SCHEDULE OF SERVICES AND PRICE.docx

DOCX document 42 KB Posted

Attached to
R499--FACILITY SIGNAGE
Solicitation number
36C26221Q1149
Issued by

View the file

Other files

File Type Posted
PRICE WORKSHEET.pdf PDF
36C26221Q1149 0002.docx DOCX document
J.2 Perpendicular Large Flag.pdf PDF
Mandatory Signage.pdf PDF
SCHEDULE OF SERVICES AND PRICE.pdf PDF
PRICE WORKSHEET.docx DOCX document
36C26221Q1149 0002_1.docx DOCX document
D.4 ATTACHMENT F - N.1 SIGNAGE.pdf PDF
D.4 ATTACHMENT B CONTINUED - SIGNAGE TYPES.pdf PDF
D.4 ATTACHMENT A - E.pdf PDF
36C26221Q1149 0001.docx DOCX document
D.4 ATTACHMENT G - N.3 SIGNAGE.pdf PDF
D.3 WAGE DETERMINATION.pdf PDF
D.4 ATTACHMENT H - R.1 SIGNAGE.pdf PDF
36C26221Q1149.docx DOCX document
S02 - SOLICITATION W. ATTACHMENTS.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B.2 SCHEDULE OF SERVICES AND PRICE

1. Contractor shall provide Wayfinding Signage with ancillary services for Veteran Affairs San Diego Healthcare System (VASDHS) in accordance with (IAW) the Statement of Work (SOW) described in Section B.3.

2. A five (5) year BPA shall be awarded as a fixed-price. The contractor shall provide all qualified personnel, labor, supplies, materials, supervision and all resources necessary to accomplish the deliverables identified for each BPA Line Item Number (CLINs) below.

3. OPTION TO EXTEND SERVICES: In accordance with FAR 52.217-8, Option to Extend Services, the BPA may be extended at the Government’s sole discretion for a period of up to six (6) months. If this option is exercised, pricing for the period in effect shall apply. Evaluation of option shall not obligate the Government to exercise the option(s).

4. DE-OBLIGATION OF EXCESS FUNDS: The Government shall only pay for CLINs that have been ordered and received. Any unused excess funds will be de-obligated at the end of the period of performance by issuing a modification.

BASE PERIOD: SEPTEMBER 1, 2021 – AUGUST 31, 2022

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
UNIT
UNIT PRICE
0001
Provide graphic design and fabrication services for a comprehensive Interior and Exterior Environmental Graphics/Signage/Wayfinding including concept, design, manufacture, and installation. Mandatory signage on an as-needed basis to meet Mandatory VA Policy Signs by Directive. https://www.cfm.va.gov/til/signs/Signage07-Mandatory.pdf"

EA

0002
ID B.1
0003
ID B.2
0004
ID C
0005
ID D.1
0006
ID D.2
0007
ID D.3

EA

0008
PLUS E.1
0009
PLUS E.2
0010
H.1
0011
J.1
0012
J.2
0013
RR K.1
0014
RR.K2
0015
RR K.3
0016
RR K.4
0017
RR K.5
0018
RR K.6
0019
M.1
0020
M.2
0021
N.1
0022
N.3
0023
Q.2
0024
R.1
0025
Installing

signage, preparation and clean-up of installation site and associated maintenance

HR

0026
IDA

OPTION PERIOD 1: SEPTEMBER 1, 2022 – AUGUST 31, 2023

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
UNIT
UNIT PRICE
1001
Provide graphic design and fabrication services for a comprehensive Interior and Exterior Environmental Graphics/Signage/Wayfinding including concept, design, manufacture, and installation. Mandatory signage on an as-needed basis to meet Mandatory VA Policy Signs by Directive. https://www.cfm.va.gov/til/signs/Signage07-Mandatory.pdf"
1002
ID B.1
1003
ID B.2
1004
ID C
1005
ID D.1
1006
ID D.2
1007
ID D.3

EA

1008
PLUS E.1
1009
PLUS E.2
1010
H.1
1011
J.1
1012
J.2
1013
RR K.1
1014
RR.K2
1015
RR K.3
1016
RR K.4
1017
RR K.5
1018
RR K.6
1019
M.1
1020
M.2
1021
N.1
1022
N.3
1023
Q.2
1024
R.1
1025
Installing

signage, preparation and clean-up of installation site and associated maintenance

HR

1026
IDA
EA

OPTION PERIOD 2: SEPTEMBER 1, 2023 – AUGUST 31, 2024

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
UNIT
UNIT PRICE
2001
Provide graphic design and fabrication services for a comprehensive Interior and Exterior Environmental Graphics/Signage/Wayfinding including concept, design, manufacture, and installation. Mandatory signage on an as-needed basis to meet Mandatory VA Policy Signs by Directive. https://www.cfm.va.gov/til/signs/Signage07-Mandatory.pdf"
2002
ID B.1
2003
ID B.2
2004
ID C
2005
ID D.1
2006
ID D.2
2007
ID D.3

EA

2008
PLUS E.1
2009
PLUS E.2
2010
H.1
2011
J.1
2012
J.2
2013
RR K.1
2014
RR.K2
2015
RR K.3
2016
RR K.4
2017
RR K.5
2018
RR K.6
2019
M.1
2020
M.2
2021
N.1
2022
N.3
2023
Q.2
2024
R.1
2025
Installing

signage, preparation and clean-up of installation site and associated maintenance

HR

2026
IDA
EA

OPTION PERIOD 3: SEPTEMBER 1, 2024 – AUGUST 31, 2025

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
UNIT
UNIT PRICE
3001
Provide graphic design and fabrication services for a comprehensive Interior and Exterior Environmental Graphics/Signage/Wayfinding including concept, design, manufacture, and installation. Mandatory signage on an as-needed basis to meet Mandatory VA Policy Signs by Directive. https://www.cfm.va.gov/til/signs/Signage07-Mandatory.pdf"
3002
ID B.1
3003
ID B.2
3004
ID C
3005
ID D.1
3006
ID D.2
3007
ID D.3

EA

3008
PLUS E.1
3009
PLUS E.2
3010
H.1
3011
J.1
3012
J.2
3013
RR K.1
3014
RR.K2
3015
RR K.3
3016
RR K.4
3017
RR K.5
3018
RR K.6
3019
M.1
3020
M.2
3021
N.1
3022
N.3
3023
Q.2
3024
R.1
3025
Installing

signage, preparation and clean-up of installation site and associated maintenance

HR

3026
IDA
EA

OPTION PERIOD 4: SEPTEMBER 1, 2025 – AUGUST 31, 2026

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
UNIT
UNIT PRICE
4001
Provide graphic design and fabrication services for a comprehensive Interior and Exterior Environmental Graphics/Signage/Wayfinding including concept, design, manufacture, and installation. Mandatory signage on an as-needed basis to meet Mandatory VA Policy Signs by Directive. https://www.cfm.va.gov/til/signs/Signage07-Mandatory.pdf"
4002
ID B.1
4003
ID B.2
4004
ID C
4005
ID D.1
4006
ID D.2
4007
ID D.3

EA

4008
PLUS E.1
4009
PLUS E.2
4010
H.1
4011
J.1
4012
J.2
4013
RR K.1
4014
RR.K2
4015
RR K.3
4016
RR K.4
4017
RR K.5
4018
RR K.6
4019
M.1
4020
M.2
4021
N.1
4022
N.3
4023
Q.2
4024
R.1
4025
Installing

signage, preparation and clean-up of installation site and associated maintenance

HR

4026
IDA
EA

File details come from the government source that posted it. Updated .