This document package includes structural engineering drawings and notes for a construction project to repair structural flooring at a Department of Veterans Affairs medical facility in Biloxi, Mississippi. The drawings show demolition of existing concrete slabs and installation of new grade beams, slabs, and soil stabilization measures. Structural notes provide design criteria, concrete specifications, reinforcement details, inspection requirements, and demolition phasing. Relatedly, solicitation number 36C25622R0146 from the VA seeks construction services for project number 520-16-102 to address structural and foundation problems at building 3 of the Biloxi facility. The opportunity is open to all responsible sources, with award planned for late 2022 following evaluation of proposals.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURAL NOTES
3-S-100
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORDCONSULTANTS
Principal Engineering, Inc.
in association with Hardy and Associates Architect,PLLC 15260 Big John Road Biloxi, MS 39532
PH: 228-215-1851
2021-08-26 ACM MJR
520-16-102
ED STRUCTURAL
FLOOR REPAIRS
BILOXI, MS
100% CONSTRUCTION
DOCUMENTSCivil Engineer: Principal Engineering, Inc.
Landscape Architect: N/A Interior Designer: Hardy and Associates Architect,PLLC Structural Engineer: Principal Engineering, Inc.
Mechanical Engineer: RBR-Engineering, LLC Fire Protection Engineer: Principal Engineering, Inc.
Electrical Engineer: Welcon Electrical Consultants
Revision 7/28/2022
STRUCTURAL NOTES:
GENERAL NOTES:
1. THE CONTRACTOR SHALL REVIEW ALL DOCUMENTS AND VERIFY ALL DIMENSIONS AND FIELD CONDITIONS AND SHALL CONFIRM THAT WORK IS BUILDABLE AS SHOWN. ANY CONFLICTS OR OMISSIONS, ETC., SHALL BE IMMEDIATELY REPORTED TO THE ENGINEER IN WRITING FOR CLARIFICATION PRIOR TO THE PERFORMANCE OF ANY WORK IN
QUESTION.
2. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. INCASE OF CONFLICT, NOTIFY THE ENGINEER IN WRITING. ARCHITECTURAL FLOOR PLAN SUPERSEDES OTHER
PLANS.
3. THE CONTRACTOR IS EXPECTED TO KEEP PREMISES CLEAN DURING CONSTRUCTION. TRASH WILL NOT BE ALLOWED TO ACCUMULATE IN THE SPACE DURING CONSTRUCTION.
DEBRIS SHALL BE REMOVED DAILY. SAFE WORKING AREA AND CONDITIONS SHALL BE MAINTAINED AT ALL TIMES.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FURNISH AND INSTALL ALL WORK, MATERIALS, EQUIPMENT, AND INCIDENTALS NECESSARY TO COMPLETE PROJECT. THE CONTRACTOR IS TO DELIVER PROJECT CLEAN, COMPLETE, AND USABLE AS APPROVED BY OWNER. INCIDENTAL AND SUPPORTING WORK NECESSARY TO COMPLETE THE PROJECT SHALL BE REQUIRED AT THE CONTRACT PRICE, WHETHER EXPLICITLY SHOWN ON DRAWINGS OR NOT.
5. THE CONTRACTOR SHALL VERIFY LOCATIONS OF EXISTING UTILITIES BEFORE COMMENCING WORK. CARE SHALL BE TAKEN TO PROTECT ALL UTILITIES WHICH ARE TO REMAIN.
6. PERFORM ALL WORK IN ACCORDANCE WITH ACCEPTED CONSTRUCTION STANDARDS. ALL CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS UNLESS A VARIANCE IS APPROVED BY THE GOVERNMENT.
7. WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE, AND LOCAL BUILDING CODE REQUIREMENTS, EXECUTED IN ACCORDANCE WITH
ACCEPTED INDUSTRY STANDARDS AND SHALL CONFORM TO SPECIFIC REGULATIONS OF THE VA
GENERAL STRUCTURAL NOTES
1. DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL BE CONSTRUED TO APPLY TO ANY SIMILAR SITUATION ELSEWHERE ON THE
PROJECT EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN.
2. COORDINATE STRUCTURAL DRAWINGS WITH ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS. GENERAL CONTRACTOR SHALL INSTALL REQUIRED OPENINGS IN
SLAB.
3. ANY CONDITION ENCOUNTERED NOT CONSISTENT WITH THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION IMMEDIATELY.
DESIGN CRITERIA:
DESIGN CODES:
ASCE / SEI 7-10 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES.
