210727 Riverside 901CM3043 Final Design - 1 of 6.pdf
PDF 19 MB Posted
- Solicitation number
- 36C78621B0013
About this file
This document provides details of a federal contract opportunity for improvements at the Riverside National Cemetery in Riverside, California. The solicitation number is 36C78621B0013 and will be issued on or about July 15, 2021 for the Riverside National Cemetery Improvements Project 901-043. The acquisition type will be an Invitation for Bid with a construction magnitude between $2,000,000 and $5,000,000. This is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses under NAICS code 237990 with a size standard of $36.5 million. To be eligible, offers must come from verified SDVOSBs listed in the Vendor Information Pages database. Amendments to the solicitation will be posted on Contract Opportunities and acknowledgement is required. The point of contact is Auvorie Benson of the Department of Veterans Affairs National Cemetery Administration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
COVERSHEET
SITE LOCATION MAP
SCALE: NTS
N
SHEET INDEX
SHEET
NO.
DRAWING
NO.
SHEET TITLE
1 G-001 COVERSHEET
DEPARTMENT OF VETERANS AFFAIRS
RIVERSIDE NATIONAL CEMETERY
SITE IMPROVEMENTS
NCA PROJECT NO. 901CM3043
22495 Van Buren Blvd, Riverside, CA 92518
V-101 OVERALL TOPOGRAPHIC SURVEY - CEMETERY
C-101
OVERALL SITE, GRADING & DRAINAGE PLAN - CEMETERY
JVTM
SITE LOCATION AND ACCESS MAP
SCALE: NTS
N
CODE OF CONDUCT
1. BURIAL CEREMONIES WILL BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT. COORDINATE
DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED REPRESENTATIVE TO
ACCOMMODATE SCHEDULED BURIALS. CONTRACTOR SHALL OBTAIN THE SCHEDULE FOR THE NEXT DAY
SERVICES PRIOR TO THE CLOSE OF BUSINESS EACH DAY. ALLOWABLE WORK TO BE DETERMINED BY THE
CEMETERY DIRECTOR.
2. BECAUSE OF THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH
WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED
IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE
END OF EACH DAY AND/OR MORE FREQUENTLY AS REQUIRED.
3. THE CONTRACTORS STAFF AND SUBCONTRACTORS STAFF SHALL NOT: DRESS IN SLEEVELESS SHIRTS
OR SHORT PANTS, WEAR CLOTHING WITH INAPPROPRIATE LOGOS, PLAY MUSIC, TALK LOUD, PLACE
PERSONAL ITEMS ON HEADSTONES, LEAN AGAINST OR SIT ON HEADSTONES.
4. THE EFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMAL AND SHALL BE COORDINATED WITH THE
CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH
PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS.
5. DO NOT WORK UPON NOR STORE ANY MATERIALS ON OCCUPIED GRAVE PLOTS. ALL EFFORT WILL BE
MADE TO MAINTAIN DISTANCE FROM OCCUPIED GRAVE PLOTS.
1. TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PERFORMED BY
ATC DESIGN GROUP DATED NOVEMBER 13, 2020. THE GENERAL
CONTRACTOR SHALL VERIFY ALL SURVEY INFORMATION.
2. THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA
COORDINATE SYSTEM, ZONE 6 OCS 83. THE BASIS OF ELEVATION IS
NAVD 88.
3. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED
UPON AVAILABLE INFORMATION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL
UTILITIES PRIOR TO BEGINNING ANY WORK. IF UTILITIES OTHER THAN
THOSE SHOWN HEREON ARE ENCOUNTERED, THE CONTRACTOR
SHALL NOTIFY THE COR IMMEDIATELY AND TAKE APPROPRIATE
MEASURES TO PROTECT THE LINE(S) AND ENSURE CONTINUED
SERVICE. DAMAGE CAUSED TO EXISTING UTILITIES BY THE
CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL VERIFY
THE CONNECTION POINTS OF NEW UTILITIES TO EXISTING UTILITIES
PRIOR TO BEGINNING CONSTRUCTION.
4. THE CONTRACTOR SHALL INSTALL TREE PROTECTION BARRICADES
PRIOR TO BEGINNING EARTHWORK OPERATIONS.
5. THE CONTRACTOR SHALL NOTIFY THE CO/COR IF UNSUITABLE
MATERIAL IS DISCOVERED PRIOR TO BEGINNING ANY REMOVAL
OPERATION. (SEE SPECIFICATION SECTION 31.20.00)
6. THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS WITHIN
LIMITS OF DEMOLITION AND PROPOSED WORK. THIS INCLUDES
STAGING AREA AND LAYDOWN AREAS.
7. CONTRACTOR SHALL GRADE ALL DISTURBED AREAS TO DRAIN FOR
POSITIVE FLOW PRIOR TO FINAL APPROVAL.
8. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND
TEMPORARY SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
9. IN PERFORMING CONSTRUCTION OBSERVATION VISITS TO THE JOB
SITE, THE ENGINEER SHALL HAVE NEITHER CONTROL OVER NOR
RESPONSIBILITY FOR THE CONTRACTOR'S MEANS, METHODS,
SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE
WORK.
10. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR
PROCEDURES IN PERFORMING THE WORK IS SOLELY THE
RESPONSIBILITY OF THE CONTRACTOR, WHO IS ALSO RESPONSIBLE
FOR COMPLYING WITH ALL HEALTH AND SAFETY PRECAUTIONS AS
REQUIRED BY ANY REGULATORY AGENCY.
11. THERE SHALL BE AT ALL TIMES, WHEN WORK IS BEING DONE, A
COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND
PROGRESS OF ALL AREAS OF WORK ON SITE. THIS COMPETENT
PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF
THE CONTRACTOR. HE SHALL BE AWARE AND KNOWLEDGEABLE OF
ALL THE SAFETY CONCERNS ON THE JOB SITE. HE SHALL BE
EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE
ACTIONS OF ANY WORKMAN ON SITE.
