36C25619R0073-012.pdf

PDF 19 MB Posted

Attached to
580-320 Construct Spinal Cord Injury Expansion Federal contract opportunity
Solicitation number
36C25619R0073
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

36C25619R0073 ATTACHMENT K - Project Drawings Part 8 - Dated 6-8-18 - 20 pages.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 580-320 Construct Spinal Cord Injury Expansion, newest first.
File Type Posted
36C25619C0124-000.docx DOCX document
36C25619R0073-0002000.docx DOCX document
36C25619R0073-0001000.docx DOCX document
36C25619R0073-0001013.pdf PDF
36C25619R0073-0001002.pdf PDF
36C25619R0073-0001006.pdf PDF
36C25619R0073-0001003.docx DOCX document
36C25619R0073-0001004.pdf PDF
36C25619R0073-0001014.pdf PDF
36C25619R0073-0001006.pdf PDF
36C25619R0073-0001014.pdf PDF
36C25619R0073-0001012.pdf PDF
36C25619R0073-0001005.pdf PDF
36C25619R0073-0001000.docx DOCX document
36C25619R0073-0001002.pdf PDF
36C25619R0073-0001009.pdf PDF
36C25619R0073-0001012.pdf PDF
36C25619R0073-0001005.pdf PDF
36C25619R0073-0001010.pdf PDF
36C25619R0073-017.pdf PDF
36C25619R0073-007.pdf PDF
36C25619R0073-020.pdf PDF
36C25619R0073-002.docx DOCX document
36C25619R0073-011.pdf PDF
36C25619R0073-021.docx DOCX document
36C25619R0073-014.pdf PDF
36C25619R0073-004.pdf PDF
36C25619R0073-010.pdf PDF
36C25619R0073-003.pdf PDF
36C25619R0073-022.pdf PDF
36C25619R0073-013.pdf PDF
36C25619R0073-024.doc DOC document
36C25619R0073-015.pdf PDF
36C25619R0073-006.pdf PDF
36C25619R0073-011.pdf PDF
36C25619R0073-020.pdf PDF
36C25619R0073-009.pdf PDF
36C25619R0073-018.pdf PDF
36C25619R0073-016.pdf PDF
36C25619R0073-024.doc DOC document
36C25619R0073-014.pdf PDF
36C25619R0073-021.docx DOCX document
36C25619R0073-007.pdf PDF
36C25619R0073-017.pdf PDF
36C25619R0073-005.pdf PDF
36C25619R0073-002.docx DOCX document
36C25619R0073-010.pdf PDF
36C25619R0073-019.pdf PDF
36C25619R0073-000.docx DOCX document
36C25619R0073-000.docx DOCX document
Show all 50

580-320 Construct Spinal Cord Injury Expansion has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F.E .C

F .E

.C

F.E.C

F.E .C

F .E

.C

SS

R.8R.8

RR

Q.5Q.5

QQ

P.5P.5

PP

N

N

8.1

8.1

11.5

11.5

12.5

12.5

9.5

9.5

8.5

8.5

N.9N.9

M.9M.9

9.1

9.111.4

C1B-103

CORR

1B-154

W/C & SPEC BED STOR

1B-152

BRMS2

1B-152A

TLTS1

1B-148A

TLTS1

1B-148

BRMS2

1B-146

BRMS1

1B-146A

TLTS1

1B-147

STORAGE

1B-144A

TLTS1

1B-144

BRMS2

1B-142

BRMS2

1B-138

BRMS2

1B-136A

TLTS1

1B-136

BRMS1

C1B-107

CORR

C1B-108

CORR

C1B-104

CORR

C1B-109

CORR

1B-142A

TLTS1

1B-138A

TLTS1

1B-134A

MECHANICAL

1B -1

B

1B -1

1B -1

1B -1

1B-146A

1B-136A

1B -1

1B-138A

1B-142A

1B-144A

1B -1

RE: SHEET AE-102

M A

T C

H L

IN

E

1B-152A

1B -1

1B-146B

BRAR1

MATCH LINE

R E

S

H E

E T

A E

-1

P H

A S

E

1B-148A

1B -1

1B -1

AE-401

E1

AE-501

C7

AE-401

E6

1B-134A

RE: SHEET AE-102

MATCH LINE

R E: S

H

EET A

E-1

M

ATC

H L

IN

E

ADDITION

31 37 39

C1B-109

M A

T C

H L

IN

E

R E

S

H E

E T

A E

-1

P H

A S

E

AE-404

E1

SIM, OP HD

TYP

TYP

45 45

100-83 1G1H

100-84

1K 100-85

100-80 1D

100-79 1C

100-78 1B

100-77 1A

100-82 1F 1E

100-81

KEY PLAN

T R

U E

N

P L A

N N

PLAN N

A

T

PATIE

NT U

NIT

S

A. FOR ADDITIONAL ARCHITECTURAL FLOOR PLAN NOTES, REFER TO AE-400.

B. FOR MEPT WORK, REFER TO MEP DRAWINGS.

C. FOR STRUCTURAL WORK, REFER TO 'S' SERIES STRUCTURAL DRAWINGS.

D. FOR GENERAL INFORMATION INCLUDING PROJECT PHASING AND ALTERNATES, REFER TO 'G' SERIES DRAWINGS. ADDITIONAL

DETAILED INFORMATION PERTAINING TO PHASING AND ALTERNATES ARE NOTED THROUGHOUT DRAWING SET.

E. FOR PARTITION TYPES AND DIMENSIONS OF PARTITIONS ON FLOOR PLANS REFER TO AE-111 SERIES DRAWINGS.

F. ALL EXISTING FIREPROOFING TO BE REPAIRED TO ACHIEVE PROTECTION EQUIVALENT TO EXISTING PROTECTION.

G. ALL NEW STRUCTURAL STEEL, PRIMARY AND SECONDARY, TO RECEIVE SPRAY ON FIREPROOFING EQUIVALENT TO PROTECTION

ON EXISTING COLUMNS.

H. NEW CLINIC STEEL ROOF FRAMING, PRIMARY AND SECONDARY, TO RECEIVE 2-HR SPRAY ON FIREPROOFING.

I. PROVIDE VERTICAL GYPSUM BOARD EXPANSION JOINTS WHERE PARTITION FRAMING TRANSITIONS/ CROSSES/ ABUTS BETWEEN

NEW STRUCTURAL ELEMENTS AND EXISTING.

J. REFER TO SHEET AE-566 FOR FRAMING AND CONSTRUCTION REQUIREMENTS WHERE PARTITIONS, RATED AND NON F.R. RATED, ABUT SPRAYED ON FIREPROOFING CONDITIONS.

K. MAINTAIN REQUIRED ADA/ ABA CLEARANCES INCLUDING CLEAR FLOOR SPACE AND CLEARANCES AT DOORS, INCLUDING

CLEARANCES AT STRIKE ON PULL SIDE OF DOORS.

L. PATCH AND REPAIR FIREPROOFING AROUND COLUMN AND ENSURE A 2-HR RATING.

M. DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE.

ARCHITECTURAL FLOOR PLAN GENERAL NOTES

AREA NOT IN CONTRACT. COORDINATE ACCESS TO AREA W/ OWNER.

PREPARE FLOOR SUBSTRATE & INSTALL NEW FLOOR AS SCHEDULED.

PROVIDE SELF LEVELING CONCRETE UNDERLAYMENT AS SPECIFIED OVER EXISTING FLOOR SUBSTRATE.

NEW DOOR FRAME, RE: DOOR SCHEDULE

EXISTING CONSTRUCTION TO REMAIN AS INDICATED, PATCH WALL AS NECESSARY DUE TO RENOVATION WORK, MATCH EXISTING

WALL FINISH.

UPGRADE EXISTING PARTITION TO FIRE RATED PARTITION AS SCHEDULED, REFER TO GI-011 LIFE SAFETY FOR SCHEDULED RATING LOCATION. PATCH, REPAIR AND FILL ALL PENETRATIONS TO COMPLY WITH SCHEDULED RATING AND APPLICABLE UL LISTING AS

SCHEDULED ON AE-601 PARTITION TYPES.

