORMATION
PERTAINING TO ASBESTOS AND LEAD BASTED PAINT
CONTAINING MATERIALS ABATEMENT REQUIREMENTS AND
PROCEDURES. THE PROCEDURE 5 WORK PLAN IS
INCLUDED IN THE BID DOCUMENTS AS AN ATTACHMENT TO
SPECIFICATION SECTIONS: 02 82 12.41 ASBESTOS
ABATEMENT FOR TOTAL DEMOLITION PROJECT, AND 02 83
33.13 LEAD PAINT REMOVAL.
1 1 1 1 1 1
MADM
2 2 1
ALL PUMP STATION A HAZARDOUS ABATEMENT
WORK IS TO BE INCLUDED IN THE BASE BID.
MOTOR CONTROL
BREAKER PANEL
TRANSFORMER
ACID TANK
ACID TANK
FE
N
C E
LI
N
E
FE
N
C E
LI
N
E
FENCE LINE
FENCE LINE
Consulting Engineers and Scientists
1421 EDINGER AVE, SUITE C TUSTIN, CA
PH.949.261.0051 FAX. 949.261.6110
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering HD402
HAZARDOUS MATERIAL DEMOLITION
PLAN - PUMP STATION B
1. TYPICAL, REMOVE ALL GRAY LEAD PAINT ON ALL METAL
PIPING AT PUMP STATION B, SEE DETAIL F7/HD402.
KEYED NOTES
GENERAL NOTES
1. DRAWINGS ARE BASED UPON AVAILABLE FLOOR
CONFIGURATION DATA. DRAWINGS MAY DIFFER FROM
ACTUAL FIELD CONDITIONS. VARIATION IN SOME
PARTITION WALLS SHOULD BE EXPECTED, SEE F3/HD401.
2. THE DRAWINGS AND NOTES DEPICTING EXISTING
CONDITIONS ARE INTENDED ONLY AS MEANS OF
PROVIDING A GENERAL SENSE OF EXISTING SITE AND
BUILDING CONDITIONS WHERE ABATEMENT IS REQUIRED.
IT IS THE CONTRACTORS'S RESPONSIBILITY TO
COORDINATE THE ABATEMENT WORK NEEDED WITH ALL
OTHER CONTRACT DOCUMENTS AND FIELD VERIFY THE
SIZE, QUANTITY, LOCATION, CONFIGURATION AND
CONDITIONS WHICH AFFECT THE REMOVAL OF ALL
HAZARDOUS MATERIALS DESCRIBED HEREIN.
3. SEE PRE-DEMOLITION HAZARDOUS MATERIALS SURVEY
REPORT PREPARED BY TERRACON CONSULTANTS, INC.
FOR FURTHER DETAILED INFORMATION PERTAINING TO
ASBESTOS AND LEAD BASED PAINT FIELD INVESTIGATION,
SAMPLE TESTING, FINDINGS, AND LOCATIONS OF
MATERIALS TO BE ABATED. THE SURVEY REPORT IS
INCLUDED IN THE BID DOCUMENTS AS AN ATTACHMENT TO
SPECIFICATION SECTIONS: 02 82 12.41 ASBESTOS
ABATEMENT FOR TOTAL DEMOLITION PROJECT, AND 02 83
33.13 LEAD PAINT REMOVAL.
4. SEE RIVERSIDE NATIONAL CEMETERY ABANDONED WATER
TREATMENT PLAN PROCEDURE 5 WORK PLAN PREPARED
BY TERRACON CONSULTANS, INC. FOR INFORMATION
PERTAINING TO ASBESTOS AND LEAD BASTED PAINT
CONTAINING MATERIALS ABATEMENT REQUIREMENTS AND
PROCEDURES. THE PROCEDURE 5 WORK PLAN IS
INCLUDED IN THE BID DOCUMENTS AS AN ATTACHMENT TO
SPECIFICATION SECTIONS: 02 82 12.41 ASBESTOS
ABATEMENT FOR TOTAL DEMOLITION PROJECT, AND 02 83
33.13 LEAD PAINT REMOVAL.
MADM
ALL PUMP STATION B HAZARDOUS ABATEMENT
WORK IS TO BE INCLUDED IN THE BASE BID.
BASIN BASIN
MAIN
BUILDING
BASIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management EngineeringConsulting Engineers and Scientists
1421 EDINGER AVE, SUITE C TUSTIN, CA
PH.949.261.0051 FAX. 949.261.6110
HD403
ASBESTOS & LEAD ABATEMENT PLAN - WASTE
WATER TREATEMENT PLANT
MADM
1. REMOVE <1% ASBESTOS CONTAINING STUCCO AND
STUCCO DEBRIS, SEE DETAILS B6/HD403. TYPICAL FOR
THE BASINS AND BASEMENT OF THE WASTE WATER
TREATMENT PLANT.
2. REMOVE ASBESTOS CONTAINING TRANSITE PIPE, SEE
DETAIL F1/HD403.
3. REMOVE <1% ASBESTOS CONTAINING WINDOW PUTTY,
SEE DETAIL F6/HD403.
4. REMOVE ASBESTOS CONTAINING FILLER MATERIAL AT
THE TOP OF THE ROOF ACCESS HATCH, SEE DETAIL
C6/HD403.
5. REMOVE ASBESTOS CONTAINING WALL SEAM MASTIC (AT
THE BASE OF THE WALL), SEE DETAIL E6/HD403.
6. REMOVE TAN LEAD PAINT ON METAL MIXER IN THE
CENTER OF THE BASIN AND SILVER LEAD PAINT FROM
METAL EQUIPMENT/BUCKETS HOUSINGS THROUGHOUT
THE WASTE WATER TREATMENT PLANT, SEE DETAILS C6 &
F8/HD901.
7. REMOVE TAN LEAD PAINT ON THE ROLL UP DOOR FRAME,
SEE DETAIL C4/HD901.
8. REMOVE WHITE LEAD PAINT ON CENTER BASIN WALLS.
SEE DETAIL C1/HD901.
9. REMOVE GRAY/BLACK LEAD PAINT FROM BASEMENT
CEILING. REMOVE TAN LEAD PAINT FROM 2'X2' VALVES.
10. REMOVE TAN LEAD PAINT FROM CONCRETE WALLS AND
BASIN WALLS, SEE DETAIL F1/HD901. TYPICAL, NOTE
APPLICABLE TO TAN PAINT ON CONCRETE THROUGHOUT
THE WASTE WATER TREATMENT PLANT.
11. REMOVE MULTICOLORED LEAD PAINT FROM CONCRETE
SURFACES, PIPES, AND VALVES, SEE DETAIL F4/HD901.
TYPICAL, NOTE APPLICABLE THROUGHOUT THE WASTE
WATER TREATMENT PLANT.
KEYED NOTES
GENERAL NOTES
1. DRAWINGS ARE BASED UPON AVAILABLE FLOOR
CONFIGURATION DATA. DRAWINGS MAY DIFFER FROM
ACTUAL FIELD CONDITIONS. VARIATION IN SOME
PARTITION WALLS SHOULD BE EXPECTED, SEE
F3/HD401.
2. THE DRAWINGS AND NOTES DEPICTING EXISTING
CONDITIONS ARE INTENDED ONLY AS MEANS OF
PROVIDING A GENERAL SENSE OF EXISTING SITE AND
BUILDING CONDITIONS WHERE ABATEMENT IS
REQUIRED. IT IS THE CONTRACTORS'S RESPONSIBILITY
TO COORDINATE THE ABATEMENT WORK NEEDED WITH
ALL OTHER CONTRACT DOCUMENTS AND FIELD VERIFY
THE SIZE, QUANTITY, LOCATION, CONFIGURATION AND
CONDITIONS WHICH AFFECT THE REMOVAL OF ALL
HAZARDOUS MATERIALS DESCRIBED HEREIN.