12. CONTRACTOR SHALL PREPARE AND SUBMIT A WELDING PLAN TO THE
CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE PRIOR TO
PERFORMING ANY FIELD WELDING SHOULD IT BE REQUIRED.
FOLLOWING APPROVAL ALL WELDS SHALL BE PERFORMED IN
ACCORDANCE WITH THE APPROVED PLAN.
GENERAL NOTES
PROJECT TEAM
C-102
ARCHITECT / ENGINEER
VALI COOPER INTERNATIONAL, LLC
DENVER, CO 80249
CONTACT: TAQI MUHAMMAD
TAQI@VALIINT.COM
504-378-7399
LANDSCAPE ARCHITECT
MRWM LANDSCAPE ARCHITECTS
ALBUQUERQUE, NM 87102
CONTACT: BRIAN VERARDO
BVERARDO@WRMWLA.COM
505-268-2266
SURVEYOR
ATC DESIGN GROUP
ESCONDIDO, CA 92029
CONTACT: RYAN POST
RPOST@ATCDESIGNGROUP.COM
760-738-8800
SITE OWNER
VA NCA
RIVERSIDE NATIONAL CEMETERY
CONTACT: PETER YOUNG
PETER.YOUNG@VA.GOV
951-653-8417
GEOTECH
TERRACON
TUSTIN, CA 92780
CONTACT: JOSHUA MORGAN
JOSHUA.MORGAN@TERRACON.COM
949-864-2048
HAZARDOUS MATERIALS
TERRACON
TUSTIN, CA 92750
CONTACT: DANISH MANSOOR
DANISH.MANSOOR@TERRACON.COM
949-383-1976
CD101 OVERALL DEMOLITION PLAN - CEMETERY
FIRM PANEL
SCALE: NTS
N
G-101
CONSTRUCTION ACCESS, FENCING & STAGING PLAN
PERRIS
RESERVIOR
MARCH AIR
RESERVE BASE
E ALESSANDRO BLVD
MORENO VALLEY FWY
HWY 60
VAN BUREN BOULEVARD
NADINA AVE
V I L L A
G E
W
D
R C
L A
K
S
T
A
R
M
F
O
R
C
F
H
H
Y
RIVERSIDE NC
WWTP
ENLARGED TOPOGRAPHIC SURVEY - REFLECTIVE POOL, UPPER POND & LOWER POND
V-401
CD102 OVERALL DEMOLITION PLAN - WASTE WATER TREATMENT PLANT
CD401
ENLARGED DEMOLITION PLAN - EGRESS ROAD, ORNAMENTAL FENCING & PUMP STATION A ACCESS ROAD IMPROVEMENTS
OVERALL GRADING PLAN - WASTE WATER TREATMENT PLANT
C-401 ENLARGED SITE PLAN - EGRESS ROAD & PUMP STATION A ACCESS ROAD IMPROVEMENTS
C-402 ENLARGED SITE PLAN - ORNAMENTAL FENCING PLAN
L-101
DEMOLITION, CONSTRUCTION, IRRIGATION AND PLANTING REFERENCE PLAN
C-403 ENLARGED GRADING PLAN & ROADWAY PROFILE - EGRESS ROAD
C-501 DETAILS - SITE
MD101 MECHANICAL DEMOLITION PLAN - PUMP STATION A
MD102 MECHANICAL DEMOLITION PLAN - PUMP STATION B
NEW PUMP STATION A PLAN
NEW PUMP STATION B PLAN
MS101
MS102
RIVERSIDE NC
WWTP
C-404 ENLARGED GRADING PLAN - PUMP STATION A ACCESS ROAD IMPROVEMENTS
C-502
DETAILS - ORNAMENTAL FENCING
C-503
DETAILS - SITE & EROSION AND SEDIMENTATION CONTROL
C-405
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - EGRESS ROAD & PUMP STATION A ACCESS ROAD IMPROVEMENTS
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - WASTE WATER TREATMENT PLANT
ENLARGED TOPOGRAPHIC SURVEY - FRONT ENTRY & UPPER POND
ENLARGED TOPOGRAPHIC SURVEY - LOWER POND & PUMP STATION A
ENLARGED TOPOGRAPHIC SURVEY - CENTRAL ROUND ABOUT
ENLARGED TOPOGRAPHIC SURVEY - EGRESS ROAD, INTERSECTION IMPROVEMENTS AND ORNAMENTAL FENCING
ENLARGED TOPOGRAPHIC SURVEY - CANAL AREA 1
ENLARGED TOPOGRAPHIC SURVEY - CANAL AREA 1
ENLARGED TOPOGRAPHIC SURVEY - CANAL AREA 2 & AREA 3
ENLARGED TOPOGRAPHIC SURVEY - PUMP STATION A & B
V-402
V-403
V-404
V-405
V-406
V-407
V-408
V-409
DETAILS - WATER SUPPLY CONTROLMS501
V-102 OVERALL TOPOGRAPHIC SURVEY - WASTE WATER TREATMENT PLANT
GC101
GC103
CD402 ENLARGED DEMOLITION PLAN - LOWER LAKE A
CD403 ENLARGED DEMOLITION PLAN - UPPER LAKE A
CD404 ENLARGED DEMOLITION PLAN - UPPER & LOWER POND
CD405 ENLARGED DEMOLITION PLAN - REFLECTIVE POOL
CD406 ENLARGED DEMOLITION PLAN - CANAL AREA 1
CD407 ENLARGED DEMOLITION PLAN - CANAL AREA 2
CD408 ENLARGED DEMOLITION PLAN - CANAL AREA 3
GC104
PHASING PLAN
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - UPPER & LOWER LAKE
GC901 WASTE WATER TREATMENT PLANT IMAGERY
ENLARGED GRADING PLAN - LOWER LAKE A
C-406
ENLARGED GRADING PLAN - UPPER LAKE A
C-407
ENLARGED GRADING PLAN - UPPER & LOWER POND
C-408
ENLARGED GRADING PLAN - CANAL AREA 1
C-409
ENLARGED GRADING PLAN - CANAL AREA 2
C-410