EXISTING FLOOR BASE AND WALLS TO REMAIN THIS ROOM EXCEPT AT NEW PARTITIONS INDICATED. PATCH REPAIR, REPLACE DAMAGED OR MISSING FINISHES DUE TO RENOVATION WORK. MATCH EXISTING FLOOR, BASE AND WALL FINISHES AS NEEDED FOR

LIKE NEW COMPLETE APPEARANCE.

REINSTALL SALVAGED CURTAIN WALL ASSEMBLY TO MATCH ORIGINAL INSTALLATION.

EXISTING DOOR & FRAME TO REMAIN.

PATCH EXISTING WALLS TO REMAIN AS NECESSARY, PROVIDE NEW FINISH AS SCHEDULED, SEE ROOM FINISH SCHEDULE.

NEW HANDRAILS AND CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.

NEW CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.

PREPARE FLOOR SUBSTRATE & INSTALL NEW TO MATCH EXISTING ADJACENT FINISH.

PATCH EXISTING OPENING TO REMAIN AFTER THE REMOVAL OF EXISTING DOOR FRAME AND HARDWARE.

NEW PLUMBING FIXTURES; RE PLUMBING.

PATCH & REPAIR EXISTING CURTAIN WALL ASSEMBLY TO MATCH EXISTING. RESEAL & REPLACE GASKETS AS NEEDED TO ENSURE A

WATER TIGHT ASSEMBLY.

FILL IN EXISTING OPENING MATCH ADJACENT FINISH. ALIGN FINISH FACE W/ EXISTING FINISH.

NEW SHAFT WALL CONSTRUCTION.

ALIGN NEW PARTITION FINISHED FACE WITH EXISTING ADJACENT WALL, TYPICAL. MATCH EXISTING ADJACENT WALL FINISH.

REPAIR EXISTING WATERPROOFING. REINSTALL SALVAGED PAVERS PER ORIGINAL CONSTRUCTION IN PATTERN SHOWN. REFER TO

SHEET AE-301 KEY NOTE #30 FOR ADDITIONAL INFORMATION AND REQUIREMENTS

NEW DOOR, FRAME & HARDWARE, RE: DOOR SCHEDULE.

EXISTING COLUMN ENCLOSURE TO REMAIN; PATCH, REPAIR & CLEAN FOR LIKE NEW APPEARANCE.

NEW WINDOW & ASSEMBLY.

EXISTING STOREFRONT SYSTEM TO REMAIN.

NEW STOREFRONT SYSTEM TO MATCH ADJACENT; RE:

LINE OF PRIVACY CURTAIN TRACK ABOVE.

INFILL CONCRETE SLAB ON METAL DECK AT REMOVED PLANTER. PROVIDE NEW WATERPROOFING OVER NEW CONCRETE TO MATCH

EXISTING. RE: STRUCTURAL

SCHEDULED STAINLESS STEEL LINEAR SHOWER DRAIN AT SHOWER CURTAIN LINE, RE PLUMBING, TYP.

CONCRETE HOUSEKEEPING PAD FOR MECHANICAL EQUIPMENT. RE: MECHANICAL FOR EQUIPMENT CONFIGURATION.

EXISTING STORM DRAIN TO REMAIN, RE PLUMBING.

CONTRACTOR TO RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.

PHASE CONSTRUCTION OF THIS ROOM/AREA UNTIL CONSTRUCTION ACCESS THROUGH THIS AREA IS NO LONGER NEEDED BUT IN NO

CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.

REINSTALL SALVAGED WINDOW SYSTEM AS ORIGINALLY CONSTRUCTED WITH EXISTING WINDOW GLAZING, STONE, AND PRECAST COMPONENTS. PROVIDE NEW WALL FRAMING, SHEATHING, DAMP PROOFING, FLASHING, SEALANTS, GYPSUM BOARD, FIRE SAFING AND OTHER COMPONENTS UTILIZED IN THE EXISTING CONSTRUCTION. ALL WORK TO MATCH EXISTING RESULTING IN A UNIFORM APPEARANCE OF THE BUILDING ELEVATION. PRIOR TO REINSTALLATION, REPAIR ANY AND ALL BUILDING ELEMENTS DAMAGED DUE

TO WORK IN THIS CONTRACT. RESTORE SITE WORK TO ORIGINAL CONDITION.

PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT REMOVED DOOR TO MATCH EXISTING FINISHES.

PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT NEW DOOR AND FRAME TO MATCH EXISTING FINISHES.

REINSTALL EXISTING GLASS DOOR SYSTEM TO MATCH ORIGINAL INSTALLATION. PATCH AND REPAIR ADJACENT SURFACES TO MATCH

EXISTING FINISHES.

REPLACE FLOOR FINISHES, BASE, AND PAINT WALLS TO MATCH EXISTING, PRIOR TO NEW FINISHES, PATCH AND PREPARE AND REPAIR SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES. REPAINT H.M. DOOR FRAME. REPLACE DOOR AND HARDWARE

IF DAMAGED DURING CONSTRUCTION.

PAINT NEW PARTITIONS TO MATCH EXISTING, PROVIDE NEW BASE TO MATCH EXISTING. PRIOR TO THE INSTALLATION OF NEW FINISHES, PATCH, REPAIR AND PREPARE SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES, INCLUDING REWORKING

CEILING, FUR DOWNS AND FLOOR FINISHES TO MATCH EXISTING.

REPAIR FLOOR, CEILING AND WALL CONSTRUCTION TO MATCH EXISTING AT REMOVED TEMPORARY CONSTRUCTION PARTITION.

REFER TO MEP DRAWINGS FOR WORK IN THIS ROOM. VERIFY AND CONSTRUCT ALTERATIONS/CONSTRUCTION OF HOUSEKEEPING

PADS FOR MEP EQUIPMENT.

COORDINATE WORK IN THIS AREA ACCORDING TO CONSTRUCTION PHASING PLANS.

EXISTING FLOOR FINISH TO REMAIN IN THIS AREA UNTIL PHASE 4 IS CONSTRUCTED. PATCH, REPAIR FLOOR FINISH AND WALL BASE

WHERE WALLS HAVE BEEN REMOVED AS PART OF PREVIOUS PHASES.

PROVIDE MATCHING FLOOR FINISH THIS AREA UNTIL FINAL SCHEDULED FLOOR AND BASE FINISH IS INSTALLED AS PART OF PHASE 4 CONSTRUCTION. INSTALL HANDRAILS, CRASH RAILS, CORNER GUARDS AND WALL GUARDS AT PHASE 1 CONSTRUCTION.

2 HOUR FIRE RESISTIVE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1 & 4. SEE GI-130 FOR 2 HOUR PARTITION

REQUIREMENT W/ BID OPTION #2

2 HOUR FIRE SMOKE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1.

RELOCATED INTERIOR FIXED GLAZING SYSTEM FROM EXISTING INTERNET CAFE. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING GLAZING TO REMAIN W/ DEDUCT #1 W/ OPENING CLOSED W/ CONTINUATION OF SCHEDULED PARTITION.

RELOCATED INTERIOR HORIZONTAL SLIDING GLASS DOOR AND SIDE LIGHTS FROM EXISTING INTERNET CAFE. CONNECT AND ADJUST AUTO OPENER TO BE FULLY FUNCTIONAL AS EXISTING INSTALLATION. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING DOOR TO REMAIN W/ DEDUCT ALT #1 AND ALTERNATE EXISTING HORIZONTAL SLIDING GLASS DOOR FROM EXISTING DAYROOM ENTRY TO BE RELOCATED INSTEAD. ADJUST OPENING SIZE AND AUTO OPENER CONNECTIONS AS REQUIRED.

ALL ELECTRICAL RECEPTACLES THIS ROOM TO BE 48" A.F.F. UNLESS NOTED OTHERWISE ON ELECTRICAL DWGS.

EXISTING COURTYARD UNDER PAVERS. REINSTALL/REPAIR WATERPROOFING AND INSTALL PAVERS PER ORIGINAL CONSTRUCTION TO ALLOW DRAINAGE FLOW TO DRAINS. WHERE DRAINS ARE IN EXISTING PLANTERS, RAISE DRAIN TO NEW LEVEL OF COURTYARD

CONCRETE SLAB ELEVATION.