3. SEE PRE-DEMOLITION HAZARDOUS MATERIALS
SURVEY REPORT PREPARED BY TERRACON
CONSULTANTS, INC. FOR FURTHER DETAILED
INFORMATION PERTAINING TO ASBESTOS AND LEAD
BASED PAINT FIELD INVESTIGATION, SAMPLE TESTING,
FINDINGS, AND LOCATIONS OF MATERIALS TO BE
ABATED. THE SURVEY REPORT IS INCLUDED IN THE BID
DOCUMENTS AS AN ATTACHMENT TO SPECIFICATION
SECTIONS: 02 82 12.41 ASBESTOS ABATEMENT FOR
TOTAL DEMOLITION PROJECT, AND 02 83 33.13 LEAD
PAINT REMOVAL.
4. SEE RIVERSIDE NATIONAL CEMETERY ABANDONED
WATER TREATMENT PLAN PROCEDURE 5 WORK PLAN
PREPARED BY TERRACON CONSULTANS, INC. FOR
INFORMATION PERTAINING TO ASBESTOS AND LEAD
BASTED PAINT CONTAINING MATERIALS ABATEMENT
REQUIREMENTS AND PROCEDURES. THE PROCEDURE
5 WORK PLAN IS INCLUDED IN THE BID DOCUMENTS AS
AN ATTACHMENT TO SPECIFICATION SECTIONS: 02 82
12.41 ASBESTOS ABATEMENT FOR TOTAL DEMOLITION
PROJECT, AND 02 83 33.13 LEAD PAINT REMOVAL.
5 3
3 3 2
1 1
ALL WWTP HAZARDOUS ABATEMENT WORK
IS TO BE INCLUDED IN THE BASE BID.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management EngineeringConsulting Engineers and Scientists
1421 EDINGER AVE, SUITE C TUSTIN, CA
PH.949.261.0051 FAX. 949.261.6110
HD901
PHOTOS OF LEAD BASED PAINT
MATERIALS
MADM
GENERAL NOTES
1. DRAWINGS ARE BASED UPON AVAILABLE FLOOR
CONFIGURATION DATA. DRAWINGS MAY DIFFER FROM
ACTUAL FIELD CONDITIONS. VARIATION IN SOME
PARTITION WALLS SHOULD BE EXPECTED, SEE DETAIL
E2/HD402.
2. THE DRAWINGS AND NOTES DEPICTING EXISTING
CONDITIONS ARE INTENDED ONLY AS MEANS OF
PROVIDING A GENERAL SENSE OF EXISTING SITE AND
BUILDING CONDITIONS WHERE ABATEMENT IS
REQUIRED. IT IS THE CONTRACTORS'S RESPONSIBILITY
TO COORDINATE THE ABATEMENT WORK NEEDED WITH
ALL OTHER CONTRACT DOCUMENTS AND FIELD VERIFY
THE SIZE, QUANTITY, LOCATION, CONFIGURATION AND
CONDITIONS WHICH AFFECT THE REMOVAL OF ALL
HAZARDOUS MATERIALS DESCRIBED HEREIN.
3. ALL PAINTED SURFACES ARE ASSUMED LEAD
CONTAINING AND TO BE ABATED UNLESS
SPECIFICALLY TESTED AND PROVEN OTHERWISE. SEE
PRE-DEMOLITION HAZARDOUS MATERIALS SURVEY
REPORT, SEE ALL DETAILS ON HD901.
4. DEMOLITION OF ANY LEAD CONTAINING FINISH,
STRUCTURAL, OR MECHANICAL COMPONENT WITH
LEAD CONTAINING PAINT IS A REGULATED
LEAD-RELATED CONSTRUCTION TASK.
5. PAINT THAT SEPARATES FROM BUILDING MATERIAL
SUBSTRATES DURING DEMOLITION AND/OR PAINT THAT
IS INTENTIONALLY REMOVED SHALL BE MANAGED AS
AN INDEPENDENT WASTE STREAM
6. CREATE WASTE STREAMS AND PERFORM ALL
APPROPRIATE WASTE STREAM TESTING AS REQUIRED
BY THE SPECIFICATIONS, APPLICABLE REGULATIONS,
AND SELECTED DISPOSAL FACILITY. REPRESENTATIVE
COMPOSITE SAMPLES PER WASTE STREAM SHALL BE
COLLECTED FOR TESTING. WASTE CHARACTERIZATION
TESTING SHALL INCLUDE, BUT IS NOT LIMITED TO,
TOTAL THRESHOLD LIMIT CONCENTRATION (TTLC),
SOLUBLE THRESHOLD LIMIT CONCENTRATION (STLC),
AND TOXICITY CHARACTERISTIC LEACHING
PROCEDURE (TCLP). WASTE STREAM TESTING SHALL
BE COMPLETED FOR EACH IDENTIFIED WASTE STREAM
INTENDED FOR LANDFILL DISPOSAL.
7. SEE PRE-DEMOLITION HAZARDOUS MATERIALS
SURVEY REPORT PREPARED BY TERRACON
CONSULTANTS, INC. FOR FURTHER DETAILED
INFORMATION PERTAINING TO ASBESTOS AND LEAD
BASED PAINT FIELD INVESTIGATION, SAMPLE TESTING,
FINDINGS, AND LOCATIONS OF MATERIALS TO BE
ABATED. THE SURVEY REPORT IS INCLUDED IN THE BID
DOCUMENTS AS AN ATTACHMENT TO SPECIFICATION
SECTIONS: 02 82 12.41 ASBESTOS ABATEMENT FOR
TOTAL DEMOLITION PROJECT, AND 02 83 33.13 LEAD
PAINT REMOVAL.
8. SEE RIVERSIDE NATIONAL CEMETERY ABANDONED
WATER TREATMENT PLAN PROCEDURE 5 WORK PLAN
PREPARED BY TERRACON CONSULTANS, INC. FOR
INFORMATION PERTAINING TO ASBESTOS AND LEAD
BASTED PAINT CONTAINING MATERIALS ABATEMENT
REQUIREMENTS AND PROCEDURES. THE PROCEDURE
5 WORK PLAN IS INCLUDED IN THE BID DOCUMENTS AS
AN ATTACHMENT TO SPECIFICATION SECTIONS: 02 82
12.41 ASBESTOS ABATEMENT FOR TOTAL DEMOLITION
PROJECT, AND 02 83 33.13 LEAD PAINT REMOVAL.
ALL WWTP HAZARDOUS ABATEMENT WORK
IS TO BE INCLUDED IN THE BASE BID.
LEGEND SYMBOLS AND
NOTES
M-001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
EXISTING RETAINING WALL
GEAR PANEL
M O
T O
R
C
O N
T R
O L
B R
E A
K E
R
P
A N
E L
S C
E
F
E E
D E
R
EXISTING RETAINING WALL
F E
N C
E
L
I N
E
F E
N C
E
L I N
E
TRANSFORMER
ACID TANK
FERTILIZER TANK
MANHOLE
MANHOLE
FENCE LINE
FENCE LINE
LOWER LAKE A
PUMP STATION A
1. REMOVE 12" MAIN IRRIGATION SUPPLY LINE
INCLUDING ALL FITTINGS, VALVES AND
CONCRETE PIPE SUPPORTS UP TO LIMIT OF
DEMOLITION NOTED AT PIPE FLANGE.
2. REMOVE ALL VERTICAL TURBINE PUMPS
INCLUDING SUBMERSIBLE JOCKEY PUMP IN
THE WET WELL. ALL CONNECTED PIPING,
FITTINGS ELECTRICAL AND SUPPORTS
(TYP.3) SHALL ALSO BE REMOVED. SEE
ELECTRICAL PLAN FOR ELECTRICAL
DEMOLITION.
3. REMOVE PUMP VFD CONTROLLER, TYPICAL
FOR ALL PUMPS. SEE ELECTRICAL PLANS.
4. REMOVE ALL EXISTING SAND FILTERS
INCLUDING ALL CONNECTED PIPING,
FITTINGS AND SUPPORTS.(TYP.7)
5. REMOVE ACID INJECTION AND FERTIGATION
SYSTEM, INCLUDING ALL CONNECTED PIPING
AND COMPONENTS.
6. REMOVE ACID STORAGE TANKS.
7. REMOVE RTU CONTROL TRANSMITTER AND
WET WELL LEVEL CONTROLLER, SEE
ELECTRICAL PLANS.
8. REMOVE 12" INLINE DUAL SCREEN FILTER.
9. 4" BACKWASH PIPING RISER SECTION SHALL
REMAIN FOR CONNECTION TO NEW PUMP
STATION.