ENLARGED GRADING PLAN - CANAL AREA 3
C-504
DETAILS - SITE
LD401 DEMOLITION PLAN ENLARGEMENT
LD402
LD403
LD404
CONSTRUCTION ENLARGEMENT PLAN
CONSTRUCTION DETAILS
CONSTRUCTION DETAILS
DEMOLITION PLAN ENLARGEMENT
DEMOLITION PLAN ENLARGEMENT
DEMOLITION PLAN ENLARGEMENT
LS401
LS402
LS403
LS404
LS501
LS502
LI401
LI402
LI403
LI404
IRRIGATION PLAN ENLARGEMENT
IRRIGATION PLAN ENLARGEMENT
IRRIGATION PLAN ENLARGEMENT
IRRIGATION PLAN ENLARGEMENT
LI501 IRRIGATION DETAILS
LP401
LP402
LP403
LP404
PLANTING PLAN ENLARGEMENT
PLANTING DETAILSLP501
GC105
GC106
GC107
GC108
GC401
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - UPPER & LOWER POND
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - REFLECTIVE POOL
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - CANAL AREA 1
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - CANAL AREA 2
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - CANAL AREA 3
ED401 ELECTRICAL DEMOLITION PLAN - PUMP STATION A & B
E-401 ELECTRICAL PLAN - NEW PUMP STATION A
EL201
LIGHTING PLAN, DEMOLITION PLAN AND DETAILS
EL202
LIGHTING PLAN, SIGN WALL & GATES
M-001
MECHANICAL LEGEND, SYMBOLS AND NOTES
DETAILS - IRRIGATION EQUIPMENTMS502
HD401 HAZARDOUS MATERIAL DEMOLITION PLAN - PUMP STATION A
HD402
PHOTOS OF LEAD BASED PAINT MATERIALSHD901
STRUCTURAL GENERAL NOTES, PLANS AND DETAILS
S-101
CONSTRUCTION ENLARGEMENT PLAN
CONSTRUCTION ENLARGEMENT PLAN
CONSTRUCTION ENLARGEMENT PLAN
PLANTING PLAN ENLARGEMENT
PLANTING PLAN ENLARGEMENT
PLANTING PLAN ENLARGEMENT
C-505
DETAILS - SITE
HD403 ASBESTOS & LEAD ABATEMENT PLAN - WASTE WATER TREATMENT PLANT
HAZARDOUS MATERIAL DEMOLITION PLAN - PUMP STATION B
E-402 ELECTRICAL PLAN - NEW PUMP STATION B
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - FRONT ENTRY IMPROVEMENTS
GC102
GC109
No. 44593
PROFESSIONAL
R
E
G
I S
T E
R
E
D
J
O
R
D
A
N
VA
N
D
E
R
M
E
E
R
E
N
G
IN
E
E
R
7/02/2021
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
NOTE TO BIDDERS:
A SITE VISIT PRIOR TO BID IS ADVISED
BUT NOT MANDATORY AND MAY BE
COORDINATED WITH THE
CONTRACTING OFFICER.
TOPSOIL
MANUFACTURING
FACILITY
G-002 BID ALTERNATE DESCRIPTIONS
MD103 LAKE A & LAKE B FILL VALVE DEMOLITION PLAN
NEW LAKE A & LAKE B FILL VALVE PLANMS103
G-002
BID ALTERNATE DESCRIPTIONS
JVTM
No. 44593
PROFESSIONAL
R
E
G
I S
T E
R
E
D
J
O
R
D
VA
N
D
E
R
M
E
E
R
E
N
G
IN
E
E
R
7/02/2021
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
18" STORM DRAIN
INV= 1530.70'
18" STORM DRAIN
NV= 1533.40'
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
M A
T C
H
L I N
E
S
T A
T
H
I
H
E
E
T
M A
T C
H
L I N
E
S
T A
T
H
E
E
T
M A
T C
H
L I N
E
S
T A
T
H
E
E
T
M A
T C
H
L I N
E
S
T A
T
H
E
E
T
W
W
W
W
W
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
LOWER POND
BOULDER
BOULDER
BOULDER
LANDSCAPE BORDER
LANDSCAPE BORDER
UPPER POND
BOULDER
BOULDER
BOULDER
BOULDER
BOULDER
BOULDER
BOULDER
REFLECTIVE
POOL
BOULDER
BOULDERS
BOULDER
BOULDER
BOULDER
BOULDER
BOULDER
BOULDER
BOULDER
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
PUMP STATION
INTAKE
WATER
FEATURE
LOWER LAKE A
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
15" STORM
DRAIN
8 1
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
12" DRAIN
WATER
FEATURE
UPPER LAKE A
WATER
FEATURE
15" STORM
DRAIN
500 GAL
ACID TANK
X
L P
E
F
E R
T I G
A T
I O
N
LINE
WD-M
MODULE
500 GAL
FERTILIZER TANK
W7 G5 SYSTEM
MODULE
192"
3/8" OD FEP ACID LINE INSIDE
OF PROTECTIVE JACKET
X
L P
E
A
C I D
W
A T
E R
INJECTION LINE
N
B
T
T A
K
L
N
E
3/4" INTAKE/SAMPLE PORT
4"Ø
MOTOR CONTROL
BREAKER PANEL
TRANSFORMER
Ø
ELEVATION
27'-0"
6'-0"
2'-11"
Rive
N al Cemetery
19'-6"
19'-5"
1'-0"
6'-4 1/2"
1 2
6'-4 1/2"
8 9
6'-4 1/2"
5'-9"
VAN BUREN BLVD.
