564-17-135\F\ B21 Upgrade Restrooms ADA Compliance
Solicitation number
36C25620B0003
Issued by

About this file

36C25620B0003 SOW 564-17-135 Upgrade Restrooms in B21 to ADA Compliance R1.pdf

View the file

Other files

File Type Posted
36C25620B0003-0004001.docx DOCX document
36C25620B0003-0004000.docx DOCX document
36C25620B0003-0003000.docx DOCX document
36C25620B0003-0002000.docx DOCX document
36C25620B0003-0002001.pdf PDF
36C25620B0003-0001004.pdf PDF
36C25620B0003-0001001.pdf PDF
36C25620B0003-0001002.pdf PDF
36C25620B0003-0001000.docx DOCX document
36C25620B0003-0001003.pdf PDF
36C25620B0003-002.docx DOCX document
36C25620B0003-001.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

564-17-135 Upgrade Restrooms in B21 to ADA Compliance 11/12/2019

Statement of Work (SOW) Upgrade Restrooms in B21 to ADA Compliance

Project 564-17-135 Veterans Health Care System of the Ozarks (VHSO)

Fayetteville, Arkansas

The Contractor must furnish all management, supervision, labor, material, equipment, tools, supplies, parts, and related services, in accordance with the SOW, drawings, and specifications to be complete and working system(s). Electronic copies of drawings and specifications to this work must be furnished by VA upon Contractor’s written request to the Contracting Officer (CO). Hard copies of SOW, Drawings, and Specifications must be the Contractor’s responsibility and expense. Contractor is responsible to verify existing and new dimensions, locations, measurements, and quantities. The work includes renovations to restrooms in the basement of VHSO building 21 (men’s’ restroom L230-21, women’s’ restroom L231-21). All work as described herein shall work seamlessly with current VA healthcare facility fixtures and utilities

1. General

a. Any provision or partial provision of the Contract drawings, specifications, documents or requirements that is not consistent with this SOW, Drawings, and Specifications is null and void only to the extent of the inconsistency. All other provisions or partial provisions of the Contract drawings, specifications, documents, or requirements must remain in full force and effect.

b. Information Technology (IT) security requirements Certification and Accreditation (authorization) (C&A) of the contractor system: The C & A requirements do not apply and a Security Accreditation Package is not required.

c. Safety must be the Contractor’s highest priority.

d. This project must be a turn-key operation for the work as described in this SOW, Drawings, and

Specifications to be a complete and working system(s).

e. VHSO facility must continue to operate during the period of performance of this contract to include but not limited to the mechanical and electrical systems.

f. Contractor is responsible to develop a project schedule (including phasing control plan if applicable) that incorporates requirements set forth in this SOW, Drawings, and Specifications and meets the requirements of the VHSO. The Project Schedule and or Phasing plan must contain provisions to include but not limited to staging all equipment and materials ahead of closing the affected patient care areas and working extended hours to meet the requirement.

g. Contractor’s work must be conducted in a manner and at times which would present the least amount of disruption to the VHSO facility.

h. Prior to the start of job site activities, the contractor and Contracting Officer Representative (COR) will conduct a site survey to identify and review specific work and differing site conditions.

i. Period of Performance: One Hundred Twenty (120) Calendar days.

j. Project submittals must be submitted for approval no later than ten (10) Calendar days after Notice to Proceed.

k. VHSO utilities and work areas may not be immediately available and the Contractor must be flexible in the project schedule at no additional cost to VHSO.

l. Building materials, equipment, tools, and supplies must not be left unattended within the work area.

When working in common areas, there must be a minimum of 2 individuals in proximity of the job site to ensure that building materials, equipment, tools, and supplies are not accessible to patients or others.

m. Warranty: Contractor must guarantee workmanship for a period of one (1) year after COR written acceptance of work. Contractor must furnish a minimum 1-year parts and labor warranty on equipment, components, and materials furnished and any manufacturer’s warranty greater than one (1) year. Emergency service must be available 24 hours per day. The Contractor must respond on-site to emergency calls within two (2) hours of notification. The Contractor must have the issue(s) corrected or a plan in place (awaiting parts) within four (4) hours of arrival at job site. Any temporary repairs must be approved by the VHSO Chief of Engineering or designated representative.

2. Specifications and Drawings:

a. Contractor must verify dimensions, locations, measurements, and quantities. Contractor to notify

COR of verification and differing site conditions.

b. Contractor must furnish “As Built” drawings to include but is not limited to electrical, mechanical, and architectural prior to closeout. Drawings must be in electronic form in latest edition of AutoCAD (.dwg) and stored on cd(s).

