This document contains a pre-solicitation notice and related questions and answers for a federal construction contract opportunity. The Michael E. DeBakey VA Medical Center in Houston, Texas is seeking to replace dumbwaiter elevators T1 through T6 under project number 580-23-113. Interested parties are advised to check the website frequently for the forthcoming solicitation and any amendments, as this will be a 100% service-disabled veteran-owned small business set-aside awarded as a firm-fixed-price construction contract. The pre-solicitation period will end on or around June 20, 2023 when the request for proposals is issued. A 90-day proposal acceptance period, bid bond, and performance and payment bonds will be required. The work must be performed without disrupting medical center operations and in accordance with all applicable safety and construction standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign-In Sheet.jpg | JPG image | |
| 580-23-113 Project Drawings.pdf | ||
| SF24 Bid Bond.pdf | ||
| 36C25623R0094_1.docx | DOCX document | |
| DOL Wage Determinations TX20230253 dated 5-5-23.pdf | ||
| 580-23-113 Project Specifications.pdf | ||
| 580-23-113 Statement of Work.docx | DOCX document | |
| 36C25623R0094.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25623R0094: 580-23-113 Replace Dumbwaiter Elevators T1-T6 Clarifications
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
580-23-113 Department of Veterans Affairs Network Contracting Office 16 5075 Westheimer Road, Suite 750
Houston TX 77056-5643
Department of Veterans Affairs Network Contracting Office 16 5075 Westheimer Road, Suite 750
Houston TX 77056-5643 To all Offerors/Bidders
36C25623R0094 07-19-2023
X
X X
Wednesday, July 26, 2023 @4pm Central
RE: Replace Dumbwaiter Elevators T1-T6
Clarifications and site visit sign-in sheet are attached. Proposal due date is extended until 7/26 at 4pm Central.
Tabitha Contreras Contracting Officer
1. Does the VA have known timeline for when the AETHON/TUG robot upgrade will take place? If so, could you please let us know when construction is expected to start and finish on that project?
Answer: The new TUGs are scheduled to start arriving in September 2023, and should all be on site by the end of December 2023. Per AETHON, the current system will support the new TUGs.
2. Please advise if there is a beam for material hoisting and what the beam capacity is. One beam was noted during the site walk as available to use, but the capacity was not known.
Answer: The beam capacity is not known, and it is listed as a trolly beam for getting the elevator equipment to the machine rooms. It was used on the last modernization for the larger service and passenger elevators. It has also been used for replacement on the existing generators and motors on the existing T cars. See response to RFI #8 for additional information.
3. T-5 & T-6 Cab Interior. RFI: Please confirm retain rather than replace cab components?
DISCUSSION: We only got to see one of the 2, but in the one we looked at had torn stainless and rather beat up inside the cabs. Best to replace rather than retain.
Answer: The base bid is to replace the door system as noted in the SOW. During contract performance, the contractor shall notify the VA if the existing damaged stainless steel does not impact the installation and operation of the doors.
4. Pit Lighting. RFI: Please confirm pit lighting is to be brought up to ASME 17.1 Code.
DISCUSSION: Pit lighting is insufficient but not addressed directly. Needs to be updated.
Answer: Lighting will need to be upgraded in the pit to comply with the current AMSE code.
5. Conduit. RFI: Are we to replace the screw down couplings with compression couplings where the former was used on EMT in the machine rooms?
DISCUSSION: Existing EMT has screw down couplings. VA Standard is compression.
Answer: No, you are only responsible for new conduit and installation. If the conduit is being replaced, then it will need to comply with VA standards.
6. Machine Room Floor. RFI: Are we to epoxy coat the floor?
DISCUSSION: Not stated, but coating is compromised, and new coating should be applied.
Answer: Yes, include a solid color epoxy flooring system in the machine rooms. VA shall have final choice of color.
7. Cab Flooring. RFI: Please confirm if new flooring is required in T1-T4, T5 & T6?
DISCUSSION: Language in specs seems conflicting between sections on whether or not to replace the flooring in all 6 Dumbwaiters.
Answer: The existing flooring shall remain. If needed the facility will install an LVT or sheet vinyl over the existing. This is typical for all six units.
8. Please advise the roof loads for the area used to transport equipment from the access hatch to the adjacent machine room for T3 and T4.
Answer: The roof load in the area designed for transport of elevator equipment is 12,000 lbs. over a 4 square foot area.
9. Are any of the units on emergency power?
Answer: Yes, T-1, T-2, T-3, and T-4 are on Emergency Power.
10. What are the access requirements for units T5 and T6 located in SPS and the operating rooms?
Answer: Both units in the operating room are located in separate rooms. These rooms can be sealed off and accessed from a sub-sterile corridor. All material removed and installed will need to be covered and sealed when moving through the operating room area. Negative air will be required in these rooms during the work.
In the SPS area, plastic containment barriers will need to be installed around the work area. All material being removed and installed will need to be covered and sealed when moving through the SPS area. Negative air will be required in these areas during the work.
The VA will assist in locating connection points for the negative air units.
11. Do these transport elevators have a fire fighter panel?
Answer: No, they are connected to the main fire fighter panel in the fire control room and return to 1st floor in the event of a fire. They do not have a separate fire fighter panel.
See attached document: Site Visit Sign-In Sheet.