26'-1 1/2"
CEMETERY ENTRANCE
GATE
PLAN
7'-6"
WASTE WATER TREATMENT PLANT DEMOLITION
POND REHABILITATION
REFLECTIVE POOL
SEDIMENT REMOVAL
LAKE B PUMP STATION
REPLACEMENT
FENCE LINE
EXISTING RETAINING WALL
190"
3/4" NBR WATER INTAKE LINE
X
L P
E
F
E R
T I G
A T
I O
N
LINE
W7 G5 SYSTEM
MODULE
MANHOLE
WD-M
MODULE
3/8" OD FEP ACID LINE INSIDE
OF PROTECTIVE JACKET
MANHOLE
X
L P
E
A
C I D
W
A T
E R
INJECTION LINE
3/4" INJECTION PORT
500 GAL
ACID TANK
X
L P
E
F
E R
T I G
A T
I O
N
LINE
500 GAL
FERTILIZER TANK
STILLING WELL W/ LAKE
LEVEL CONTROL SENSOR
3 1
WELL ACCESS
DOOR 6
MAIN SWITCH
GEAR PANEL
TRANSFORMER
EXISTING RETAINING WALL
M O
T O
R
C
O N
T R
O L
B R
E A
K E
R
P
A N
E L
S C
E
F
E E
D E
R
LAKE A PUMP STATION
REPLACEMENT
EGRESS ROAD PAVING
ROAD TO PUMP
STATION A
INTERSECTION
IMPROVEMENTS
CANAL AREA 1 REPAIR
CANAL AREA 2 REPAIR
CANAL AREA 3 REPAIR
ORNAMENTAL FENCING
DRAWING
NO.
SHEET TITLE
C-101
OVERALL SITE, GRADING & DRAINAGE PLAN - CEMETERY
C-102
CD101 OVERALL DEMOLITION PLAN - CEMETERY
G-101
CONSTRUCTION ACCESS, FENCING & STAGING PLAN
CD102 OVERALL DEMOLITION PLAN - WASTE WATER TREATMENT PLANT
CD401
ENLARGED DEMOLITION PLAN - EGRESS ROAD, ORNAMENTAL FENCING & PUMP STATION A ACCESS ROAD IMPROVEMENTS
OVERALL GRADING PLAN - WASTE WATER TREATMENT PLANT
C-401 ENLARGED SITE PLAN - EGRESS ROAD & PUMP STATION A ACCESS ROAD IMPROVEMENTS
C-402 ENLARGED SITE PLAN - ORNAMENTAL FENCING PLAN
C-403 ENLARGED GRADING PLAN & ROADWAY PROFILE - EGRESS ROAD
C-501 DETAILS - SITE
MD101 MECHANICAL DEMOLITION PLAN - PUMP STATION A
MD102 MECHANICAL DEMOLITION PLAN - PUMP STATION B
NEW PUMP STATION A PLAN
NEW PUMP STATION B PLAN
MS101
MS102
C-404 ENLARGED GRADING PLAN - PUMP STATION A ACCESS ROAD IMPROVEMENTS
C-502
DETAILS - ORNAMENTAL FENCING
C-503
DETAILS - SITE & EROSION AND SEDIMENTATION CONTROL
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - EGRESS ROAD & PUMP STATION A ACCESS ROAD IMPROVEMENTS
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - WASTE WATER TREATMENT PLANT
DETAILS - WATER SUPPLY CONTROLMS501
GC101
GC103
CD404 ENLARGED DEMOLITION PLAN - UPPER & LOWER POND
CD405 ENLARGED DEMOLITION PLAN - REFLECTIVE POOL
CD406 ENLARGED DEMOLITION PLAN - CANAL AREA 1
CD407 ENLARGED DEMOLITION PLAN - CANAL AREA 2
CD408 ENLARGED DEMOLITION PLAN - CANAL AREA 3
PHASING PLAN
GC901 WASTE WATER TREATMENT PLANT IMAGERY
C-407
ENLARGED GRADING PLAN - UPPER & LOWER POND
C-408
ENLARGED GRADING PLAN - CANAL AREA 1
C-409
ENLARGED GRADING PLAN - CANAL AREA 2
C-410
ENLARGED GRADING PLAN - CANAL AREA 3
C-504
DETAILS - SITE
GC105
GC106
GC107
GC108
GC401
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - UPPER & LOWER POND
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - REFLECTIVE POOL
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - CANAL AREA 1
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - CANAL AREA 2
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - CANAL AREA 3
ED401 ELECTRICAL DEMOLITION PLAN - PUMP STATION A & B
E-401 ELECTRICAL PLAN - NEW PUMP STATION A
M-001
MECHANICAL LEGEND, SYMBOLS AND NOTES
DETAILS - IRRIGATION EQUIPMENTMS502
HD401 HAZARDOUS MATERIAL DEMOLITION PLAN - PUMP STATION A
HD402
PHOTOS OF LEAD BASED PAINT MATERIALSHD901
C-505
DETAILS - SITE
HD403 ASBESTOS & LEAD ABATEMENT PLAN - WASTE WATER TREATMENT PLANT
HAZARDOUS MATERIAL DEMOLITION PLAN - PUMP STATION B
E-402 ELECTRICAL PLAN - NEW PUMP STATION B
GC109
FRONT ENTRY LANDSCAPE IMPROVEMENTS
FRONT ENTRY
SIGN
DRAWING
NO.