EXISTING DRAIN AT PERIMETER TRENCH DRAIN UNDER PAVERS. TERMINATE EXISTING TRENCH DRAIN AT FACE OF ADDITION CONCRETE. REPAIR WATER PROOFING. INSURE ALL SECTIONS OF TRENCH DRAIN HAVE PROPER FLOW TO DRAIN. INSTALL PAVERS PER ORIGINAL CONSTRUCTION BRIDGING OVER TRENCH AND ALLOWING DRAINAGE FLOW INTO TRENCH.

PROTECT EXISTING CONSTRUCTION, SEE NOTES 31 & 37 FOR ADDITIONAL INFORMATION.

MED GAS, REFER TO M.E.P. DRAWINGS.

ROOF ACCESS LADDER

FLOOR PLAN KEY NOTES

NOT ALL USED ON THIS SHEET

LINE TYPE LEGEND

PROJECT SCOPE BOUNDARIES

DETAIL AND PLAN ENLARGEMENT REFERENCE

2 HOUR FIRE RESISTIVE PARTITION

2 HOUR FIRE SMOKE PARTITION

6565 West Loop South, Suite 560, Bellaire, TX 77401

713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t

0 Revisions:

IS

S

U E

D F

O R

B

ID

D

IN

G

C O

N S

TR

U

C

TI

O N

Drawing Number

DrawnChecked

Dwg. of Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

VA FORM 08-6231

Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Drawing Title

Approved: Project Director

Project Title

Location

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Building Number

B100

Project Number

Office of

Construction and Facilities

Management

V eterans Affairs P alo Alto Heal th Ca re Sy stem

S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"

AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem

D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED

T exas Reg. No.G FE Project No.F-571213060

Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18

AE-101

ARCHITECTURAL PLAN - FIRST FLOOR -

PHASE 1 - NOTES

CONSTRUCT SPINAL CORD

INJURY BED EXPANSION

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

#580 - 320

0' 8' 12'4' 1/8" = 1'-0"

ARCHITECTURAL PLAN - FIRST FLOOR - PHASE 1 - NOTES

F1

CONSTRUCTION

ACCESS TO ATRIUM,

RE: PHASING AND

DEMOLITION PLANS

CONSTRUCTION

ACCESS TO ATRIUM,

RE: PHASING AND

DEMOLITION PLANS

P L A

N N

T R

U E

N

PLA

N N

A T

PATIE

N T U

N

IT

S

F.E.C.F.E.C.

F.E.C

F.E .C

F .E

.C

PP

NN

MM

LL

N.9N.9

L.1L.1

M.9M.9

9.1

9.1

F1

AE-302

1B-119

DAYROOM

1B-427

MECHANICAL

1B-413A

STORAGE

C1B-123

CORR

COURTYARD

1B-443

OFDC1

1B-441

OFD01

1B-439

OFM03

1B-437

OFD01

1B-435

OFD01

1B-433

OFD01

1B-444

OFDC1

1B-442

OFD01

1B-425

USCL1

1B-426

UCCL1

1B-424

TRGS1

1B-423

OFD01

1B-420

MEDP1

1B-419

TLTU1

1B-422

TRGS1

1B-418

TRGS1

1B-416

TRGS1

1B-417

NSTA1

1B-415

TRGS1

1B-438

OFDC1

1B-436

OFD01

1B-434

OFD01

1B-432

SEC01

1B-411

WRC01

C1B-117

CORR

1B-413

SRLB1

1B-414

SL001

1B-412

TLTU1

C1B-121

CORR

C1B-119

CORR

1B-431

OFD01

C1B-120

CORR

MATCH LINE

W1

W1

W1

W1

W1

1B-431

1B-433

1B-435

1B-437

1B-439

1B-441

1B-443

C

1B-444

C

1B-425 1B-426

1B-423

1B-424

1B-422

1B-419

B

-4

1B-438 1B-417

1B-418

1B-415

1B-416

1B-410

1B-436

1B-434

B

-4

B

-4

1B-414

B

-4 A

B

-4

C A

AE-201 D4

1B-410

RECP1

1B-135

RESP THERAPY

1B-137

LR002

TOILET

1B-139

B

-1

AE-502

B1

AE-503

F3

AE-503

F2

AE-503

F8

AE-405

D6

11.4

11.4

AE-502

F1

AE-502

B8

E1

AE-301

AE-502

B5

AE-405

C4

C

AE-201

F7

1B-139

RE: SHEET AE-101

MATCH LINE

RE: SHEET AE-101

F1

AE-312

AE-405

F3

B6

AE-521

F1

AE-512

F4

AE-512

F1

AE-503

C6

Z2E02

Z2E01

1B-411

1B-119B

F5

AE-502

ABOVE AT

INTERSTITIAL

F5

AE-502

ABOVE AT

INTERSTITIAL

AREA NOT IN CONTRACT. COORDINATE ACCESS TO AREA W/ OWNER.

PREPARE FLOOR SUBSTRATE & INSTALL NEW FLOOR AS SCHEDULED.

PROVIDE SELF LEVELING CONCRETE UNDERLAYMENT AS SPECIFIED OVER EXISTING FLOOR SUBSTRATE.

NEW DOOR FRAME, RE: DOOR SCHEDULE

EXISTING CONSTRUCTION TO REMAIN AS INDICATED, PATCH WALL AS NECESSARY DUE TO RENOVATION WORK, MATCH EXISTING

WALL FINISH.

UPGRADE EXISTING PARTITION TO FIRE RATED PARTITION AS SCHEDULED, REFER TO GI-011 LIFE SAFETY FOR SCHEDULED RATING LOCATION. PATCH, REPAIR AND FILL ALL PENETRATIONS TO COMPLY WITH SCHEDULED RATING AND APPLICABLE UL LISTING AS

SCHEDULED ON AE-601 PARTITION TYPES.

EXISTING FLOOR BASE AND WALLS TO REMAIN THIS ROOM EXCEPT AT NEW PARTITIONS INDICATED. PATCH REPAIR, REPLACE DAMAGED OR MISSING FINISHES DUE TO RENOVATION WORK. MATCH EXISTING FLOOR, BASE AND WALL FINISHES AS NEEDED FOR

LIKE NEW COMPLETE APPEARANCE.

REINSTALL SALVAGED CURTAIN WALL ASSEMBLY TO MATCH ORIGINAL INSTALLATION.

EXISTING DOOR & FRAME TO REMAIN.

PATCH EXISTING WALLS TO REMAIN AS NECESSARY, PROVIDE NEW FINISH AS SCHEDULED, SEE ROOM FINISH SCHEDULE.

NEW HANDRAILS AND CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.

NEW CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.

PREPARE FLOOR SUBSTRATE & INSTALL NEW TO MATCH EXISTING ADJACENT FINISH.

PATCH EXISTING OPENING TO REMAIN AFTER THE REMOVAL OF EXISTING DOOR FRAME AND HARDWARE.

NEW PLUMBING FIXTURES; RE PLUMBING.

PATCH & REPAIR EXISTING CURTAIN WALL ASSEMBLY TO MATCH EXISTING. RESEAL & REPLACE GASKETS AS NEEDED TO ENSURE A

WATER TIGHT ASSEMBLY.

FILL IN EXISTING OPENING MATCH ADJACENT FINISH. ALIGN FINISH FACE W/ EXISTING FINISH.

NEW SHAFT WALL CONSTRUCTION.

ALIGN NEW PARTITION FINISHED FACE WITH EXISTING ADJACENT WALL, TYPICAL. MATCH EXISTING ADJACENT WALL FINISH.

REPAIR EXISTING WATERPROOFING. REINSTALL SALVAGED PAVERS PER ORIGINAL CONSTRUCTION IN PATTERN SHOWN. REFER TO

SHEET AE-301 KEY NOTE #30 FOR ADDITIONAL INFORMATION AND REQUIREMENTS

NEW DOOR, FRAME & HARDWARE, RE: DOOR SCHEDULE.