ASCE 7-10 BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE ACI 318-11.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION, (AISC) 325-10
INTERNATIONAL BUILDING CODE 2015 EDITION.
DESIGN LOADS:
1.) LIVE LOADS
UNIFORM DISTRIBUTED 125 PSF
CONCENTRATED 2000LBS
SOIL COMPACTION NOTES:
1. FILL MATERIAL IF REQUIRED SHALL BE GRANULAR STRUCTURAL FILL. EXISTING FILL EXCAVATED UNDER SLAB MAY BE REUSED. DO NOT REUSE EXCAVATED POLYMER FOAM
2. FILL SHALL BE PLACED IN LOOSE LIFTS OF 8 INCHES AND COMPACTED TO A MINIMUM OF 95% OF STANDARD MAXIMUM DRY DENSITY.
FORM NOTES:
1. CONTRACTOR SHALL MAKE EARTH FORMS NEAT, UNIFORM, AND FREE FROM WATER OR DEBRIS. CONSTRUCTED STEEL OR WOOD FORMS SHALL BE REQUIRED IF CONTRACTOR IS UNABLE TO COMPLETE SATISFACTORY EARTH FORMS. SUBGRADE SHALL BE COMPACTED, SMOOTH, AND SET TO GRADE PRIOR TO SLAB CONCRETE POUR.
2. FORMS, CENTERING, CORES, MOLDS, ETC.: CONSTRUCT SO THAT THE FINISHED CONCRETE WILL CONFORM TO THE SHAPES, LINES, GRADES AND DIMENSIONS INDICATED ON
THE DRAWINGS.
3. SUBSTANTIALLY AND SUFFICIENTLY TIGHTEN FORMS TO PREVENT LEAKAGE OF MORTAR AND PREVENT THE DEFLECTION OF FORMS UNDER THE WEIGHT OF WET CONCRETE OR
OF CONSTRUCTION LOADS.
CONCRETE NOTES:
1. ALL CONCRETE SHALL BE NORMAL WEIGHT CONCRETE AND CONFORM TO CURRENT ACI SPECIFICATIONS AND SHALL DEVELOP 4000 PSI IN 28 DAYS. SEE SPECIFICATIONS.
2. PATCH HONEYCOMBS. REMOVE EXPOSED FINS AND ROUGH EDGES.
3. A STEEL TROWEL FINISH SHALL BE GIVEN TO ALL CONCRETE EXPOSED IN COMPLETED WORK, BUT NOT INCLUDING FLOOR SLABS, UNLESS SPECIFIED OTHERWISE. FINS AND PROJECTIONS SHALL BE REMOVED AND THE SURFACES RUBBED WITH CEMENT OR CARBORUNDUM BRICK. NO MORTAR OR GROUT SHALL BE EMPLOYED. FORM MARKS SHALL
BE REMOVED LEAVING SURFACES UNIFORMLY SMOOTH AND WASHED CLEAN.
4. INSTALL 15 MIL VAPOR BARRIER OVER ALL FILL UNDER ALL CONCRETE. SEAL AROUND ALL PIPE AND LAP ALL JOINTS A MIN. OF 12".
5. NO ALUMINUM PIPES OR WIRES SHALL BE EMBEDDED IN THE CONCRETE UNLESS THE ALUMINUM IS ADEQUATELY COATED.
REINFORCING STEEL NOTES:
1. REINFORCING STEEL SHALL BE ASTM A615, GRADE 60, ALL BARS SHALL BE DEFORMED CONFORMING TO ASTM A305
2. DETAILING AND ACCESSORIES SHALL CONFORM TO TYPICAL DETAILS SHOWN IN THE "MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES", ACI 315, LATEST EDITION.
3. LAP BARS 30 DIAMETERS AT CORNERS, SPLICES, AND INTERSECTIONS OR 1'-6, WHICHEVER IS GREATER. PROVIDE NECESSARY REINFORCING STEEL ACCESSORIES TO HOLD
BARS IN PROPER POSITION.
4. ACCURATELY PLACE AND POSITION BARS AND SECURE AGAINST DISPLACEMENT BY USING SUITABLE CLIPS, METAL CHAIRS, SPACERS, OR BY METAL HANGERS.
5. PROVIDE MINIMUM PROTECTIVE CONCRETE COVER FOR REINFORCING STEEL AS INDICATED ON THE DRAWINGS.
STATEMENT OF SPECIAL INSPECTIONS:
1. CONTINUOUS INSPECTION OF CONCRETE SLUMP, TEMPERATURE, BATCH TIME, AND CURED STRENGTH SHALL BE BY INDEPENDENT TESTING LAB PERSONNEL. SEE SPECS.