SHEET TITLE
G-101
CONSTRUCTION ACCESS, FENCING & STAGING PLAN
L-101
DEMOLITION, CONSTRUCTION, IRRIGATION AND PLANTING REFERENCE PLAN
LD401 DEMOLITION PLAN ENLARGEMENT
LD402
LD403
LD404
CONSTRUCTION ENLARGEMENT PLAN
CONSTRUCTION DETAILS
CONSTRUCTION DETAILS
DEMOLITION PLAN ENLARGEMENT
DEMOLITION PLAN ENLARGEMENT
DEMOLITION PLAN ENLARGEMENT
LS401
LS402
LS403
LS404
LS501
LS502
LI401
LI402
LI403
LI404
IRRIGATION PLAN ENLARGEMENT
IRRIGATION PLAN ENLARGEMENT
IRRIGATION PLAN ENLARGEMENT
IRRIGATION PLAN ENLARGEMENT
LI501 IRRIGATION DETAILS
LP401
LP402
LP403
LP404
PLANTING PLAN ENLARGEMENT
PLANTING DETAILSLP501
EL202
LIGHTING PLAN, SIGN WALL & GATES
STRUCTURAL GENERAL NOTES, PLANS AND DETAILS
S-101
CONSTRUCTION ENLARGEMENT PLAN
CONSTRUCTION ENLARGEMENT PLAN
CONSTRUCTION ENLARGEMENT PLAN
PLANTING PLAN ENLARGEMENT
PLANTING PLAN ENLARGEMENT
PLANTING PLAN ENLARGEMENT
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - FRONT ENTRY IMPROVEMENTS
GC102
DRAWING
NO.
SHEET TITLE
C-501 DETAILS - SITE
C-502
C-503
DETAILS - SITE & EROSION AND SEDIMENTATION CONTROL
C-405
CD402 ENLARGED DEMOLITION PLAN - LOWER LAKE A
CD403 ENLARGED DEMOLITION PLAN - UPPER LAKE A
GC104
PHASING PLAN
EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - UPPER & LOWER LAKE
ENLARGED GRADING PLAN - LOWER LAKE A
C-406
ENLARGED GRADING PLAN - UPPER LAKE A
C-504
DETAILS - SITE
GC401
DETAILS - SITE
LOWER LAKE A
UPPER LAKE A
BASE BID (CLIN 0001)
BID ALTERNATE #1 (CLIN 0002)
BID ALTERNATE #2 (CLIN 0003)
EL201
LIGHTING PLAN, DEMOLITION PLAN AND DETAILS
SP
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
CONSTRUCTION ACCESS,
FENCING & STAGING PLAN
G-101
0 0 0
ON SAFETY
ZERO
Department of Veterans Affairs
PAINTED BORDER
MEMBER BLACK ENAMEL
2" X 4" FRAME AND BRACES
IN SAME PLANE
METAL FACE
STRETCH METAL FACE
TIGHT, TURN OVER FRAME
AND SECURE WITH FLAT
HEAD DEFORMED NAILS
LETTERING TO BE
HELVETICA STYLE 5"
HIGH
METAL FACE WHITE
ENAMEL
LETTERING TO BE
HELVETICA STYLE 3"
HIGH TO BE CENTERED
HORIZONTALLY
2" X 4" FRAME AND
BRACE IN BACK
LETTERING TO BE
HELVETICA STYLE 2" HIGH
TO BE CENTERED
HORIZONTALLY
LETTERING TO BE
HELVETICA STYLE 1-1/2"
HIGH TO BE CENTERED
HORIZONTALLY
4" X 4" POSTS
PAINTED WHITE
BORDER MEMBER
PAINTED BLACK
BACKGROUND TO BE
PAINTED WHITE
LETTERING TO BE
HELVETICA STYLE 1"
HIGH TO BE CENTERED
HORIZONTALLY
LETTERING TO BE
HELVETICA STYLE 1-1/2"
HIGH TO BE CENTERED
HORIZONTALLY
SURROUNDING BORDER TO
BE BLUE
CENTER TO BE WHITE
8'-8"
6'-6"
6"
1-1/2" 3" 5" 2" 5" 5" 3" 2"
1-1/2"
4'-0" MIN.
3"
6"
9"
6"
3" 2" 3"
6"
ALL LETTERING TO BE
PAINTED BLACK WITH
EXCEPTION OF PROJECT
TITLE WHICH IS TO BE BLUE
NOTE:
ANY SEAM IN METAL TO BE
FLAT SEAM - SEAMS TO BE
HORIZONTAL AND OCCUR
BETWEEN LINES OF
LETTERING.
SECTION ON CENTER
4'-0"
BRACING SEE
CONSTRUCTION SIGN
SECTION DETAIL
C7/A-509
3'-0"
VARIES
3'-0"
BLUE
BLUE OUTLINE WITH
WHITE INTERIOR
BLUE
WHITE
RED
RED
2"
2"
PROVIDE (3) SETS OF
REMOVABLE NUMERALS
PAINTED ON 1/8" TEMPERED
HARDBOARD
2"
1-3/4"
2"
WOOD STRIPS
BRACING
4" X 4" POST IF SIGN IS
INSTALLED ON GRADE
FIN. GRADE
VARIES;
AVERAGE 3'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
LEGEND AND SYMBOLSPROJECT SIGN;
SEE DETAIL
F8/G-101
SAFETY SIGN;
SEE DETAIL
D8/G-101
PUMP STATION B HAUL ROUTE
EGRESS ROAD, PUMP STATION A
AND FENCING HAUL ROUTE
WATER FEATURE HAUL ROUTE
OPTION -2
WATER FEATURE HAUL ROUTE
OPTION -1
VAN BUREN
VAN BUREN
VI
LL
AG
E
D R
FR
O
N
TAG
E R O
AD
VI
LL
AG
E
D R
NANDINA AVE
AREA 1 CANAL IMPROVEMENTS
HAUL ROUTE
FENCING NOTES:
· WASTE WATER TREATMENT PLANT - SEE SHEET GC101 FOR FENCING
PLAN
· FRONT ENTRY IMPROVEMENTS - SEE SHEET GC102 FOR FENCING
PLAN
· EGRESS ROAD AND PUMP STATION A INTERSECTION IMPROVEMENTS -
SEE SHEET GC103 FOR FENCING PLAN
· UPPER AND LOWER LAKE A - SEE SHEET GC104 FOR FENCING PLAN
· UPPER AND LOWER POND - SEE SHEET GC105 FOR FENCING PLAN
· REFLECTIVE POOL - SEE SHEET GC106 FOR FENCING PLAN
· CANAL AREA 1 - SEE SHEET GC107 FOR FENCING PLAN
· CANAL AREA 2 - SEE SHEET GC108 FOR FENCING PLAN
· CANAL AREA 3 - SEE SHEET GC109 FOR FENCING PLAN
No. 44593
PROFESSIONAL
R
E
G
I S
TE
R
E
D
J
O
R
D
VA
N
D
E
R
M
E
E
R
E
N
G
IN
E
E
7/02/2021
SP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
6 1
EROSION & SEDIMENTATION CONTROL
AND FENCING PLAN - WASTE WATER
TREATMENT PLANT
GC101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
0 20 40
1 INCH = 20 FEET
EXISTING ASPHALT ROAD
KEYED NOTESKEYED NOTES
1. STABILIZED STONE CONSTRUCTION
ENTRANCE, DETAIL B2/C-504.