KEYED NOTES
PUMP STATION A DEMO PLAN
MD101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
1 1
E21/4" = 1'-0"
PUMP STATION A DEMO PLAN
C6NTS
PARTIAL SITE PLAN
TRANSFORMER
ACID TANK
FERTILIZER TANK
F E
N C
E
L I N
E
F E
N C
E
L I N
E
FENCE LINE
FENCE LINE
LAKE B
PUMP STATION B
WEATHER STATION
KEYED NOTES
PUMP STATION B DEMO PLAN
MD102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
1. REMOVE ALL SAND FILTERS INCLUDING ALL
CONNECTED PIPING, FITTINGS, SUPPORTS,
ETC. (TYP. OF 10)
2. REMOVE ALL IRRIGATION PIPING AS SHOWN
INCLUDING FITTINGS, VALVES AND
CONCRETE PIPE SUPPORTS.
3. REMOVE ALL VERTICAL TURBINE PUMPS
INCLUDING SUBMERSIBLE JOCKEY PUMP IN
THE WET WELL. ALL CONNECTED PIPING,
FITTINGS, ELECTRICAL AND
SUPPORTS(TYP.4) SHALL ALSO BE REMOVED.
SEE ELECTRICAL PLANS FOR ELECTRIC
DEMOLITION.
4. REMOVE RAISED STEEL PUMP BASE
PLATFORM.
5. REMOVE EXISTING STORAGE TANKS
6. REMOVE ACID INJECTION AND FERTIGATION
SYSTEMS, INCLUDING ALL CONNECTED
PIPING, FITTINGS AND PORTS.
7. REMOVE ALL PUMP VFD CONTROLLERS AND
PANEL, SEE ELECTRICAL PLANS.
8. REMOVE LEVEL CONTROLLER AND
TRANSMITTER, INCLUDING RTU
TRANSMITTER.
9. EXISTING 12" INLINE DUAL SCREEN FILTER
TO BE REMOVED.
10. REMOVE EXISITNG 6" BACKWASH PIPING
BACK TO THIS POINT.
11. STEEL ACCESS PANEL TO WET WELL TO BE
REMOVED.
12. WEATHER STATION SHALL REMAIN.
13. CAP EXISTING 6" RECIRCULATION LINE.
E21/4" = 1'-0"
PUMP STATION B DEMO PLAN
D7NTS
PARTIAL SITE PLAN
OUTSIDE OF FENCE INSIDE OF FENCE
EXISTING FENCE
10" FILL VALVE OUTSIDE OF FENCE
10" FILL VALVE INSIDE OF FENCE
8" FILL VALVE LOCATION
12" FILL VALVE LOCATION
KEYED NOTES
LAKE A & LAKE B FILL VALVE
DEMO PLAN
MD103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
1. REMOVE 10" FILL VALVE, 5FT OF PIPING ON
BOTH SIDES OF VALVE, WIRING, INCLUDING
CONCRETE VAULT WHICH IS
APPROXIMATELY 3FT x 5FTx2FT
2. REMOVE 10" FILL VALVE, 5FT OF PIPING ON
BOTH SIDES OF VALVE, WIRING, INCLUDING
CONCRETE VAULT WHICH IS
APPROXIMATELY 4FTx6FTx2FT.
3. REMOVE EXISTING 12" FILL VALVE
INCLUDING 12" GATE VALVE AND 3FT OF
PIPE TO ACCOMMODATE NEW CONTROL
VALVE, GATE VALVE AND BYPASS.
4. REMOVE EXISTING 8" FILL VALVE, REPLACE
WITH 8" STRAIGHT PIPE. VAULT SHALL
REMAIN AS IS.
5. EXISTING UTILITY PIPE AND WATER METER
SHALL REMAIN.
6. EXISTING POLE, PANEL AND SOLAR PANEL
SHALL REMAIN. REMOVE CONNECTED
MONITORING EQUIPMENT STRAPPED TO 12"
LINE.
7. EXISTING BOULDERS WILL NEED TO BE
REMOVED TO ACCOMMODATE NEW
CONTROL VALVE AND BYPASS.
8. REMOVE APPROXIMATELY 6FT OF 8" PIPE
CONNECTED TO 8" FILL VALVE TO
ACCOMMODATE NEW VAULT AND CONTROL
VALVE. SEE MS 103 AND MS 502 FOR NEW
INSTALLATION DETAILS.
D21/4" = 1'-0"
LAKE A FILL VALVE DEMO PLAN
F61/4" = 1'-0"
LAKE B FILL VALVE DEMO PLAN
LAKE A FILL VALVE LOCATION
SEE DETAIL D2 THIS SHEET
LAKE B FILL VALVE LOCATION
SEE DETAIL F6 THIS SHEET
25'-0"
EXISTING RETAINING WALL
MAIN SWITCH
GEAR PANEL
M O
T O
R
C
O N
T R
O L
B R
E A
K E
R
P
A N
E L
S C
E
F
E E
D E
R
EXISTING RETAINING WALL
F E
N C
E
L I N
E
F E
N C
E
L I N
E
TRANSFORMER
500 GAL
FENCE LINE
FENCE LINE
MANHOLE
W7 G5 SYSTEM
MODULE
ACID TANK
500 GAL
FERTILIZER TANK
3/4" NBR WATER INTAKE LINE
3/4" INJECTION PORT
WELL ACCESS
DOOR
MANHOLE
STILLING WELL W/ LAKE
LEVEL CONTROL SENSOR
WD-M
MODULE
190"
3/4" XLPE ACID/WATER
INJECTION LINE
3/8" OD FEP ACID LINE INSIDE
OF PROTECTIVE JACKET
3/8" XLPE FERTIGATION
LINE
3/8" XLPE FERTIGATION
LINE
'-0
DISCHARGE
ISOLATION VALVE (12")
12" 316 STS PIPING
3x8" SUCTION
SCANNING FILTERS
4" PRESSURE RELIEF
VALVE. DISCHARGE INTO
WET WELL
5 HP PRESSURE
MAINTENANCE PUMP
TYPICAL SUPPORT
FOR ALL PIPING ABOVE
GRADE.
FLOW METER
FILTER FLUSH LINE
3x100HP VERTICAL TURBINE
PUMPS
PUMP SCHEDULE
MARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE
CIRCULATING FLUID
MIN % EFF
ELECTRICAL MOTOR
FLUID
FLOW HEAD NPSH AVAILABLE TEMPERATURE
SP GR
NOMINAL POWER
PHASE VOLT MAX RPM
SPEED
CONTROL
REMARKS
GPM FT FT PSIG °F [°C] HP [kW]
P-1A STATION-A LAKE-A -SUPPLY IRRIGATION VERTICAL TURBINE WATER 900 N/A 65 1 3 460 3450 VFD
P-2A STATION-A 900 N/A 1 3 460 3450 VFD
P-3A STATION-A N/A 1 3 460 3450 VFD
CWP-2 PENTHOUSE CHILLED SUPPLY CHILLED WATER INLINE CHILLED WATER/GLYCOL MIX 75 [ 5 ] N/A 42 1 [ ] 3 460 3450 CONSTANT
LAKE-A -SUPPLY IRRIGATION
LAKE-A -SUPPLY IRRIGATION
VERTICAL TURBINE
VERTICAL TURBINE
WATER
WATER
PSIG
N/A
N/A
N/A900
P-4A STATION-A N/A 1 3 460 3450 CONSTLAKE-A -STATION PRESS-MAINT SUBMERSIBLE WATER 65N/A100 173 75 5
P-5A STATION-A N/A 1 3 460 3450 CONSTLAKE-A -STATION INTERMEDIATE SUBMERSIBLE WATER 65N/ANA NA NA 15 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
98" LOW
WATER
LEVEL
168"
PUMP
DEPTH
98"
5 HP PRESSURE
MAINTENANCE PUMP
15 HP SUBMERSIBLE
INTERMEDIATE PUMP
LOW LEVEL SHUT
DOWN SAFETY
1. NEW PREFABRICATED SKID MOUNT PUMP
STATION. BASIS OF DESIGN (RAINBIRD VT-3)
2. EXISTING CONCRETE PAD 25'x11', 12"
REINFORCED CONCRETE LID ON WET WELL.
