D.4 VA Negative Pressure Drawings.pdf
PDF 6 MB Posted
- Attached to
- H241--HVAC Inspection & Balancing Services CI
- Solicitation number
- 36C26325Q0765
About this file
These architectural and engineering documents detail a project to upgrade and add negative air pressure rooms at the Des Moines VA Medical Center. The project involves modifying the mechanical, electrical, and air handling systems for isolation rooms 3616 and 3617 on the third and fourth floors, with work phased across three stages. Key technical specifications include:
The project requires installing new exhaust fans (1-EF-1 and 1-EF-2), air filter assemblies, ductwork, and pressure monitoring systems to create independent negative air pressure systems for each isolation room. The work involves precise pressure control (-0.01 inches water column between ante rooms and corridors, -0.02 inches between isolation rooms and ante rooms), with specific airflow requirements of 12 air changes per hour in isolation and toilet rooms and 10 air changes in ante rooms. Electrical modifications include installing new variable frequency drives, circuit breakers, and wiring to support the mechanical system upgrades. The construction documents specify detailed phasing to ensure at least one negative-pressure isolation room remains operational throughout the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7M
6M
BUILDING LEGEND
1 Main Hospital
1W Clinical Addition
2 Dietetics/Admin/SPD
3 Administration
4 Canteen/Library
5 Domiciliary
6 Vacant Quarters
6M Behavioral Health
7M Annex (Primary Care)
9 Linen Processing/Shops
10 Warehouse/Shops
11 Chiller Plant/Boiler Plant
12 Community Living Center (NHCU)
13 Transformer Building
15 Garage
19 Tractor Shed
21 Paint Shop
24 Engineering Shops
28 Parking Garage
33 Generator
34 Generator
35 Primary Switchgear
36 Primary Switchgear
37 Switchgear Building
NTS
G-001
SITE PLAN1
Cover Sheet
SITE
Des Moines, Iowa Project Number: 636A6-20-116
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
G-001
A
F i l e
P a t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E firm POC: Mike Lavoie
Des Moines VA Medical Center - Upgrade and Add Negative Air Rooms
3600 36th St., Des Moines, IA 50310
636A6-20-116
Project Director
Revisions: Date: 06/22/2021 NN ---
CONSTRUCTION DOCUMENTS
BID DOCUMENTS 06/22/2021
VAMC NEGATIVE PRESSURE ROOMS
SHEET INDEX
SHEET
G-001
G-002
A-001
A-101
A-102
A-103
M-001
M-101
M-102
M-103
M-104
M-105
M-106
M-107
M-501
M-601
E-001
E-101
E-601
CONTENTS
COVER SHEET
PCRA AND ICRA, REQUIREMENTS AND DRAWINGS
ARCHITECTURAL - LEGEND AND CODE ANALYSIS
NOT USED
ARCHITECTURAL - BUILDING 1 - FOURTH FLOOR PLAN, PHASE 2
ARCHITECTURAL - BUILDING 1 - FOURTH FLOOR PLAN, PHASE 3
MECHANICAL - SYMBOLS LEGEND AND ABBREVIATIONS
NOT USED
MECHANICAL - BUILDING 1 - THIRD FLOOR PLAN, PHASE 1
MECHANICAL - BUILDING 1 - THIRD FLOOR PLAN, PHASE 2
MECHANICAL - BUILDING 1 - THIRD FLOOR PLAN, PHASE 3
MECHANICAL - BUILDING 1 - FOURTH FLOOR PLAN, PHASE 1
MECHANICAL - BUILDING 1 - FOURTH FLOOR PLAN, PHASE 2
MECHANICAL - BUILDING 1 - FOURTH FLOOR PLAN, PHASE 3
MECHANICAL - BUILDING 1 - SCHEDULES AND DETAILS
MECHANICAL - BUILDING 1 - SEQUENCE OF OPERATIONS
ELECTRICAL - SYMBOLS LEGEND AND ABBREVIATIONS
ELECTRICAL - BUILDING 1 - FOURTH FLOOR PLAN
ELECTRICAL - PANELBOARD SCHEDULES AND ONE-LINE DIAGRAMS
LOCATION
PHONE
WEBSITE
219 EIGHTH STREET
DES MOINES, IOWA 50309
515-244-7167
WWW.BBSAE.COM
BBS PROJECT No.
ARCHITECT MATT COLE
21011
C304B
ISOLATION ROOM
3616B
PATIENT TOILET
3617A
ANTE ROOM
3617B
PATIENT TOILET
ISOLATION ROOM
3619A
PATIENT
TOILET
PATIENT ROOM
CRASH CART
COVE
3618A
WHEEL CHAIR
COVE
NURSES
STATION
3606A
MEDICATION
ROOM
PATIENT TOILET
STAIRWELL
NO. 1-7
3620A
PATIENT
TOILET
BREAK ROOM
3621A
LOCKER ROOM
STAIRWELL
NO. 1-8
PATIENT ROOM
3616A
ANTE ROOM
ROOF
REF.
OMNICELL #1LNKD #1
Project Area
PHASE: 2 & 3 PHASE: 2 & 3 PHASE: 2 & 3
PHASE: 2 & 3 PHASE: 2 & 3
PHASE: 2 PHASE: 3
INFECTION CONTROL GENERAL NOTES
A. THE INTENT OF INFECTION CONTROL ISOLATION IS TO PROTECT
PATIENTS AND EMPLOYEES IN THE FACILITY. REFER TO PROJECT
MANUAL FOR FURTHER REQUIREMENTS
B. CONSTRUCTION OPERATIONS NEED TO BE DIRECTED TO CONTAIN DUST
AND PARTICULATE MATTER TO THE CONSTRUCTION AREA. THE
CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED COMPLETELY
WITH A SOLID CONSTRUCTION BARRIER AS NOTED ON THE PLANS. ALL
WORK TO BE PERFORMED IN OR ABOVE CORRIDORS TO BE CONTAINED
BY THE CONTROL CUBE METHOD.
C. MAINTAIN A MINIMUM 4’-0” CLEAR PATH IN CORRIDORS AT ALL TIME.
CONTROL CUBE AND OTHER CONSTRUCTION RELATED OBSTRUCTIONS
MAY NOT LIMIT THE CORRIDOR WIDTH TO LESS THAN 4’-0” AT ANY TIME
OR LOCATION.
D. PROVIDE TRIATEK ISOLATION MONITORS IN EACH ENCLOSED
CONSTRUCTION AREA TO BE UNDER NEGATIVE PRESSURE (0.02”WC)
DURING THESE OPERATIONS: MINIMUM (1) ONE IN AREAS LESS THAN 1000
SF; AND (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF.
MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN
CONSTRUCTION AREA AND ADJACENT OCCUPIED AREA.
E. CONSTRUCT INFECTION CONTROL CONSTRUCTION BARRIERS AS SHOWN
IN DETAILS ON THIS SHEET. EXCEPTION: IF BARRIER IS ADJACENT TO
EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND
EXTENDS TO FLOOR OR DECK ABOVE, THEN CONSTRUCT INFECTION
CONTROL BARRIER FROM FLOOR TO ABOVE CORRIDOR CEILING WITH
POLY BEING SEALED ON ALL EDGES (FLOOR, TOP OF WALL, SIDES, AND
ALL PENETRATIONS).
F. GENERAL CONTRACTOR SHALL PROVIDE NEW CONSTRUCTION ACCESS
DOORS W/ CLOSERS WHERE INDICATED IN THE INFECTION CONTROL
PLANS. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY
BEFORE 7:00 A.M. AND AFTER 8:00 P.M..
G. HVAC CONTRACTOR SHALL WORK WITH CONTROLS CONTRACTOR TO
ADJUST THE SUPPLY AIR VAV TERMINAL UNITS AND, AS NECESSARY,
VARIABLE FREQUENCY DRIVES FOR AHU SERVING THE WORK AREA AND
THE ADJACENT CONSTRUCTION AREAS TO CONTROL DUST AND
PARTICULATE DISTRIBUTION THROUGHOUT THE BUILDING. THIS
TERMINAL UNIT AND VFD ADJUSTMENT IS NECESSARY PRIOR TO
STARTING ANY CONSTRUCTION OR DEMOLITION OPERATIONS TO
ENSURE PROPER INFECTION CONTROL MEASURES. ADJUST TERMINAL
UNITS AND, AS NECESSARY, VFD FOR BALANCING SUPPLY TO MEET
INFECTION CONTROLS MEASURES AS INDICATED.
H. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO
COMPLETELY EXCHANGE THE REGULATED AIR VOLUME (4) FOUR ACTUAL
TIME PER HOUR. A COMPETENT PERSON SHALL DETERMINE THE NUMBER
OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC
FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT
RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT
TO DETERMINE THE NUMBER OF UNITS NEEDED. PROVIDE A STANDBY
UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN
ADJACENT AREA.
I. ALL CONSTRUCTION DEBRIS, WASTE, AND TRANSPORTATION OF
DEMOLITION ITEMS SHALL BE CONVEYED IN COVERED DUMPSTER
CONTAINERS SUCH THAT NO DEBRIS/ITEMS ARE VISIBLE. ALL
CONTAINERS SHALL BE TRANSPORTED WHERE DIRECTED BY THE COR.
J. AT THE CONSTRUCTION ACCESS DOORS, PROVIDE A MINIMUM OF ONE (1)
RUNOFF MAT ON THE INSIDE AND A MINIMUM OF TWO (2) RUNOFF MATS
ON THE OUTSIDE. ALSO PROVIDE A MINIMUM OF TWO (2) RUNOFF MATS
IMMEDIATELY INSIDE THE BUILDING ON THE FOURTH FLOOR WHERE
CREWS WILL BE ACCESSING THE WORK AREA ON THE ROOF AND
CONSTRUCTION WASTE DESCRIBED IN THE NOTE ABOVE WILL BE
ENTERING THE BUILDING.
K. CONTRACTOR TO CONFIRM LOCATION AND EXTENT OF PROJECT
CONSTRUCTION ACCESS WITH THE ARCHITECT AND COR.