3. Renovate B-21 basement restrooms L230-21, L231-21:

Contractor shall furnish all supervision, labor, materials, equipment, tools, supplies, and related services required for complete and working systems to renovate the referenced areas as documented in the accompanying plans and in accordance with the accompanying specifications.

a. Construction of dust barrier and infectious control requirements:

1) VHSO Infectious Control Nurse will perform Infectious Control Risk Assessment (ICRA). ICRA will furnish requirements including but not limited to barrier construction, negative pressure requirement, and procedures for mitigating risks. Contractor must comply with and incorporate ICRA requirements.

2) Refer to accompanying demolition plan for location of dust control barrier.

3) Visual indication of sufficient negative pressure in the construction area will be required. “Ball-in-tube” device (Baulin or equal) mounted in construction barrier.

b. Men’s’ Restroom L230-21:

1) Remove existing door and store for modification and re-use.

2) Demo and remove existing door frame.

3) Modify existing door rough opening to add header above door and furnish rough opening for new metal door frame to accommodate 7’x3’6” door.

4) Install blocking in header above door frame for supporting electric door operator (refer to operator manufacturer installation instructions for details).

5) Install gypsum board both sides of new door header to match existing wall coverings. Finish and paint according to finish schedule (entire restroom walls to receive new paint).

6) Furnish and install new hollow metal door frame for 7’x3’6” door with continuous hinge.

7) Trim existing door to match new 7’ frame and furnish/install new continuous hinge (stainless steel). Re-install modified door in new frame.

8) Furnish and install 120V/1/60 duplex, hospital grade receptacle above ceiling to power new electric door operator. Wire receptacle to existing receptacle circuit for restroom.

9) Furnish and install new electric door operator at location indicated on plans. Door operator to be

DC Controls (Addison, TX) 7100 Series Low Energy Operator (or equal). Operator must be self-contained electromechanical design with DC power open (minimum six reduction gears) and spring force close (motor off in closing mode). Door must be allowed to be manually opened with power on or off to operator without damages to operator. Furnish unit with clear anodized finish. Configure to open (LH or RH) to match door swing. Furnish three-way toggle switch (On/Off/Hold) mounted on unit header. Operator must be activated by push-button switches or by “Push-n-Go” feature.

10) Furnish and install where indicated on plans two new push plate switches complete with wireless transmitters and receivers for activation of the door operator. Push plate switches must be BEA model PB10 (or equal). Furnish stainless steel finish. Transmitter/receiver must be BEA model

433Mhz or equal. Mount switches and transmitters/receivers to back boxes to be installed in existing walls as part of this contract. Coordinate back box requirements with equipment installation instructions.

11) Demo and remove existing floor coverings and base. Level, patch, and repair existing floor as needed to prepare for new resinous epoxy floor. Protect existing fixtures and equipment from dust and debris. Remove existing ceramic tile from walls and repair/prepare for application of resinous epoxy covering.

12) Paint entire restroom according to finish schedule.

13) Furnish/install new resinous epoxy floor covering in accordance with accompanying specifications and manufacturer’s instructions. Include integral wall base/covering up to previous ceramic tile line AFF.

14) Replace acoustical ceiling tile throughout restroom.

c. Women’s’ Restroom L231-21:

1) Remove existing door and store for modification and re-use.

2) Demo and remove existing door frame.

3) Modify existing door rough opening to add header above door and furnish rough opening for new metal door frame to accommodate 7’x3’6” door.

4) Install blocking in header above door frame for supporting electric door operator (refer to operator manufacturer installation instructions for details).

5) Install gypsum board both sides of new door header to match existing wall coverings. Finish and paint according to finish schedule (entire restroom walls to receive new paint).

6) Furnish and install new hollow metal door frame for 7’x3’6” door with continuous hinge.

7) Trim existing door to match new 7’ frame and furnish/install new continuous hinge (stainless steel). Re-install modified door in new hollow metal frame.

8) Furnish and install 120V/1/60 duplex, hospital grade receptacle above ceiling to power new electric door operator. Wire receptacle to existing receptacle circuit for restroom.