EXISTING COLUMN ENCLOSURE TO REMAIN; PATCH, REPAIR & CLEAN FOR LIKE NEW APPEARANCE.

NEW WINDOW & ASSEMBLY.

EXISTING STOREFRONT SYSTEM TO REMAIN.

NEW STOREFRONT SYSTEM TO MATCH ADJACENT; RE:

LINE OF PRIVACY CURTAIN TRACK ABOVE.

INFILL CONCRETE SLAB ON METAL DECK AT REMOVED PLANTER. PROVIDE NEW WATERPROOFING OVER NEW CONCRETE TO MATCH

EXISTING. RE: STRUCTURAL

SCHEDULED STAINLESS STEEL LINEAR SHOWER DRAIN AT SHOWER CURTAIN LINE, RE PLUMBING, TYP.

CONCRETE HOUSEKEEPING PAD FOR MECHANICAL EQUIPMENT. RE: MECHANICAL FOR EQUIPMENT CONFIGURATION.

EXISTING STORM DRAIN TO REMAIN, RE PLUMBING.

CONTRACTOR TO RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.

PHASE CONSTRUCTION OF THIS ROOM/AREA UNTIL CONSTRUCTION ACCESS THROUGH THIS AREA IS NO LONGER NEEDED BUT IN NO

CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.

REINSTALL SALVAGED WINDOW SYSTEM AS ORIGINALLY CONSTRUCTED WITH EXISTING WINDOW GLAZING, STONE, AND PRECAST COMPONENTS. PROVIDE NEW WALL FRAMING, SHEATHING, DAMP PROOFING, FLASHING, SEALANTS, GYPSUM BOARD, FIRE SAFING AND OTHER COMPONENTS UTILIZED IN THE EXISTING CONSTRUCTION. ALL WORK TO MATCH EXISTING RESULTING IN A UNIFORM APPEARANCE OF THE BUILDING ELEVATION. PRIOR TO REINSTALLATION, REPAIR ANY AND ALL BUILDING ELEMENTS DAMAGED DUE

TO WORK IN THIS CONTRACT. RESTORE SITE WORK TO ORIGINAL CONDITION.

PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT REMOVED DOOR TO MATCH EXISTING FINISHES.

PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT NEW DOOR AND FRAME TO MATCH EXISTING FINISHES.

REINSTALL EXISTING GLASS DOOR SYSTEM TO MATCH ORIGINAL INSTALLATION. PATCH AND REPAIR ADJACENT SURFACES TO MATCH

EXISTING FINISHES.

REPLACE FLOOR FINISHES, BASE, AND PAINT WALLS TO MATCH EXISTING, PRIOR TO NEW FINISHES, PATCH AND PREPARE AND REPAIR SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES. REPAINT H.M. DOOR FRAME. REPLACE DOOR AND HARDWARE

IF DAMAGED DURING CONSTRUCTION.

PAINT NEW PARTITIONS TO MATCH EXISTING, PROVIDE NEW BASE TO MATCH EXISTING. PRIOR TO THE INSTALLATION OF NEW FINISHES, PATCH, REPAIR AND PREPARE SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES, INCLUDING REWORKING

CEILING, FUR DOWNS AND FLOOR FINISHES TO MATCH EXISTING.

REPAIR FLOOR, CEILING AND WALL CONSTRUCTION TO MATCH EXISTING AT REMOVED TEMPORARY CONSTRUCTION PARTITION.

REFER TO MEP DRAWINGS FOR WORK IN THIS ROOM. VERIFY AND CONSTRUCT ALTERATIONS/CONSTRUCTION OF HOUSEKEEPING

PADS FOR MEP EQUIPMENT.

COORDINATE WORK IN THIS AREA ACCORDING TO CONSTRUCTION PHASING PLANS.

EXISTING FLOOR FINISH TO REMAIN IN THIS AREA UNTIL PHASE 4 IS CONSTRUCTED. PATCH, REPAIR FLOOR FINISH AND WALL BASE

WHERE WALLS HAVE BEEN REMOVED AS PART OF PREVIOUS PHASES.

PROVIDE MATCHING FLOOR FINISH THIS AREA UNTIL FINAL SCHEDULED FLOOR AND BASE FINISH IS INSTALLED AS PART OF PHASE 4 CONSTRUCTION. INSTALL HANDRAILS, CRASH RAILS, CORNER GUARDS AND WALL GUARDS AT PHASE 1 CONSTRUCTION.

2 HOUR FIRE RESISTIVE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1 & 4. SEE GI-130 FOR 2 HOUR PARTITION

REQUIREMENT W/ BID OPTION #2

2 HOUR FIRE SMOKE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1.

RELOCATED INTERIOR FIXED GLAZING SYSTEM FROM EXISTING INTERNET CAFE. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING GLAZING TO REMAIN W/ DEDUCT #1 W/ OPENING CLOSED W/ CONTINUATION OF SCHEDULED PARTITION.

RELOCATED INTERIOR HORIZONTAL SLIDING GLASS DOOR AND SIDE LIGHTS FROM EXISTING INTERNET CAFE. CONNECT AND ADJUST AUTO OPENER TO BE FULLY FUNCTIONAL AS EXISTING INSTALLATION. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING DOOR TO REMAIN W/ DEDUCT ALT #1 AND ALTERNATE EXISTING HORIZONTAL SLIDING GLASS DOOR FROM EXISTING DAYROOM ENTRY TO BE RELOCATED INSTEAD. ADJUST OPENING SIZE AND AUTO OPENER CONNECTIONS AS REQUIRED.

ALL ELECTRICAL RECEPTACLES THIS ROOM TO BE 48" A.F.F. UNLESS NOTED OTHERWISE ON ELECTRICAL DWGS.

EXISTING COURTYARD UNDER PAVERS. REINSTALL/REPAIR WATERPROOFING AND INSTALL PAVERS PER ORIGINAL CONSTRUCTION TO ALLOW DRAINAGE FLOW TO DRAINS. WHERE DRAINS ARE IN EXISTING PLANTERS, RAISE DRAIN TO NEW LEVEL OF COURTYARD

CONCRETE SLAB ELEVATION.

EXISTING DRAIN AT PERIMETER TRENCH DRAIN UNDER PAVERS. TERMINATE EXISTING TRENCH DRAIN AT FACE OF ADDITION CONCRETE. REPAIR WATER PROOFING. INSURE ALL SECTIONS OF TRENCH DRAIN HAVE PROPER FLOW TO DRAIN. INSTALL PAVERS PER ORIGINAL CONSTRUCTION BRIDGING OVER TRENCH AND ALLOWING DRAINAGE FLOW INTO TRENCH.

PROTECT EXISTING CONSTRUCTION, SEE NOTES 31 & 37 FOR ADDITIONAL INFORMATION.

MED GAS, REFER TO M.E.P. DRAWINGS.

ROOF ACCESS LADDER

FLOOR PLAN KEY NOTES

NOT ALL USED ON THIS SHEET

100-83 1G1H

100-84

1K 100-85

100-80 1D

100-79 1C

100-78 1B

100-77 1A

100-82 1F 1E

100-81

T R

U E

N

ADDITION

KEY PLAN

P L A

N N

PLAN N

A

T

PATIE

NT U

NIT

S

LINE TYPE LEGEND

PROJECT SCOPE BOUNDARIES

DETAIL AND PLAN ENLARGEMENT REFERENCE

2 HOUR FIRE RESISTIVE PARTITION

2 HOUR FIRE SMOKE PARTITION

A. FOR ADDITIONAL ARCHITECTURAL FLOOR PLAN NOTES, REFER TO AE-400.

B. FOR MEPT WORK, REFER TO MEP DRAWINGS.

C. FOR STRUCTURAL WORK, REFER TO 'S' SERIES STRUCTURAL DRAWINGS.

D. FOR GENERAL INFORMATION INCLUDING PROJECT PHASING AND ALTERNATES, REFER TO 'G' SERIES DRAWINGS. ADDITIONAL

DETAILED INFORMATION PERTAINING TO PHASING AND ALTERNATES ARE NOTED THROUGHOUT DRAWING SET.