3. THREE SELF CLEANING SCREEN FILTERS.
BASIS OF DESIGN (YARDNEY FILTAWORX)
4. PUMP VFD CONTROLLER WITH PUMP
SYSTEM MANAGEMENT SOFTWARE.
5. NEW 500 GALLON ACID TANK WITH
CONTAINMENT.
6. NEW MOTOR CONTROL PANEL, CONNECT
POWER TO NEW PUMP VFD CONTROLLER,
SEE ELECTRICAL PLANS.
7. NEW WERECON ACID INJECTION SYSTEM.
8. 4" FILTRATION BACKWASH, CONNECT TO
EXISTING.
9. NEW MAGNETIC FLOW METER.
10. EXISTING CONCRETE PAD OPENINGS TO BE
COVERED BY PUMP STATION PLATFORM.
11. SAW CUT 5FTX7FT OPENING IN CONCRETE
PAD ABOVE WET WELL TO ACCOMMODATE
NEW PUMP STATION. CONTRACTOR SHALL
VERIFY EXACT DIMENSIONS IN FIELD.
12. NEW WERECON FERTIGATION SYSTEM.
13. NEW 500 GALLON FERTILIZER TANK.
14. NEW BUTTERFLY VALVE, CONNECT TO
EXISTING IRRIGATION LINE, INSPECT AND
REPLACE EXISTING FLANGE IF NECESSARY.
KEYED NOTES
NEW PUMP STATION A PLAN
MS101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
E21/4" = 1'-0"
NEW PUMP STATION A PLAN VIEW
C61/4" = 1'-0"
NEW PUMP STATION A SECTION VIEW
GENERAL NOTES
1. CONTRACTOR SHALL INSPECT AND CLEAN
OUT ALL SILT/ DEBRIS IN WET WELL PRIOR
TO INSTALLATION OF NEW PUMP STATION.
F61/4" = 1'-0"
NEW PUMP STATION A SECTION VIEW
2. NEW PUMP STATION SHOP DRAWINGS
REQUIRE APPROVAL OF PROJECT COR.
PRIOR TO ORDERING EQUIPMENT.
AutoCAD SHX Text
AutoCAD SHX Text [ 120 ]
AutoCAD SHX Text
AutoCAD SHX Text 3.0000 jordan.vandermeer Placed Image
TRANSFORMER
500 GAL
FERTILIZER TANK
500 GAL
W7 G5 SYSTEM
MODULE
3/4" INTAKE/SAMPLE PORT
ACID TANK
WD-M
MODULE
192"
6"
264"
4"Ø
Ø
3/4" NBR WATER INTAKE LINE
3/8" OD FEP ACID LINE INSIDE
OF PROTECTIVE JACKET
3/8" XLPE FERTIGATION
LINE
3/4" XLPE ACID/WATER
INJECTION LINE
'-0
DISCHARGE
ISOLATION VALVE (12")
12" 316 STS PIPING
3x8" SUCTION
SCANNING FILTERS
4" PRESSURE RELIEF
VALVE. DISCHARGE INTO
WET WELL
5 HP PRESSURE
MAINTENANCE PUMP
TYPICAL SUPPORT
FOR ALL PIPING ABOVE
GRADE.
FLOW METER
FILTER FLUSH LINE
3x100HP VERTICAL TURBINE
PUMPS
PUMP SCHEDULE
MARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE
CIRCULATING FLUID
MIN % EFF
ELECTRICAL MOTOR
FLUID
FLOW HEAD NPSH AVAILABLE TEMPERATURE
SP GR
NOMINAL POWER
PHASE VOLT MAX RPM
SPEED
CONTROL
REMARKS
GPM FT PSIG FT PSIG °F [°C] HP [kW]
P-1B STATION-B LAKE-B -SUPPLY IRRIGATION VERTICAL TURBINE WATER 3 460 1800 VFD
P-2B STATION-B 3 460 1800 VFD
P-3B STATION-B 3 460 1800 VFD
LAKE-B -SUPPLY IRRIGATION
LAKE-B -SUPPLY IRRIGATION
VERTICAL TURBINE
VERTICAL TURBINE
WATER
WATER
N/A 65 1
N/A 1
N/A 1
N/A
N/A
N/A
P-4B STATION-B LAKE-B -STATION PRESS-MAINT SUBMERSIBLE WATER 100 N/A 165N/A173 75 5 1800 CONST3 460
CWP-2 PENTHOUSE CHILLED SUPPLY CHILLED WATER INLINE CHILLED WATER/GLYCOL MIX 75 N/A 42 1 [ ] 3 460 3450 CONSTANTP-5B STATION-B N/A 1 3 460 3450 CONSTLAKE-B -STATION INTERMEDIATE SUBMERSIBLE WATER 65N/ANA NA NA 15 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
98" LOW
WATER
LEVEL
168"
PUMP
DEPTH
98"
5 HP PRESSURE
MAINTENANCE PUMP
15 HP SUBMERSIBLE
INTERMEDIATE PUMP
LOW LEVEL SHUT
DOWN SAFETY
KEYED NOTES
NEW PUMP STATION B PLAN
MS102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
1. NEW PREFABRICATED SKID MOUNT PUMP
STATION. BASIS OF DESIGN (RAINBIRD VT-3)
2. EXPAND EXISTING CONCRETE PAD TO 22'x18'
TO ACCOMMODATE NEW PUMP STATION, 8"
REINFORCE PAD. APPROXIMATE ADDED
CONCRETE AREA IS 257SF.
3. NEW WELL ACCESS COVER.
4. (3) 8" SELF CLEANING SCREEN FILTER. BASIS
OF DESIGN (YARDNEY FILTAWORX)
5. PUMP VFD CONTROLLER WITH PUMP
SYSTEM MANAGEMENT SOFTWARE.
6. NEW 500GAL ACID TANK.
7. EXISTING MOTOR CONTROL PANEL,
CONNECT POWER TO NEW PUMP VFD
CONTROLLER.
8. NEW WERECON ACID INJECTION SYSTEM
9. 6" FILTRATION BACKWASH PIPE, CONNECT
TO EXISTING.
10. NEW WERECON FERTIGATION SYSTEM.
11. NEW 500 GALLON FERTILIZER TANK.
12. CONNECT NEW IRRIGATION PIPING TO
EXISTING, INSPECT AND REPLACE FLANGE IF
NECESSARY.
E31/4" = 1'-0"
NEW PUMP STATION B PLAN VIEW
C71/4" = 1'-0"
NEW PUMP STATION B SECTION VIEW
F71/4" = 1'-0"
NEW PUMP STATION B SECTION VIEW
GENERAL NOTES
1. CONTRACTOR SHALL INSPECT AND CLEAN
OUT ALL SILT/ DEBRIS IN WET WELL PRIOR
TO INSTALLATION OF NEW PUMP STATION.
2. NEW PUMP STATION SHOP DRAWINGS
REQUIRE APPROVAL OF PROJECT COR.
PRIOR TO ORDERING EQUIPMENT.
AutoCAD SHX Text
AutoCAD SHX Text [ 120 ]
AutoCAD SHX Text
AutoCAD SHX Text 3.0000
AutoCAD SHX Text
SCALE: 1/4"=1'-0"
AutoCAD SHX Text 16'
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
F
T.
6FT.
OUTSIDE OF FENCE INSIDE OF FENCE
EXISTING FENCE
6FT.
F
T
6FT.
F
T
KEYED NOTES
NEW LAKE A & LAKE B FILL
VALVE PLAN
MS103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
1. INSTALL NEW 12" RATE OF FLOW CONTROL
VALVE (CLA VAL OR EQUAL), ORIFICE PLATE
AND 12" GATE VALVE. INSTALL 12" BYPASS
WITH GATE VALVE. REUSE EXISTING VALVE
COVER.
2. INSTALL NEW WATER METER, SEE SHEET
MS501 AND MS502 FOR DETAILS.
COORDINATE WITH WATER UTILITY.
3. INSTALL NEW VAULT TO ACCOMMODATE
NEW 8" CONTROL VALVE, ORIFICE PLATE,
GATE VALVE, 8" BYPASS AND WATER METER.