2. INSPECTION OF DOWELS/ANCHORS FIXED INTO EXISTING CONCRETE, AND COMPLETED REINFORCING STEEL PRIOR TO NEW CONCRETE POUR SHALL BE BY ENGINEER OF
RECORD, OR HIS DESIGNATED QUALIFIED REPRESENTATIVE.
3. NOTIFICATION NO LESS THAN 3 DAYS PRIOR TO REQUIRED INSPECTION DATE IS A CONTRACTOR RESPONSIBILITY. WORK COMPLETED WITHOUT REQUIRED INSPECTIONS SHALL
BE REMOVED AND RE-CONSTRUCTED AT CONTRACTOR EXPENSE.
4. CONTRACTOR SHALL X-RAY EXISTING CONCRETE MEMBERS PRIOR TO DRILLING FOR ANCHORS. FURNISH REPORT OF INSPECTION TO CONTRACTING OFFICER STATING ABSENCE OR PRESENCE OF CONFLICT. REPEAT X-RAY AT NEW LOCATIONS IDENTIFIED, IF NECESSARY.
131211a10a8b7b6b 7a1
ELEVATOR PIT
SIM.
A
S1.2 A
S1.2
A
S1.3
1'- 4 3/4"
3" FROM
COLUMN ℄
3" FROM
COLUMN ℄
2'-3" FROM
COLUMN ℄
1'-6" FROM EDGE
OF ELEVATOR PIT
3"
REMOVE EXISTING 4" FLOOR SLAB
(THICKENED TO 6" AT EXTERIOR
WALLS AND ELEVATOR)
9" FROM
COLUMN ℄
SLAB TO REMAIN
IN PLACE
9" FROM
COLUMN ℄
9" FROM
COLUMN ℄
HAND CHIP TO CONCRETE
WALL AS REQ'D FOR
GRADE BEAMS
JACK AND LEVEL SLAB W/ STRUCTURAL POLYURETHANE
FOAM AFTER SLAB HAS BEEN LEVELED, CONTRACTOR
SHALL INSTALL GRID OF COMPACTION GROUTED
24" DIAMETER MICRO PILES 20' IN LENGTH (CHEMICAL GROUT).
'-3
GR
OU
TE
D
CU
RT
AI
N W
AL
L
REQ'D PERMEATION GROUTED CURTAIN WALL (TIP
ELEV. 8'-0" BELOW EXISTING SLAB, 18" O.C. INJECTION
POINTS, POLYURETHANE SOIL GROUT) SEE NOTE 15
HAND CHIP TO CONCRETE
WALL AS REQ'D FOR
GRADE BEAMS
HAND CHIP TO CONCRETE
WALL AS REQ'D FOR
GRADE BEAMS
SAWCUT SLAB
FULL DEPTH
SAWCUT SLAB
FULL DEPTH
EXISTING PILE CAPS
TO REMAIN (TYP.)
EXISTING GRADE BEAMS
TO BE REMOVED (8" DEEP)
ELECTRICAL ROOMS AND
EQUIPMENT SHALL REMAIN
ACTIVE AND ACCESSIBLE
AT ALL TIMES.
EDGE OF EXISTING
GRADE BEAM
SAWCUT SLAB FULL
DEPTH AT 1' - 4 34"
FROM FACE OF WALL
SAWCUT SLAB
FULL DEPTH
SAWCUT SLAB
FULL DEPTH AT 1' - 9"
FROM FACE OF WALL
STRIP OF EXISTING
SLAB TO REMAIN
9'-8"9'-8"9'-8"
6'- 5"
6'- 5"
6'- 5"
6'- 6"
7'
1'-0"
24" DIAMETER (MIN.)
MICROPILE
LOCATION (TYP.)
SAWCUT SLAB FULL DEPTH
AT 10 34" FROM FACE OF WALL
SAWCUT SLAB FULL DEPTH
AT 10 34" FROM FACE OF WALL
NOTE 3,
TYP.
NOTE 3,
TYP.