INFECTION CONTROL BARRIER : POLY TYPE
INFECTION CONTROL BARRIER : WALL TYPE
INFECTION CONTROL BARRIER LEGEND
DOOR / ZIPPER ACCESS AT INFECTION CONTROL BARRIR
AREA TO BE CONTAINED BY THE CONTROL CUBE METHOD
DURING ANY WORK IN THIS AREA
CONT WOOD NAILER
CLOSE CEILING SPACE W/
GYP BD WALL TO BOTTOM OF
DECK WHERE CEILING TO BE
REMOVED FOR CONST,
OR
CLOSE CEILING SPACE W/
POLY BARRIER WHERE
CEILING REMAINS. SEAL ALL
JOINTS, PENETRATIONS, AND
ENTIRE PERIMETER OF
BARRIER W/ CONT DUCT TAPE
CLOSE OPEN DUCTS W/
2 LAYERS OF POLY BARRIER.
SEAL EDGES W/
CONT DUCT TAPE
WORK / CONSTRUCTION SIDE OF BARRIER OCCUPIED SIDE OF BARRIER
DOORS - PROVIDE KEYED
DEAD BOLT ON OCCUPIED
SIDE (NO HANDLE / KNOB OR
LIGATURE POINTS) AND
LIGATURE RESISTANT HINGES
5/8" GYP BD EA SIDE,
FINISH OCCUPIED SIDE W/
TAPE & GLOSS PAINT
POLY BARRIER ON WORK /
CONST SIDE OF BARRIER
3 5/8" STL STUD @ 16" OC W/
FULL SOUND BATT INSUL
EXIST FIN FLOOR
CONT DUCT TAPE SEAL EA SIDE
COMPRESSIBLE INSUL
1 LAYER POLY BARRIER
(SHOWN DASHED)
1 LAYER POLY BARRIER
(SHOWN DASHED)
AT ACT CEILING, EXTEND
THROUGH TO DECK ABOVE
(SHOWN DASHED)
COMPRESSIBLE INSUL
CONT DUCT TAPE SEAL EA SIDE
EXIST CEILING
CONT WOOD NAILER
1 LAYER POLY BARRIER
(SHOWN DASHED)
POLY SHEETING OVER
CEILING PENETRATIONS
POLY SHEETING OVER WALL
PROTRUSION
POLY SHEETING OVER
WALL OPENINGS
POLY SHEETING OVER
EQUIPMENT OR FURNISHING
POLY SHEETING OVER
DOORS & WINDOWS
DOOR
BEYOND
WINDOW
BEYOND
NOTES:
1. ALL POLY TO BE CONT. OVERLAPPING SHEETS TO BE SEALED WITH DUCT TAPE TO FORM CONT BARRIER.
2. ALL SIDES OF POLY TO BE SEALED WITH DUCT TAPE.
3. ALL CRACKS TO BE SEALED WITH DUCT TAPE.
4. ALL CORNERS TO FORM 90 DEGREE ANGLE WITHOUT RADIUS.
5. ALL DOORS THAT ARE EXISTING TO REMAIN: RE-CORE LOCKS TO A CONTRACTOR'S KEY. CONTRACTOR
TO PROVIDE 3 KEYS TO THE COR FOR EACH TYPE OF CORE INSTALLED.
6. ALL DOORS THAT WILL BE USED DURING CONSTRUCTION TO HAVE A ZIPPER INSTALLED IN THE POLY ON
THE OPPOSITE SIDE OF THE DOOR SWING
Drawing Number
Drawing Title
Revisions: Date:
LOCATION
PHONE
WEBSITE
219 EIGHTH STREET
DES MOINES, IOWA 50309
515-244-7167
WWW.BBSAE.COM
Project Number
VA FORM 08 - 6231
9 10
F
E
D
C
B
A
87654321
BBS PROJECT No.
Location
Project Title
9 1087654321
Issue Date Checked Drawn
Building Number
Phase
Approved: Project Director
Stamp
ARCHITECT/ENGINEER OF RECORDCONSULTANT
U.S. Department of Veterans AffairsA/E firm POC: Mike Lavoie
ARCHITECT MATT COLE
F
E
D
C
B
A
/2
/2
:1
:1
A
M
C
U s e rs
\M G a u l\ D o c u m e n ts
\R e v it
L o c a l F ile s \2
V A
D S
M I s o la ti o n R o o m s m g a u l5
H
V C
.r v t
CONSTRUCTION DOCUMENTS Des Moines VA Medical Center - Upgrade and Add Negative Air Rooms
PCRA and ICRA Requirements and Drawings
3600 36th St., Des Moines, IA 50310
Office of Construction and Facilities Management
G-002 21011
636A6-20-116
05/28/2021
Checker Author
KEY PLAN
1/4" = 1'-0"D5 THIRD FLOOR AREA PCRA & ICRA PLAN
NORTH
1/2" = 1'-0"F7 INFECTION CONTROL BARRIER, WALL TYPE
1/2" = 1'-0"F4 INFECTION CONTROL BARRIER, POLY TYPE
BID DOCUMENTS 06/22/2021
ISOLATION ROOM
3616B
PATIENT TOILET
3617A
ANTE ROOM
3617B
PATIENT TOILET
ISOLATION ROOM
CRASH CART
COVE
3621A
LOCKER ROOM
3616A
ANTE ROOM
ROOF
OMNICELL #1LNKD #1
AB
AC
ACI
ACT
AD-#
ADJ
AE-#
AF-#
AFF
AFG
AGG
AHU
AHU-#
AIC
ALT
ALUM
AMP
ANCH
ANSI
APPROX
ARCH
AS REQ'D
ASD
ASHRAE
ASTM
ATS
ATTEN
ANCHOR BOLT
ALTERNATING CURRENT
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
AREA DRAIN - (MECH)
ADJACENT
AIR ELIMINATION DEVICE
AIR FITTING
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AGGREGATE
AIR HANDLING UNIT - (ARCH)
AIR HANDLING UNIT - (MECH)
AMPS INTERRUPTING CAPACITY
ALTERNATE
ALUMINUM
AMPERE
ANCHOR
AMERICAN NATIONAL STANDARDS
INSTITUTE
APPROXIMATE
ARCHITECTURAL
AS REQUIRED
ALLOWABLE STRESS DESIGN
AMERICAN SOCIETY OF HEATING,
REFRIGERATING, & AIR
CONDITIONING ENGINEERS
AMERICAN SOCIETY FOR TESTING &
MATERIALS
AUTOMATIC TRANSFER SWITCH
ATTENUATION
B-#
BB
BD
BFA-#
BFU-#
BLDG
BLK
BLKG
BM
BM
BOC
BOT
BRG
BTU
BTUH
BUR
BOILER
BALLED AND BURLAPPED
BOARD
BACKFLOW ASSEMBLY
BOILER FEED UNIT
BUILDING
BLOCK
BLOCKING
BENCH MARK (ARCH, CIVIL)
BEAM (STRUC)
BOTTOM OF CURB
BOTTOM
BEARING
BRITISH THERMAL UNIT
BRITISH THERMAL UNIT PER HOUR
BUILT-UP ROOFING
STANDARD ABBREVIATIONS
A
B
C C-#
CAB
CB
CB-#
CCTV
CCW-#
CDX-#
CF-#
CFM
CFOI
CG
CH-#
CHC
CHKBD
CI
CIP
CJ
CKT
C/B
CLG
CLR
CMT
CMU
CNTR
CO
COR
COL
COMM
CON-#
CONC
CONST
CONT
COORD
CORR
CPH-#
CPT
CR
CR-#
CRE-#
CRH-#
CRI-#
CRP-#
CRU-#
CSK
CT
CT
CT-#
CTR
CU-#
CUH
CUH-#
CW
CONDUIT (ELEC)
CONDENSER (MECH)
CABINET
CATCH BASIN (ARCH)
CATCH BASIN (MECH)
CLOSED CIRCUIT TELEVISION
CHILLED WATER COIL
COIL, DX
CARBON DIOXIDE FITTING
CUBIC FEET PER MINUTE
CONTRACTOR FURNISHED, OWNER
INSTALLED
CORNER GUARD
CHILLER
COIL, HEATING
CHALK BOARD
CAST IRON
CAST IN PLACE
CONTROL JOINT
CIRCUIT
CIRCUIT BREAKER
CEILING
CLEAR
CERAMIC MOSAIC TILE
CONCRETE MASONRY UNITY
COUNTER
CLEAN OUT
CONTRACTING OFFICER'S
REPRESENTATIVE (OWNER'S REP)
COLUMN
COMMUNICATION
CONVECTOR
CONCRETE
CONSTRUCTION
CONTINUOUS
COORDINATE, COORDINATED
CORRIDOR
COIL, PREHEAT
CARPET
COLD ROLLED (STRUC)
CARD READER (ELEC)
COIL, EXHAUST RECLAIM
COIL, REHEAT
COIL, INTAKE RECLAIM
CONDENSATE RETURN PUMP
COMPUTER ROOM UNITY
COUNTERSINK
CERAMIC TILE (ARCH)
CURRENT TRANSFORMER (ELEC)
COOLING TOWER (MECH)
CENTER, CENTERED
CONDENSING UNIT
CABINET UNIT HEATER (ARCH)
CABINET UNIT HEATER (MECH)
COLD WATER, DOMESTIC
C
DA-#
DBL
DC
DC-#
DD-#
DDC
DEMO
DEPT
DF
DF-#
DIA
DIAG
DIM
DISP
DN
DRWG
DS
DTL
DWC-#
DWH-#
DEAERATOR
DOUBLE
DIRECT CURRENT (ELEC)
DRY COOLER (MECH)
DECK DRAIN
DIRECT DIGITAL CONTROL
DEMOLITION
DEPARTMENT
DRINKING FOUNTAIN (ARCH)
DRINKING FOUNTAIN (MECH)
DIAMETER
DIAGONAL
DIMENSION
DISPENSER
DOWN
DRAWING
DOWNSPOUT
DETAIL
DRINKING WATER CHILLER (MECH)
DOMESTIC WATER CHILLER (MECH)
D
E
EA
EC-#
ECB
ED-#
EEW-#
EF
EF-#
EFC-#
EIFS
EJ
ELEV
EMERG
ENAM
ENCL
EP
EQ
EQUIP
ES-#
ET-#
EVC-#
EW
EW-#
EWC
EWC-#
EWS-#
EXH
EXIST
EXP
EXPS
EXT
ELECTRICAL
EACH
EXHAUST, CEILING MOUNTED
ENCLOSED CIRCUIT BREAKER (ELEC)
EXHAUST, DUCT MOUNTED
EMERGENCY EYE WASH
EACH FACE
EXHAUST, FLOOR MOUNTED
EVAPORATIVE FLUID COOLER
EXTERIOR INSULATION & FINISH SYSTEM
EXPANSION JOINT
ELEVATION
EMERGENCY
ENAMEL
ENCLOSURE
ELECTRICAL PANELBOARD
EQUAL
EQUIPMENT
EMERGENCY SHOWER
EXPANSION TANK
EVAPORATIVE CONDENSER
EACH WAY (STRUC)
EXHAUST, WALL MOUNTED (MECH)
ELECTRIC WATER COOLER (ARCH)
ELECTRIC WATER COOLER (ELEC)
EMERGENCY WASH STATION
EXHAUST
EXISTING
EXPANSION
EXPOSED
EXTERIOR
E
F-#
FA
FACP
FB-#
FC-#
FCU
FCU-#
FD
FD-#
FDN
FE
FE-#
FEC
FH
FH
FHC
FIN
FIXT
FL
FLASH
FLEX
FLG
FLOUR
FLR
FO
FPC-#
FPS
FPT-#
FR-#
FS-#
FSK-#
FT
FTG
FTR-#
FURR
FURNACE
FUSED AT
FIRE ALARM CONTROL PANEL
