This document contains responses to questions from a site visit for a security camera installation project at the VA San Diego Hospital. The contractor must provide lifts, cabling and complete new cable runs for all cameras. Asbestos is present requiring compliance with infection control and safety documents. Plenum-rated cable is required along with rigid conduit for exterior cameras. The project is prevailing wage. Normal work hours are Monday through Friday 6:00 to 16:00 Pacific time and weekend work will not be approved. The selection criteria considers price as well as best benefit to the government. Cable testing is not specifically required but the system must integrate fully. No onsite storage will be provided.

View the file

Other files

File Type Posted
S2 36C26222Q1447 0006 Amendment.docx DOCX document
Updated Drawing Plans.pdf PDF
36C26222Q1447 0005.docx DOCX document
36C26222Q1447 0004.docx DOCX document
36C26222Q1447 0003.docx DOCX document
36C26222Q1447 0002.docx DOCX document
36C26222Q1447 0001.docx DOCX document
FMS Vendor File Update Request Form.pdf PDF
Drawings _ Plans.pdf PDF
VA Form 10091.pdf PDF
W-9 Form.pdf PDF
36C26222Q1447_1.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) None

NCO 22

Department of Veterans Affairs

NCO 22

335 East Germann Road Gilbert AZ 85297

NCO 22

Department of Veterans Affairs

NCO 22

335 East Germann Road Gilbert AZ 85297 To all Offerors/Bidders

36C26222Q1447 08-23-2022

X X X

X This amendment is to responded to the last of the questions from the site visit.

All contractors must acknowledge this amendment

CONTINUATION PAGE

LAST OF THE SITE VISIT QUESTIONS AND ANSWERS

Site visit questions and answers

1. There is mentioning of 77 ext. cameras and 211 int. cameras. Where are these cameras located? It seems only partial maps are provided.

a. Updated drawings have been provided to the CS.

2. If lift is required, does this need to be included / provided by the contractor.

a. The contractor must provide lifts per the SOW.

3. Please confirm switches and patch panels and patch cables are provided by the Customer.

a. Network switches and patch panels will be provided by VA San Diego, cabling is the responsibility of the contractor.

4. How many cameras are replacements for existing? How many cameras are completely new runs? How can we assess properly any requirements for conduit, penetration, etc. for the new runs?

a. All cameras are going to be installed with new cable runs. If we are requesting a new camera to be installed where an existing camera is present the contractor should removed and returned to VA San Diego Police Server.

5. Please indicate any conduit requirements? Is there a need for conduit from end to end? Or is free-air acceptable?

6. Please indicate any asbestos or other issues that might be applicable to the building structures.

a. Asbestos is present in Bld 1, the contractor must comply with the details of the Infection Control Risk Assessment and Interim Life Safety Measures documents that will be completed prior to installation.

7. Please describe your selection criteria? It is based on price only?

a. The selection criteria is under section E Addendum FAR 52.212- Instructions to offerors commercial items where it states Evaluation Approach. The Government will evaluate quotations using the comparative evaluation process outlined in FAR 13.106-2 (b) (3), where quotations will be compared to one another to determine which provides the best benefit to the Government. Price is not the only factors that are being taken into consideration for award.

8. Are there any cable testing requirements?

a. The security system shall be installed and tested to ensure all components are fully compatible as a system and can integrate with all associated security subsystems. Specific testing of cable is not required by VA.

9. Do any OSHPD requirements apply to this project?

a. No.

10. Is the project prevailing wage?

a. Wage determination is found on page 35 D.4 of the solicitation.

11. What are the working hours? Are there any restrictions to access to the buildings or part of the building sections?

a. Default working hours are Monday-Friday 0600-1600 PST, we can modify the hours of operation based on request. Weekend work will not be approved.

12. Can work be completed during normal business hours?

a. Default working hours are Monday-Friday 0600-1600 PST, we can modify the hours of operation based on request. Weekend work will not be approved.

13. Are there as-builts that show location of cable tray and cable pathways?

a. No.

14. There appears to be a discrepancy in the quantity of cameras shown on the plans vs. the quantities referenced in Section F of the RFP. Will additional information be provided to show locations of all cameras?

a. Updated drawings have been provided to the CS.

15. Will onsite storage be provided for materials, equipment, and tools?

a. Onsite storage of materials and equipment will not be provided.

16. What are the specifications for the 500 feet of fiber? Does it need to be singlemode or multimode? How many strands?

a. We use single and multimode fiber, vendor will be required to provide whatever type is required to complete the requested installation.

17. Does the Cat6a need to be plenum?

a. Plenum cable is required.

18. Are there any cameras installed in parking lots or on poles that would require outside rated cabling?

a. There are no cameras to be installed in the parking lots.

19. Are there any cameras installed in parking lots or on poles that are not replacing an existing camera and require new underground conduit?

a. There are no cameras to be installed in the parking lots.

20. In Building 1, the 5th floor identifies “OPTZ/P” camera locations which appear to be installed on the exterior of the 5th floor, is this correct?

a. Updated drawings indicated which cameras are exterior cameras, camera numbering text color is red.

21. In Building 1, the 6th floor identified “OPTZ/P” camera locations which appear to be installed on the exterior of the 6th floor, is this correct?

a. Updated drawings indicated which cameras are exterior cameras, camera numbering text color is red.

22. Regarding the previous two questions for Building 1, are these cameras accidentally duplicated?

a. Updated drawings indicated which cameras are exterior cameras, camera numbering text color is red.

23. Are conduits installed outside to be Rigid or EMT?

a. VA San Diego would like rigid conduits to be installed in relation to exterior cameras.