18" O.C. (MAX)
9"
MAX
EDGE OF EXISTING
SLAB TO REMAIN SAWCUT AS REQUIRED
FOR DRAIN LINES. SEE
PLUMBING FOR DRAIN
LOCATIONS
SAWCUT SLAB
FULL DEPTH
9" MAX
2 3
P
3-S-101
EXISTING WALL TO
REMAIN
SAWCUT LINE
6"
SLAB (TO BE REMOVED)
GROUT CURTAIN
WALL REQ'D
SLAB DEMOLITION AND SOIL
STABILIZATION PLAN
3-S-101
LEGEND
SAW CUT FULL DEPTH
REMOVE FLOOR SLAB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORDCONSULTANTS
Principal Engineering, Inc.
in association with Hardy and Associates Architect,PLLC 15260 Big John Road Biloxi, MS 39532
PH: 228-215-1851
2021-08-26 ACM MJR
520-16-102
ED STRUCTURAL
FLOOR REPAIRS
BILOXI, MS
100% CONSTRUCTION
DOCUMENTSCivil Engineer: Principal Engineering, Inc.
Landscape Architect: N/A Interior Designer: Hardy and Associates Architect,PLLC Structural Engineer: Principal Engineering, Inc.
Mechanical Engineer: RBR-Engineering, LLC Fire Protection Engineer: Principal Engineering, Inc.
Electrical Engineer: Welcon Electrical Consultants
Revision 7/28/2022
D
B9
A8
AA
BB
NORTH
DEMOLITION PHASING
1. INSTALL CHEMICALLY GROUTED CURTAIN WALL ALONG COLUMN LINE 8b. SLAB MAY BE REMOVED
TO EXPOSE SOIL ON CURTAIN WALL ALIGNMENT.
2. JACK AND LEVEL SLAB TO REMAIN IN-PLACE W/ITH POLYURETHANE FOAM. MATCH EXISTING
FINISHED FLOOR ELEVATION.
3. INSTALL CHEMICALLY GROUTED MICRO PILES TO UNDERPIN SLAB TO REMAIN IN PLACE.
4. CONTRACTOR SHALL SAW CUT SLAB AS SHOWN FULL DEPTH.
5. COMPLETE DEMOLITION WORK.
DEMOLITION NOTES
6. CONTRACTOR SHALL EXERCISE CARE NOT TO DISTURB OR DAMAGE WALLS, COLUMNS, CEILING, SLABS AND STRUCTURE THAT ARE TO REMAIN IN-PLACE OR ITEMS THAT ARE TO BE SALVAGED.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO THESE ITEMS.
7. CONTRACTOR SHALL CAREFULLY REMOVE TRAUMA ROOM LIGHT AND ITS STEEL FRAMEWORK.
LIGHT AND FRAMEWORK SHALL BE RELOCATED IN NEW TRAUMA ROOM, REFER TO
ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR FURTHER DETAILS.
8. CONTRACTOR SHALL CAREFULLY REMOVE PATIENT LIFTS AND LIFT FRAMING FROM EXAM
ROOMS. PATIENT LIFTS AND FRAMEWORK ARE TO BE REINSTALLED IN RENOVATED EXAM ROOMS.
REFER TO ARCHITECTURAL DRAWINGS FOR FURTHER DETAIL.
9. CONTRACTOR SHALL SURVEY SLAB TO REMAIN TO ESTABLISH EXISTING ELEVATION AND PITCH, AND SUBMIT PROPOSED LEVELING DISTANCES FOR APPROVAL PRIOR TO CONSTRUCTION.
10. HAND PROBE MICROPILE LOCATION PRIOR TO INJECTION TO ESTABLISH CLEARANCE FROM
BURIED OBSTRUCTION.
11. GROUT SLAB PENETRATIONS AFTER LEVELING AND MICROPILE INSTALLATION WITH NON-SHRINK
EPOXY GROUT.
12. EXISTING EQUIPMENT REMOVED SHALL BE STORED, PROTECTED, AND SECURED UNTIL
RE-INSTALLED BY CONTRACTOR.
SOIL STABILIZATION NOTES
13. CONTRACTOR SHALL JACK AND LEVEL REMAINING SLAB AND INSTALL GROUTED MICROPILES
AFTER SAWCUTTING SLAB BUT PRIOR TO GENERAL SLAB DEMOLITION.
14. SLAB JACKING AND LEVELING SHALL UTILIZE A TWO COMPONENT, HIGH STRENGTH, HIGH
DENSITY, HYDRO INSENSITIVE, STRUCTURAL POLYURETHANE FOAM.
15. CURTAIN WALLS AND MICROPILES SHALL BE CHEMICALLY GROUTED WITH A SINGLE COMPONENT, MOISTURE ACTIVATED, HYDROPHOBIC, LOW VISCOSITY, POLYURETHANE SOIL GROUT.