FILTER/FILTER BANK
FAN, CEILING MOUNTED
FAN COIL UNIT (ARCH)
FAN COIL UNIT (MECH)
FLOOR DRAIN (ARCH)
FLOOR DRAIN (MECH)
FOUNDATION
FIRE EXTINGUISHER
FAN, EXHAUST (MECH)
FIRE EXTINGUISHER CABINET
FIRE HYDRANT (CIVIL)
FLAT HEAD (STRUC)
FIRE HOSE CABINET
FINISH FLOOR
FIXTURE
FLOW LINE
FLASHING
FLEXIBLE
FLANGE (STRUC)
FLUORESCENT
FLOOR
FIBER OPTIC
FIRE PROTECTION CABINET
FEET PER SECOND
FAN POWERED TERMINAL
FAN, RELIEF
FAN, SUPPLY
FLOOR SINK
FEET/FOOT
FOOTING
FINNED TUBE RADIATOR
FURRING
F
G
G, GND
GA
GALV
GB
GC
GF-#
GFI
GL
GPM
GYP
GYP BD
GAS
GROUND
GAGE
GALVANIZED
GRADE BEAM
GENERAL CONTRACTOR
GAS FITTING
GROUND FAULT INTERRUPTER
GLASS
GALLONS PER MINUTE
GYPSUM
GYPSUM WALLBOARD
G
H-#
HB
HB-#
HC
HDWD
HDWR
HEX-#
HM
HOA
HORIZ
HP
HP
HP-#
HSS
HT
HTG
HTR
HW
HY
HZ
HUMIDIFIER
HOSE BIB (ARCH)
HOSE BIB (MECH)
HOLLOW CORE
HARDWOOD
HARDWARE
HEAT EXCHANGER
HOLLOW METAL
HAND OFF AUTOMATIC
HORIZONTAL
HIGH POINT (CIVIL, STRUCT)
HORSEPOWER (MECH)
HOUR
HOLLOW STRUCTURAL SHAPE
HEIGHT
HEATING
HEATER
HOT WATER, DOMESTIC
HYDRANT
HERTZ
H
IBC
ID
IG
IN
INSUL
INV
INTERNATIONAL BUILDING CODE
INSIDE DIAMETER
ISOLATED GROUND
INCH
INSULATION, INSULATED
INVERT
I
JAN
JB
JST
JT
JANITOR
JUNCTION BOX
JOIST
JOINT
J
KCMIL
KO
KVA
KW
THOUSAND CIRCULAR MILL
KNOCK OUT
KILOVOLT AMPERES
KILOWATTS
K
L-#
LAM
LAV
LCP
LDC
LGMF
LLH
LLV
LP
LP
LRFD
LT WT CON
LT-#
LVR
LVT
LAVATORY (MECH)
LAMINATE
LAVATORY (ARCH)
LIGHTING CONTROL PANEL
LOAD DISTRIBUTION CABINET
LIGHT GAGE METAL FRAMING
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LOW POINT (CIVIL, STRUCT)
LIQUID PETROLEUM GAS (MECH)
LOAD & RESISTANCE FACTOR DESIGN
LIGHT WEIGHT CONCRETE
LAVATORY TRIM
LOUVER
LUXURY VINYL TILE
L
MACH
MAN
MAU-#
MAX
MB
MB-#
MCC-#
MDF
MDO
MECH
MEMB
MEZZ
MFG
MH
MH-#
MIN
MISC
MO
MPH
MS
MTC
MTD
MTL
MTR
MUL
MACHINE
MANUAL
MAKE-UP AIR UNIT
MAXIMUM
MOP BASIN (ARCH)
MOP BASIN (MECH)
MOTOR CONTROL CENTER
MEDIUM DENSITY FIBERBOARD
MEDIUM DENSITY OVERLAY
MECHANICAL
MEMBRANE
MEZZANINE
MANUFACTURER
MANHOLE (ARCH)
MANHOLE (MECH)
MINIMUM
MISCELLANEOUS
MASONRY OPENING
MILES PER HOUR
MOTOR STARTER
EMPTY CONDUIT
MOUNTED
METAL
MOTOR
MULLION
M
N, NEUT
N/A
NC
NEC
NF
NFPA
NIC
NO
NO
NOM
NTS
NEUTRAL
NOT APPLICABLE
NORMALLY CLOSED
NATIONAL ELECTRIC CODE
NON FUSED
NATIONAL FIRE PROTECTION
ASSOCIATION
NOT IN CONTRACT
NORMALLY OPEN (ELEC)
NUMBER (GENERAL)
NOMINAL
NOT TO SCALE
N
OA
OC
OD
OD-#
OFCI
OFOI
OH
OPNG
OPP
OSB
OVER ALL
ON CENTER
OUTSIDE DIAMETER
OVERFLOW DRAIN (MECH)
OWNER FURNISHED, CONTRACTOR
INSTALLED
OWNER FURNISHED, OWNER INSTALLED
OVERHEAD
OPENING
OPPOSITE
ORIENTED STRAND BOARD
O
PCD-#
PCH-#
PCI
PCW-#
PDI-#
PDR-#
PDU-#
PF
PF-#
PFO-#
PHP-#
PHR-#
PHW-#
PIR-#
PL
PL
PLAM
PLYWD
PNL
POLY
PPB-#
PR
PRA-#
PRC-#
PRI
PRO-#
PRV-#
PSE-#
PSF
PSI
PST-#
PT
PT
PTN
PVC
PWR
PUMP, CONDENSATE DRAIN
PUMP, CHILLED WATER
PRECAST CONCRETE INSTITUTE
PUMP, CONDENSER WATER
PUMP, DEIONIZED WATER
PUMP, DRINKING WATER - DOMESTIC
POWER DISTRIBUTION UNIT
POWER FACTOR
FIRE PUMP
PUMP, FUEL OIL SYSTEM
PUMP, HEAT PUMP SYSTEM
PUMP, DOMESTIC WATER RECIRCULATING
PUMP, HEATING WATER
PUMP, IRRIGATION
PILOT LIGHT (ELEC)
PLATE (STRUC, ARCH)
PLASTIC LAMINATE
PLYWOOD
PANEL
POLYETHYLENE SHEETING
PUMP, DOMESTIC PRESSURE BOOSTER
PAIR
PRESSURE REDUCING ASSEMBLY
PUMP, RECLAIM SYSTEM
PRIMARY
PUMP, REVERSE OSMOSIS
PRESSURE RELEASE VALVE
PUMP, SANITARY SEWAGE EJECTOR
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PUMP, STORM AND FOOTING DRAIN SUMP
POTENTIAL TRANSFORMER (ELEC)
POINT
PARTITION
POLYVINYL CHLORIDE
POWER
P
QT QUARRY TILE
Q
R R
RA
RB
RC
RC-#
RCP
RCP
RD
RD-#
RDR-#
REBAR
REF
REQ'D
RESIL
RF-#
RHW
RND
RO
RTU
RTU-#
RADIUS
RISER(S)
RETURN AIR
RESILIENT BASE
RESILIENT COVE BASE
RETURN, CEILING MOUNTED
REINFORCED CONCRETE PIPE (MECH)
REFLECTED CEILING PLAN (ARCH)
ROOF DRAIN (ARCH)
RETURN, DUCT MOUNTED
ROOF DRAIN RECEIVER
REINFORCING BAR
REFERENCE, REFER
REQUIRED
RESILIENT
RETURN, FLOOR MOUNTED
RECIRCULATING HOT WATER, DOMESTIC
ROUND
ROUGH OPENING
ROOF TOP UNIT (ARCH)
ROOF TOP UNIT (MECH)
R
S-#
SA
SA-#
SC-#
SCHED
SD-#
SECT
SF-#
SG-#
SH-#
SHT
SHT-#
SHTG
SIM
SPEC
SQ
SS
SS-#
ST-#
STD
STL
STRUC
SURF
SUSP
SW-#
SWBD
SWGR
SINK (MECH)
SUPPLY AIR
SOUND ATTENUATOR
SUPPLY, CEILING MOUNTED
SCHEDULE
SUPPLY, DUCT MOUNTED
SECTION
SUPPLY, FLOOR MOUNTED
STEAM GUN
SHOWER
SHEET (ARCH, STRUC)
SHOWER TRIM (MECH)
SHEATHING
SIMILAR
SPECIFICATION(S)
SQUARE
STAINLESS STEEL (ARCH) OR SANITARY
SEWER
SERVICE SINK (MECH)
SINK TRIM
STANDARD
STEEL
STRUCTURAL
SURFACE
SUSPENDED
SUPPLY, WALL MOUNTED
SWITCHBOARD
SWITCHGEAR
S
T T & G
TC-#
TD-#
TEL
TELECOM
TERR
TF
TF-#
THRU
TKBD
TOB
TOC
TOS
TS
T'STAT
TW-#
TYP
TREAD(S)
TONGUE AND GROOVE
TRANSFER GRILLE, CEILING MOUNTED
TRENCH DRAIN
TELEPHONE
TELECOMMUNICATIONS
TERRAZZO
TOP FLANGE (STRUC)
TRANSFER GRILLE, FLOOR MOUNTED
THROUGH
TACKBOARD
TOP OF BEAM
TOP OF CURB, TOP OF CONCRETE
TOP OF FOOTING
TOP OF STEEL
THERMOSTAT
TRANSFER GRILLE, WALL MOUNTED
TYPICAL
T
UH-#
UMC
UNO
UPC
UPS
UR-#
UNIT HEATER
UNIFORM MECHANICAL CODE
UNLESS NOTED OTHERWISE
UNIFORM PLUMBING CODE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
U
V V
VA
VAE-#
VAR-#
VAS-#
VAV
VB
VCP
VCT
VDT
VER
VERT
VEST
VF-#
VFD-#
VSF
VTR
VWC
VOLT(S) (ELEC)
VENT (MECH)
VOLT AMPERE
VARIABLE AIR EXHAUST TERMINAL UNIT
VARIABLE AIR RETURN TERMINAL UNIT
VARIABLE AIR SUPPLY TERMINAL UNIT
VARIABLE AIR VOLUME
VINYL BASE
VITRIFIED CLAY PIPE
VINYL COMPOSITION TILE
VIDEO DISPLAY TERMINAL
VERIFY
VERTICAL
VESTIBULE
VACUUM FITTING
VARIABLE FREQUENCY DRIVE
VINYL SHEET FLOORING
VENT THRU ROOF
VINYL WALL COVERING
V
W W W/ W/O
WC-#
WD
WH
WH-#
WR
WT
WWF
WASTE (MECH)
WATTS (ELEC)
WITH
WITHOUT
WATER CLOSET
WOOD
WATER HEATER (ARCH)
WALL HYDRANT (MECH)
WATER RESISTANT
WEIGHT
WELDED WIRE FABRIC
W
STANDARD SYMBOLS
STANDARD MATERIALS LEGEND
12.22
12.22
12.22
12.22
12.22
12.22
DETAIL
1/8" = 1'-0"
0' 4' 8' 16' 32'
SECTION MARK - SEE
SECTION 1 ON SHEET
12.22
SECTION MARK - SEE
SECTION 1 ON SHEET
12.22 - DIRECTIONAL
DETAIL MARK - SEE
DETAIL 1 ON SHEET
12.22
DETAIL MARK - WITH
BUBBLE - SEE DETAIL 1
ON SHEET 12.22
ELEVATION MARK - SEE
ELEVATION 1 ON
SHEET 12.22
ELEVATION MARK - SEE
ELEVATION 1, 2, 3, AND
4 ON SHEET 12.22 -
FOUR VIEWS
DRAWING TITLE -
NAME, NUMBER, AND
SCALE
GRAPHICAL SCALE
BREAK LINES
DATUM POINT
SECOND LEVEL
12' - 5 1/2"
REVISION BUBBLE AND
REVISION DELTA TAG
KEY NOTE MARK
WITH LEADER
WOOD
INSULATION
FINISHES
PARTITION INDICATIONS
ELEVATION INDICATIONS
FINISHED WOOD
BATT OR LOOSE FILL
METAL STUD
CERAMIC TILE
CERAMIC TILE
RIGID INSULATION
STRUCTURAL GLASS
WOOD BLOCKING -
CONTINUOUS
WOOD BLOCKING -
DISCONTINUOUS
PLYWOOD -
LARGE SCALE
MEDIUM DENSITY
FIBERBOARD
THIS IS A MASTER LIST. ALL ITEMS LISTED MAY NOT BE APPLICABLE TO THIS PARTICULAR PROJECT.
