Fort Harrison Pressurization Rooms Balance Report 4-5-21.pdf

PDF 546 KB Posted

Attached to
H341--HVAC Air Test/Balance Service
Solicitation number
36C25922Q0234
Issued by

View the file

Other files

File Type Posted
36C25922Q0234 0002.docx DOCX document
Color HVAC.pdf PDF
Satellite Storage Rooms Report.pdf PDF
36C25922Q0234 0001.docx DOCX document
Temperature and Humdity Monitoring Surgical Services.pdf PDF
Architectural Fourth Floor B154.pdf PDF
Architectural Third Floor B154.pdf PDF
36C25922Q0234.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1352 Airport Road Kalispell, MT 59901 Phone: (406) 257-3013

PROJECT

Fort Harrison Pressurization Rooms Balance Report

3687 Veterans Dr.

Fort Harrison, Montana

TEST AND BALANCE REPORT

DATE

Monday, April 5, 2021

DATE:

1352 Airport Road Kalispell, MT 59901 Phone: (406) 257-3013 Fax: (406) 890-2848

NEBB TAB COMPANY: Precision Air & Water Balance

TAB SUPERVISOR: Jeremy Kiehn

SIGNATURE: 4/5/2021

PROJECT: Fort Harrison Pressurization Rooms Balance Report

ADDRESS: 3687 Veterans Dr. Fort Harrison, Montana

THE DATA PRESENTED IN THIS REPORT IS A SUMMARY OF SYSTEM PERFORMANCE

AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARDS AND PROCEDURES.

ANY VARIANCES FROM DESIGN THAT EXCEEDS NEBB TOLERANCES ARE NOTED.

PROJECT:

TEST DATE: 4/5/2021

ENDOSCOPE CLEANING ROOM 206

NUKE MED 136A

NUKE MED HOT ROOM 136

OR-217B

OR-212

STERILE CORE 220

STERILE PROCESSING LOCKER ROOMS 226 & 228

STERILE PROCESSING 222

GROSS DECONTAMINATION 221

TABLE OF CONTENTS

Fort Harrison Pressurization Rooms Balance Report

REMARKS

INSTRUMENT CALIBRATION REPORT

LEGEND

OR-217A

TEST DATE: 4/5/2021 READINGS BY: JK

Summary: Airflow and pressure readings were taken in the nuke med rooms and the OR / sterile processing areas. All supply & exhaust flows have been totaled for each room. The pressure readings have been called out on a room plan diagram showing the direction or the airflow where each reading was taken.

REMARKS

Fort Harrison Pressurization Rooms Balance Report

DATE: 4/5/2021

MODEL SERIAL

ADM-870 M951006

S-PVF-1 1300267

Evergreen Telemetry Air Data Multimeter 3/23/2021

INSTRUMENT CALIBRATION REPORT

MANUFACTURER Purpose Last Calibrated

Shortridge Air Data Multimeter 5/5/2020

TEST DATE: 4/5/2021

# NUMBER

W WEST

WT WATTS

S.P. STATIC PRESSURE

T.S.P. TOTAL STATIC PRESSURE

SER.FCTR SERVICE FACTOR

SHV SHEAVE

S SOUTH

S.A. SUPPLY AIR

RM ROOM

RPM ROTATIONS PER MINUTE

O.A. OUTSIDE AIR

O.D. OUTSIDE DIAMETER

N/A NOT APPLICABLE

NMP. NAMEPLATE

MKE MAKE

N NORTH

MAU MAKE UP AIR UNIT

MECH. MECHANICAL

IN INCHES

INCH W.C. INCHES WATER COLUMN

FUR FURNACE

HP HORSE POWER

EF EXHAUST FAN

E.S.P. EXTERNAL STATIC PRESSURE

DIA DIAMETER

DIS DISTANCE

E EAST

C.S. CIRCUIT SETTER

D.D. DIRECT DRIVE

C CENTER

CFM CUBIC FEET PER MINUTE

AHU AIR HANDLER UNIT

ACT. ACTUAL

LEGEND

Fort Harrison Pressurization Rooms Balance Report

SYMBOL DEFINITION

LOCATION:

Remarks:

+0.012”

+0.001”P-2

PASS

PASS

TOTAL EXHAUST FLOW (CFM)1755 770

PRESSURE READINGS

P-1

ROOM FLOOR PLAN

TEST DATE: 4/5/2021 READINGS BY: JK

TOTAL SUPPY FLOW (CFM)

ROOM CONDITION REPORT

VAMT Fort Harrison

Operating Room 217A

ROOM AREA

CUBIC FEET

4,766

MINIMUM REQUIRED AIR

CHANGES PER HOUR (ACH)

ACTUAL AIR CHANGES

PER HOUR (ACH)

22.1

Remarks:

ROOM FLOOR PLAN

TEST DATE: 4/5/2021 READINGS BY: JK

PRESSURE READINGS

P-1 +0.005” PASS

P-2 +0.001” PASS

TOTAL SUPPY FLOW (CFM) 1157 TOTAL EXHAUST FLOW (CFM) 685

ROOM CONDITION REPORT

VAMT Fort Harrison

Operating Room 217B

ROOM AREA

CUBIC FEET

2,880

MINIMUM REQUIRED AIR

CHANGES PER HOUR (ACH)

ACTUAL AIR CHANGES

PER HOUR (ACH)

