36C25818B0324-015.pptx
PPTX presentation 707 KB Posted
- Attached to
- PROJECT 605-15-351 Steam Distro Def Corrections: PLACE OF PERFORMANCE IS LOMA LINDA CALIFORNIA Federal contract opportunity
- Solicitation number
- 36C25818B0324
About this file
36C25818B0324 S02_Utility Shutdown SOP Process Rev 1.pptx
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Utility Shutdown Process LLVAMC FMS-Project SOP
Click to see Slide Click to see Slide
Permit Process (Form SSP 605-25-1) Step 1: Contractor fills out Part I and sends to COR by 21-Days from required shutdown date.
Step 2: COR reviews and does initial assessment of impacted areas outside the work area.
Step 3: COR coordinates with appropriate staff from effected services and FMS shops to ensure the plan for the shutdown, resource requirements and staff responsibilities.
(Print Name and Initial are annotated in section C)
Step 4: COR signs and submits permit to supervisors in section A of Part III
Step 6: Chief of Projects will review and make recommendation.
Step 6: Assistant Chief, will review and make recommendation.
Step 7: Chief FMS reviews, signs and returns COR Step 8: COR provides copy to Contractor
14-Day Service Chief Notice Project: project Name Outage Type: List utility service to be shutdown Planning Date and Time: Time and Date (Estimated)
Actions to occur: The contractor renovating the Cath Lab, AMB Contractors, will conduct a shutdown of the fire sprinkler system on 26 Jan 16. The Project PM, PM NAME, is coordinating with your staff the details of the shutdown.
Operational Impacts: List all possible clinical or service operational impacts.
L/S Impacts: List possible impacts.
Coordination: The VALLMC team with the FMS PM as the lead will plan and coordinate all operational and L/S impact mitigation actions and provide details approximately 3-days out from the planned outage.
POC: PM Contact info
Submitted by COR Via email to Chief of Projects NLT 14-days out
Include Map of effected area
**************CONSTRUCTION NOTICE (Utility Shutdown)************
WHEN: Tuesday, January 26, 2016 from 7 am to 9 am WHO: Advanced Medical Builders WHAT: Fire Sprinkler shutdown to facilitate renovations for the 4E-60 Angio Lab Siemens Artis Q Biplane project ACTIONS: Fire sprinkler shutdown by FMS will begin Tuesday morning at 7:00 AM. An ILSM is not required because the system will be down for less than 4 hours. All alert and notification systems remain operational, and employees will follow the same procedures for a fire incident.
WHERE: Fire Zone 2-3-5 (See Attached Map)
If you have any further questions, feel free to call Adrienne Dunfee, FMS-Project Manager, at extension 4423.
3-Day General Notice Submitted by COR Via email to Chief of Projects NLT 5-days out
Include Map of effected area
Map Examples
Project Name: Triage Sink Shutdown Type: Domestic Water Date and Time: 1/12/16 , 4am to 6am Legend
Effected Area
Work Area
System Shutoff Points
ILSM Symbols
Access Denied Alternate Route
Egress Points
1st Floor
Project Name:
Shutdown Type:
Date and Time:
Legend
Effected Area
Work Area
System Shutoff Points ILSM Symbols
Access Denied Alternate Route
2nd Floor
Date and Time:
Legend
Effected Area
Work Area
System Shutoff Points ILSM Symbols
Access Denied Alternate Route
3rd Floor
Date and Time:
Legend
Effected Area
Work Area
System Shutoff Points ILSM Symbols
Access Denied Alternate Route
4th Floor image1.png image2.emf image3.emf image4.emf image5.emf image6.png