4. NEW 8" WATER METER, SEE DETAILS ON
MS501 AND MS502.
5. INSTALL NEW VAULT TO ACCOMMODATE
NEW 10" CONTROL VALVE, ORIFICE PLATE,
GATE VALES, 10" BYPASS AND WATER
METER.
6. NEW 10" WATER METER, SEE SHEET MS501
AND MS502 FOR DETAILS.
7. EXISTING UTILITY METER SHALL REMAIN.
E2NTS
NEW LAKE B FILL VALVE PLAN
GENERAL NOTES
1. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS PRIOR TO BID, INCLUDING BUT
NOT LIMITED TO FILL VALVE VAULT
LOCATIONS.
2. CONTRACTOR SHALL COORDINATE WITH
NATIONAL CEMETERY PERSONNEL ON
EXACT LOCATION OF EXISTING VAULTS AND
ROUTING OF NEW UNDERGROUND CONDUIT
FOR LOW VOLTAGE CONNECTION TO FILL
VALVES.
C1NTS
NEW LAKE A FILL VALVE PLAN
LAKE A FILL VALVE LOCATION
SEE DETAIL C1 THIS SHEET
LAKE B FILL VALVE LOCATION
SEE DETAIL E2 THIS SHEET
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
SCALE: 1/4"=1'-0"
AutoCAD SHX Text 16'
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text jordan.vandermeer Placed Image
PUMP STATION A
UPPER LAKE A
LOWER LAKE A
IRRIGATION SUPPLY
PUMP STATION B
UPPER LAKE B
LOWER LAKE B
IRRIGATION SUPPLY
OPEN CHANNEL
(2) 10" CONTROL VALVES
LAKE A FILL
12" CONTROL VALVE
LAKE B FILL
8" CONTROL VALVE
LAKE B FILL
LAKE LEVEL CONTROL SENSOR
LAKE LEVEL CONTROL SENSOR
SEQUENCE OF OPERATION
PUMP STATION
MAIN PUMPS WILL BE CONTROLLED BY PUMP CONTROL PRESSURE TRANSMITTER AND
PLC IN THE PUMP CONTROL PANEL. THE PLC WILL CONTROL THE PUMP AND
VFD VIA 4-20MA SIGNAL FROM THE PRESSURE TRANSMITTER. REUSE WATER
PUMP WILL MAINTAIN A MINIMUM DISCHARGE PRESSURE OF100 PSI. IF THE
PRESSURE EXCEEDS MORE THAN 110 PSI AT THE MINIMUM SPEED IT WILL
SHUT DOWN THE PUMP.
PRESSURE MAINT. PUMP AND ASSOCIATED VARIABLE FREQUENCY DRIVE
WILL BE CONTROLLED BY PUMP CONTROL PRESSURE TRANSMITTER AND
PLC IN THE PUMP CONTROL PANEL LOCATED IN THE PUMP STATION. THE PLC
WILL CONTROL THE PUMP AND VFD VIA 4-20MA SIGNAL FROM THE PRESSURE
TRANSMITTER. WHEN THE DISCHARGE PRESSURE DROPS BELOW 100 PSI
FOR MORE THAN 30 SECONDS PRIMARY PUMP (P-1A/B) WILL START AND PRESS MAINT.
WILL SHUT DOWN. P-1,2,3 A/B WILL STAGE TO MAINTAIN A MINIMUM DISCHARGE PRESSURE
OF 100PSI. WHEN THE DISCHARGE PRESSURE EXCEEDS 110 PSI AT THE MINIMUM
SPEED FOR MORE THAN 30 SECONDS P-1,2,3 A/B WILL SHUT DOWN AND PRESSURE MAINT.
PUMP WILL START AND MAINTAIN A PRESSURE OF 100 PSI.
IRRIGATION WATER PUMPS (P-1A-3A, P-1B-3B)) WILL ALTERNATE STARTS EVERY
24 HOURS (ADJ.)
ALL IRRIGATION WATER PUMPS WILL BE PROVIDED WITH AN ADJUSTABLE MINIMUM
RUN TIME TIMER SET FOR 30 SECONDS.
ALL PUMPS WILL SHUT DOWN WHEN WATER LEVEL IN THE PUMP STATION
WET WELL DROPS TO THE LOW WATER LEVEL.
LAKE FILL CONTROL VALVE
1. LAKE FILL CONTROL VALVE WILL BE CONTROLLED BY LIQUID LEVEL TRANSMITTER
IN THE PUMP STATION WET WELL AND RELAYS IN THE REUSE WATER HOLDING
POND LIQUID LEVEL CONTROL PANEL LOCATED IN THE PUMP STATION. THE LIQUID
LEVEL SWITCHES AND RELAYS WILL OPEN AND CLOSE THE LAKE FEED CONTROL
AND MAINTAIN THE LIQUID LEVEL IN THE REUSE HOLDING LAKE.
CENTRAL
CONTROLLER
LAKE-A
PUMP STATION
PLAN NOTES:
1. REMOVE EXISTING RTU AT PUMP STATION A AND B.
2. INSTALL NEW REMOTE TERMINAL UNITS (RTU)/WIFI
RADIO TRANSMITTER ANTENNA IN EXISTING PANEL
TO COMMUNICATE WITH MAXICOM CENTRAL
CONTROLLER (900MHz COMMUNICATION)
3. INSTALL NEW RTU/WIFI-ANTENNA AT EXISTING
CONTROL ROOM AREA. INTEGRATE WITH UPDATED
CENTRAL CONTROLLER FOR AUTOMATED CONTROL
OF LAKE FILL VALVES. AN UPGRADED PC IS
REQUIRED TO RUN NEW SOFTWARE
4. NEW WATER FLOW METERS LOCATED AT FILL
VALVES AND PUMP STATIONS SHALL BE CAPABLE
OF TRANSMITTING FLOW DATA TO CENTRAL
CONTROLLER FOR RECORDING OF TOTAL WATER
CONSUMPTION AND FLOW. ESP-SAT SHALL ALSO
PROVIDE 24V POWER TO NEW WATER METER.
5. PROVIDE 1" CONDUIT FOR (2) 24V POWER WIRE AND
SINGE DATA CABLE. PAGE SPEC P7162D, 16GA
SHIELDED WIRE OR EQUAL.
CONTROLLER
CCU LINK
ESP-SAT LINK
MAGNETIC FLOW METER
MAGNETIC FLOW METER
WIFI/RTU TRANSMITTER
2. LAKE A FILL CONTROL VALVE WILL BE CONTROLLED BY LIQUID TRANSMITTER LEVEL
AND MANUALLY AT THE CENTRAL CONTROLLER FOR WATER FEATURE DISPLAY.
CREATE DAY SCHEDULE FOR ENABLING/DISABLING FILL VALVES FOR WATER
FEATURE.
WIFI TRANSMITTER
PUMP STATION
CONTROLLER
PLC
IRRIGATION
ESP-SAT LINK
PUMP STATION
CONTROLLER
PLC
LAKE-B
PUMP STATION
ESP-SAT LINK
WIFI/RTU TRANSMITTER
WIFI/RTU TRANSMITTER
NEAREST
IRRIGATION
ESP-SAT LINK
NEAREST
KEYED NOTES
WATER SUPPLY CONTROL
DETAIL
MS501
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
1. PROVIDE 24V POWER TO NEW CONTROL
VALVE FROM NEAREST IRRIGATION
ESP-SAT. CONTRACTOR SHALL PLAN FOR
1000FT OF UNDERGROUND CONDUIT TO
ACCOMMODATE 24V POWER CABLE AND
DATA CABLE.
2. NEW WET WELL LEVEL SENSOR TO BE
INSTALLED WITH NEW PUMPS STATION
PACKAGE.
3. INSTALL NEW FLOW METER AT FILL VALVE
VAULT, BASIS OF DESIGN IS McCROMETER
UM06 WITH 24V DC POWER AND PULSE
SCALED OUTPUT. METER SHALL MATCH
PIPE SIZE AND FLOW RANGE. SEE SHEET
MS502 FOR DETAILS.
