About this file

36C25818B0324 0002 S02 - RFI 01 Commissioning VA RESPONSE.pdf

View the file

Other files for this federal contract opportunity

Other files attached to PROJECT 605-15-351 Steam Distro Def Corrections: PLACE OF PERFORMANCE IS LOMA LINDA CALIFORNIA, newest first.
File Type Posted
36C25818B0324-018.docx DOCX document
36C25818B0324-019.pdf PDF
36C25818B0324-0002005.doc DOC document
36C25818B0324-0002006.docx DOCX document
36C25818B0324-0002007.pdf PDF
36C25818B0324-0002002.pdf PDF
36C25818B0324-0002004.pdf PDF
36C25818B0324-0002003.pdf PDF
36C25818B0324-0002000.docx DOCX document
36C25818B0324-0001002.pdf PDF
36C25818B0324-0001001.pdf PDF
36C25818B0324-0001003.pdf PDF
36C25818B0324-0001000.docx DOCX document
36C25818B0324-003.pdf PDF
36C25818B0324-010.pdf PDF
36C25818B0324-008.pdf PDF
36C25818B0324-001.docx DOCX document
36C25818B0324-013.pdf PDF
36C25818B0324-016.pdf PDF
36C25818B0324-005.pdf PDF
36C25818B0324-015.pptx PPTX presentation
36C25818B0324-002.pdf PDF
36C25818B0324-012.pdf PDF
36C25818B0324-004.pdf PDF
36C25818B0324-014.pdf PDF
36C25818B0324-006.pdf PDF
36C25818B0324-007.pdf PDF
36C25818B0324-011.pdf PDF
36C25818B0324-017.docx DOCX document
36C25818B0324-009.pdf PDF
36C25818B0324-000.docx DOCX document
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI FORM

Contractor Name:

Address:

Phone/Fax:

Send to: timothy.saffles@va.gov

RFI

(REQUEST FOR INFORMATION)

PROJECT NO.: RFI NO.:

PROJECT NAME: DATE REQUESTED:

SOLICITATION NO.: REFERENCE:

DRAWING: SPECIFICATION

SECTION:

DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED

Please be specific as possible:

PROJECT MANAGER’S RESPONSE

TRACKING NO.: AMENDMENT NO.:

VA PROJECT ENGINEER/MANAGER: DATE:

Item #5 states, " A third party commissioning agent hired by contractor shall perform the commissioning of the project. VA and the AE consultant will support commissioning the project for design through USGBC.”

Specification Section 23 08 00 (1.1)(B) states, “The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.”

Commissioning agent will be hired by contractor, and appointed by the VA.

JXR-5

Text Box JXR Constructors

JXR-5

Text Box 4550 Kearny Villa Road, Suite 207, San Diego, CA 92123

JXR-5

Text Box 858-874-1925/858-874-1930

JXR-5

Typewritten Text 605-15-351

JXR-5

Text Box Steam Distribution Deficiencies Correction, Loma Linda

JXR-5

Typewritten Text 36C25818B0324

JXR-5

Typewritten Text

JXR-5

Typewritten Text 7/20/2018

JXR-5

Typewritten Text Statement of Work

JXR-5

Typewritten Text 23 08 00

JXR-5

Text Box Item #5 of the Sustainable Design & Energy Reduction scope in the Statement of Work calls for "A third party commissioning agent hired by contractor shall perform the commissioning of the project." Commissioning Specification 23 08 00 General Description states, " A commissioning agent hired by the VA will manage the commissioning process." Please clarify if the VA hired commissioning agent is performing the commissioning or is limited to managing the process on behalf of the VA.

File details come from the government source that posted it.