9) Furnish and install new electric door operator at location indicated on plans. Door operator to be

DC Controls (Addison, TX) 7100 Series Low Energy Operator (or equal). Operator must be self-contained electromechanical design with DC power open (minimum six reduction gears) and spring force close (motor off in closing mode). Door must be allowed to be manually opened with power on or off to operator without damages to operator. Furnish unit with clear anodized finish. Configure to open (LH or RH) to match door swing. Furnish three-way toggle switch (On/Off/Hold) mounted on unit header. Operator must be activated by push-button switches or by “Push-n-Go” feature.

10) Furnish and install where indicated on plans two new push plate switches complete with wireless transmitters and receivers for activation of the door operator. Push plate switches must be BEA model PB10 (or equal). Furnish stainless steel finish. Transmitter/receiver must be BEA model 433Mhz or equal. Mount switches and transmitters/receivers to back boxes to be installed in existing walls as part of this contract. Coordinate back box requirements with equipment installation instructions.

11) Demo and remove existing water closet privacy partitions.

12) Demo and remove existing northern toilet (wall mounted). Cut and cap cold water supply above ceiling at main (general location indicated on plumbing plan sheet). Open existing wall to expose cold water stub out, sanitary pipe connection, and wall hanger. Demo and cap sanitary pipe toilet connection inside wall. Demo abandoned cold water pipe back to within wall, drain abandoned line, and cap. Remove existing wall hanger. Patch, repair, and refinish walls.

13) Relocate existing grab bars as shown on plans. Install blocking in existing walls at new locations to support grab bars.

14) Patch, repair, and refinish walls at demo’d and new locations.

15) Furnish and install new water closet privacy partition with door as shown on plans. Secure new partition to structure above ceiling. Reconfigure support framework above ceiling to accommodate location of new partition support.

16) Demo and remove existing floor coverings and base. Level, patch, and repair existing floor as needed to prepare for new resinous epoxy floor. Protect existing fixtures and equipment from dust and debris. Remove existing ceramic tile from walls and repair/prepare for application of resinous epoxy covering.

17) Paint entire restroom according to finish schedule.

18) Furnish/install new resinous epoxy floor covering in accordance with accompanying specifications and manufacturer’s instructions. Include integral wall base/covering up to previous ceramic tile line AFF.

19) Paint entire restroom according to finish schedule.

20) Furnish/install new resinous epoxy floor covering in accordance with accompanying specifications and manufacturer’s instructions. Include 6” integral wall base.

21) Replace acoustical ceiling tile throughout restroom.

d. All materials must be installed per manufacturer’s installation instructions and as noted herein.

4. Wiring must be installed in accordance to the latest edition of the National Electric Code (NEC), drawings, and specifications at time of installation.

a. Wiring except fixture whips must be enclosed in EMT conduit. Fixture whips and conduit installed properly per NEC with compression fittings. Electrical termination(s) must be in accordance to manufacturer’s installation instructions and as noted herein.

5. Contractor Access and Activities

a. Contractor must comply with the VHSO security management program.

b. Contractor must not enter the work site without VHSO issued identity Badge. Contractor can be subject to inspection of personal effects when entering or leaving the project site and VHSO property. Contractor superintendent must escort Contractor employees to Engineering (Building 7- A) to obtain badge(s). The Contractor must maintain a log of Employee Names, Badge ID Numbers, Start Date(s), Departure Date(s), ID Lost Date(s), and ID Return Date(s). Updated Badge log must be given to the COR weekly or as directed by COR. Contractor’s superintendent must return all badges on day of departure of employee from project to COR. Contractor’s superintendent must return all remaining badges at project closeout to COR. Lost Badges must be reported immediately to the COR and documented on badge log. Contractor is responsible for a $100.00 fee for each lost or unreturned badge to VHSO.

c. The Contractor’s superintendent may check out a key to access mechanical and electrical room as project requires. Contractor superintendent must check out and return a key at Engineering (Building 7-A) on a daily basis and the key must not leave VHSO property. The Contractor’s superintendent must notify the COR when a key is lost. The Contractor is responsible for a $3,500.00 fee for each lost or unreturned key.

d. Supervision: Contractor must furnish qualified supervisor(s), on site during work activities to supervise continuously. Contractor supervisor must not engage in any direct trades’ labor. The Contractors’ supervision must be responsible for quality control and ensure the systems are complete and working.

e. (VHSO) Property Access Regular Business Hours: Work by the Contractor must be completed as specified in the SOW under General, except work that will interfere with normal operations must be coordinated and approve prior to or ahead of designated time by the COR with affected VHSO departments and accomplished during designated maintenance times, as noted otherwise herein, as requested and approved by the COR for special circumstances.