4. PROVIDE 24V POWER TO NEW CONTROL
VALVE FROM NEAREST IRRIGATION
ESP-SAT. CONTRACTOR SHALL PLAN FOR
300FT OF UNDERGROUND CONDUIT TO
ACCOMMODATE 24V POWER CABLE AND
DATA CABLE.
5. PROVIDE 1" CONDUIT FOR (2) 24v WIRES
AND SINGLE DATA WIRE. DATA WIRE
SHALL BE PAIGE ELECTRIC P7162D
SHIELDED 16GA WIRE OR EQUAL.
6. INSTALL RAINBIRD PULSE SENSING
TRANSMITTER AND PULSE DECODERS TO
EXISTING SATELLITE CONTROLLERS.
C2NTS
LAKE A WATER SUPPLY
F4NTS
LAKE B WATER SUPPLY
WALL
NOTES:
IRRIGATION EQUIPMENT
DETAILS
MS502
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
C1NTS
DETAIL FOR STILLING WELL
E4NTS
DETAIL FOR SUPPORTING PIPE ON CONCRETE SLAB
E1NTS
NEW CONCRETE PAD DETAIL
C6NTS
TYPICAL FILL VALVE & VAULT DETAIL
MAGNETIC FLOW METER
MCCROMETER ULTRA MAG OR
EQUAL.
NRS FLG GATE
VALVE (TYP.)
BYPASS
4'X6'
ACCESS
HATCH
PIPE LENGTH TO
BE A MINIMUM 2'
FLOW
CONTROL
VALVE
ORIFICE
PLATE
RESTRAINED M.J.
6" REINFORCED PRECAST CONCRETE VAULT
UNI-FLANGE (TYP.)
1' MINIMUM DUCTILE IRON STUB OUT
1' MINIMUM DUCTILE IRON STUB OUT
1' MINIMUM DUCTILE IRON STUB OUT
NRS FLG GATE
VALVE (TYP.)
MJ FLG COUPLING
MAGNETIC FLOW METER
MCCROMETER ULTRA MAG OR
EQUAL.
12" SUMP WITH CAST IRON GRATE
4'X6' ALUMINUM DOOR WITH SPRING
OPEN ASSIST HINGE. BILCO TYPE
LID OR APPROVED EQUAL.
STEEL STEPS
FINISHED ELEVATION TO BE
6" ABOVE EXISTING GRADE
VAULT NOTES
1. CONTRACTOR SHALL SUBMIT ALL CONCRETE VAULT SHOP
DRAWING SUBMITTALS TO THE VA FOR APPROVAL PRIOR
TO ORDERING.
2. COMPACT SUBGRADE UNDER AND 12" ON EITHER SIDE OF
FOOTING TO 95% STANDARD PROCTOR MAXIMUM DRY
DENSITY.
3. PRECAST VAULT TO HAVE #4 REBAR @ 9" O.C. BOTH WAYS.
4. PIPE AND ELECTRICAL PENETRATION VOIDS TO BE FILLED
WITH NON-SHRINK GROUT.
5. ALL PIPING THROUGH VAULT SHALL BE DUCTILE IRON PIPE.
6. HATCH SHALL BE SPRING ASSISTED.
7. HATCH SHALL HAVE POSITIVE LOCK AT 90 DEGREES.
8. HATCH SHALL HAVE PADLOCKING CAPABILITIES.
9. VAULT TO HAVE STEEL STEPS CAST IN PLACE AT THE TIME
OF FABRICATION FOR VAULTS WITH A DEPTH GREATER
THAN OR EQUAL TO 36".
9.1. MAXIMUM STEP SPACING SHALL BE 15"
6" REINFORCED PRECAST CONCRETE VAULT
MINIMUM 18" OF #4 STONE BACKFILL
EXTENDING 1' BEYOND THE EDGE
OF VAULT AND WRAPPED IN 8 OZ-SY
NON WOVEN GEOTEXTILE FABRIC
6' X 10' MINIMUM REINFORCED PRECAST CONCRETE
VAULT WITH A 6" MINIMUM WALL THICKNESS
AutoCAD SHX Text
JUNCTION BOX
AutoCAD SHX Text
LEVEL SENSOR
AutoCAD SHX Text
12" LINKSEAL CS
AutoCAD SHX Text
PLASTIC SLEEVE
AutoCAD SHX Text
8" PVC FLANGE
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
LINKSEAL
AutoCAD SHX Text
LEVEL CIRCUITS IN CONDUIT
AutoCAD SHX Text
TO CONTROL PANEL
AutoCAD SHX Text 2"x8" REDUCING
AutoCAD SHX Text
PVC FLANGE
AutoCAD SHX Text
DRILL (4) 1" DIAMETER
AutoCAD SHX Text
HOLES IN STILLING WELL
AutoCAD SHX Text
PIPE EVERY 2 FEET
AutoCAD SHX Text
SUPPORTS AS REQ'D
AutoCAD SHX Text
TO MAINTAIN VERT
AutoCAD SHX Text
ALIGNMENT OF PVC
AutoCAD SHX Text
STILLING WELL (3 MIN.)
AutoCAD SHX Text
STILLING WELL TO BE AS REQ'D
AutoCAD SHX Text
BY INSTRUMENT
AutoCAD SHX Text
8" SCHEDULE 40
AutoCAD SHX Text
PVC STILLING WELL
AutoCAD SHX Text
316 SST OFFSET PIPE
AutoCAD SHX Text
CLAMP GRINNELL #103-SS
AutoCAD SHX Text
PIPE SUPPORT
AutoCAD SHX Text
" STAINLESS STEEL
AutoCAD SHX Text
CONCRETE ANCHOR (TYP)
AutoCAD SHX Text
8" PVC PIPE STILLING WELL
AutoCAD SHX Text
TBD IN FIELD
AutoCAD SHX Text 8"x8"x3/8" [203x203x8.0mm] STEEL PLATE
AutoCAD SHX Text
WELD PLATE TO PIPE
AutoCAD SHX Text SECURE TO SLAB WITH (4) 3/8" [8.0mm] EXPANSION BOLTS OR WELD TO STEEL DECK
AutoCAD SHX Text
CONCRETE SLAB OR STEEL ROOF DECK
AutoCAD SHX Text
WELD PIPE SADDLE SUPPORT TO PIPE. PROVIDE WATER TIGHT CONNECTION
AutoCAD SHX Text 2" [50mm] STEEL PIPE
AutoCAD SHX Text 2-1/2" [65mm] STEEL PIPE
AutoCAD SHX Text
NOTES: PROVIDE RESTRAINING CLAMPS 8'-0" [2438] O.C.
AutoCAD SHX Text
4000 PSI CONCRETE MEDIUM BROOM FINISH
AutoCAD SHX Text #4 REBAR @ 12" O.C. EACH WAY AND MUST BE SUPPORTED ON REINFORCEMENT BAR CHAIRS WHEN INSTALLED.
AutoCAD SHX Text
9" ODOT TYPE 'A' AGGREGATE BASE
AutoCAD SHX Text
UNDISTURBED FOUNDATION MATERIAL TYP.