1B
WINDOW TAG
DOOR TAG
OFFICE
ROOM TAG - ROOM NAME
AND ROOM NUMBER
FLOOR DRAIN
BRICK
PLYWOOD -
SMALL SCALE
MATERIAL KEY NOTE
MARK WITH LEADER
XXXXX.X
WALL TYPE TAG
ACOUSTIC
CEILING TILE
GYPSUM BOARD
FOAMED IN PLACE
INSULATION
TROFFER LIGHT FIXTURE
RECESSED LIGHT FIXTURE
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER
EXHAUST FAN
EXIT LIGHT
OCCUPANCY SENSOR
SMOKE DETECTOR
FIRE ALARM STROBE
SPRINKLER HEAD
S
OS
SECURITY CAMERA
PAGING SPEAKERS
WIRELESS ACCESS POINT
MD MOTION DETECTOR
WAP
ARCHITECTURAL LEGEND
EARTHWORKS
CONCRETE
MASONRY
METAL
EARTH /
COMPACT FILL
CAST IN PLACE
CONCRETE
FACE BRICK
STEEL /
OTHER METALS
CONCRETE
MASONRY UNIT
ALUMINUM
SAND
PRECAST CONCRETE
PERMIT LOGIC
This mechanical modification will maintain the ratings of the wall and roof assemblies it passes through and will otherwise not impact life safety.
CODE ANALYSIS
PROJECT DESCRIPTION
The existing negative air pressure system utilized by isolation rooms 3616 and 3617 will be modified to provide each room with an independent and dedicated system. The scope of this work occours primarily above ceiling and at the roof, with the exception of wall mounted system sensors in 3616 and 3617.
APPLICABLE CODES - CITY OF DES MOINES
2018 International Building Code (IBC) 2021 International Mechanical Code (IMC) 2021 National Fuel Gas Code, NFPA 70 2021 International Fire Code (IFC) 2020 National Electrical Code, NFPA 70 (NEC) 2021 Uniform Plumbing Code, with State of Iowa Amendments (UPC) 2021 International Energy Conservation Code (IECC) 2021 Iowa Statewide Urban Design and Specifications/Standards for Public Improvements (SUDAS)
OCCUPANCY TYPE (IBC CHAPTER 3)
I-2 – Institutional Group I-2, Hospitals.
TYPES OF CONSTRUCTION (IBC CHAPTER 6)
Construction Type New work to match existing, including ratings.
BUILDING HEIGHTS AND AREAS (IBC CHAPTER 5)
No change.
MEANS OF EGRESS (IBC CHAPTER 10)
No change.
PLUMBING FIXTURES
No change.
SPECIAL REQUIREMENTS (IBC CHAPTER 4)
None.
FIRE & SMOKE PROTECTION FEATURES (IBC CHAPTERS 7 & 9)
No change.
All corridor walls are smoke resistant and all new and modified penetrations through will be smoke resistant.
SMOKE RESISTANT CONSTRUCTION
ACOUSTIC RESISTANT CONSTRUCTION
SMOKE
RESISTANT
WALLS
Project Area
Drawing Number
Drawing Title
Revisions: Date:
LOCATION
PHONE
WEBSITE
219 EIGHTH STREET
DES MOINES, IOWA 50309
515-244-7167
WWW.BBSAE.COM
Project Number
VA FORM 08 - 6231
9 10
F
E
D
C
B
A
87654321
BBS PROJECT No.
Location
Project Title
9 1087654321
Issue Date Checked Drawn
Building Number
Phase
Approved: Project Director
Stamp
ARCHITECT/ENGINEER OF RECORDCONSULTANT
U.S. Department of Veterans AffairsA/E firm POC: Mike Lavoie
ARCHITECT MATT COLE
F
E
D
C
B
A
/2
/2
:0 :1
P
M
C
U s e rs
\M G a u l\ D o c u m e n ts
\R e v it
L o c a l F ile s \2
V A
D S
M I s o la ti o n R o o m s m g a u l5
H
V C
.r v t
CONSTRUCTION DOCUMENTS Des Moines VA Medical Center - Upgrade and Add Negative Air Rooms
Architectural - Legend And Code Analysis
3600 36th St., Des Moines, IA 50310
Office of Construction and Facilities Management
A-001 21011
636A6-20-116
05/28/2021
Checker Author
1/8" = 1'-0"A-001
8E THIRD FLOOR CODE PLAN FOR AREA OF WORK
NORTH
KEY PLAN
BID DOCUMENTS 06/22/2021
AF-1
1-EF-1
EA
EA
x1
EA
1-EF-2 (EXISTING)
1 1/2"
3/4"
MPR
MPR
CHR
CHR
1"
MPS
MPS
EXIST MPS AND MPR
RISERS UP FROM FLOOR
BELOW. CONNECT NEW 2«"
MPS AND 1" MPR LINES
INTO EXIST RISERS.
CHS
EXIST CWS AND CWR RISERS UP FROM
FLOOR BELOW. CONNECT NEW 2" CWS
AND CWR LINE INTO EXIST RISERS.
STEAM REHEAT COIL RH3
FAN AHU-3B
STEAM
HUMIDIFIER
CHILLED WATER COIL
PROVIDE 3/4"
CONDENSATE DRAIN
PIPE CONNECT TO
EXISTING AHU COND.
DRAIN LINE
BAG FILTER
FILTER
STEAM
PREHEAT
COIL
STEAM REHEAT
COILS RH1 & RH2
12"x24" HEPA FILTERS
12"x24" HEPA FILTERS
10x10
(2) HEPA FILTERS, 12x24, ONE
EACH DUCT (STACKED).
INSTALL TO ALLOW READY
ACCESS FOR SERVICING.
8x6 EXHAUST
DUCTS FROM THIRD
FLOOR.
ROOF
x1
EA
1-EF-2 (EXISTING)
1 1/2"
3/4"
MPR
MPR
CHR
CHR
1"
MPS
MPS
EXIST MPS AND MPR
RISERS UP FROM FLOOR
BELOW. CONNECT NEW 2«"
MPS AND 1" MPR LINES
INTO EXIST RISERS.
CHS
EXIST CWS AND CWR RISERS UP FROM
FLOOR BELOW. CONNECT NEW 2" CWS
AND CWR LINE INTO EXIST RISERS.
STEAM REHEAT COIL RH3
FAN AHU-3B
STEAM
HUMIDIFIER
CHILLED WATER COIL
PROVIDE 3/4"
CONDENSATE DRAIN
PIPE CONNECT TO
EXISTING AHU COND.
DRAIN LINE
BAG FILTER
FILTER
STEAM
PREHEAT
COIL
STEAM REHEAT
COILS RH1 & RH2
12"x24" HEPA FILTERS
12"x24" HEPA FILTERS
10x10
(2) HEPA FILTERS, 12x24, ONE
EACH DUCT (STACKED).
INSTALL TO ALLOW READY
ACCESS FOR SERVICING.
8x6 EXHAUST
DUCTS FROM THIRD
FLOOR.
ROOF
F1
A-102
E1
A-102
TYP
1F
A-103
C1
A-102
TYP
C1
A-102
TYP
ALIGN FACE OF NEW ROOF PENETRATION WITH
FACE OF EXISTING ROOF PENETRATION.
IF EXISTING CONDITIONS PROHIBIT THIS,
CONTACT ARCHITECT, ENGINEER, AND COR.
PROPOSE CLOSEST POSIBLE ALTERNATE LOCATION.
MECH DUCT - SEE MECH
STL ANGLE FOUR SIDES,
SEE:
EXIST ROOF MEMB SYSTEM
SEALANT- FULLY ADHERED
SLOPED, PRE FINISHED,
GALV STL CURB CAP WITH
TWO PART FLASHING
/B1 A-102
INSULATED GALV STL
EQUIPMENT SUPPORT
CURB, SECURED AND
SEALED TO ROOF DECK
F A
S T
E N
E R
H T
M
IN
M
IN
EXIST COVER BOARD
EXIST ROOF INSUL
EXIST METAL DECK
TREATED WOOD NAILER
ROOF MEMB SYSTEM
PREFINISHED GALV STL
FLASHING, FULLY ADHERED,
EXTEND BEYOND ROOF
CURB BY 4"
STL ANGLE FOUR SIDES,
SEE:
EXIST ROOF MEMB SYSTEM
SEALANT- FULLY ADHERED
SLOPED, PRE FINISHED,
GALV STL CURB CAP
TURNED UP ADJACENT WALL
/B1 A-102
INSULATED GALV STL
EQUIPMENT SUPPORT
CURB, SECURED AND
SEALED TO ROOF DECK
M
IN
EXIST COVER BOARD
EXIST ROOF INSUL
EXIST METAL DECK
TREATED WOOD NAILER
MECH DUCT - SEE MECH
M
IN
/2
EXIST ROOFING TERM BAR
EXIST MASONRY WALL
2x6 TREATED WOOD
FRAMING, ALIGNED W/ CURB5 1/2" MIN
VERIFY IN FIELD, CONTACT
ARCHITECT, ENGINEER,
AND COR IF THIS WILL BE
GREATER THAN 8" DUE TO
EXISTING CONDITIONS
SPRAY-APPLIED
FIREPROOFING, SEE SPEC
MECH EQUIP - SEE MECH
SLOPED, PREFINISHED,
GALV STL CURB CAP WITH
TWO PART FLASHING
TREATED WOOD NAILER
EXIST ROOF MEMB SYSTEM
INSULATED GALV STL
EQUIPMENT SUPPORT
CURB, SECURED AND
SEALED TO ROOF DECK
F A
S T
E N
E R
H T
M
IN
EXIST COVER BOARD
EXIST ROOF INSUL
EXIST METAL DECK
ROOF MEMB SYSTEM
NEAREST STRUCTURAL
MEMEBER
ROOF PENETRATION
SECONDARY STEEL ANGLES
WELDED TO PRIMARY
STEEL ANGLES
NEAREST STRUCTURAL
MEMBER
3 1/2" X 3 1/2" A36
PRIMARY STEEL ANGLES
WELDED TO NEAREST
STRUCTURAL MEMBERS
STEEL DECK
NOTE: ALL WORK TO BE FIREPROOFED WITH SPRAY ON PRODUCT COMPATIBLE WITH
AND TO SAME RATING / THICKNESS AS EXISTING FIREPROOFING TO REMAIN
3 1/2" X 3 1/2" A36
SECONDARY STEEL ANGLES
WELDED TO PRIMARY
STEEL ANGLES
GENERAL NOTES
A. SCREENED (GRAY-TONE) LINES INDICATE EXISTING CONSTRUCTION TO
REMAIN.