2. SILT FENCE, DETAIL B5/C-504
3. HYDROSEED ALL DISTURBED AREAS WITH
NATIVE REVEGETATION SEED MIX
(REFERENCE SPECIFICATION 32 90 90.
4. CONTRACTOR SHALL PROVIDE A 20' WIDE,
CHAIN LINK, LOCKABLE ACCESS GATE IN
EXISTING FENCING AT THE CONSTRUCTION
ENTRANCE.
KEYED NOTES
LEGEND AND SYMBOLS
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
CONSTRUCTION ENTRANCE
SILT FENCING
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
LIMITS OF DISTURBANCE
EXISTING ASPHALT DRIVE
EXISTING FENCING
ALL WORK ON THIS SHEET SHALL BE
INCLUDED IN THE BASE BID.
GENERAL NOTES:
1. CONTRACTOR SHALL CLEAN ALL TRACKED MATERIAL
AT THE END OF EVERY WORK DAY.
2. CONTRACTOR SHALL PROVIDE TEMPORARY
IRRIGATION OF NATIVE REVEGETATION SEEDING
AREAS FOR ESTABLISHMENT OF NATIVE
REVEGETATION AT FINAL ACCEPTANCE, REFERENCE
SPECIFICATION SECTION 32 90 00.
2.1. CONTRACTOR SHALL PROVIDE TEMPORARY
IRRIGATION FOR NATIVE GRASSES PRIOR TO
ACCEPTANCE.
2.2. WATER FOR IRRIGATION WILL NOT BE PROVIDED
BY THE NCA.
No. 44593
PROFESSIONAL
R
E
G
I S
TE
R
E
D
J
O
R
D
VA
N
D
E
R
M
E
E
R
E
N
G
IN
E
E
R
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
36" DIA PEPPER
12" DIA PEPPER
34" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
36" DIA PEPPER
36" DIA PEPPER
8" DIA PEPPER
12" DIA PEPPER
18" DIA PEPPER
8" DIA PEPPER
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
6" DIA PEPPER
8" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
6" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA PEPPER
6" DIA PEPPER
8" DIA PEPPER
8" DIA PEPPER
12" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA PEPPER
12" DIA PEPPER
8" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
12" DIA PEPPER
36" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
36" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
32" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
24" DIA PEPPER
6" DIA PEPPER
12" DIA SYCAMORE
8" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
16" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
16" DIA SYCAMORE
16" DIA SYCAMORE
6" DIA PEPPER
8" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
16" DIA PEPPER
24" DIA PEPPER
12" DIA PEPPER
6" DIA HACKBERRY
8" DIA HACKBERRY
6" DIA HACKBERRY
6" DIA HACKBERRY
8" DIA HACKBERRY
16" DIA PEPPER
BOULDER
BOULDER
BOULDER
BOULDER
BOULDER
BOULDER
BOULDER
LANDSCAPE BORDER
LANDSCAPE BORDER
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
15" STORM
DRAIN
LIMITS OF DISTURBANCE
0 30 60
1 INCH = 30 FEET
EROSION & SEDIMENTATION CONTROL
AND FENCING PLAN - FRONT ENTRY
IMPROVEMENTS
GC102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
KEYED NOTESKEYED NOTESKEYED NOTES
LEGEND AND SYMBOLS
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
VICINITY MAP
NOT TO SCALE
AOI
GENERAL NOTES:
1. SILT FENCE SHALL BE INSTALLED ALONG THE PERIMETER OF
EACH MEDIAN, NOT SHOWN FOR CLARITY.
2. CONTRACTOR SHALL INSTALL PRIVACY FENCING AROUND
FRONT ENTRY SIGN DURING EXCAVATION AND CONCRETE
POURING ACTIVITIES WHILE NO WORK IS TAKING PLACE.
3. CONTRACTOR MAY CLOSE ONE LANE OF
INBOUND/OUTBOUND TRAFFIC AS NEEDED FOR SIGN AND
CURB CONSTRUCTION.
3.1. CONTRACTOR SHALL COORDINATE ALL LANE CLOSURES
OR DISTURBANCES WITH CEMETERY STAFF.
4. THE CONTRACTOR SHALL DISPOSE OF WASTE CONCRETE AT
OTHER CONCRETE WASHOUT LOCATIONS.
5. CONTRACTOR SHALL LOCATE AND PROTECT ALL IRRIGATION
HEADS WITHIN THE DISTURBED AREAS THAT ARE NOT
INDICATED FOR DEMOLITION, SEE LANDSCAPE DEMOLITION
PLANS.