16. CONTRACTOR SHALL SUBMIT PRODUCT DATA TO CONTRACTING OFFICER'S REPRESENTATIVE
FOR APPROVAL PRIOR TO INSTALLATION. CERTIFY THAT PRODUCTS ARE COMPATIBLE WITH SOIL CONDITIONS, ACCORDING TO SOIL BORINGS. IF SOIL CONDITIONS ARE DISCOVERED TO VARY, SUBMIT REVISED PRODUCTS FOR APPROVAL. NO ADJUSTMENT IN PAY SHALL BE MADE FOR
VARYING SOIL CONDITIONS
17. MATERIAL SHALL BE STORED, HANDLED AND INSTALLED ACCORDING TO MANUFACTURER'S
INSTRUCTIONS.
18. SLAB LEVELING, CURTAIN WALL, AND MICROPILES SHALL BE INSTALLED BY A QUALIFIED
SPECIALTY SUBCONTRACTOR. SUBMIT NO LESS THAN 5 PROJECTS SIMILAR IN SCOPE
COMPLETED IN THE LAST 2 YEARS FOR APPROVAL OF CREW OR SUBCONTRACTOR PRIOR TO
CONSTRUCTION.
19. SPECIALTY SUBCONTRACTOR SHALL SUBMIT LEVELING AND GROUTING PLAN FOR APPROVAL
PRIOR TO CONSTRUCTION. DETAIL AND DESCRIBE THE SCHEDULE, EQUIPMENT, AND SEQUENCE
OF TASKS.
AutoCAD SHX Text 3/16"=1'
AutoCAD SHX Text
SLAB DEMOLITION PLAN
AutoCAD SHX Text 1"=1'-0"
AutoCAD SHX Text
SAWCUT DETAIL
AutoCAD SHX Text P
131211a10a8b7b7a1
ELEVATOR PIT
SEE ARCH.
A
S1.2 A
S1.2
A
S1.3
26'-0"
13'-0" 13'-0"
26'-0"
13'-0" 13'-0"
28'-0"
14'-0"11'-9" 2'-3"
'-0
'-0
'-0
'-0
2'- 1 1
/4"
GRADE BEAM "A"
(TYP.)(EAST-WEST)
GRADE BEAM "B"
(TYP.)(NORTH-SOUTH)
1'-0" FROM
COLUMN ℄
2'-
GR
AD
E
BE
AM
8" SLAB W/ 2 MATS OF #4
E.W. @ 12" O.C. FF ELEV.
26.56 (MATCH EXISTING)
'-3
GR
OU
TE
D
CU
RT
AI
N W
AL
L
REQ'D PERMEATION GROUTED CURTAIN WALL (TIP
ELEV. 8'-0" BELOW EXISTING SLAB, 18" O.C. INJECTION
POINTS, POLYURETHANE SOIL GROUT) SEE NOTE 15
B
3-S-102
C
3-S-103
A
3-S-102
G
3-S-103
F
3-S-103
ELECTRICAL ROOMS AND
EQUIPMENT SHALL REMAIN
ACTIVE AND ACCESSIBLE
AT ALL TIMES.
EDGE OF EXISTING GRADE BEAM
E
3-S-103
M
3-S-103
L
3-S-103
L
3-S-103
L
3-S-103
D
3-S-103 D
3-S-103
D
3-S-103
N
3-S-104
N
3-S-103
G
3-S-104
G
3-S-104
G
3-S-104
F
3-S-103
M
3-S-103
N
3-S-103
TYP.
O
3-S-104
SEE PLUMBING
PLANS FOR DRAIN
LINE LOCATIONS.
(TYP.)
1'-4"
8"
2'- 0"
3" C
LR
3" CLR
3" C
LR
3/4 " C
LR
1"
(3) #6
(3) #8
#3 STIRRUPS
(SPACING VARIES)
VAPOR BARRIER (TYP.
UNDER SLAB)
#4@ 8" O.C. E.W. T&B
1'-3"
8"
1'- 9"
3" C
LR
3" CLR
3" C
LR
3/4 " C
LR
1"
(3) #6
(3) #8
#3 STIRRUPS
(SPACING VARIES)
VAPOR BARRIER (TYP.