B. BOLD SOLID LINES INDICATE NEW CONSTRUCTION.
C. FIELD VERIFY EXISTING BUILDING CONDITIONS, ELEVATIONS, AND
DIMENSIONS PRIOR TO START OF WORK. NOTIFY ARCHITECT AND COR
OF ANY DISCREPANCIES FOUND IN RELATION TO THE CONTRACT
DOCUMENTS.
D. GENERAL CONTRACTOR SHALL COORDINATE WORK OF ALL TRADES
PRIOR TO STARTING ANY DEMOLITION/CONSTRUCTION.
E. DO NOT SCALE DRAWINGS TO DETERMINE DIMENSIONS. VERIFY ALL
DIMENSIONS AND IMMEDIATELY REPORT ANY DISCREPANCIES TO THE
ARCHITECT AND COR.
F. PROTECT FROM DAMAGE ALL EXISTING CONSTRUCTION TO REMAIN.
G. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.
H. ALL DIMENSIONS ARE GIVEN TO THE FACE OF FINISHED SURFACE,
UNLESS NOTED OTHERWISE. +/- DIMENSIONS ALLOW FOR VARIATION DUE
TO EXISTING CONDITIONS.
I. ALL DIMENSIONS TO EXISTING STRUCTURE/WALLS ARE APPROXIMATE.
CONTRACTOR SHALL FIELD VERIFY.
J. REFER TO AND COORDINATE WITH MECHANICAL, AND ELECTRICAL
DRAWINGS FOR EXTENT OF ASSOCIATED DEMOLITION AND NEW WORK.
K. MAINTAIN OPERATION OF ALL EXISTING SERVICES AND UTILITIES TO THE
BUILDING. COORDINATE ANY DISRUPTIONS OR DISCONTINUATIONS WITH
THE OWNER'S REPRESENTATIVE IN ADVANCE.
L. PATCH AND REPAIR ALL SURFACES ADJACENT TO DEMOLISHED ITEMS AS
REQUIRED TO MATCH EXISTING OR NEW ADJACENT CONSTRUCTION.
M. PATCH AND REPAIR ALL OPENINGS AND VOIDS LEFT BY REMOVAL OF
EXISTING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, CONDUIT, ETC.
AS REQUIRED TO MATCH ADJACENT.
N. CONSULT ARCHITECT/STRUCTURAL ENGINEER AND COR FOR ANY AND
ALL LOCATIONS WHERE UNFORESEEN OR UNUSUAL STRUCTURAL
CONDITIONS EXIST.
O. ALL WALLS TO HAVE A MINIMUM STC RATING OF 45.
P. ALL CORRIDOR WALLS ARE SMOKE RESISTANT.
DEMOLITION GENERAL NOTES
A. SCREENED (GRAY-TONE) LINES INDICATE EXISTING CONSTRUCTION TO
REMAIN.
B. BOLD DASHED LINES INDICATE EXISTING CONSTRUCTION TO BE
REMOVED.
C. FIELD VERIFY EXISTING BUILDING CONDITIONS, ELEVATIONS, AND
DIMENSIONS PRIOR TO START OF WORK. NOTIFY ARCHITECT OF ANY
DISCREPANCIES FOUND IN RELATION TO THE CONTRACT DOCUMENTS.
D. GENERAL CONTRACTOR SHALL COORDINATE WORK OF ALL TRADES
PRIOR TO STARTING ANY DEMOLITION/CONSTRUCTION.
E. DO NOT SCALE DRAWINGS TO DETERMINE DIMENSIONS. VERIFY ALL
DIMENSIONS AND IMMEDIATELY REPORT ANY DISCREPANCIES TO THE
ARCHITECT.
F. PERFORM DEMOLITION WITHOUT DAMAGE TO ADJACENT RETAINED
CONSTRUCTION. WHERE SUCH DAMAGE OCCURS, PATCH, REPAIR, OR
OTHERWISE RESTORE TO ITS ORIGINAL CONDITION.
G. PATCH AND REPAIR ALL OPENINGS AND VOIDS LEFT BY REMOVAL OF
EXISTING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, CONDUIT, ETC.
AS REQUIRED TO MATCH ADJACENT.
H. PROTECT FROM DAMAGE ALL EXISTING CONSTRUCTION TO REMAIN.
I. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.
J. REFER TO AND COORDINATE WITH MECHANICAL, PLUMBING, AND
ELECTRICAL DRAWINGS FOR EXTENT OF ASSOCIATED DEMOLITION AND
NEW WORK.
K. MAINTAIN OPERATION OF ALL EXISTING SERVICES AND UTILITIES TO THE
BUILDING. COORDINATE ANY DISRUPTIONS OR DISCONTINUATIONS WITH
THE OWNER'S REPRESENTATIVE IN ADVANCE.
L. PROVIDE TEMPORARY SHORING AS REQUIRED FOR SELECTIVE
DEMOLITION.
M. CONSULT ARCHITECT/STRUCTURAL ENGINEER FOR ANY AND ALL
LOCATIONS WHERE UNFORESEEN OR UNUSUAL STRUCTURAL
CONDITIONS EXIST.
N. UNLESS SPECIFICALLY INDICATED OTHERWISE, REMOVE ALL
DEMOLISHED MATERIALS FROM THE SITE AND FOLLOW IOWA DNR AND
LANDFILL PROCEDURES TO PROPERLY SEPARATE AND DISPOSE OF
MATERIALS REMOVED FROM THE SITE.
O. PROVIDE ALL DEMOLITION AND DISPOSAL AS REQUIRED FOR
INSTALLATION OF NEW WORK AS INDICATED, OR AS REASONBLY IMPLIED
BY THESE CONSTRUCTION DOCUMENTS.
P. STORE AND PROTECT ALL SALVAGED ITEMS NOTED OR REQUESTED TO
BE RETURNED TO OWNER. COORDINATE WITH OWNER FOR THE
LOCATION OF STORAGE FOR SALVAGED ITEMS.
Q. A PHASING/DEMOLITION PLAN WILL BE IMPLEMENTED THAT ENSURES AT
LEAST ONE NEGATIVE-PRESSURE ISOLATION ROOM IS IN OPERATION
THROUGHOUT THE DURATION OF THE PROJECT.
Project Area
Drawing Number
Drawing Title
Revisions: Date:
LOCATION
PHONE
WEBSITE
219 EIGHTH STREET
DES MOINES, IOWA 50309
515-244-7167
WWW.BBSAE.COM
Project Number
VA FORM 08 - 6231
9 10
F
E
D
C
B
A
87654321
BBS PROJECT No.
Location
Project Title
9 1087654321
Issue Date Checked Drawn
Building Number
Phase
Approved: Project Director
Stamp
ARCHITECT/ENGINEER OF RECORDCONSULTANT
U.S. Department of Veterans AffairsA/E firm POC: Mike Lavoie
ARCHITECT MATT COLE
F
E
D
C
B
A
/2
/2
:0 :1
P
M
C
U s e rs
\M G a u l\ D o c u m e n ts
\R e v it
L o c a l F ile s \2
V A
D S
M I s o la ti o n R o o m s m g a u l5
H
V C
.r v t
CONSTRUCTION DOCUMENTS Des Moines VA Medical Center - Upgrade and Add Negative Air Rooms
Architectural - Building 1 - Fourth Floor Plan -
Phase 2
3600 36th St., Des Moines, IA 50310
Office of Construction and Facilities Management
A-102 21011
636A6-20-116
05/28/2021
Checker Author
BID DOCUMENTS 06/22/2021
1/4" = 1'-0"A-102
5F FOURTH FLOOR ROOF AREA NEW WORK PLAN, PHASE 2
NORTH
NORTH
1/4" = 1'-0"A-102
5C FOURTH FLOOR ROOF AREA DEMOLITION PLAN, PHASE 2
1 1/2" = 1'-0"A-102
F1 ROOF CURB AT DUCT PENETRATION, TYPICAL, SECTION
1 1/2" = 1'-0"A-102
E1 ROOF CURB AT DUCT PENETRATION AND WALL, SECTION
1 1/2" = 1'-0"A-102
C1 ROOF CURB FOR MECH EQUIPMENT, TYPICAL, SECTION
1 1/2" = 1'-0"A-102
B1 ROOF PENETRATION FRAMING, RCP
# DEOMLITION KEY NOTES (THIS SHEET)
11. DEMOLITION FOR NEW ROOF PENETRATION, SEE NEW WORK PLAN OR
LOCATION.
# NEW WORK KEY NOTES (THIS SHEET)
11. NEW ROOF CURB AT DUCT PENETRATION. LOCATE TIGHT TO ADJACENT
WALL WITHIN ONE SLOPED SURFACE OF ROOF, SEE DETAILS.
14. NEW ABOVE ROOF DUCT, FILTER, AND EXHAUST FAN, SEE MECHANICAL.
15. MODIFY AND OR EXTEND GALV STL WALL MOUNTED SUPPORT FOR
EXHAUST STACKS TO ACCOMMODATE BOTH STACKS WITH SPACING PER
MECHANICAL DRAWINGS FINAL LAYOUT.
16. BY-PASS, SEE MECHANICAL
KEY PLAN
PHASE 2:
1. CREATE NEW ROOF PENETRATION.
2. CONSTRUCT NEW DUCTS, FILTER, AND FAN OVER TOP OF NEW ROOF
CURBS.
CONSTRUCTION PHASING PLAN
AF-2
EA
FILTER SERVICE
ACCESS AREA (TYP)
EA
1-EF-2
1 1/2"
1 1/2"
3/4"
MPR
MPR
CHR
CHR
1"
MPS
MPS
EXIST MPS AND MPR
RISERS UP FROM FLOOR
BELOW. CONNECT NEW 2«"
MPS AND 1" MPR LINES
INTO EXIST RISERS.
CHS
EXIST CWS AND CWR RISERS UP FROM
FLOOR BELOW. CONNECT NEW 2" CWS
AND CWR LINE INTO EXIST RISERS.
STEAM REHEAT COIL RH3
FAN AHU-3B
STEAM
HUMIDIFIER
CHILLED WATER COIL
PROVIDE 3/4"
CONDENSATE DRAIN
PIPE CONNECT TO
EXISTING AHU COND.
DRAIN LINE
BAG FILTER
FILTER
STEAM
PREHEAT
COIL
STEAM REHEAT
COILS RH1 & RH2
12"x24" HEPA FILTERS
12"x24" HEPA FILTERS
10x10
(2) HEPA FILTERS, 12x24, ONE
EACH DUCT (STACKED).
