This document package includes drawings and specifications for a structural repair project at a Veterans Affairs medical center emergency room. The solicitation calls for demolition and new construction work to address structural problems in Building 3, including repairs to slabs, grade beams, walls, ceilings and associated mechanical, electrical and plumbing systems. The work encompasses emergency room areas, temporary emergency department spaces, and surgical suites. The solicitation was issued by the Veterans Health Administration under Department of Veterans Affairs contract number 36C25622R0146, with responses due on unspecified dates. The specifications include over 60 drawings laying out the scope of demolition and new construction work in detail.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4-20-20

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

COVER SHEET

3-GI-001 – ARCH INFORMATION : SHEET INDEX, ABBREVIATIONS, CODE AND GENERAL

NOTES

3-GI-002 – GENERAL CONSTRUCTION DETAILS

3-GI-003 – GENERAL CONSTRUCTION DETAILS

3-GI-004 – AMERICANS WITH DISABILITIES ACT STANDARD DETAILS

3-GI-005 – GENERAL DEMOLITION NOTES

3-GI-006 – GENERAL NEW CONSTRUCTION NOTES

3-GI-101 – BUILDING 3 OVERALL PLAN- 1”=20’-0”, ARCH. SYMBOLS, INFECTION

CONTROL NOTES, STORAGE NOTES, PHASING NOTES

3-GI-102 – ED NEW LIFE SAFETY PLAN - 3/16” = 1’-0”

3-GI-103 – TEMPORARY ED NEW LIFE SAFETY PLAN - 3/16” = 1’-0”

3-AD-101 – ER DEMOLITION FLOOR PLAN - 3/16” = 1’-0”

3-AD-102 – ER DIMENSIONED DEMOLITION FLOOR PLAN - 3/16” = 1'-0"

3-AD-103 – ER EQUIPMENT DEMOLITION FLOOR PLAN - 3/16” = 1’-0”

3-AD-131 – ER DEMOLITION REFLECTED CEILING PLAN - 3/16” = 1’-0”

3-AD-132-1 – ER DEMOLITION PARTIAL RELECTED CEILING PLAN - 1/4” = 1’-0”

3-AD-132-2 – ER DEMOLITION PARTIAL RELECTED CEILING PLAN - 1/4” = 1’-0”

3-AS-101 – ER WALL TYPES FLOOR PLAN AND WALL TYPES SCHEDULE - 3/16” = 1'-0"

3-AS-102-1 – ER PARTIAL FLOOR PLAN - 3/8” = 1'-0"

3-AS-102-2 – ER PARTIAL FLOOR PLAN - 3/8” = 1'-0"

3-AS-103 - TEMPORARY ED DEMOLITION AND NEW WORK - 3/16” = 1’-0”

3-AS-104 - TEMPORARY ED RCP, TEMPORARY AMBULANCE DROPOFF DEMOLITION AND NEW

WORK - 3/16” = 1’-0”

3-AS-111-1 – ER DIMENSIONED PARTIAL PLAN - 1/4" = 1'-0"

3-AS-111-2 – ER DIMENSIONED PARTIAL PLAN - 1/4" = 1'-0"

3-AS-121 - ER ROOF PLAN AND DETAILS - 3/16” = 1’-0”

3-AS-131-1 – ER PARTIAL REFLECTED CEILING PLAN - 1/4" = 1'-0"

3-AS-131-2 – ER PARTIAL REFLECTED CEILING PLAN - 1/4" = 1'-0"

3-AS-151 – EQUIPMENT, FURNISHING AND ACCESSORY LEGENDS

3-AS-500 – INTERIOR ELEVATIONS

3-AS-501 – INTERIOR ELEVATIONS

3-AS-502 – INTERIOR ELEVATIONS

00 01 15 - 2

3-AS-551 – MILLWORK SECTIONS

3-AS-552 – MODULAR FURNITURE PLAN AND DETAILS

3-AS-553 – MODULAR FURNITURE SPECIFICATIONS

3-AS-600 – DOOR ELEVATIONS, SCHEDULES AND DETAILS

3-AS-601 – DOOR AND WINDOW ELEVATIONS AND DETAILS, GLAZING LEGEND

3-AS-602 – DOOR DETAILS

3-AS-700 – COLUMN DETAILS

3-AS-900 – NEW FINISH SCHEDULES

3-AS-901 – NEW FINISH SCHEDULE AND LEGEND

3-AS-910 – ER FINISH PLAN AND DETAILS

3-AS-911 – ER REFLECTED CEILING FINISH PLAN

3-S-100 – STRUCTURAL NOTES

3-S-101 – SLAB DEMOLITION PLAN – 3/16” = 1’-0”