UNDER SLAB)
#4@ 8" O.C. E.W. T&B
SLAB AND GRADE BEAM PLAN
3-S-102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORDCONSULTANTS
Principal Engineering, Inc.
in association with Hardy and Associates Architect,PLLC 15260 Big John Road Biloxi, MS 39532
PH: 228-215-1851
2021-08-26 ACM MJR
520-16-102
ED STRUCTURAL
FLOOR REPAIRS
BILOXI, MS
100% CONSTRUCTION
DOCUMENTSCivil Engineer: Principal Engineering, Inc.
Landscape Architect: N/A Interior Designer: Hardy and Associates Architect,PLLC Structural Engineer: Principal Engineering, Inc.
Mechanical Engineer: RBR-Engineering, LLC Fire Protection Engineer: Principal Engineering, Inc.
Electrical Engineer: Welcon Electrical Consultants
Revision 7/28/2022
D
B9
A8
AA
BB
SLAB AND GRADE BEAM NOTES:
1. CONTRACTOR SHALL REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR REQUIRED SLAB AND GRADE
BEAM PENETRATION LOCATIONS. ADJUST SLAB REBAR AS NECESSARY TO PROVIDE A MINIMUM OF 2 INCH CLEARANCE BETWEEN SLAB REINFORCEMENT AND EDGE OF PENETRATION. ADDITIONAL BARS MAY BE
REQUIRED AT NO ADDITIONAL PAY.
2. FINISHED FLOOR ELEVATION SHALL MATCH EXISTING (26.56)
3. APPROXIMATELY 162 CY OF FILL MATERIAL BELOW THE EXISTING SLAB SHALL REQUIRE EXCAVATION DUE TO THE STRUCTURAL SLAB AND GRADE BEAMS BEING THICKER THAN THE EXISTING 4 INCH SLAB BEING REMOVED. NOTE THAT THE EXISTING HAS BEEN URETHANE FOAM JACKED PREVIOUSLY THUS IN ADDITION TO THE GRANULAR FILL MATERIAL THERE WILL BE POLYURETHANE STRUCTURAL FOAM WITHIN THE AREA OF
REQUIRED STRUCTURAL EXCAVATION.
4. CONTRACTOR SHALL BE AWARE THAT THERE ARE EXISTING UTILITIES AND CONDUIT WITHIN THE EXCAVATION AREA AND SHALL TAKE PRECAUTIONS NOT TO DAMAGE ANY EXISTING UTILITIES OR CONDUIT.
REFER TO MECHANICAL DRAWINGS FOR FURTHER DETAILS. ANY UTILITIES DAMAGED SHALL BE REPLACED
AT THE CONTRACTOR'S EXPENSE.
5. VAPOR BARRIER (15 MIL) SHALL BE PLACED BETWEEN THE CONCRETE AND GRADE.
LEGEND
REQ'D STRUCTURAL SLAB
NORTH
AutoCAD SHX Text 3/16"=1'
AutoCAD SHX Text
SLAB AND GRADE BEAM PLAN
AutoCAD SHX Text 1"=1'-0"
AutoCAD SHX Text
TYPICAL GRADE BEAM "B" SECTION (NORTH - SOUTH ORIENTATION)
AutoCAD SHX Text 1"=1'-0"
AutoCAD SHX Text
TYPICAL GRADE BEAM "A" SECTION (EAST - WEST ORIENTATION)
AutoCAD SHX Text A
B
TOP OF SLAB/BEAM
1'- 4"
4"
8"
2'- 0"
(4) #4 X 1'-0" DEFORMED DOWEL BARS ADHESIVELY
ANCHORED INTO EXISTING PILE CAP (6"
EMBEDMENT)
1/2"
JOINT FILLER
9"3'-0"
EXISTING PILE CAP AND
COLUMN
EL. 25.23
1'-0"
EXISTING PILE CAP
K
3-S-103
(3) #6
(3) #8
9" 2'-0"
STIRRUPS @ 4" O.C. IF BEAM
DEPTH IS REDUCED
STIRRUPS @ 6" O.C.