E. FOR PARTITION TYPES AND DIMENSIONS OF PARTITIONS ON FLOOR PLANS REFER TO AE-111 SERIES DRAWINGS.

F. ALL EXISTING FIREPROOFING TO BE REPAIRED TO ACHIEVE PROTECTION EQUIVALENT TO EXISTING PROTECTION.

G. ALL NEW STRUCTURAL STEEL, PRIMARY AND SECONDARY, TO RECEIVE SPRAY ON FIREPROOFING EQUIVALENT TO PROTECTION

ON EXISTING COLUMNS.

H. NEW CLINIC STEEL ROOF FRAMING, PRIMARY AND SECONDARY, TO RECEIVE 2-HR SPRAY ON FIREPROOFING.

I. PROVIDE VERTICAL GYPSUM BOARD EXPANSION JOINTS WHERE PARTITION FRAMING TRANSITIONS/ CROSSES/ ABUTS BETWEEN

NEW STRUCTURAL ELEMENTS AND EXISTING.

J. REFER TO SHEET AE-566 FOR FRAMING AND CONSTRUCTION REQUIREMENTS WHERE PARTITIONS, RATED AND NON F.R. RATED, ABUT SPRAYED ON FIREPROOFING CONDITIONS.

K. MAINTAIN REQUIRED ADA/ ABA CLEARANCES INCLUDING CLEAR FLOOR SPACE AND CLEARANCES AT DOORS, INCLUDING

CLEARANCES AT STRIKE ON PULL SIDE OF DOORS.

L. PATCH AND REPAIR FIREPROOFING AROUND COLUMN AND ENSURE A 2-HR RATING.

M. DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE.

ARCHITECTURAL FLOOR PLAN GENERAL NOTES

6565 West Loop South, Suite 560, Bellaire, TX 77401

713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t

0 Revisions:

IS

S

U E

D F

O R

B

ID

D

IN

G

C O

N S

TR

U

C

TI

O N

Drawing Number

DrawnChecked

Dwg. of Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

VA FORM 08-6231

Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Drawing Title

Approved: Project Director

Project Title

Location

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Building Number

B100

Project Number

Office of

Construction and Facilities

Management

V eterans Affairs P alo Alto Heal th Ca re Sy stem

S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"

AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem

D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED

T exas Reg. No.G FE Project No.F-571213060

Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18

AE-102

ARCHITECTURAL PLAN - FIRST FLOOR -

PHASE 1 ADDITION - NOTES

CONSTRUCT SPINAL CORD

INJURY BED EXPANSION

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

#580 - 320

0' 8' 12'4' 1/8" = 1'-0"

ARCHITECTURAL PLAN -

FIRST FLOOR - PHASE 1 ADDITION - NOTES

F1

P L A

N N

T R

U E

N

PLA

N N

A T

PATIE

N T U

N

F.E.C.

F .E

.C

F.E .C

F.E .C

SS

R.8R.8

RR

Q.5Q.5

QQ

P.5P.5

PP

1.8

1.82

2.5

2.5

3.5

3.5

55.2

5.25.5

5.5

6.5

6.5

6.9

6.9

C1B-206

CORR

1B-248A

TLTS1

1B-242A

TLTS1

C1B-203

CORR

1B-236

MECHANICAL

1B-237A

TLTS1

1B-237

BRMS1

1B-238A

TLTS1

1B-238

BRMS2

1B-242

BRMS2

1B-244A

TLTS1

1B-246A

TLTS1

1B-246

BRMS2

1B-248

BRMS2

1B-252

TLTS2

1B-256

STORAGE

1B-254

GU LAB

1B-266

HC STAFF

1B-264

BREAK ROOM

1B-212

CORR

C1B-209

CORR

C1B-204

CORR

C1B-208

CORR

1B-237A

1B-237

1B -2

A

1B-238

1B-242

1B -2

A

1B-244

1B -2

A

1B -2

A

1B-246

1B-248

1B -2

A

1B-244

BRMS2

1B-212A

CORR

1B-266

AE-401

E6 SIM, OP HD

C 1B

-2

M A

T C

H L

IN

E

R E

S

H E

E T

A E

-1

P H

A S

E

R

E S

H E

E T

A E

-1

P H

A S

E

AE-402

C1

07 10

07 10

07 10

AE-404

E1

15 16

15 16

15 16

15 16

15 16

15 16

AE-404

E6

LINE TYPE LEGEND

PROJECT SCOPE BOUNDARIES

DETAIL AND PLAN ENLARGEMENT REFERENCE

2 HOUR FIRE RESISTIVE PARTITION

2 HOUR FIRE SMOKE PARTITION

100-83 1G1H

100-84

1K 100-85

100-80 1D

100-79 1C

100-78 1B

100-77 1A

100-82 1F 1E

100-81

KEY PLAN

T R

U E

N

P L A

N N

PLAN N

A

T

PATIE

NT U

NIT

S

A. FOR ADDITIONAL ARCHITECTURAL FLOOR PLAN NOTES, REFER TO AE-400.

B. FOR MEPT WORK, REFER TO MEP DRAWINGS.

C. FOR STRUCTURAL WORK, REFER TO 'S' SERIES STRUCTURAL DRAWINGS.

D. FOR GENERAL INFORMATION INCLUDING PROJECT PHASING AND ALTERNATES, REFER TO 'G' SERIES DRAWINGS. ADDITIONAL

DETAILED INFORMATION PERTAINING TO PHASING AND ALTERNATES ARE NOTED THROUGHOUT DRAWING SET.

E. FOR PARTITION TYPES AND DIMENSIONS OF PARTITIONS ON FLOOR PLANS REFER TO AE-111 SERIES DRAWINGS.

F. ALL EXISTING FIREPROOFING TO BE REPAIRED TO ACHIEVE PROTECTION EQUIVALENT TO EXISTING PROTECTION.

G. ALL NEW STRUCTURAL STEEL, PRIMARY AND SECONDARY, TO RECEIVE SPRAY ON FIREPROOFING EQUIVALENT TO PROTECTION

ON EXISTING COLUMNS.

H. NEW CLINIC STEEL ROOF FRAMING, PRIMARY AND SECONDARY, TO RECEIVE 2-HR SPRAY ON FIREPROOFING.

I. PROVIDE VERTICAL GYPSUM BOARD EXPANSION JOINTS WHERE PARTITION FRAMING TRANSITIONS/ CROSSES/ ABUTS BETWEEN

NEW STRUCTURAL ELEMENTS AND EXISTING.

J. REFER TO SHEET AE-566 FOR FRAMING AND CONSTRUCTION REQUIREMENTS WHERE PARTITIONS, RATED AND NON F.R. RATED, ABUT SPRAYED ON FIREPROOFING CONDITIONS.

K. MAINTAIN REQUIRED ADA/ ABA CLEARANCES INCLUDING CLEAR FLOOR SPACE AND CLEARANCES AT DOORS, INCLUDING

CLEARANCES AT STRIKE ON PULL SIDE OF DOORS.

L. PATCH AND REPAIR FIREPROOFING AROUND COLUMN AND ENSURE A 2-HR RATING.

M. DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE.

ARCHITECTURAL FLOOR PLAN GENERAL NOTES

AREA NOT IN CONTRACT. COORDINATE ACCESS TO AREA W/ OWNER.

PREPARE FLOOR SUBSTRATE & INSTALL NEW FLOOR AS SCHEDULED.

PROVIDE SELF LEVELING CONCRETE UNDERLAYMENT AS SPECIFIED OVER EXISTING FLOOR SUBSTRATE.

NEW DOOR FRAME, RE: DOOR SCHEDULE

EXISTING CONSTRUCTION TO REMAIN AS INDICATED, PATCH WALL AS NECESSARY DUE TO RENOVATION WORK, MATCH EXISTING

WALL FINISH.

UPGRADE EXISTING PARTITION TO FIRE RATED PARTITION AS SCHEDULED, REFER TO GI-011 LIFE SAFETY FOR SCHEDULED RATING LOCATION. PATCH, REPAIR AND FILL ALL PENETRATIONS TO COMPLY WITH SCHEDULED RATING AND APPLICABLE UL LISTING AS

SCHEDULED ON AE-601 PARTITION TYPES.