6. CONTRACTOR SHALL CLEAN ALL TRACKED MATERIAL AT THE
END OF EVERY WORK DAY.
PRIVACY FENCING
1. SILT FENCE, DETAIL B5/C-504
2. PRIVACY FENCE SHALL BE INSTALLED AS
SHOWN.
SILT FENCING
ALL ENTRANCE IMPROVEMENT WORK SHALL
BE EXCLUDED FROM THE BASE BID AND
SHALL BE INCLUDED IN ADD ALTERNATE #1
No. 44593
PROFESSIONAL
R
E
G
I S
TE
R
E
D
J
O
R
D
VA
N
D
E
R
M
E
E
R
E
N
G
IN
E
E
R
7/02/2021
12" DIA EUCALYPTUS
12" DIA PINE
W
W
W
W
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
12" DIA EUCALYPTUS
12" DIA EUCALYPTUS
24" DIA EUCALYPTUS
12" DIA PINE
18" DIA PINE
18" DIA PINE
W
W
W
W
W
W
0 10 20
1 INCH = 10 FEET
EROSION & SEDIMENTATION CONTROL AND
FENCING PLAN - EGRESS ROAD, ORNAMENTAL
FENCING & ROAD TO PUMP STATION A
INTERSECTION IMPROVEMENTS
GC103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
KEYED NOTESKEYED NOTES
1. STABILIZED STONE CONSTRUCTION
ENTRANCE, DETAIL B2/C-504.
2. CONCRETE WASHOUT AREA, DETAIL B7/C-504.
3. SILT FENCE, DETAIL B5/C-504
4. ALL DISTURBED AREAS SHALL BE SODDED OR
LANDSCAPED TO MATCH EXISTING
CONDITIONS.
5. PRIVACY FENCING WITH LOCKABLE ACCESS
GATE SHALL BE INSTALLED ALONG THE LIMITS
OF DISTURBANCE, EGRESS ROAD ONLY. NOT
SHOWN FOR CLARITY.
KEYED NOTES
LEGEND AND SYMBOLS
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
CONSTRUCTION ENTRANCE
CONCRETE WASHOUT AREA
SILT FENCING
MINOR CONTOUR
MAJOR CONTOUR
LIMITS OF DISTURBANCE
VICINITY MAP
NOT TO SCALE
AOI
ALL WORK ON THIS SHEET SHALL BE
INCLUDED IN THE BASE BID.
GENERAL NOTES:
1. SOD SHALL BE PROVIDED AND INSTALLED PER
SPECIFICATION SECTION 32 90 00.
2. GRAVEL MULCH SHALL MATCH EXISTING IN SIZE,
COLOR AND DEPTH AND SHALL BE INSTALLED OVER
LANDSCAPE FABRIC PER SPECIFICATION SECTION 32
90 00.
3. CONTRACTOR SHALL LOCATE AND PROTECT ALL
IRRIGATION HEADS WITHIN THE DISTURBED AREAS.
4. CONTRACTOR SHALL CLEAN ALL TRACKED MATERIAL
AT THE END OF EVERY WORK DAY.
No. 44593
PROFESSIONAL
R
E
G
I S
TE
R
E
D
J
O
R
D
VA
N
D
E
R
M
E
E
R
E
N
G
IN
E
E
R
7/02/2021
8" DIA PEPPER
12" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA PEPPER
12" DIA PEPPER
8" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
12" DIA PEPPER
16" DIA PEPPER
12" DIA PEPPER
36" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
32" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
24" DIA PEPPER
6" DIA PEPPER
12" DIA SYCAMORE
8" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
16" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
16" DIA SYCAMORE
16" DIA SYCAMORE
6" DIA PEPPER
8" DIA SYCAMORE
8" DIA SYCAMORE
24" DIA PEPPER
12" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
6" DIA PEPPER
12" DIA PINE
24" DIA PINE
12" DIA PINE
12" DIA PINE
12" DIA PINE
12" DIA PINE
24" DIA PEPPER
24" DIA PINE
12" DIA PINE
12" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
12" DIA PINE
12" DIA PINE
12" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
24" DIA PINE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
16" DIA SYCAMORE
16" DIA SYCAMORE
16" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
6" DIA SYCAMORE
6" DIA SYCAMORE
6" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
16" DIA PEPPER
6" DIA HACKBERRY
8" DIA HACKBERRY
6" DIA HACKBERRY
6" DIA HACKBERRY
8" DIA HACKBERRY
8" DIA STAGHORN SUMACS
8" DIA STAGHORN SUMACS
6" DIA STAGHORN SUMACS
8" DIA STAGHORN SUMACS
8" DIA STAGHORN SUMACS
8" DIA STAGHORN SUMACS
12" DIA STAGHORN SUMACS
6" DIA STAGHORN SUMACS
12" DIA STAGHORN SUMACS
12" DIA STAGHORN SUMACS
12" DIA STAGHORN SUMACS
12" DIA STAGHORN SUMACS
16" DIA PEPPER
6" DIA SYCAMORE
6" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
6" DIA SYCAMORE
6" DIA SYCAMORE
6" DIA SYCAMORE
LANDSCAPE BORDER
12" DRAIN
PUMP STATION
INTAKE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
15" STORM
DRAIN
15" STORM
DRAIN
LIMITS OF DISTURBANCE
0 40 80
1 INCH = 40 FEET
EROSION & SEDIMENTATION CONTROL
AND FENCING PLAN - UPPER & LOWER
LAKE A
GC104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
KEYED NOTESKEYED NOTES
1. STABILIZED STONE CONSTRUCTION
ENTRANCE, DETAIL B2/C-504.
2. CONCRETE WASHOUT AREA, DETAIL B7/C-504.
3. SILT FENCE, DETAIL B5/C-504
4. SEDIMENT STORAGE AND STAGING AREA.
5. ALL DISTURBED AREAS ARE SHALL BE
SODDED OR LANDSCAPED TO MATCH THE
EXISTING CONDITIONS.