AutoCAD SHX Text
1. AGGREGATE BASE SHALL MATCH CalTrans SPECIFICATIONS, COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY AGGREGATE BASE SHALL MATCH CalTrans SPECIFICATIONS, COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D1557. . 2. UNDISTURBED NATURAL SOIL OR COMPACTED STRUCTURAL FILL PLACED IN MAXIMUM EIGHT-INCH LOOSE LIFTS COMPACTED TO AT LEAST 90 UNDISTURBED NATURAL SOIL OR COMPACTED STRUCTURAL FILL PLACED IN MAXIMUM EIGHT-INCH LOOSE LIFTS COMPACTED TO AT LEAST 90 PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D1557 FOR FINE GRAINED SOILS AND 95 PERCENT FOR GRANULAR SOILS. THE MOISTURE CONTENT SHOULD BE WITHIN 2 PERCENT OF OPTIMUM FOR GRANULAR SOILS AND AT LEAST 2 PERCENT ABOVE OPTIMUM FOR FINE-GRAINED SOILS
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
GALV. STEEL SUPPORTS
AutoCAD SHX Text %%uELEVATION%%U
AutoCAD SHX Text %%uPLAN VIEW%%U
GEAR PANEL
(UTILITY OWNED)
M O
T O
R
C
O N
T R
O L
B R
E A
K E
R
P
A N
E L
S C
E
F
E E
D E
R
U
T I L I T
Y
O
W N
E D
RETAINING CONCRETE WALL
F E
N C
E
L I N
E
F E
N C
E
L I N
E
TRANSFORMER
(UTILITY OWNED)
ACID TANK
MANHOLE
MANHOLE
FENCE LINE
FENCE LINE
FERTILIZER TANK
MOTOR CONTROL
BREAKER PANEL
ACID TANK
FERTILIZER TANK
F E
N C
E
L I N
E
F E
N C
E
L I N
E
FENCE LINE
FENCE LINE
TRANSFORMER
(UTILITY OWNED)
FLAGPOLE
FLOOD LIGHTS
BOOSTER
PUMP
TELEMETRY
CONTROLS
PANEL " L"
TRANSFORMER
PUMP #4A AUX
LOADS
PUMP #1A
PUMP #2A
PUMP #3A
MAIN BREAKER
TENT SERVICE
PUMP #6
JOCKEY
PUMP
PUMP #5
RESTROOM
FEED
XFMR DISC.
40A 2P
PUMP #10
HOLDING POND
MAIN BREAKER
500A 3P
PUMP #7
PUMP #8
PUMP #9
PANEL "LB"
TRANSFORMER
480-120/240-15KA
CONTROLS
LAKE "A" LAKE "B"
1. REMOVE PUMP CONTROLLER.
2. REMOVE ALL PUMP DISCONNECT
SWITCHES.
3. DEMO EXISTING WIRE & CONDUIT BACK TO
ELECTRICAL PANEL.
4. REMOVE CONTROL TRANSMITTER AND WET
WELL LEVEL CONTROLLER.
5. REMOVE MOTOR CONTROL BREAKER PANEL
CABINET.
6. ACID FEEDER SYSTEM SHALL BE REMOVED.
7. REMOVE PANEL AND TRANSFORMER.
8. COORDINATE WITH SOUTHERN CALIFORNIA
EDISON UTILITY TO REMOVE AND UPGRADE
THE TRANSFORMER.
KEYED NOTES
ELECTRICAL DEMOLITION PLAN
PUMP STATION A & B
ED401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
VCI Project Management Construction Management Engineering
BID DOCUMENTS
BID DOCUMENTS
D2 1/4" = 1'-0"
PUMP STATION A - DEMO PLAN
F7 1/4" = 1'-0"
PUMP STATION B - DEMO PLAN
A. FOR EXISTING EQUIPMENT, SUCH AS WIRING DEVICES,
CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED,
COMPLETELY CUT/CAP CONDUITS AT THE AREA OF WORK
PERIMETER AND REMOVE CONDUIT WITHIN THE WORK AREA,
DISCONNECT WIRING AT THE OVERCURRENT PROTECTIVE
DEVICE AND REMOVE WIRING COMPLETELY FROM THE
ABANDONED CONDUITS BACK TO JUNCTION BOX OR PANEL .
B. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE
OVERCURRENT PROTECTIVE DEVICE. COMPLETELY REMOVE
ALL ABANDONED WIRING.
GENERAL NOTES - DEMOLITION
SSBS
F2 N.T.S
MOTOR CONTORL PANEL-DEMO
ACID TANK
SHALL BE REMOVED.
SEE MD101.
FERTILIZER TANK
SHALL BE REMOVED.
SEE MD101.
ACID TANK
SHALL BE REMOVED.
SEE MD102.
FERTILIZER TANK
SHALL BE REMOVED.
SEE MD102.
ALL WORK THIS SHEET IS TO BE
INCLUDED IN THE BASE BID.
56436
7/23/2021
25'-0"
RETAINING CONCRETE WALL
F E
N C
E
L I N
E
F E
N C
E
L I N
E
FENCE LINE
FENCE LINE
MANHOLE
MANHOLE
TRANSFORMER
(UTILITY OWNED)
MAIN SWITCH
GEAR PANEL
(UTILITY OWNED)
N
EW
M D
P-
SC
E
FE
ED
ER
(U
TI
LI
TY
O
W N
ED
'-0
DISCHARGE
ISOLATION
VALVE (12")
12" 316 STS PIPING
3x8" SUCTION
SCANNING FILTERS
4" PRESSURE RELIEF
VALVE. DISCHARGE INTO
WET WELL
5 HP PRESSURE
MAINTENANCE PUMP
TYPICAL SUPPORT
FOR ALL PIPING ABOVE
SLAB.
FLOW METER
FILTER FLUSH LINE
3x100HP
VERTICAL TURBINE
PUMPS
ELECTRICAL PLAN-NEW PUMP
STATION A
E-401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
VCI Project Management Construction Management Engineering
BID DOCUMENTS
BID DOCUMENTS
E2 1/4" = 1'-0"
NEW PUMP STATION A PLAN VIEW
1. PUMP VFD CONTROLLER WITH PUMP
SYSTEM MANAGEMENT SOFTWARE.
2. INSTALL NEW DISCONNECT SWITCHES
(SQUARE D HEAVY DUTY SAFETY SWITCH
OR EQUAL).
3. INSTALL NEW NEMA 3R CABINET.
4. NEW WERECON ACID INJECTION SYSTEM.
5. NEW WERECON FERTIGATION SYSTEM.
6. ELECTRICAL EQUIPMENT. SEE DETAIL F6
THIS SHEET.ELECTRICAL EQUIPMENT SHALL
BE LOCATED IN SIGHT FROM THE CONTROL
PANEL.
7. UTILITY OWNED TRANSFORMER.
CONTRACTOR TO COORDINATE WITH
SOUTHERN CALIFORNIA EDISON UTILITY FOR
REQUIRED UPGRADE THE TRANSFORMER.
POWER METER TO BE PROVIDED BY
SOUTHERN CALIFORNIA EDISON UTILITY AND
FIELD COORDINATED AT TRANSFORMER.
PAD TO BE INSTALLED BY CONTRACTOR.
8. PROVIDE #1/0 BARE CU CONDUCTOR,
TWO 1"x10' COPPERCLAD GROUND RODS.
9. PROVIDE 8 EA. 20 AMP SINGLE-POLE
BREAKERS, AND 3 EACH 20 AMP 2-POLE
BREAKERS INITIALLY. PROVIDE ANY
ADDITIONAL BREAKERS WHICH MAY BE
CURRENTLY UNIDENTIFIED BUT
NECESSARY FOR THE COMPLETION OF
THE PUMP STATION.
10. PROVIDE 15KVA 480-208/120 TRANSFORMER.
11. EXISTING LOADS TO REMAIN.
12. TRANSFORMER SHALL BE GROUNDED PER
NEC ARTICLE 250 PART X, AND SPECIFICALLY
NEC 250.184(B)
13. FENCE SHALL BE GROUNDED PER NEC.
CONTRACTOR COORDINATE WITH
SOUTHERN CALIFORNIA EDISON UTILITY FOR
REQUIREMENTS.
KEYED NOTES
LEGEND AND SYMBOLS
CIRCUIT BREAKER
FUSED DISCONNECT SWITCH.
MOTOR, HORSEPOWER AS INDICATED.
VARIABLE FREQUENCY DRIVE.
TRANSFORMER
EARTH GROUND
GENERAL NOTES - NEW WORK
SSBS
5HP
C6 NOT TO SCALE
ONE-LINE DIAGRAM - LAKE A
VFD
TO UTILITY
NEW MDP -1
PANEL
M
ACID INJECTION SYSTEM
3HP
ACID INJECTION SYSTEM FEEDER(N)
3/4"C, (4)#10, (1)#10G.
FERTIGATION SYSTEM
3HP
FERTIGATION SYSTEM FEEDER(N)
3/4"C, (4)#10, (1)#10G.
CONTROLLER CONTROLLERPUMP CONTROLLER PANEL
BOOST PUMP
BOOST PUMP
BOOST PUMP
BOOST PUMP
100HP
100HP
100HP
5HP
STATION PUMP FEEDER (N)
(5)2"C, W/2 300KCMIL,1 #2 G
800A, 480V, 3PH, 4W BUS
FL
AG
P O
LE
AU
X.