VAPOR BARRIER
1'- 9"
8"
1'- 9"
4 1 2" 4"
EXISTING PERIMETER / ELEVATOR
FOUNDATION WALL
(5) #6 X 2'-0" DEFORMED DOWEL BARS ADHESIVELY
ANCHORED INTO FOUNDATION WALL (12" EMBEDMENT)
SEE SECTION J
SL
AB
4 1 2"
J
3-S-103
(3) #6
(3) #8
EXTERIOR WALL
#3 STIRRUPS
SAWCUT
VAPOR BARRIER
8" 8"
2'- 0"
#4 X 1'-0" DOWELS
ADHESIVELY/ANCHORED INTO
EXISTING PILE CAP (6"
EMBEDMENT)
31 2" 41 2"
9"9"
8"
4"41
4"
3'- 1"
5'-6"
EXISTING PILE CAP
℄ DOWEL
3" C
LR
3/4 " C
LR#4@ 8" O.C. E.W. T&B
PILE CAP SHOWN
BEYOND SECTION
8"
1'- 9"
3" C
LR
3" CLR
3" C
LR
1" C
LR(3) #6
(3) #8
#4@ 8" O.C. E.W. T&B
#3
VAPOR BARRIER
4"
PERMEATED RESIN CURTAIN WALL
EXISTING SLAB ON
GRADE
8" C
LR
4'- 6"
M
IN
1'-6"
8"
1'- 9"
(5) #6 DOWELS
1 2" 4"
4" 4 1 2"
4" 43
4"43 4" 41
4"
℄ DOWEL
DOWEL
BEAM ℄
DOWEL
℄ DOWEL
℄ DOWEL
3" C
LR
3/4 " C
LR#4@ 8" O.C. E.W. T&B
VAPOR BARRIER
2" M
IN
6" SLEEVE (PVC
PIPE) (SCH. 40)
(3) #8
3" C
LR
3/4 " C
LR#4@ 8" O.C. E.W. T&B
SEAL VAPOR BARRIER
AT ALL PENETRATIONS
8"
EXISTING PERIMETER / ELEVATOR
FOUNDATION WALL
SL
AB
4" 4"
#4@ 8" O.C. E.W. T&B
PLATE DOWELS @ 18" O.C.
VAPOR BARRIER
8"
4"
EXISTING SLAB
SAWCUT
TOP OF SLAB
GRADE BEAM "A" OR "B"
AS REQUIRED
VAPOR BARRIER (TYP.)
PLATE DOWELS @ 18" O.C. AT
MID-DEPTH OF EXISTING SLAB
EXISTING PERIMETER
FOUNDATION WALL
EXTERIOR WALLSAWCUT
GRADE BEAM "B"
TOP OF SLAB
VAPOR BARRIER (TYP.)
PLATE DOWELS @ 18" O.C.
6"
4" 4"
NON-SHRINK EPOXY
PLATE DOWEL, MIN. 24 SQ. IN.,
3/8 IN. THICK.
COMPRESSIBLE SLEEVE TO
MATCH DOWEL
EXISTING CONCRETE
4" 4"
SLAB AND GRADE BEAM SECTIONS
AND DETAILS
3-S-103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORDCONSULTANTS
Principal Engineering, Inc.
in association with Hardy and Associates Architect,PLLC 15260 Big John Road Biloxi, MS 39532
PH: 228-215-1851
2021-08-26 ACM MJR
520-16-102
ED STRUCTURAL
FLOOR REPAIRS
BILOXI, MS
100% CONSTRUCTION
DOCUMENTSCivil Engineer: Principal Engineering, Inc.
Landscape Architect: N/A Interior Designer: Hardy and Associates Architect,PLLC Structural Engineer: Principal Engineering, Inc.
Mechanical Engineer: RBR-Engineering, LLC Fire Protection Engineer: Principal Engineering, Inc.
Electrical Engineer: Welcon Electrical Consultants
Revision 7/28/2022
NOTE:
NOT ALL REINFORCEMENT
SHOWN FOR CLARITY
AutoCAD SHX Text 1'=1'=0"
AutoCAD SHX Text
GRADE BEAM TO WALL CONNECTION
AutoCAD SHX Text 1'=1'=0"
AutoCAD SHX Text
GRADE BEAM TO PILE CAP CONNECTION
AutoCAD SHX Text 1'=1'=0"
AutoCAD SHX Text
GRADE BEAM CORBEL AND CURTAIN WALL SECTION
AutoCAD SHX Text 1'=1'=0"
AutoCAD SHX Text
GRADE BEAM PIPE PENETRATION DETAIL
AutoCAD SHX Text 1'=1'=0"
AutoCAD SHX Text
GRADE BEAM TO WALL CONNECTION DETAIL
AutoCAD SHX Text 1'=1'=0"
AutoCAD SHX Text
TYPICALGRADE BEAM TO PILE CAP CONNECTION DETAIL
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text 1'=1'=0"
AutoCAD SHX Text
SLAB TO WALL CONNECTION SECTION
AutoCAD SHX Text F
AutoCAD SHX Text 1"=1'-0"
AutoCAD SHX Text
GRADE BEAM CORBEL SECTION
AutoCAD SHX Text L
AutoCAD SHX Text 1"=1'-0"
AutoCAD SHX Text
GRADE BEAM AT EXTERIOR WALL
AutoCAD SHX Text M
AutoCAD SHX Text 3"=1'-0"
TYPICAL PLATE DOWEL
3'-
3"
2'-0"
9"-0"
FACE OF COLUMN / WALL
COLUMN AND
FOOTING
COMPACTED STRUCTURAL
FILL (TYP.)VAPOR BARRIER
(TYP.)