f. Work Hours: The Contractor must sequence their work plan so that no more than one (1) OR is unavailable to the VHSO at a time. Contractor must schedule to start work on one (1) OR at 4:30 PM on Thursday and must schedule the work to be complete and accepted by the COR no later than noon on the following Sunday. Any work performed by the Contractor, at the Contractor’s own volition outside specified working hours, will need written authorization by the COR and at no additional cost to the VHSO.

g. Safety: Safety must be the Contractor’s highest priority. The Contractor must be solely responsible for compliance with Federal, State, Local OSHA regulations, latest edition of NEC, latest edition of NFPA 70E, and 01 35 26 Safety Requirements specification. The Contractor must furnish and have in place Personal Protective Equipment (PPE), safety signage, cones, barricades etc., to protect the safety of VHSO patients, employees, visitors, volunteers, tenants and others. Contractor must not be permitted to work without proper PPE and can be asked to leave job site. Contractor must furnish required safety items. Work must be conducted in a manner and at times which would present the least amount of disruption to the VA healthcare facility.

h. Contractor must not leave or unattended out-of-service any utility, fire protection, or security system without written permission of the COR. If a utility, fire protection, or security system is not functioning at the end of a work period without written permission of the COR, if then the Contractor must restore the system(s) to working order prior to leaving the job site or must furnish an around-the-clock watch until the system is functioning properly. If the Contractor fails to do so, the Contractor must be liable for any costs incurred by the VHSO to furnish around-the-clock watch and or repair the system.

i. Vehicles and Construction equipment: Contractors’ keys to unattended vehicles and equipment must be removed and vehicles locked.

j. Material Storage and Staging: The Contractor must submit in writing a request for storage or staging of materials, equipment, tools, and supplies. The Contractor’s written request must be submitted to the COR for approval a minimum of seven (7) business days prior to the storage or staging so there is time to review and notify the impacted parties. Contractor must have prior written authorization by the VHSO for storage or staging of Contractor supplied materials and equipment. No storage must commence until written approval and authorization of the Contractor’s request is furnished by the COR. Contractor stored materials may need to be relocated because of interference with VHSO scheduled activities. Relocation will be at Contractor’s expense.

k. Tools: Contractor must furnish materials, equipment, tools to include but not limited to ladders and supplies to complete Contractor’s work.

l. Unloading and Parking: No materials or equipment are permitted through the front entry. Use Employee entrance – only for loading and unloading, do not leave vehicle(s) unattended.

Contractor parking on VHSO property is limited to availability of designated Contractor parking.

Contractor must have prior written approval of on-site Contractor parking from COR.

m. Elevators: Contractor must use COR designated elevators and must protect elevator cabs and controls during periods of use. Contractor must not exceed elevator weight limits. Designated elevator(s) and usage times are not to interfere with VHSO activities.

n. Radios and Mobile Devices: Contractor must use mobile devices at low volume or outside. Contractor must not carry on conversations in hallways or near any patient areas. AM/FM radios and other media producing devices must not be used in the VHSO buildings.

o. Noise: Contractor must coordinate and schedule construction noise making activities with the COR.

For any noise making work activities, the Contractor must furnish a written request to the COR for COR approval a minimum of seven (7) business days prior to construction noise making activities. The COR will schedule and furnish written authorization to proceed three (3) business days in advance of the proposed activity.

p. Infection Control:

1) Contractor must be responsible to develop a phasing and Infection Control Risk Assessment

(ICRA) that incorporates requirements of 01 00 00 General Requirements specification to meet the requirements of the VHSO. Contractor must install and create temporary dust barriers with the follow products: ZipWall® ZIP POLES FOUR PACK (Includes 4 Spring Loaded Steel Zip Poles, 4 GripDisk™ Slide Stoppers, 2 standard zippers, 1 carry bag) or equal, construction film must be white, fire retardant polyethylene, antistatic, 12 x 100 Ft x minimum 6 mil thickness, imprinted with fire retardant labeling. Zippers must be straight or curved heavy duty ZipWall® Zippers or equal. Sticky mat must be STICKY MAT Flat Store Clean Mat or equal, tacky mat, white, 24 x 45-inch minimum. Construction traffic through the facility must be coordinated with the COR.

Construction workers, materials, and clothing must be transported through the hospital dust free. Any dusty, dirty, odorous or wet materials must be transported in sealed clean bags.

Traffic routes will be at the discretion of the COR.

2) Contractor must be responsible to develop a phasing and ICRA that incorporates requirements of 01 00 00 General Requirements and meets the requirements of the VHSO and VHSO ICRA.