INSTALL TO ALLOW READY
ACCESS FOR SERVICING.
8x6 EXHAUST
DUCTS FROM THIRD
FLOOR.
ROOF
AF-1
1-EF-1
EA
EA
FILTER
1-EF-2 (EXISTING)
STEAM REHEAT COIL RH3
FAN AHU-3B
STEAM
HUMIDIFIER
CHILLED WATER COIL
PROVIDE 3/4"
CONDENSATE DRAIN
PIPE CONNECT TO
EXISTING AHU COND.
DRAIN LINE
BAG FILTER
FILTER
STEAM
PREHEAT
COIL
STEAM REHEAT
COILS RH1 & RH2
12"x24" HEPA FILTERS
12"x24" HEPA FILTERS
10x10
(2) HEPA FILTERS, 12x24, ONE
EACH DUCT (STACKED).
INSTALL TO ALLOW READY
ACCESS FOR SERVICING.
8x6 EXHAUST
DUCTS FROM THIRD
FLOOR.
ROOF
1-EF-1
EA
EA
C1
A-102
TYP
C1
A-102
TYP
1F
A-103
Project Area
D13
D12
LEAVE EXISTING WEATHER-TIGHT ROOF
PENETRATION UNDISTURBED.
SEALANT, FULL LENGTH
ANGLES AND WELDED /
BOLTED CONNECTIONS TO
MATCH EXISTING, TYP
EXPANSION MASONRY
ANCHOR
MECH DUCT - SEE MECH
EXISTING MASONRY WALL
SEALANT, FULL LENGTH
EXPANSION MASONRY
ANCHOR
MATCH EXIST
ELEVATION
MATCH EXIST
ELEVATION
MATCH EXIST
MATCH EXIST
DEMOLITION GENERAL NOTES
A. SCREENED (GRAY-TONE) LINES INDICATE EXISTING CONSTRUCTION TO
REMAIN.
B. BOLD DASHED LINES INDICATE EXISTING CONSTRUCTION TO BE
REMOVED.
C. FIELD VERIFY EXISTING BUILDING CONDITIONS, ELEVATIONS, AND
DIMENSIONS PRIOR TO START OF WORK. NOTIFY ARCHITECT OF ANY
DISCREPANCIES FOUND IN RELATION TO THE CONTRACT DOCUMENTS.
D. GENERAL CONTRACTOR SHALL COORDINATE WORK OF ALL TRADES
PRIOR TO STARTING ANY DEMOLITION/CONSTRUCTION.
E. DO NOT SCALE DRAWINGS TO DETERMINE DIMENSIONS. VERIFY ALL
DIMENSIONS AND IMMEDIATELY REPORT ANY DISCREPANCIES TO THE
ARCHITECT.
F. PERFORM DEMOLITION WITHOUT DAMAGE TO ADJACENT RETAINED
CONSTRUCTION. WHERE SUCH DAMAGE OCCURS, PATCH, REPAIR, OR
OTHERWISE RESTORE TO ITS ORIGINAL CONDITION.
G. PATCH AND REPAIR ALL OPENINGS AND VOIDS LEFT BY REMOVAL OF
EXISTING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, CONDUIT, ETC.
AS REQUIRED TO MATCH ADJACENT.
H. PROTECT FROM DAMAGE ALL EXISTING CONSTRUCTION TO REMAIN.
I. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.
J. REFER TO AND COORDINATE WITH MECHANICAL, PLUMBING, AND
ELECTRICAL DRAWINGS FOR EXTENT OF ASSOCIATED DEMOLITION AND
NEW WORK.
K. MAINTAIN OPERATION OF ALL EXISTING SERVICES AND UTILITIES TO THE
BUILDING. COORDINATE ANY DISRUPTIONS OR DISCONTINUATIONS WITH
THE OWNER'S REPRESENTATIVE IN ADVANCE.
L. PROVIDE TEMPORARY SHORING AS REQUIRED FOR SELECTIVE
DEMOLITION.
M. CONSULT ARCHITECT/STRUCTURAL ENGINEER FOR ANY AND ALL
LOCATIONS WHERE UNFORESEEN OR UNUSUAL STRUCTURAL
CONDITIONS EXIST.
N. UNLESS SPECIFICALLY INDICATED OTHERWISE, REMOVE ALL
DEMOLISHED MATERIALS FROM THE SITE AND FOLLOW IOWA DNR AND
LANDFILL PROCEDURES TO PROPERLY SEPARATE AND DISPOSE OF
MATERIALS REMOVED FROM THE SITE.
O. PROVIDE ALL DEMOLITION AND DISPOSAL AS REQUIRED FOR
INSTALLATION OF NEW WORK AS INDICATED, OR AS REASONBLY IMPLIED
BY THESE CONSTRUCTION DOCUMENTS.
P. STORE AND PROTECT ALL SALVAGED ITEMS NOTED OR REQUESTED TO
BE RETURNED TO OWNER. COORDINATE WITH OWNER FOR THE
LOCATION OF STORAGE FOR SALVAGED ITEMS.
Q. A PHASING/DEMOLITION PLAN WILL BE IMPLEMENTED THAT ENSURES AT
LEAST ONE NEGATIVE-PRESSURE ISOLATION ROOM IS IN OPERATION
THROUGHOUT THE DURATION OF THE PROJECT.
GENERAL NOTES
A. SCREENED (GRAY-TONE) LINES INDICATE EXISTING CONSTRUCTION TO
REMAIN.
B. BOLD SOLID LINES INDICATE NEW CONSTRUCTION.
C. FIELD VERIFY EXISTING BUILDING CONDITIONS, ELEVATIONS, AND
DIMENSIONS PRIOR TO START OF WORK. NOTIFY ARCHITECT AND COR
OF ANY DISCREPANCIES FOUND IN RELATION TO THE CONTRACT
DOCUMENTS.
D. GENERAL CONTRACTOR SHALL COORDINATE WORK OF ALL TRADES
PRIOR TO STARTING ANY DEMOLITION/CONSTRUCTION.
E. DO NOT SCALE DRAWINGS TO DETERMINE DIMENSIONS. VERIFY ALL
DIMENSIONS AND IMMEDIATELY REPORT ANY DISCREPANCIES TO THE
ARCHITECT AND COR.
F. PROTECT FROM DAMAGE ALL EXISTING CONSTRUCTION TO REMAIN.
G. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.
H. ALL DIMENSIONS ARE GIVEN TO THE FACE OF FINISHED SURFACE,
UNLESS NOTED OTHERWISE. +/- DIMENSIONS ALLOW FOR VARIATION DUE
TO EXISTING CONDITIONS.
I. ALL DIMENSIONS TO EXISTING STRUCTURE/WALLS ARE APPROXIMATE.
CONTRACTOR SHALL FIELD VERIFY.
J. REFER TO AND COORDINATE WITH MECHANICAL, AND ELECTRICAL
DRAWINGS FOR EXTENT OF ASSOCIATED DEMOLITION AND NEW WORK.
K. MAINTAIN OPERATION OF ALL EXISTING SERVICES AND UTILITIES TO THE
BUILDING. COORDINATE ANY DISRUPTIONS OR DISCONTINUATIONS WITH
THE OWNER'S REPRESENTATIVE IN ADVANCE.
L. PATCH AND REPAIR ALL SURFACES ADJACENT TO DEMOLISHED ITEMS AS
REQUIRED TO MATCH EXISTING OR NEW ADJACENT CONSTRUCTION.
M. PATCH AND REPAIR ALL OPENINGS AND VOIDS LEFT BY REMOVAL OF
EXISTING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, CONDUIT, ETC.
AS REQUIRED TO MATCH ADJACENT.
N. CONSULT ARCHITECT/STRUCTURAL ENGINEER AND COR FOR ANY AND
ALL LOCATIONS WHERE UNFORESEEN OR UNUSUAL STRUCTURAL
CONDITIONS EXIST.
O. ALL WALLS TO HAVE A MINIMUM STC RATING OF 45.
P. ALL CORRIDOR WALLS ARE SMOKE RESISTANT.
Drawing Number
Drawing Title
Revisions: Date:
LOCATION
PHONE
WEBSITE
219 EIGHTH STREET
DES MOINES, IOWA 50309
515-244-7167
WWW.BBSAE.COM
Project Number
VA FORM 08 - 6231
9 10
F
E
D
C
B
A
87654321
BBS PROJECT No.
Location
Project Title
9 1087654321
Issue Date Checked Drawn
Building Number
Phase
Approved: Project Director
Stamp
ARCHITECT/ENGINEER OF RECORDCONSULTANT
U.S. Department of Veterans AffairsA/E firm POC: Mike Lavoie
ARCHITECT MATT COLE
F
E
D
C
B
A
/2
/2
:0 :1
P
M
C
U s e rs
\M G a u l\ D o c u m e n ts
\R e v it
L o c a l F ile s \2
V A
D S
M I s o la ti o n R o o m s m g a u l5
H
V C
.r v t
CONSTRUCTION DOCUMENTS Des Moines VA Medical Center - Upgrade and Add Negative Air Rooms
Architectural - Building 1 - Fourth Floor Plan -
Phase 3
3600 36th St., Des Moines, IA 50310
Office of Construction and Facilities Management
A-103 21011
636A6-20-116
05/28/2021
Checker Author
1/4" = 1'-0"A-103
5F FOURTH FLOOR ROOF AREA NEW WORK PLAN, PHASE 3
NORTH
KEY PLAN
1/4" = 1'-0"A-103
5C FOURTH FLOOR ROOF AREA DEMOLITION PLAN, PHASE 3
NORTH
1 1/2" = 1'-0"A-103
1F EXHAUST STACK SUPPORT, SECTION
12. DEMOLISH ROOF CURB UNDER FAN UNIT.
13. DEMOLISH ROOF CURB CAPS, BUT NOT ROOF CURB OR ROOFING UNDER
FILTER UNIT. REUSE THESE FOR NEW FILTER UNIT.
12. NEW ROOF CURB UNDER FAN UNIT.
13. PROVIDE NEW PREFINISHED CURB CAP AND REUSE EXISTING ROOF
CURBS FOR NEW FILTER UNIT. WELD GALV STL ANGLES ACROSS TOPS OF
CURBS AS NECESSARY TO PROVIDE SUPPORT FOR NEW, SMALLER UNIT.
ENSURE NEW CAPS AND EXISTING ROOFING REMAIN WATER TIGHT.
14. NEW ABOVE ROOF DUCT, FILTER, AND EXHAUST FAN, SEE MECHANICAL.
# DEOMLITION KEY NOTES (THIS SHEET)
# NEW WORK KEY NOTES (THIS SHEET)
BID DOCUMENTS 06/22/2021
PHASE 3:
1. DEMOLISH EXISTING EXHAUST DUCTS, FILTER, AND FAN ABOVE THE ROOF
BACK TO EXISTING ROOF PENETRATION.
2. CONNECT NEW EXHAUST DUCT TO EXISTING DUCT ABOVE ROOF
PENETRATION.
3. CONSTRUCT NEW DUCTS, FILTER, AND FAN OVER NEW AND MODIFIED
ROOF CURBS.
