S05 - QNA Upgrade Existing Fire Alarm System) RD 2.pdf

PDF 57 KB Posted

Attached to
Z2DA--Upgrade Existing Fire Alarm System Federal contract opportunity
Solicitation number
36C25922R0091
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This document provides details for an upcoming federal contract opportunity to upgrade an existing fire alarm system at the Oklahoma City Veterans Affairs Medical Center. The solicitation seeks a general contractor to replace fire alarm devices, detectors, tamper and flow switches across multiple buildings to bring the system into compliance with NFPA 72 standards. Key requirements include replacing speakers, adding visual notification devices in select areas, upgrading sub-basement components, and adding a carbon monoxide system to the boiler plant area. The contractor must schedule work to minimize medical center disruptions and give 24 hours notice prior to each work period. The period of performance is 300 days from notice to proceed. Work must take place during normal business hours of 7:30am to 4:00pm Monday through Friday unless approved weekend or off-hours work is requested. The successful bidder must meet all applicable licensing and certification requirements.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS VHA Network Contracting Office 19 Rocky Mountain Acquisition Center 6162 South Willow Drive, Suite 300

Greenwood Village, CO 80111

CONTRACTOR Q&A’s (Round 2)

Upgrade Existing Fire Alarm System

Q&A No 1: Thank you for providing answers to the RFI questions for the VA OKC Fire Alarm project. I would like to follow up on Question #7 concerning the commissioning agent. If the General Contractor is responsible for hiring the 3rd party Commissioning Agent but isn’t given any specifications, pricing for this item will be impossible. We would ask you to reconsider and provide specification/scope for the commissioning so proper pricing can be included in the bid item.

Answer No.1: Please see the attached specs for commissioning as requested. (i.e., Attachments 4 & 5).

Q&A No 2:The RFP docs state that this project can take place during normal business hours. This installation will take place in various types of hospital areas including, but not limited to, corridors, offices, labs, exam rooms and conference rooms. Will these areas be available for us to work in during normal business hours? In our experience access has been limited based upon the user needs which result in weekend of night work.

Answer No.2: Area’s the contractor is wanting to work that may affect day in and day out activities must be coordinated with COR. The OKC VAMC will require a 3 week look ahead to ensure the upcoming area’s will be cleared for the contractor to work in during normal working hours.

Q&A No 3: Is it to be assumed that the existing device's back boxes have the capability to support new devices? i.e., correct mudring/support, correct wiring, etc.

Answer No.3: No, that is not to be assumed. Existing backboxes may be reused if they are compliant with new devices. If not, backbox shall be altered or replaced to accommodate new device. Refer to Specification Section SECTION 28 05 28.33 CONDUITS AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY. The design assumes existing speaker wiring is sufficient for one-for-one replacement.

Q&A No 4: Is all existing cabling installed in conduit? If not, would this be addressed on a case-by-case basis?

Answer No.4: Existing areas outside of this scope of work were not evaluated. All new wiring is to be installed in conduit as noted in General Note #4 on Sheet FA000. Existing fire alarm wire that is not in conduit will be evaluated during the installation process.

Q&A No 5: For clarification, is the intent to only replace the devices and equipment shown on the drawings?

Answer No.5: As noted in the PROJECT INFORMATION/SCOPE OF WORK section on Sheet FA000, there are numerous areas that have been remodeled and are not properly represented on the existing building floorplans. Unit Pricing was requested in SECTION 01 00 00 GENERAL REQUIREMENTS to allow for scope changes based on field discoveries not correctly shown on the drawings.