Contractor must furnish and install a temporary dust barriers with the following products: Edge- Guard Panel Transparent Infection Control Wall Partitions with a 42 inch door and associated components or equal to the entrance of the OR; Edge-Guard Panel Transportation Cart(s) or equal; STICKY MAT Flat Store Clean Mat or equal, tacky mat, 24 x 45 inch minimum, ZipWall® (construction film must be white, fire retardant polyethylene, antistatic, 6 mil thickness, imprinted with fire retardant labeling) or equal for entrance to sterile room and each OR must maintain negative air pressure when job site activities are in progress. Ball-in-the-Wall or equal must be installed for each OR when job site activities are in progress. Construction traffic through the facility must be coordinated with the COR. Construction works, materials, and clothing must be transported through the hospital dust free. Any dust, dirty, odorous, or wet materials must be transported in sealed clean bags or in clean sealed containers. Traffic routes will be at the discretion of the COR.

q. Dust Proofing and Cleaning: Contractor must cover furnishings and equipment with plastic or clean drop cloth. Contractor(s) must furnish HEPA vacuum cleaner(s), cleaning tools, and tacky mats at both sides of entrance of the work zone. Contractor must not use any broom(s).

r. Personnel Protective Equipment (PPE): Contractor must furnish required PPE. Contractor is not permitted to work without proper PPE. Contractor may be asked to leave job site if the proper PPE is missing or not in use.

s. Fire Alarm: Dust and smoke producing activities will activate the buildings fire alarm. In Contractor planned work activities, an evaluation must be made to determine if the fire alarm system has to be bypassed. Contractor must be responsible for fire watch in the areas where coverage is removed or disabled. Contractor must be responsible to coordinate with the COR and Electronic Technician for the removal and restoration of fire protection coverage. After hours supervision of the fire alarm panel is required at the contactors expense. The Contractor must be responsible for completion and submission of a written Fire Alarm Bypass Request. The Contractors’ written request must be submitted for COR approval and if approved by COR, then the COR must furnish a written authorization to proceed three (3) business days in advance of any proposed work activity. If the fire alarm system requires any deactivation, it must be reactivated the same day before the Contractor leaves the job site to ensure that the fire alarm system is functioning properly. If the fire alarm system is not functioning properly, the Contractor must restore the fire alarm system to working order prior to leaving the site or must furnish an around-the-clock fire watch until the fire alarm system is functioning properly. The Contractor must be liable for any costs incurred by the VHSO to furnish the fire watch and or to repair the fire alarm system.

t. Hot Work: Contractor must perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Contractor must coordinate with the COR. Contractor must obtain Hot Work permits from COR at least forty-eight (48) hours in advance for any work or operation involving open flame or producing heat or sparks, burning, welding, or a similar operation that is capable of initiating fires or explosions. This work includes but is not limited to processes such as arc welding, oxygen-fuel gas welding, open-flame soldering, brazing, thermal spraying, oxygen cutting, arc cutting, chipping, grinding, heat treating, sand blasting, torch-applied roofing, and chemical welding.

u. Fire and Smoke Barrier Penetration: Contractor must perform, maintain, and safeguard the integrity of smoke and fire barriers in accordance with NFPA 101, NFPA 80, and NFPA 90A.

Contractor penetrations in barriers must be repaired in an approved manner (filled with the designated and approved flame retardant filler) as soon as feasible after the work has been completed. Contractor must obtain Hot Work permit(s) from the COR.

v. Energized Circuit Work: Contractor must coordinate with the COR. Contractor must obtain Energized Circuit Work permit from COR at least seven (7) work days in advance when an electrical shut down is required. Contractor must perform, maintain, and safeguard the integrity of the VHSO electrical systems and must follow procedures around energized equipment in accordance with NFPA 70E standards including proper PPE. VHSO electrician or electrical engineer must monitor work.

Contractor must use safety equipment to include but not be limited to 12 calorie arc flash suits with hoods and 5KV gloves. No exits will be blocked. Personnel without proper PPE will not be allowed within the working area around live panels with the cover removed.

w. Utility interruption: Contractor must submit in writing Utility Interruption Request(s) in advance to the COR. The Contractor’s written utility interruption request must be submitted to the COR for written approval a minimum of seven (7) business days prior to the work activity. Work must be planned in advance to give as much time as possible to schedule a utility interruption. Work activity must not commence until written approval and authorization of the Contractor’s request is furnished by the COR seventy-two (72) hours prior to the utility interruption. There may be times when a utility interruption request is denied because of insufficient lead-time or interference with ongoing VHSO activities and must be rescheduled at the Contractor’s expense.

x. Disposal: The Contractor must submit a written request(s) for disposal of any government owned materials, equipment, or property in advance to the COR for COR approval. Contractor must remove and properly dispose construction debris, materials, equipment, and substances from this project and the VHSO property daily into the contractor supplied containers. Construction debris created from the project must not be disposed of at the job site, in VHSO dumpsters, or on VHSO property.