EXISTING PILE CAP
(12) #3 STIRRUPS @ 6" O.C.
(3) #6
(3) #8
6"
4"
EXISTING SLAB
SAWCUT
TYPICAL GRADE BEAM "B"
VAPOR BARRIER (TYP.)
3"
3"
1'-4"
TYPICAL GRADE BEAM "A"
18"
#3 DOWELS @ 6" DRILL AND ANCHOR W/ HIGH-STRENGTH EPOXY
NEAT VERTICAL SAW CUT
6" (MIN.)
EXISTING SLAB
BURIED UTILITY
6" LAP (MIN.)
TAMP BACKFILL
PATCH AND SEAL VAPOR BARRIER W/ MANUFACTURER
APPROVED TAPE
#3 BARS CONT.
EXISTING DRIVEWAY
PAVING
EXPOSE AND CLEAN
EXISTING REINFORCING
8"
EXPANSION JOINT
SEE DETAIL "T"
EXISTING COMPACTED FILL
4 x 4 W 5.5 x W 5.5 WWF
11"
9" 9"
9"
SEE DETAIL "T"
SUPPORT CHAIR
EXPANSION JOINT FILLER
4"
1" DIA. DOWELS @ 12" O.C.
9"
8"
3/8"
1/4
LOW MODULUS
SILICONE SEALANT
1/2
1 1 /4"
CLOSED CELL
POLYETHYLENE
BACKER ROD
(1/2" DIA.)
1/8"
3"
EXPANSION
JOINT FILLER
CLOSED CELL
POLYETHYLENE
BACKER ROD
(1/2" DIA.)
1/2"
1/4
1/2
LOW MODULUS
SILICONE
SEALANT
2" (S
AW
ED
OR
F
OR
ME
D)
SLAB AND GRADE BEAM SECTIONS
AND DETAILS
3-S-104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORDCONSULTANTS
Principal Engineering, Inc.
in association with Hardy and Associates Architect,PLLC 15260 Big John Road Biloxi, MS 39532
PH: 228-215-1851
2021-08-26 ACM MJR
520-16-102
ED STRUCTURAL
FLOOR REPAIRS
BILOXI, MS
100% CONSTRUCTION
DOCUMENTSCivil Engineer: Principal Engineering, Inc.
Landscape Architect: N/A Interior Designer: Hardy and Associates Architect,PLLC Structural Engineer: Principal Engineering, Inc.
Mechanical Engineer: RBR-Engineering, LLC Fire Protection Engineer: Principal Engineering, Inc.
Electrical Engineer: Welcon Electrical Consultants
Revision 7/28/2022
LEGEND
NEW WORK
EXISTING
AutoCAD SHX Text 1"=1'-0"
AutoCAD SHX Text
GRADE BEAM TURN DOWN
AutoCAD SHX Text G
AutoCAD SHX Text 1"=1'-0"
AutoCAD SHX Text
GRADE BEAM INTERSECTION
AutoCAD SHX Text N
AutoCAD SHX Text 3"=1'-0"
AutoCAD SHX Text
SLAB REPAIR
AutoCAD SHX Text O
AutoCAD SHX Text 3"=1'-0"
AutoCAD SHX Text
EXPANSION JOINT AT TEMPORARY AMBULANCE DROPOFF
AutoCAD SHX Text 3"=1'-0"
AutoCAD SHX Text
TYPICAL PAVING EXPANSION JOINT
AutoCAD SHX Text T
AutoCAD SHX Text 1'-0"=1'-0"
AutoCAD SHX Text
TYPICAL PAVING CONTRACTION JOINT
AutoCAD SHX Text Q
AutoCAD SHX Text R
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
DETAIL
S
| Sheets and Views |
| 1843-MS-Structural Notes-NOTES |
| 1843-PL-Slab Plan-(4) |
| 1843-PL-Slab Plan-(5) |
| 1843-DT-Details-(6) |
| 1843-DT-Details-(7) |
File details come from the government source that posted it. Updated .