24.1

Remarks:

ROOM FLOOR PLAN

TEST DATE: 4/5/2021 READINGS BY: JK

TOTAL SUPPY FLOW (CFM) 690 TOTAL EXHAUST FLOW (CFM) 159

PRESSURE READINGS

P-1 +0.011” PASS

ROOM CONDITION REPORT

VAMT Fort Harrison

Operating Room 212

ROOM AREA

CUBIC FEET

1,908

MINIMUM REQUIRED AIR

CHANGES PER HOUR (ACH)

ACTUAL AIR CHANGES

PER HOUR (ACH)

21.7

Remarks:

ROOM FLOOR PLAN

TEST DATE: 4/5/2021 READINGS BY: JK

P-2 +0.001” PASS

P-3 +0.001” PASS

TOTAL SUPPY FLOW (CFM) 887 TOTAL EXHAUST FLOW (CFM) 268

PRESSURE READINGS

P-1 +0.01” PASS

ROOM CONDITION REPORT

VAMT Fort Harrison

Sterile Core 220

ROOM AREA

CUBIC FEET

6,386

MINIMUM REQUIRED AIR

CHANGES PER HOUR (ACH)

ACTUAL AIR CHANGES

PER HOUR (ACH)

8.3

Remarks:

-0.0011” PASS

P-5 -0.007” PASS

ROOM FLOOR PLAN

TEST DATE: 4/5/2021 READINGS BY: JK

P-4

P-6 -0.001" PASS

P-7 -0.0011" PASS

P-2 -0.0019” PASS

P-3 -0.0017” PASS

TOTAL SUPPY FLOW (CFM) 162 TOTAL EXHAUST FLOW (CFM) 271

PRESSURE READINGS

P-1 -0.013” PASS

ROOM CONDITION REPORT

VAMT Fort Harrison

Sterile Processing Locker Rooms 226 & 228

ROOM AREA

CUBIC FEET

MINIMUM REQUIRED AIR

CHANGES PER HOUR (ACH)

ACTUAL AIR CHANGES

PER HOUR (ACH)

30.6

Remarks:

ROOM FLOOR PLAN

TEST DATE: 4/5/2021 READINGS BY: JK

P-3 +0.0137” PASS

P-4 -0.0031”

P-2 -0.013” PASS

P-5 -0.007” PASS

PASS

TOTAL SUPPY FLOW (CFM) 2744 TOTAL EXHAUST FLOW (CFM) 701

PRESSURE READINGS

P-1 +0.01” PASS

ROOM CONDITION REPORT

VAMT Fort Harrison

Sterile Processing 222

ROOM AREA

CUBIC FEET

8,020

MINIMUM REQUIRED AIR

CHANGES PER HOUR (ACH)

ACTUAL AIR CHANGES

PER HOUR (ACH)

20.5

Remarks:

ROOM FLOOR PLAN

TEST DATE: 4/5/2021 READINGS BY: JK

P-2 -0.0012” PASS

P-3 -0.002” PASS

TOTAL SUPPY FLOW (CFM) 0 TOTAL EXHAUST FLOW (CFM) 333

PRESSURE READINGS

P-1 -0.007” PASS

ROOM CONDITION REPORT

VAMT Fort Harrison

Gross Decontamination 221

ROOM AREA

CUBIC FEET

1,908

MINIMUM REQUIRED AIR

CHANGES PER HOUR (ACH)

ACTUAL AIR CHANGES

PER HOUR (ACH)

10.5

Remarks:

ROOM FLOOR PLAN

TEST DATE: 4/5/2021 READINGS BY: JK

P-2 +0.023” PASS

TOTAL SUPPY FLOW (CFM) 207 TOTAL EXHAUST FLOW (CFM) 45

PRESSURE READINGS

P-1 +0.005” PASS

ROOM CONDITION REPORT

VAMT Fort Harrison

Dedicated Endoscope Cleaning Area 206

ROOM AREA

CUBIC FEET

MINIMUM REQUIRED AIR

CHANGES PER HOUR (ACH)

ACTUAL AIR CHANGES

PER HOUR (ACH)

13.5

Remarks:

ROOM FLOOR PLAN

TEST DATE: 4/5/2021 READINGS BY: JK

P-2 -0.0021" PASS

P-3 -0.0022" PASS

TOTAL SUPPY FLOW (CFM) 463 TOTAL EXHAUST FLOW (CFM) 771

PRESSURE READINGS

P-1 -0.003" PASS

ROOM CONDITION REPORT

VAMT Fort Harrison

Nuke Med Exam Room 136A

ROOM AREA

CUBIC FEET

3,473

MINIMUM REQUIRED AIR

CHANGES PER HOUR (ACH)

ACTUAL AIR CHANGES

PER HOUR (ACH)

13.3

Remarks:

ROOM FLOOR PLAN

TEST DATE: 4/5/2021 READINGS BY: JK

TOTAL SUPPY FLOW (CFM) 143 TOTAL EXHAUST FLOW (CFM) 178

PRESSURE READINGS

P-1 -0.003" PASS

ROOM CONDITION REPORT

VAMT Fort Harrison

Nuke Med Hot Room 136

ROOM AREA

CUBIC FEET

MINIMUM REQUIRED AIR

CHANGES PER HOUR (ACH)

ACTUAL AIR CHANGES

PER HOUR (ACH)

13.2