EXISTING FLOOR BASE AND WALLS TO REMAIN THIS ROOM EXCEPT AT NEW PARTITIONS INDICATED. PATCH REPAIR, REPLACE DAMAGED OR MISSING FINISHES DUE TO RENOVATION WORK. MATCH EXISTING FLOOR, BASE AND WALL FINISHES AS NEEDED FOR

LIKE NEW COMPLETE APPEARANCE.

REINSTALL SALVAGED CURTAIN WALL ASSEMBLY TO MATCH ORIGINAL INSTALLATION.

EXISTING DOOR & FRAME TO REMAIN.

PATCH EXISTING WALLS TO REMAIN AS NECESSARY, PROVIDE NEW FINISH AS SCHEDULED, SEE ROOM FINISH SCHEDULE.

NEW HANDRAILS AND CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.

NEW CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.

PREPARE FLOOR SUBSTRATE & INSTALL NEW TO MATCH EXISTING ADJACENT FINISH.

PATCH EXISTING OPENING TO REMAIN AFTER THE REMOVAL OF EXISTING DOOR FRAME AND HARDWARE.

NEW PLUMBING FIXTURES; RE PLUMBING.

PATCH & REPAIR EXISTING CURTAIN WALL ASSEMBLY TO MATCH EXISTING. RESEAL & REPLACE GASKETS AS NEEDED TO ENSURE A

WATER TIGHT ASSEMBLY.

FILL IN EXISTING OPENING MATCH ADJACENT FINISH. ALIGN FINISH FACE W/ EXISTING FINISH.

NEW SHAFT WALL CONSTRUCTION.

ALIGN NEW PARTITION FINISHED FACE WITH EXISTING ADJACENT WALL, TYPICAL. MATCH EXISTING ADJACENT WALL FINISH.

REPAIR EXISTING WATERPROOFING. REINSTALL SALVAGED PAVERS PER ORIGINAL CONSTRUCTION IN PATTERN SHOWN. REFER TO

SHEET AE-301 KEY NOTE #30 FOR ADDITIONAL INFORMATION AND REQUIREMENTS

NEW DOOR, FRAME & HARDWARE, RE: DOOR SCHEDULE.

EXISTING COLUMN ENCLOSURE TO REMAIN; PATCH, REPAIR & CLEAN FOR LIKE NEW APPEARANCE.

NEW WINDOW & ASSEMBLY.

EXISTING STOREFRONT SYSTEM TO REMAIN.

NEW STOREFRONT SYSTEM TO MATCH ADJACENT; RE:

LINE OF PRIVACY CURTAIN TRACK ABOVE.

INFILL CONCRETE SLAB ON METAL DECK AT REMOVED PLANTER. PROVIDE NEW WATERPROOFING OVER NEW CONCRETE TO MATCH

EXISTING. RE: STRUCTURAL

SCHEDULED STAINLESS STEEL LINEAR SHOWER DRAIN AT SHOWER CURTAIN LINE, RE PLUMBING, TYP.

CONCRETE HOUSEKEEPING PAD FOR MECHANICAL EQUIPMENT. RE: MECHANICAL FOR EQUIPMENT CONFIGURATION.

EXISTING STORM DRAIN TO REMAIN, RE PLUMBING.

CONTRACTOR TO RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.

PHASE CONSTRUCTION OF THIS ROOM/AREA UNTIL CONSTRUCTION ACCESS THROUGH THIS AREA IS NO LONGER NEEDED BUT IN NO

CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.

REINSTALL SALVAGED WINDOW SYSTEM AS ORIGINALLY CONSTRUCTED WITH EXISTING WINDOW GLAZING, STONE, AND PRECAST COMPONENTS. PROVIDE NEW WALL FRAMING, SHEATHING, DAMP PROOFING, FLASHING, SEALANTS, GYPSUM BOARD, FIRE SAFING AND OTHER COMPONENTS UTILIZED IN THE EXISTING CONSTRUCTION. ALL WORK TO MATCH EXISTING RESULTING IN A UNIFORM APPEARANCE OF THE BUILDING ELEVATION. PRIOR TO REINSTALLATION, REPAIR ANY AND ALL BUILDING ELEMENTS DAMAGED DUE

TO WORK IN THIS CONTRACT. RESTORE SITE WORK TO ORIGINAL CONDITION.

PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT REMOVED DOOR TO MATCH EXISTING FINISHES.

PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT NEW DOOR AND FRAME TO MATCH EXISTING FINISHES.

REINSTALL EXISTING GLASS DOOR SYSTEM TO MATCH ORIGINAL INSTALLATION. PATCH AND REPAIR ADJACENT SURFACES TO MATCH

EXISTING FINISHES.

REPLACE FLOOR FINISHES, BASE, AND PAINT WALLS TO MATCH EXISTING, PRIOR TO NEW FINISHES, PATCH AND PREPARE AND REPAIR SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES. REPAINT H.M. DOOR FRAME. REPLACE DOOR AND HARDWARE

IF DAMAGED DURING CONSTRUCTION.

PAINT NEW PARTITIONS TO MATCH EXISTING, PROVIDE NEW BASE TO MATCH EXISTING. PRIOR TO THE INSTALLATION OF NEW FINISHES, PATCH, REPAIR AND PREPARE SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES, INCLUDING REWORKING

CEILING, FUR DOWNS AND FLOOR FINISHES TO MATCH EXISTING.

REPAIR FLOOR, CEILING AND WALL CONSTRUCTION TO MATCH EXISTING AT REMOVED TEMPORARY CONSTRUCTION PARTITION.

REFER TO MEP DRAWINGS FOR WORK IN THIS ROOM. VERIFY AND CONSTRUCT ALTERATIONS/CONSTRUCTION OF HOUSEKEEPING

PADS FOR MEP EQUIPMENT.

COORDINATE WORK IN THIS AREA ACCORDING TO CONSTRUCTION PHASING PLANS.

EXISTING FLOOR FINISH TO REMAIN IN THIS AREA UNTIL PHASE 4 IS CONSTRUCTED. PATCH, REPAIR FLOOR FINISH AND WALL BASE

WHERE WALLS HAVE BEEN REMOVED AS PART OF PREVIOUS PHASES.

PROVIDE MATCHING FLOOR FINISH THIS AREA UNTIL FINAL SCHEDULED FLOOR AND BASE FINISH IS INSTALLED AS PART OF PHASE 4 CONSTRUCTION. INSTALL HANDRAILS, CRASH RAILS, CORNER GUARDS AND WALL GUARDS AT PHASE 1 CONSTRUCTION.

2 HOUR FIRE RESISTIVE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1 & 4. SEE GI-130 FOR 2 HOUR PARTITION

REQUIREMENT W/ BID OPTION #2

2 HOUR FIRE SMOKE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1.

RELOCATED INTERIOR FIXED GLAZING SYSTEM FROM EXISTING INTERNET CAFE. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING GLAZING TO REMAIN W/ DEDUCT #1 W/ OPENING CLOSED W/ CONTINUATION OF SCHEDULED PARTITION.

RELOCATED INTERIOR HORIZONTAL SLIDING GLASS DOOR AND SIDE LIGHTS FROM EXISTING INTERNET CAFE. CONNECT AND ADJUST AUTO OPENER TO BE FULLY FUNCTIONAL AS EXISTING INSTALLATION. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING DOOR TO REMAIN W/ DEDUCT ALT #1 AND ALTERNATE EXISTING HORIZONTAL SLIDING GLASS DOOR FROM EXISTING DAYROOM ENTRY TO BE RELOCATED INSTEAD. ADJUST OPENING SIZE AND AUTO OPENER CONNECTIONS AS REQUIRED.

ALL ELECTRICAL RECEPTACLES THIS ROOM TO BE 48" A.F.F. UNLESS NOTED OTHERWISE ON ELECTRICAL DWGS.