6. PRIVACY FENCE WITH LOCKABLE ACCESS
GATE SHALL BE INSTALLED AS SHOWN.
KEYED NOTES
LEGEND AND SYMBOLS
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
CONSTRUCTION ENTRANCE
CONCRETE WASHOUT AREA
SILT FENCING
VICINITY MAP
NOT TO SCALE
AOI
GENERAL NOTES:
1. SOD SHALL BE PROVIDED AND INSTALLED PER
SPECIFICATION SECTION 32 90 00.
2. GRAVEL MULCH SHALL MATCH EXISTING IN SIZE,
COLOR AND DEPTH AND SHALL BE INSTALLED OVER
LANDSCAPE FABRIC PER SPECIFICATION SECTION 32
90 00.
3. CONTRACTOR SHALL STORE ALL REMOVED SEDIMENT
WITHIN THE THE AREAS SHOWN. NO SEDIMENT SHALL
BE STORED OUTSIDE OF THE INDICATED AREA.
4. CONTRACTOR SHALL LOCATE AND PROTECT ALL
IRRIGATION HEADS WITHIN THE DISTURBED AREAS.
5. CONTRACTOR SHALL CLEAN ALL TRACKED MATERIAL
AT THE END OF EVERY WORK DAY.
PRIVACY FENCING
ALL LAKE A WORK SHALL BE EXCLUDED
FROM THE BASE BID AND SHALL BE
INCLUDED IN ADD ALTERNATE #2
No. 44593
PROFESSIONAL
R
E
G
I S
TE
R
E
D
J
O
R
D
VA
N
D
E
R
M
E
E
R
E
N
G
IN
E
E
| Sheets and Views |
| G-002 BID ALTERNATE DESCRIPTIONS |
| G-101 CONSTRUCTION ACCESS, FENCING & STAGING PLAN |
| GC101 EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - |
| GC102 EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - |
| GC103 EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - EGRESS ROAD, |
| GC104 EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - |
| GC105 EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - |
| GC106 EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - REFLECTIVE |
| GC107 EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - CANAL AREA 1 |
| GC108 EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - CANAL AREA 2 |
| GC109 EROSION & SEDIMENTATION CONTROL AND FENCING PLAN - CANAL AREA 3 |
| GC201 PHASING PLAN |
| GC901 WASTE WATER TREATEMENT PLANT IMAGERY |
| V-101 OVERALL TOPOGRAPHICAL SURVEY - CEMETERY |
| V-102 OVERALL TOPOGRAPHICAL SURVEY - WASTE WATER TREATMENT PLANT |
| V-401 ENLARGED TOPOGRAPHICAL SURVEY - REFLECTIVE POOL, UPPER POND & |
| V-402 ENLARGED TOPOGRAPHICAL SURVEY - FRONT ENTRY & UPPER POND |
| V-403 ENLARGED TOPOGRAPHICAL SURVEY - LOWER POND & PUMP |
| V-404 ENLARGED TOPOGRAPHICAL SURVEY - CENTRAL ROUND ABOUT |
| V-405 ENLARGED TOPOGRAPHICAL SURVEY - EGRESS ROAD, INTERSECTION |
| V-406 ENLARGED TOPOGRAPHICAL SURVEY - CANAL AREA 1 |
| V-407 ENLARGED TOPOGRAPHICAL SURVEY - CANAL AREA 1 |
| V-408 ENLARGED TOPOGRAPHICAL SURVEY - CANAL AREA 2 & AREA 3 |
| V-409 ENLARGED TOPOGRAPHICAL SURVEY - PUMP STATION A & B |
| CD101 OVERALL DEMOLITION PLAN - CEMETERY |
| CD102 OVERALL DEMOLITION PLAN - WASTE WATER TREATMENT PLANT |
| CD401 ENLARGED DEMOLITION PLAN - EGRESS ROAD, ORNAMENTAL FENCING & |
| CD402 ENLARGED DEMOLITION PLAN - LOWER LAKE A |
| CD403 ENLARGED DEMOLITION PLAN - UPPER LAKE A |
| CD404 ENLARGED DEMOLITION PLAN - UPPER & LOWER POND |
| CD405 ENLARGED DEMOLITION PLAN - REFLECTIVE POOL |
| CD406 ENLARGED DEMOLITION PLAN - CANAL AREA 1 |
| CD407 ENLARGED DEMOLITION PLAN - CANAL AREA 2 |
| CD408 ENLARGED DEMOLITION PLAN - CANAL AREA 3 |
| C-101 OVERALL SITE, GRADING & DRAINAGE PLAN - CEMETERY |
| C-102 OVERALL GRADING PLAN - WASTE WATER TREATMENT PLANT |
| C-401 ENLARGED SITE PLAN - EGRESS ROAD & ROAD TO PUMP STATION A |
| C-403 ENLARGED GRADING PLAN & ROADWAY PROFILE - EGRESS ROAD |
| C-404 ENLARGED GRADING PLAN - ROAD TO PUMP STATION A INTERSECTION |
| C-405 ENLARGED GRADING & SITE PLAN - LOWER LAKE A |
| C-406 ENLARGED GRADING & SITE PLAN - UPPER LAKE A |
| C-407 ENLARGED GRADING & SITE PLAN - UPPER & LOWER POND |
| C-408 ENLARGED GRADING & SITE PLAN - CANAL AREA 1 |
| C-409 ENLARGED GRADING & SITE PLAN - CANAL AREA 2 |
| C-410 ENLARGED GRADING & SITE PLAN - CANAL AREA 3 |
| C-501 DETAILS - SITE |
| C-502 DETAILS - SITE |
| C-503 DETAILS - SITE |
| C-504 DETAILS - SITE & EROSION AND SEDIMENTATION CONTROL |
File details come from the government source that posted it. Updated .