About this file

36C25818B0324 S02_RFI Responses - Supplemental.pdf

View the file

Other files for this federal contract opportunity

Other files attached to PROJECT 605-15-351 Steam Distro Def Corrections: PLACE OF PERFORMANCE IS LOMA LINDA CALIFORNIA, newest first.
File Type Posted
36C25818B0324-019.pdf PDF
36C25818B0324-018.docx DOCX document
36C25818B0324-0002002.pdf PDF
36C25818B0324-0002005.doc DOC document
36C25818B0324-0002001.pdf PDF
36C25818B0324-0002006.docx DOCX document
36C25818B0324-0002007.pdf PDF
36C25818B0324-0002000.docx DOCX document
36C25818B0324-0002004.pdf PDF
36C25818B0324-0002003.pdf PDF
36C25818B0324-0001001.pdf PDF
36C25818B0324-0001002.pdf PDF
36C25818B0324-0001003.pdf PDF
36C25818B0324-0001000.docx DOCX document
36C25818B0324-001.docx DOCX document
36C25818B0324-013.pdf PDF
36C25818B0324-016.pdf PDF
36C25818B0324-005.pdf PDF
36C25818B0324-015.pptx PPTX presentation
36C25818B0324-002.pdf PDF
36C25818B0324-003.pdf PDF
36C25818B0324-010.pdf PDF
36C25818B0324-008.pdf PDF
36C25818B0324-011.pdf PDF
36C25818B0324-017.docx DOCX document
36C25818B0324-009.pdf PDF
36C25818B0324-012.pdf PDF
36C25818B0324-014.pdf PDF
36C25818B0324-006.pdf PDF
36C25818B0324-007.pdf PDF
36C25818B0324-000.docx DOCX document
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI FORM

RFI

(REQUEST FOR INFORMATION)

PROJECT NO.: 605-15-351 RFI NO.:

PROJECT NAME: Steam Distribution Deficiencies Loma

Linda VA

DATE REQUESTED:

SOLICITATION NO.: 36C25818R0217 REFERENCE: Response to RFI 1 &

DRAWING:

N/A

SPECIFICATION

SECTION:

N/A

DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED

The VA Master Construction Specification does not provide the necessary Steam Monitoring information we would anticipate seeing in project plans and/or project specific specifications package. With the documents provided to date, the contractor requirements of the steam trap monitoring system is incomplete. Please see below.

RFI response #002 requests 190 wireless transmitters to be furnished and installed by contractor. Are we to assume there is an existing monitoring system infrastructure that is in working condition and includes Repeater(s), Gateway, and front end?

Does the current monitoring system include a large enough RF repeater grid or will the contractor be required to perform a new RF survey and install new repeaters to support the additional 190 wireless transmitters?

Is there an existing gateway device (i.e. Armstrong SteamEye Gateway) that the new transmitters will communicate back to? Or is this to be provided by Contractor?

Is the monitoring system currently running on any front-end such as SteamStar(will be obsolete May 1, 2019), SAGE, or integrated into the BAS? If not, who is responsible for providing this and what are the requirements?

The trap schedule does not provide steam supply (Constant / Modulating) for each trap which would determine whether to bid URFC or URFM transmitters and if a pressure switch and pressure switch connection will be required.

PROJECT MANAGER’S RESPONSE

No RF survey to be performed. Existing gateway device is D6687, Rec4000m Gateway SteamEye. Monitoring system is currently running on SteamStar. See attached additional steam trap schedule with supply notes. Contractor to provide all new SteamEye transmitters, to include pressure switch and pressure switch connections.

TRACKING NO.: AMENDMENT NO.:

VA PROJECT ENGINEER/MANAGER: DATE:

File details come from the government source that posted it.