EXISTING COURTYARD UNDER PAVERS. REINSTALL/REPAIR WATERPROOFING AND INSTALL PAVERS PER ORIGINAL CONSTRUCTION TO ALLOW DRAINAGE FLOW TO DRAINS. WHERE DRAINS ARE IN EXISTING PLANTERS, RAISE DRAIN TO NEW LEVEL OF COURTYARD

CONCRETE SLAB ELEVATION.

EXISTING DRAIN AT PERIMETER TRENCH DRAIN UNDER PAVERS. TERMINATE EXISTING TRENCH DRAIN AT FACE OF ADDITION CONCRETE. REPAIR WATER PROOFING. INSURE ALL SECTIONS OF TRENCH DRAIN HAVE PROPER FLOW TO DRAIN. INSTALL PAVERS PER ORIGINAL CONSTRUCTION BRIDGING OVER TRENCH AND ALLOWING DRAINAGE FLOW INTO TRENCH.

PROTECT EXISTING CONSTRUCTION, SEE NOTES 31 & 37 FOR ADDITIONAL INFORMATION.

MED GAS, REFER TO M.E.P. DRAWINGS.

ROOF ACCESS LADDER

FLOOR PLAN KEY NOTES

NOT ALL USED ON THIS SHEET

6565 West Loop South, Suite 560, Bellaire, TX 77401

713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t

0 Revisions:

IS

S

U E

D F

O R

B

ID

D

IN

G

C O

N S

TR

U

C

TI

O N

Drawing Number

DrawnChecked

Dwg. of Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

VA FORM 08-6231

Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Drawing Title

Approved: Project Director

Project Title

Location

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Building Number

B100

Project Number

Office of

Construction and Facilities

Management

V eterans Affairs P alo Alto Heal th Ca re Sy stem

S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"

AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem

D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED

T exas Reg. No.G FE Project No.F-571213060

Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18

AE-103

ARCHITECTURAL PLAN - FIRST FLOOR -

PHASE 2 - NOTES

CONSTRUCT SPINAL CORD

INJURY BED EXPANSION

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

#580 - 320

0' 8' 12'4' 1/8" = 1'-0"

ARCHITECTURAL PLAN - FIRST FLOOR - PHASE 2 - NOTES

F1

P L A

N N

T R

U E

N

PLA

N N

A T

PATIE

N T U

N

.E

.C

F.E .C

F.E .C

F.E.C

F.E.C

SS

R.8R.8

RR

Q.5Q.5

QQ

P.5P.5

PP

1.8

1.82

2.5

2.5

3.5

3.5

55.2

5.25.5

5.5

6.5

6.5

6.9

6.9

AE-403

D1

C1B-206

CORR

1B-232A

TLTS1

1B-230A

TLTS1

1B-228A

TLTS1

1B-226A

TLTS1

1B-224A

TLTS1

1B-220A

TLTS1

C1B-203

CORR

1B-216

TRANS EQ STOR

1B-220

BRMS2

1B-222

BRMS1

1B-224

BRMS2

1B-226

BRMS2

1B-228

BRMS2

1B-230

BRMS2

1B-232

BRMS2

1B-236

MECHANICAL

C1B-204

CORR

C1B-208

CORR

1B-222A

TLTS1

1B-235

STORAGE

1B-220A

1B -2

1B

-2

1B -2

1B-224A

1B -2

1B-226A

1B-228A 1B -2

1B

-2

1B-230A

1B-232A 1B -2

1B

-2

1B-237A

AE-403

D5

090909

1B-222A

1B-222B

STORAGE

1B -2

B

B

-2

M A

T C

H L

IN

E

R E

S

H E

E T

A E

-1

P H

A S

E

R

E S

H E

E T

A E

-1

P H

A S

E

01 01

07 10

AE-404

E1

SIM, OP HD 03

AREA NOT IN CONTRACT. COORDINATE ACCESS TO AREA W/ OWNER.

PREPARE FLOOR SUBSTRATE & INSTALL NEW FLOOR AS SCHEDULED.

PROVIDE SELF LEVELING CONCRETE UNDERLAYMENT AS SPECIFIED OVER EXISTING FLOOR SUBSTRATE.

NEW DOOR FRAME, RE: DOOR SCHEDULE

EXISTING CONSTRUCTION TO REMAIN AS INDICATED, PATCH WALL AS NECESSARY DUE TO RENOVATION WORK, MATCH EXISTING

WALL FINISH.

UPGRADE EXISTING PARTITION TO FIRE RATED PARTITION AS SCHEDULED, REFER TO GI-011 LIFE SAFETY FOR SCHEDULED RATING LOCATION. PATCH, REPAIR AND FILL ALL PENETRATIONS TO COMPLY WITH SCHEDULED RATING AND APPLICABLE UL LISTING AS

SCHEDULED ON AE-601 PARTITION TYPES.

EXISTING FLOOR BASE AND WALLS TO REMAIN THIS ROOM EXCEPT AT NEW PARTITIONS INDICATED. PATCH REPAIR, REPLACE DAMAGED OR MISSING FINISHES DUE TO RENOVATION WORK. MATCH EXISTING FLOOR, BASE AND WALL FINISHES AS NEEDED FOR

LIKE NEW COMPLETE APPEARANCE.

REINSTALL SALVAGED CURTAIN WALL ASSEMBLY TO MATCH ORIGINAL INSTALLATION.

EXISTING DOOR & FRAME TO REMAIN.

PATCH EXISTING WALLS TO REMAIN AS NECESSARY, PROVIDE NEW FINISH AS SCHEDULED, SEE ROOM FINISH SCHEDULE.

NEW HANDRAILS AND CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.

NEW CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.

PREPARE FLOOR SUBSTRATE & INSTALL NEW TO MATCH EXISTING ADJACENT FINISH.

PATCH EXISTING OPENING TO REMAIN AFTER THE REMOVAL OF EXISTING DOOR FRAME AND HARDWARE.

NEW PLUMBING FIXTURES; RE PLUMBING.

PATCH & REPAIR EXISTING CURTAIN WALL ASSEMBLY TO MATCH EXISTING. RESEAL & REPLACE GASKETS AS NEEDED TO ENSURE A

WATER TIGHT ASSEMBLY.

FILL IN EXISTING OPENING MATCH ADJACENT FINISH. ALIGN FINISH FACE W/ EXISTING FINISH.

NEW SHAFT WALL CONSTRUCTION.

ALIGN NEW PARTITION FINISHED FACE WITH EXISTING ADJACENT WALL, TYPICAL. MATCH EXISTING ADJACENT WALL FINISH.

REPAIR EXISTING WATERPROOFING. REINSTALL SALVAGED PAVERS PER ORIGINAL CONSTRUCTION IN PATTERN SHOWN. REFER TO

SHEET AE-301 KEY NOTE #30 FOR ADDITIONAL INFORMATION AND REQUIREMENTS

NEW DOOR, FRAME & HARDWARE, RE: DOOR SCHEDULE.

EXISTING COLUMN ENCLOSURE TO REMAIN; PATCH, REPAIR & CLEAN FOR LIKE NEW APPEARANCE.

NEW WINDOW & ASSEMBLY.

EXISTING STOREFRONT SYSTEM TO REMAIN.

NEW STOREFRONT SYSTEM TO MATCH ADJACENT; RE:

LINE OF PRIVACY CURTAIN TRACK ABOVE.

INFILL CONCRETE SLAB ON METAL DECK AT REMOVED PLANTER. PROVIDE NEW WATERPROOFING OVER NEW CONCRETE TO MATCH

EXISTING. RE: STRUCTURAL

SCHEDULED STAINLESS STEEL LINEAR SHOWER DRAIN AT SHOWER CURTAIN LINE, RE PLUMBING, TYP.

CONCRETE HOUSEKEEPING PAD FOR MECHANICAL EQUIPMENT. RE: MECHANICAL FOR EQUIPMENT CONFIGURATION.

EXISTING STORM DRAIN TO REMAIN, RE PLUMBING.

CONTRACTOR TO RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.

PHASE CONSTRUCTION OF THIS ROOM/AREA UNTIL CONSTRUCTION ACCESS THROUGH THIS AREA IS NO LONGER NEEDED BUT IN NO

CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.