3-S-102 – SLAB AND GRADE BEAM PLAN – 3/16” = 1’-0”

3-S-103 – SLAB AND GRADE BEAM SECTIONS AND DETAILS

3-S-104 - SLAB AND GRADE BEAM SECTIONS AND DETAILS

3-PL-0 – LEGENDS, SYMBOLS, ABBREVIATIONS, GENERAL NOTES

3-PL-1 – FIRST FLOOR - PLUMBING WASTE DEMOLITION - 1/8” = 1’-0”

3-PL-2 – FIRST FLOOR - PLUMBING SUPPLY DEMOLITION - 1/8” = 1’-0”

3-PL-3 – FIRST FLOOR – MEDICAL GAS DEMOLITION - 1/8” = 1’-0”

3-PL-4 – FIRST FLOOR - PLUMBING WASTE NEW WORK - 1/8” = 1’-0”

3-PL-5 – FIRST FLOOR - PLUMBING SUPPLY NEW WORK - 1/8” = 1’-0”

3-PL-6 – FIRST FLOOR – MEDICAL GAS NEW WORK - 1/8” = 1’-0”

3-PL-7 – FIRST FLOOR – FIRE PROTECTION NEW WORK - 1/8” = 1’-0”

3-PL-8 – PLUMBING DETAILS

3-PL-9 – PLUMBING SCHEDULES

3-MH-0 – MECHANICAL SYMBOLS AND ABBREVIATIONS

3-MH-1 – FIRST FLOOR - HVAC DEMOLITION - 1/8” = 1’-0”

3-MH-2 – FIRST FLOOR – EXHAUST DEMOLITION - 1/8” = 1’-0”

3-MH-3 – FIRST FLOOR – HEATING WATER PIPING DEMOLITION - 1/8” = 1’-0”

3-MH-4 – ROOF PLAN – EXHAUST DEMOLITION - 1/8” = 1’-0”

3-MH-5 – FIRST FLOOR – HVAC NEW WORK - 1/8” = 1’-0”

3-MH-6 – FIRST FLOOR – EXHAUST NEW WORK - 1/8” = 1’-0”

3-MH-7 – FIRST FLOOR – HEATING WATER NEW WORK - 1/8” = 1’-0”

3-MH-8 – ROOF PLAN – EXHAUST NEW WORK - 1/8” = 1’-0”

3-MH-9 – MECHANICAL DETAILS

3-MH-10 – MECHANICAL DETAILS

00 01 15 - 3

3-MH-11 – MECHANICAL DETAILS

3-MH-12 – MECHANICAL DETAILS

3-MH-13 – MECHANICAL DETAILS

3-MH-14 – MECHANICAL DETAILS

3-MH-15 – AHU-1 SCHEMATIC

3-MH-16 – CONTROLS AND POINT LIST

3-MH-17 – MECHANICAL SCHEDULES

3-MH-18 – MECHANICAL SCHEDULES

3-MH-19 – MECHANICAL SCHEDULES

3-ES-000 – ELECTRICAL LEGEND AND NOTES

3-ES-001 – ELECTRICAL DETAILS

3-ES-002 – ELECTRICAL DETAILS

3-ES-101 – ELECTRICAL DEMOLITION PLAN – 3/16” = 1’-0”

3-ES-102 – ELECTRICAL DEMOLITION PLAN – SURGICAL SUITE - 3/16” = 1’-0”

3-ES-201 – NEW LIGHTING PLAN – 3/16” = 1’-0”

3-ES-202 – NEW POWER AND COMMUNICATIONS PLAN – 3/16” = 1’-0”

3-ES-203 – NEW COMMUNICATIONS AND LOW VOLTAGE SYSTEMS CEILING PLAN –

3/16” = 1’-0”

3-ES-204 – NEW FIRE ALARM AND MECHANICAL SYSTEMS PLAN – 3/16” – 1’-0”

3-ES-205 – NEW LIGHTING, POWER AND COMMUNICATIONS PLAN – SURGICAL SUITE –

3/16” – 1’-0”

3-ES-206 – NEW FIRE ALARM AND MECHANICAL SYSTEMS PLAN – SURGICAL SUITE -

3/16” – 1’-0”

3-ES-301 – LUMINAIRE AND PANEL SCHEDULES

3-ES-302 – PANEL SCHEDULES

- - - END - - -