Disposal of construction debris, materials, equipment, and substances from the project must be in accordance with applicable Federal, State, Local and environmental laws, rules or regulations. The Contractor must ensure and furnish appropriate documentation to the CO that all hazardous waste handlers, haulers, and disposal facilities are properly licensed. The Contractor must furnish shipping manifest and documentation of proper disposal of any construction debris, materials, equipment, and substances from the project prior to final payment. Contractor must return the work site to the condition in which it was found at the Contractor’s expense.

y. Fumes: The Contractor must schedule fume producing work activities including but not limited to painting or heat produced fumes after regular business hours and request written approval by the COR prior to the work activity. Contractor must be responsible for ventilation necessary to exhaust and prevent fumes from entering adjoining areas, outside air intake ductwork, and re-entering the VHSO healthcare facilities at the Contactor’s expense.

z. Training: (NOT APPLICABLE) Training must be included to applicable VHSO personnel. The Contractor must furnish training for users of installed system(s). Training must include an agenda and instruction manual in electronic form. Contractor must furnish user and administrator training to VHSO officials and VHSO Engineering personnel, with four (4) to eight (8) hours of on-site training. Coordination and scheduling for the training must be determined after contract award.

Training must cover the following topics - Hands-on must include demonstrations.

aa. Photography: Contractor must not photograph any patients, personnel, visitors, and others on VHSO property. Contractor must be escorted by VHSO personnel to take job site related phots and be coordinated by COR.

bb. Other requirements:

1) Structural members must not be cut or altered, without CO written authorization.

2) Contractor must make every reasonable effort to protect VHSO property from damage.

3) Anything remaining in place that is damaged or defaced by the Contractor must be restored by the Contractor to the existing condition at the Contractor’s expense.

4) The Contractor must furnish adequate protection for VHSO property before any construction activities occur. Contractor moved items must be put back by the Contractor to original locations and conditions as work is completed at the Contractor’s expense.

5) The Contractor must coordinate work of different trades so that interference between mechanical, electrical, architectural, and structural work including existing services must be avoided and, within limits indicated the required space for operation, repair, removal, maintenance, and testing of equipment. Utilities including but not limited to conduit, ducts, and pipes must be arranged to ceiling slab, walls, and columns to take up a minimum footprint of space. Conduit, ducts, pipes, and equipment must not interfere with intended use of eyebolts and other lifting devices.

6) Contractor must locate existing utilities in area(s) of work. Utilities that remain in place, Contractor must furnish adequate means of support and protection. Any property including but not limited to electrical, natural gas, medical gas, communication and utility lines, landscaping, walkways, roads, and curbs damaged during the project due to carelessness or negligence of Contractor must be repaired or replaced at the Contractor’s expense. Walls, ceilings, floors, furniture, etc., will be protected from damage from water, staining, or falling debris created during any construction activities of the project including but not limited to coring and sawing process(es) at the Contractor’s expense. Areas must be cleaned after coring, sawing, and other construction activities by the Contractor at the Contractor’s expense.

7) No unauthorized work to be initiated without the prior written approval of the COR. The CO must approve any request, or proposal for changes in project scope or additional requirements, in writing prior to the Contractor proceeding with any work. Any contractor changes accomplished without prior written approval by the CO, must be done at the Contractor’s risk and at the Contractor’s expense. Contractors must visit the job site and visit the facility in order to determine if it’s reasonable or necessity to ascertain the nature and location of the work to be performed in general and the local conditions which can affect the work. Failure to do so must not relieve the Contractor of responsibility for estimating properly the difficulty or cost of successfully performing the work. Contractor is responsible for complying with applicable Federal, State, Local laws, codes, regulations, and ordinances. Additionally, the Contractor is responsible for obtaining permits, licenses, etc. that are required by applicable Federal, State, Local law, code, regulation, and ordinance.

8) Work required for the project must be in accordance with the best practices of the building trades involved and in accordance with the intent of the SOW, Drawings, and Specifications.