L O
AD
S
15KVA
480-120/240V
PANEL "L"
DISCONNECT SWITCH FEEDER (N)
(5)2"C, W/2 350KCMIL,1 #1/0 G
WIREWAY
ACID INJECTION SYSTEM FERTIGATION SYSTEM
F6 NOT TO SCALE
ELECTRICAL EQUIPMENT RACK- LAKE A
500KVA
12KV-480/277V
F1 NOT TO SCALE
EXSITING PANEL "L"
METALLIC WIREWAY
METAL STRUT RACK
TO
P
U M
P
ST
AT
IO
N
TO
A
C
ID
IN
JE
C
TI
O N
S
YS
TE
M
TO
F
ER
TI
G
AT
IO
N
S
YS
TE
M
400/400A
DISCONNECT
SWITCH
25/16A
DISCONNECT
SWITCH
25/16A
DISCONNECT
SWITCH
6" CONCRETE PAD
AL
L
EQ
U
IP
M
EN
T N
EM
A
3R
NOTE: SWITCH SIZE ARE NOTED AS RATING (A)/FUSE SIZE
('25/16A' IS A 25 AMP SWITCH WITH 16 AMP FUSE)
A. ALL CONDUIT ROUTES SHOWN WITHIN THESE PLANS ARE
DIAGRAMMATIC, AND SHOW ONLY THE NEW DESIGN INTENT
FOR NEW CONDUIT OR THE ASSUMED ROUTING OF
EXISTING CONDUITS. EXACT ROUTING OF ALL NEW
CONDUITS SHALL BE DETERMINED IN THE FIELD (AND
COORDINATED WITH THE VA) TO SUIT FIELD CONDITIONS
AND TO COMPLY WITH ALL REQUIREMENTS OF NEC, IBC,
AND OTHER APPLICABLE CODES.
B. ALL NEW WORK TO EXISTING INSTALLATIONS SHALL
COMPLY WITH THE LATEST VERSIONS OF THE NEC, IBC,
AND OTHER APPLICABLE CODES AS ADOPTED BY THE VA AT
THE TIME OF THIS PROJECT.
C. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE
THAN THREE CIRCUITS. EACH BRANCH CIRCUIT HOMERUN
SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT
GROUNDING CONDUCTOR.
D. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
COORDINATE AS TO WHICH DEVICES ARE SUPPLIED WITH
EQUIPMENT .
SPARE
NEW SERVICE ENTRANCE FEEDER (N)
(5)2-1/2"C, EA. W/3 300KCMIL
100"
104"
20"
6"
64" LIFTING DEVICE DAYTON
SUPERIOR 4 TON MFG ID# P-52
SWIFT LIFTING EYE
20"
F3 NOT TO SCALE
PRECAST CONCRETE PAD
4" FILTRATION
BACKWASHNEW
MAGNETIC
FLOW
METER
F8 1/4"=1'-0"
NEW PUMP STATION A SECTION VIEW
NEW
PREFABRICATED
SKID MOUNT
PUMP STATION
THREE SELF CLEANING
SCREEN FILTERS
EXISTING CONCRETE PAD
2 2
EXPAND EXISTING PAD
SEE NOTE 2, MS101
PRECAST CONCRETE PAD
SEE DETAIL F3
STILLING WELL W/LAKE
LEVEL CONTROL SENSOR
3/4" INJECTION PORT
500 GAL
ACID TANK
500 GAL
FERTILIZER TANK
3/4" INTAKE/SAMPLE
PORT
WD-M
MODULE
W7 G5
SYSTEM
MODULE
WELL ACCESS
DOOR
TRANSFORMER
(UTILITY OWNED)
4"Ø
Ø
NEW MDP-2
'-0
DISCHARGE
ISOLATION
VALVE (12")
12" 316 STS PIPING
3x8" SUCTION
SCANNING FILTERS
4" PRESSURE RELIEF
VALVE. DISCHARGE INTO
WET WELL
5 HP PRESSURE
MAINTENANCE PUMP
TYPICAL SUPPORT
FOR ALL PIPING ABOVE
SLAB.
FLOW METER
FILTER FLUSH LINE
3x100HP
VERTICAL TURBINE
PUMPS
ELECTRICAL PLAN-NEW PUMP
STATION B
E-402
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
VCI Project Management Construction Management Engineering
BID DOCUMENTS
BID DOCUMENTS
KEYED NOTES
LEGEND AND SYMBOLS
GENERAL NOTES - NEW WORK
F7 1/4" = 1'-0"
NEW PUMP STATION B PLAN VIEW
A. ALL CONDUIT ROUTES SHOWN WITHIN THESE PLANS ARE
DIAGRAMMATIC, AND SHOW ONLY THE NEW DESIGN INTENT
FOR NEW CONDUIT OR THE ASSUMED ROUTING OF
EXISTING CONDUITS. EXACT ROUTING OF ALL NEW
CONDUITS SHALL BE DETERMINED IN THE FIELD (AND
COORDINATED WITH THE VA) TO SUIT FIELD CONDITIONS
AND TO COMPLY WITH ALL REQUIREMENTS OF NEC, IBC,
AND OTHER APPLICABLE CODES.
B. ALL NEW WORK AND ALTERATIONS TO EXISTING
INSTALLATIONS SHALL COMPLY WITH THE LATEST
VERSIONS OF THE NEC, IBC, AND OTHER APPLICABLE
CODES AS ADOPTED BY THE VA AT THE TIME OF THIS
PROJECT.
C. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE
THAN THREE CIRCUITS. EACH BRANCH CIRCUIT HOMERUN
SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT
GROUNDING CONDUCTOR.
D. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
COORDINATE AS TO WHICH DEVICES ARE SUPPLIED WITH
EQUIPMENT .
SSBS
CIRCUIT BREAKER
FUSED DISCONNECT SWITCH.
MOTOR, HORSEPOWER AS INDICATED.
VARIABLE FREQUENCY DRIVE.
TRANSFORMER
EARTH GROUND
5HP
C6 NOT TO SCALE
ONE-LINE DIAGRAM - LAKE B
VFD
TO UTILITY
NEW MDP -2
PANEL
M
ACID INJECTION SYSTEM
3HP
ACID INJECTION SYSTEM FEEDER(N)
3/4"C, (4)#10, (1)#10G.
FERTIGATION SYSTEM
3HP
FERTIGATION SYSTEM FEEDER(N)
3/4"C, (4)#10, (1)#10G.
CONTROLLER CONTROLLERPUMP CONTROLLER PANEL
BOOST PUMP
BOOST PUMP
BOOST PUMP
BOOST PUMP
100HP
100HP
100HP
5HP
STATION PUMP FEEDER (N)
(5)2"C, W/2 350KCMIL,1 #1/0 G
800A, 480V, 3PH, 4W BUS
TE
N
T
SE
R
VI
C E
R
ES
TR
O
O M
30KVA
480-208/120V
PANEL "LB"
WIREWAY
ACID INJECTION SYSTEM FERTIGATION SYSTEM
METALLIC WIREWAY
METAL STRUT RACK
TO
P
U M
P
ST
AT
IO
N
TO
A
C
ID
IN
JE
C
TI
O N
S
YS
TE
M
TO
F
ER
TI
G
AT
IO
N
S
YS
TE
M
400/400A
DISCONNECT
SWITCH
25/16A
DISCONNECT
SWITCH
25/16A
DISCONNECT
SWITCH
6" CONCRETE PAD
AL
L
EQ
U
IP
M
EN
T
N
EM
A 3R
F6 NOT TO SCALE
ELECTRICAL EQUIPMENT RACK- LAKE B
DISCONNECT SWITCH FEEDER (N)
(5)2"C, W/2 400KCMIL,1 #1/0 G
1. PUMP VFD CONTROLLER WITH PUMP
SYSTEM MANAGEMENT SOFTWARE.
2. INSTALL NEW DISCONNECT SWITCHES
(SQUARE D HEAVY DUTY SAFETY SWITCH
OR EQUAL).
3. INSTALL NEW NEMA 3R CABINET.
4. NEW WERECON ACID INJECTION SYSTEM.
5.