CONSTRUCTION PHASING PLAN
BD
THERMOSTAT (WIRED)
THERMOSTAT W / EQUIP. NUMBERAD
HWR
HWS
P/T
T
SYMBOLS - HVAC DUCTWORK
SUPPLY DUCT UP OR TOWARD
SUPPLY DUCT DOWN OR AWAY
RETURN DUCT UP OR TOWARD
RETURN DUCT DOWN OR AWAY
EXHAUST DUCT UP OR TOWARD
EXHAUST DUCT DOWN OR AWAY
SUPPLY DIFFUSER
(WITH RETANGULAR HARD DUCT)
SUPPLY DIFFUSER
(WITH ROUND HARD DUCT)
RETURN GRILLE OR REGISTER (WITH
RETANGULAR HARD DUCT)
RETURN GRILLE OR REGISTER (WITH
FLEXDUCT)
EXHAUST GRILLE OR REGISTER
(WITH HARD DUCT)
EXHAUST GRILLE OR REGISTER
(WITH FLEXDUCT)
RECTANGULAR DUCT (FIRST FIGURE IS SIDE
SHOWN) ALL DUCT DIMENSIONS ARE INSIDE
CLEAR DIMENSIONS
ROUND DUCTWORK (Ø = DIAMETER)
FLEXIBLE DUCTWORK
90° ELBOW WITH TURNING VANES
SUPPLY DIFFUSER (WITH FLEXDUCT)
RETURN GRILLE OR REGISTER (WITH ROUND
HARD DUCT)
EXHAUST GRILLE OR REGISTER
(WITH HARD DUCT)
24x24
Ø12"
SUPPLY DIFFUSER (ONE LINE)
RETURN DIFFUSER (ONE LINE)
EXHAUST DIFFUSER (ONE LINE)
24" 12"
AIR FLOW DIRECTION
XX-X
EF-X
AD
T
XX REGISTER & DIFFUSER
RL
1" 1/2"
1/2"1"
1/2"1"
P
ABBREVIATIONS
A
A COMPRESSED AIR
A, AMP AMPERE
A/C AIR CONDITIONING(ER)
AAP AREA ALARM PANEL
AAV AUTOMATIC AIR VENT
AB ANCHOR BOLT
ABS ACRYLONITRILE-BUADIENE-STYRENE
AC ACOUSTICAL CEILING
AC ALTERNATING CURRENT
ACC AIR COOLED CONDENSER
ACCU AIR COOLED CONDENSING UNIT
ACH AIR CHANGES PER HOUR
ACM ALUMINUM COMPSITE MATERIAL
ACM ASBESTOS CONTAINING MATERIAL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD ACCESS DOOR
AD AREA DRAIN
ADDN ADDITION, ADDITIONAL
ADJ ADJUSTABLE
ADJT ADJACENT
ADMIN ADMINISTRATION, ADMINISTRATOR
AEE ASSN OF ENERGY ENGINEERS
AF AIR FILTER
AF, AFCI ARCH FLASH CIRCUIT INTERRUPTER
AFD ADJUSTABLE FREQUENCY DRIVE
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL EFFICIENCY RATIO
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING CAPACITY
AI AREA INLET
AI ANALOG INPUT
ALT ALTERNATE
AL, ALUM ALUMINUM
AMB AMBIENT
ANCH ANCHOR
ANT ANTENNA
AO ANALOG OUTPUT
AP ACCESS PANEL
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR ACID RESISTING
ARCH ARCHITECTUAL
ASB ASBESTOS
ATC AUTOMATIC TEMP CONTROL
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AND
AIR CONDITIONING ENGINEERS
ASPH ASPHALT
ASSN ASSOCIATION
AUTO AUTOMATIC
AV ACID VENT
AV AIR VENT
AV AVERAGE
AW ACID WASTE
AWG AMERICAN WIRE GAUGE
AWP ACOUSTICAL WALL PANEL
B
B BOILER
B TO B BACK TO BACK
BAS BUILDING AUTOMATION SYSTEM
BBO BOILER BLOW OFF
BC BALANCING COCK
BCA BUILDING COMMISSIONING ASSN
BCMU BURNISHED CONCRETE MASONRY
UNIT
BD BOARD
BD BACK DRAFT DAMPER
BET BETWEEN
BFP BACKFLOW PREVENTOR
BHP BREAK HORSE POWER
BI BACKWARD INCLINE
BI BINARY INPUT
BKR BREAKER
BL BUILDING LINE
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BLKHD BULKHEAD
BM BEAM
BM BENCH MARK
BO BINARY OUTPUT
BOD BOTTOM OF DUCT
BOF BOTTOM OF FOOTING
BOP BOTTOM OF PIPE
BOT BOTTOM
BRG BEARING
BRIG BRIDGING
BSLN BASELINE
BSMT BASEMENT
BT BATH TUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BUR BUILT UP ROOFING
BV BALL VALVE
BY BASE YEAR
C
C/B CIRCUIT BREAKER
°C DEGREES CELSIUS
C CONDENSER WATER
C CONDUIT
CA COMBUSTION AIR
CAB CABINET
CANT CANTILEVER
CAP CAPACITY
CAS CASING
CATV CABLE TV, COMMUNITY ANT TV
CAV CONSTANT AIR VOLUME
CBD CHALKBOARD
CCTV CLOSED CIRCUIT TELEVISION
CD COLD DECK
CD CONDENSATE DRAIN
CDD COOLING DEGREE DAYS
CDWP CONDENSER WATER PUMP
CDWR CONDENSER WATER RETURN
CDWRT CONDENSER WATER RETURN TEMP
CDWS CONDENSER WATER SUPPLY
CDWST CONDENSER WATER SUPPLY TEMP
CE COVER ELEVATION
CEM CEMENT
CEM CERTIFIED ENERGY MANAGER
CENT CENTRIFUGAL
CER CERAMIC
CF CHEMICAL FEED
CF CUBIC FEET
CFC CHLOROFLUOROCARBON
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CH CHANNEL
CH CHILLER
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CHWR CHILLED WATER RETURN
CHWRT CHILLED WATER RETURN TEMP
CHWS CHILLED WATER SUPPLY
CHWST CHILLED WATER SUPPLY TEMP
CI CAST IRON
CI CURB INLET
CIP CAST IN PLACE
CIP CAST IRON PIPE
CIRC CIRCULATING, CIRCULATION
CJ CONTROL JOINT
CJA CONTROL JOINT ABOVE
CCT, CIR, CKT CIRCUIT
CL CENTERLINE
CL CIRCUIT LINE
CLF COOLING LOAD FACTOR
CLG CEILING
CLOS CLOSET
CLR CLEAR
CLTD COOLING LOAD TEMP DIFFERENCE
CM CEILING MOUNTED
CMP CORRIGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
CO CONDUIT ONLY
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION
COMM COMMUNICATIONS
COMP COMPOSITE
COMPR COMPRESSIBLE
CONC CONCRETE
CONF CONFERENCE
CONN CONNECT, CONNECTION
CONST CONSTRUCTION
CONT CONTINUE, CONTINOUS
CONTR CONTRACTOR, CONTRACT
CONV CONVECTOR
COP COEFFICIENT OF PERFORMANCE
CORR CORRIDOR
CP CONDENSER PUMP
CP COVER PLATE
CPS CYCLES PER SECOND
CPT CARPET
CR CONDENSER WATER RETURN
CR CORROSION REISTANT
CRAC COMPUTER ROOM AIR CONDITIONER
CS COMBINATION STARTER
CS COUNTERSINK
CSA COLD SUPPLY AIR
CSTJ CONSTRUCTION JOINT
CT CERAMIC TILE
CT COOLING TOWER
CT CURRENT TRANSFORMER
CTR CENTER
CU COMBINATION UNIT
CU CONDENSING UNIT
CU COPPER
CU CUBIC
CUH CABINET UNIT HEATER
CV CONDOM VENDER
CV CONSTANT VOLUME
CVRMSE COEFFICIENT OF VARIATION OF THE
ROOT MEAN SQUARE OF THE ERROR
CW COLD WATER
CWR COLD WATER RETURN
CWS COLD WATER SUPPLY
CY CUBIC YARD
CY CURRENT YEAR
CYD CYLINDER
D
D DATA
D DEPTH
d PENNY (AS NAIL 10d)
D, DR DRAIN
DA DISCHARGE AIR
DB DATA BASE
dB DECIBEL
DB DRY BULB
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DC DIRECT CURRENT
DC DUST COLLECTOR
DCJ DUMMY CONTROL JOINT
DCV DEMAND CONTROLLED VENTILATION
DD DEGREE DAY
DDC DIRECT DIGITAL CONTROL
DE DEIONIZED WATER
DEG DEGREE
DEPR DEPRESS, DEPRESSION, DEPRESSED
DEPT DEPARTMENT
DET DETENTION
DF DRINKING FOUNTAIN
DFR DIESEL FUEL RETURN
DFS DIESEL FUEL SUPPLY
DFV DIESEL FUEL VENT
DG DOOR GRILLE
DH DUCT HEATER
DI DIGITAL INPUT
DI DUCTILE IRON
DI, DS DISTILLED WATER
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DISC DISCONNECT
DISC SW DISCONNECT SWITCH
DISCH DISCHARGE
DISTR DISTRIBUTION
DL DEAD LOAD
DM DAMPER MOTOR
DMPR DAMPER
DN DOWN
DN DOWNSPOUT NOZZLE
DO DIGITAL OUTPUT
DO OR* DITTO
DP DEW POINT
DP DIFFERENTIAL PRESSURE
DPFG DAMPPROOFING
DPS DIFFERENTIAL PRESSURE SWITCH
DR DOOR
DS DOWNSPOUT
DSP DRY STORAGE
DTL DETAIL
DTR DUCT THROUGH ROOF
DW DISHWASHER
DWG DRAWING
DWL DOWEL
DWR DRAWER
DX DIRECT EXPANSION
DXS DOUBLE EXTRA STRONG
E
E TO C END TO CENTER
E, EA EACH
EA EXHAUST AIR
EAT ENTERING AIR TEMP
EB EXPANSION BOLT
EC ELECTRICAL CONTRACTOR
ECM ELECTRONICALLY COMMUTATED
MOTOR
ECM ENERGY CONSERVATION MEASURE
ECO ENERGY CONSERVATION
OPPORTUNITY
EDH ELECTRIC DUCT HEATER
EE EACH DAY
EEM ENERGY EFFICIENCY MEASURE
EER ENERGY EFFICIENCY RATIO
EEW EMERGENCY EYEWASH
EEWS EMERGENCY EYEWASH / SHOWER
EF EACH FACE
EF EXHAUST FAN
EFF EFFICIENCY
EH ELECTRIC HEATER
EH ELECTRICAL HEATER
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAS ELASTOMERIC
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EMD ESTIMATED MAXIMUM DEMAND
EMER EMERGENCY
EMS ENERGY MANAGEMENT SYSTEM
EMT ELETRICAL METALLIC TUBING
EMV EMERGENCY MIXING VALVE
ENCL ENCLOSURE
ENT ELETRICAL NON-METALLIC TUBING
ENTR ENTRANCE
EOMD END OF MAIN DRIP
EP ELECTRO-PNEUMATIC
EP EXPLOSION PROOF
EPO EMERGENCY POWER OFF
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ERF EXPOXY RESIN FLOORING
ES EMERGENCY SHOWER
ES EXTRA STRONG
ESCO ENERGY SERVICE COMPANY
ESP EXTERNAL STATIC PRESSURE
EST ESTIMATE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMP
EXC EXCAVATE
EXH EXHAUST
EXIST, EX EXISTING
EXP EPANSION
EXP EXPOSED
EXPL EXPLOSION
EXT EXTERIOR
F
°F DEGREES FAHRENHEIT
F FIRE LANE
F FURNACE
FA FIRE ALARM
FA FRESH AIR
FAB FABRICATED
FB FACE BRICK
FC FOOT CANDLE
FC FORWARD CURVE
FCMU FLUTED CONCRETE MASONRY UNIT
FCO FLOOR CLEAN OUT
FCU FAN COIL UNIT
FD FIRE DAMPER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FDR FEEDER
FDS FACE OF STUD
FDS FUEL OIL SUPPLY
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FH FILTER HOUSING
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIM FACILITY IMPROVEMENT MEASURE
FIN FINISH
FIX FIXTURE
FL FLOOR
FLA FULL LOAD AMPS
FLASH FLASHING
FLEX FLEXIBLE
FLG FLOORING
FLM FULL LENGTH MIRROR
FLR FLOOR
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FM FIRE MAIN
FM FLOW METER
FMC FLEXIBLE METTALIC CONDUIT
FME FLOW MEASURING EQUIPMENT
FMS FACILITY MANAGEMENT SYSTEM
FO FACE OF
FO FUEL OIL
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOF FUEL OIL FILL
FOM FACE OF MASONRY
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOW FACE OF WALL
FP FIREPROOFING
FPD FIRE PUMP DISCHARGE
FPM FEET PER MINUTE
FR FIRE RESISTIVE
FR FRAME
FS FLOOR SINK
FS FLOW SWITCH
FSD FIRE/SMOKE DAMPER
FSS FOLDING SHOWER SEAT
FT FEET, FOOT
FT FIN TUBE
FT FLOW TRANSMITTER
FTG FITTING
FTG FOOTING
FUT FUTURE
FV FIELD VERIFY
FVC FIRE VALVE CABINET
FW FEED WATER
FWC FABRIC WALL COVERING
G
GR, G GRILLE
G NATURAL GAS
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GCO GRADE CLEAN OUT
GCMU GLAZED CONCRETE MASONRY UNIT
GD GARBAGE DISPOSAL
GEN GENERAL
GEN GENERATOR
GFA GROSS FLOOR AREA
GF, GFI GROUND FAULT INTERRUPTER
GFRC GLASS FIBER REINFORCE CONCRETE
GHR GLYCOL - WATER HEATING RETURN
GHS GLYCOL - WATER HEATING SUPPLY
GI GALVANIZED IRON
GL GLUE LAMINATED
GL GLASS
GLV GLOBE VALVE
GMU GLASS MASONRY UNIT
GND GROUND
GOVT GOVERNMENT
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GUARD RAIL
GR GRADE
GRC GALVANIZED RIGID CONDUIT
GRG GLASS REINFORCED GYPSUM
PLASTER
GRS GALVANIZED RIGID STEEL
GS GASOLINE
GW GREASE WASTE
GWB GYPSUM WALL BOARD
GWH GAS WATER HEATER
GYP GYPSUM
H
H2O WATER
H 1E HOOK ONE END
H, HT, HGT HEIGHT
HB HOSE BIB
HC HANDICAP
HC HOLLOW BENCH
HCB HANDICAP BENCH
HCFC HYDROCHLOROCFUOROCARBON
HCR HOT / CHILLED WATER RETURN
HCS HOT / CHILLED WATER SUPPLY
HD HAND DRYER, HAIR DRYER
HD HOT DECK
HDD HEATING DEGREE DAYS
HDR HEADER
HDWD HARDWOOD
HDWR HARDWARE
HEPA HIGH EFFICIENCY PARTICULATE
ARRESTING
HEV HOSE END VALVE
HFC HYDROFLUOROCARBON
HHV HIGHER HEATING VALUE
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HID HIGH INTENSITY DISCHARGE
HL HIGH LIMIT
HM HOLLOW METAL
HOA HAND OFF AUTO
HOBO HARD BOARD
HORIZ HORIZONTAL
HP HEAT PUMP
HP HORSEPOWER
HP HIGH PRESSURE
HPR HIGH PRESSURE STEAM RETURN
HPS HIGH PRESSURE SODIUM
HPS HIGH PRESSURE STEAM
HPS HIGH PRESSURE STEAM SUPPLY
HR HANDRAIL
HR HEAT RECOVERY
HR HOUR
HRU HEAT RECOVERY UNIT
HRV HEAT RECOVERY VENTILATOR
HS HEADSTUD
HSA HOT SUPPLY AIR
HSPF HEATING SEASONAL PERFORMANCE
FACTOR
HSTR HIGH STRENGTH
HTD HEATED
HTG HEATING
HTR HEATER
HTWR HIGH TEMP HOT WATER RETURN
HTWS HIGH TEMP HOT WATER SUPPLY
HUM HUMIDIFIER
HV HEATING VENTILATING UNIT
HVAC HEATING VENTILATING & AIR
CONDITIONING
HVC HEATING & VENTILATION
CONTRACTOR
HW DOMESTIC HOT WATER
HWC DOMESTIC HOT WATER
RECIRCULATING
HWP HOT WATER PUMP
HWR HEAVY WALL RIGID CONDUIT
HWR HOT WATER RETURN
HWR LOW TEMP HOT WATER RETURN
HWRGS HEAVY WALL RIGID GALVANIZED
STEEL CONDUIT
HWRT HOT WATER RETURN TEMP
HWS HOT WATER SUPPLY
HWS LOW TEMP HOT WATER SUPPLY
HWST HOT WATER SUPPLY TEMP
HWT HOT WATER TANK
HX HEAT EXCHANGER
Hz HERTZ
I
I/O INPUT OUTPUT
IAQ INDOOR AIR QUALITY
IAW IN ACCORDANCE WITH
IB INFRARED BURNER
IC INTERCOM
ID INSIDE DIAMETER
IE INVERT ELEVATION
IES ILLUMINATING ENGINEERING SOCIETY
IF INSIDE FACE
IG ISOLATED GROUND
IH INTAKE HOOD
IJ ISOLATION JOINGT
IJS IN JOIST SPACE
IMC INTERMEDIATE METAL CONDUIT
IN INCH
INC INCLUDE, INCLUDING
INSUL INSULATION
INT INTERIOR, INTERNAL
INT INTERNATIONAL
IP IRON PIPE
IPS IRON PIPE SIZE
IPMVP INTERNATIONAL PERFORMANCE
MEASUREMENT AND VERIFICATION
PROTOCOL
IR INFRA-RED
IW INDIRECT WASTE
J
JAN JANITOR
JB JUNCTION BOX
JCT JUNCTION
JST JOIST
JFB JOINT FILLER BOARD
JT JOINT
K
K THOUSAND (KILO)
KCJ KEYED CONSTRUCTION JOINT
KCMIL, MCM THOUSAND CIRCULAR MILS
KCP KEEN'S CEMENT PLASTER
KD KNOCKDOWN
KH KITCHEN HOOD
KHE KITCHEN HOOD EXHAUST FAN
KHS KITCHEN HOOD SUPPLY FAN
KIT KITCHEN
KO KNOCKOUT
KS KITCHEN SINK
KV KILOVOLT
KVA KILOVOLT AMPERES
KVAR KILOVOLT AMPERES REACTIVE
KW KILOWATT
HWH KILOWATT HOUR
L
L LABORATORY
L, LAB ANGLE
LA LABORATORY COMPRESSED AIR
LAM LAMINATE, LAMINATED
LAT LEAVING AIR TEMP
LAV LAVATORY
LB POUND
LBR LUMBER
LBS POUNDS
LDG LOADING
LF LINEAR FOOT (FEET)
LFMC LIQUIDTIGHT FLEXIBLE METTALIC
CONDUIT
LFNC LIQUIDTIGHT FLEXIBLE NON-METTALIC
CONDUIT
LG LENGTH (LONG)
LHV LOWER HEATING VALUE
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LL LIVE LOAD
LL LOW LIMIT
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LON LOCAL OPERATING NETWORK
LONG LONGITUDE, LONGITUDINAL
LOX LIQUID OXYGEN
LP LOW PRESSURE
LPG LIQUEFIED PETROLEM GAAS
LPR LOW PRESSURE STEAM RETURN
LPS LOW PRESSURE STEAM
LPS LOW PRESSURE STEAM SUPPLY
LR LIVING ROOM
LRA LOCKED ROTOR AMPS
LS LAWN SPRINKLER
LSC LIFE SAFETY CODE
LT LIGHT
LTD LINED TRANSFER CODE
LTG LIGHTING
LV LABORATORY VACUUM
LVL LEVEL
LVR LOUVER
LW LONG WAY
LWBT LEAVING WET BULB TEMP
LWT LEAVING WATER TEMP
M
M THOUSAND
M&V MEASUREMENT AND VERIFICATION
MA MEDICAL COMPRESSED AIR
MA MIXED AIR
MAC MACHINE
MAG MAGNETIC
MAINT MENTENANCE
MAN MANUAL
MAS MASONRY
MAT MIXED AIR TEMP
MATL MATERIAL
MAU MAKEUP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MACHINE BOLT
MB MOP BASIN
MBD MARKER BOARD
MBH, MBTUH THOUSAND BTU PER HOUR
MC MECHANICAL CONTRACTOR
MC MEDICINE CABINET
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MCM, KCMIL THOUSAND CIRCULAR MILS
MD MANUAL VOLUME DAMPER
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MEMB MEMBRANE
MET, MTL METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MFRG MANUFACTURING
MG MOTOR GENERATOR
MH MANHOLE
MH METAL HALIDE
MH MOP HOLDER
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
ML MOTORIZED LOUVER
MLDG MOLDING
MLO MAIN LUGS ONLY
MLWK MILLWORK
MO MASONRY OPENING
MPG MEDIUM PRESSURE GAS
MPR MEDIUM PRESSURE STEAM RETURN
MPS MEDIUM PRESSURE STEAM SUPPLY
MR MIRROR
MR/S MIRROR WITH SHELF
MS MAGNETIC STARTER
MTD MOUNTED
MTG MOUNTING
MTR MOTOR
MTWR MEDIUM TEMP HOT WATER RETURN
MTWS MEDIUM TEMP HOT WATER SUPPLY
MUL MULLION
MV MEDICAL VACUUM
MV MERCURY VAPOR
MX METRIX UTILITY ACCOUNTING SYSTEM
MZ MULTI-ZONE
N
N NITROGEN
N NORTH
N2O, NO NITRUS…
This is the start of the file's text. The full file is on GovTribe.