REINSTALL SALVAGED WINDOW SYSTEM AS ORIGINALLY CONSTRUCTED WITH EXISTING WINDOW GLAZING, STONE, AND PRECAST COMPONENTS. PROVIDE NEW WALL FRAMING, SHEATHING, DAMP PROOFING, FLASHING, SEALANTS, GYPSUM BOARD, FIRE SAFING AND OTHER COMPONENTS UTILIZED IN THE EXISTING CONSTRUCTION. ALL WORK TO MATCH EXISTING RESULTING IN A UNIFORM APPEARANCE OF THE BUILDING ELEVATION. PRIOR TO REINSTALLATION, REPAIR ANY AND ALL BUILDING ELEMENTS DAMAGED DUE

TO WORK IN THIS CONTRACT. RESTORE SITE WORK TO ORIGINAL CONDITION.

PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT REMOVED DOOR TO MATCH EXISTING FINISHES.

PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT NEW DOOR AND FRAME TO MATCH EXISTING FINISHES.

REINSTALL EXISTING GLASS DOOR SYSTEM TO MATCH ORIGINAL INSTALLATION. PATCH AND REPAIR ADJACENT SURFACES TO MATCH

EXISTING FINISHES.

REPLACE FLOOR FINISHES, BASE, AND PAINT WALLS TO MATCH EXISTING, PRIOR TO NEW FINISHES, PATCH AND PREPARE AND REPAIR SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES. REPAINT H.M. DOOR FRAME. REPLACE DOOR AND HARDWARE

IF DAMAGED DURING CONSTRUCTION.

PAINT NEW PARTITIONS TO MATCH EXISTING, PROVIDE NEW BASE TO MATCH EXISTING. PRIOR TO THE INSTALLATION OF NEW FINISHES, PATCH, REPAIR AND PREPARE SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES, INCLUDING REWORKING

CEILING, FUR DOWNS AND FLOOR FINISHES TO MATCH EXISTING.

REPAIR FLOOR, CEILING AND WALL CONSTRUCTION TO MATCH EXISTING AT REMOVED TEMPORARY CONSTRUCTION PARTITION.

REFER TO MEP DRAWINGS FOR WORK IN THIS ROOM. VERIFY AND CONSTRUCT ALTERATIONS/CONSTRUCTION OF HOUSEKEEPING

PADS FOR MEP EQUIPMENT.

COORDINATE WORK IN THIS AREA ACCORDING TO CONSTRUCTION PHASING PLANS.

EXISTING FLOOR FINISH TO REMAIN IN THIS AREA UNTIL PHASE 4 IS CONSTRUCTED. PATCH, REPAIR FLOOR FINISH AND WALL BASE

WHERE WALLS HAVE BEEN REMOVED AS PART OF PREVIOUS PHASES.

PROVIDE MATCHING FLOOR FINISH THIS AREA UNTIL FINAL SCHEDULED FLOOR AND BASE FINISH IS INSTALLED AS PART OF PHASE 4 CONSTRUCTION. INSTALL HANDRAILS, CRASH RAILS, CORNER GUARDS AND WALL GUARDS AT PHASE 1 CONSTRUCTION.

2 HOUR FIRE RESISTIVE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1 & 4. SEE GI-130 FOR 2 HOUR PARTITION

REQUIREMENT W/ BID OPTION #2

2 HOUR FIRE SMOKE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1.

RELOCATED INTERIOR FIXED GLAZING SYSTEM FROM EXISTING INTERNET CAFE. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING GLAZING TO REMAIN W/ DEDUCT #1 W/ OPENING CLOSED W/ CONTINUATION OF SCHEDULED PARTITION.

RELOCATED INTERIOR HORIZONTAL SLIDING GLASS DOOR AND SIDE LIGHTS FROM EXISTING INTERNET CAFE. CONNECT AND ADJUST AUTO OPENER TO BE FULLY FUNCTIONAL AS EXISTING INSTALLATION. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING DOOR TO REMAIN W/ DEDUCT ALT #1 AND ALTERNATE EXISTING HORIZONTAL SLIDING GLASS DOOR FROM EXISTING DAYROOM ENTRY TO BE RELOCATED INSTEAD. ADJUST OPENING SIZE AND AUTO OPENER CONNECTIONS AS REQUIRED.

ALL ELECTRICAL RECEPTACLES THIS ROOM TO BE 48" A.F.F. UNLESS NOTED OTHERWISE ON ELECTRICAL DWGS.

EXISTING COURTYARD UNDER PAVERS. REINSTALL/REPAIR WATERPROOFING AND INSTALL PAVERS PER ORIGINAL CONSTRUCTION TO ALLOW DRAINAGE FLOW TO DRAINS. WHERE DRAINS ARE IN EXISTING PLANTERS, RAISE DRAIN TO NEW LEVEL OF COURTYARD

CONCRETE SLAB ELEVATION.

EXISTING DRAIN AT PERIMETER TRENCH DRAIN UNDER PAVERS. TERMINATE EXISTING TRENCH DRAIN AT FACE OF ADDITION CONCRETE. REPAIR WATER PROOFING. INSURE ALL SECTIONS OF TRENCH DRAIN HAVE PROPER FLOW TO DRAIN. INSTALL PAVERS PER ORIGINAL CONSTRUCTION BRIDGING OVER TRENCH AND ALLOWING DRAINAGE FLOW INTO TRENCH.

PROTECT EXISTING CONSTRUCTION, SEE NOTES 31 & 37 FOR ADDITIONAL INFORMATION.

MED GAS, REFER TO M.E.P. DRAWINGS.

ROOF ACCESS LADDER

FLOOR PLAN KEY NOTES

NOT ALL USED ON THIS SHEET

A. FOR ADDITIONAL ARCHITECTURAL FLOOR PLAN NOTES, REFER TO AE-400.

B. FOR MEPT WORK, REFER TO MEP DRAWINGS.

C. FOR STRUCTURAL WORK, REFER TO 'S' SERIES STRUCTURAL DRAWINGS.

D. FOR GENERAL INFORMATION INCLUDING PROJECT PHASING AND ALTERNATES, REFER TO 'G' SERIES DRAWINGS. ADDITIONAL

DETAILED INFORMATION PERTAINING TO PHASING AND ALTERNATES ARE NOTED THROUGHOUT DRAWING SET.

E. FOR PARTITION TYPES AND DIMENSIONS OF PARTITIONS ON FLOOR PLANS REFER TO AE-111 SERIES DRAWINGS.

F. ALL EXISTING FIREPROOFING TO BE REPAIRED TO ACHIEVE PROTECTION EQUIVALENT TO EXISTING PROTECTION.

G. ALL NEW STRUCTURAL STEEL, PRIMARY AND SECONDARY, TO RECEIVE SPRAY ON FIREPROOFING EQUIVALENT TO PROTECTION

ON EXISTING COLUMNS.

H. NEW CLINIC STEEL ROOF FRAMING, PRIMARY AND SECONDARY, TO RECEIVE 2-HR SPRAY ON FIREPROOFING.

I. PROVIDE VERTICAL GYPSUM BOARD EXPANSION JOINTS WHERE PARTITION FRAMING TRANSITIONS/ CROSSES/ ABUTS BETWEEN

NEW STRUCTURAL ELEMENTS AND EXISTING.

J. REFER TO SHEET AE-566 FOR FRAMING AND CONSTRUCTION REQUIREMENTS WHERE PARTITIONS, RATED AND NON F.R. RATED, ABUT SPRAYED ON FIREPROOFING CONDITIONS.

K. MAINTAIN REQUIRED ADA/ ABA CLEARANCES INCLUDING CLEAR FLOOR SPACE AND CLEARANCES AT DOORS, INCLUDING

CLEARANCES AT STRIKE ON PULL SIDE OF DOORS.

L. PATCH AND REPAIR FIREPROOFING AROUND COLUMN AND ENSURE A 2-HR RATING.

M. DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE.

ARCHITECTURAL FLOOR PLAN GENERAL NOTES

100-83 1G1H

100-84

1K 100-85

100-80 1D

100-79 1C

100-78 1B

100-77 1A

100-82 1F 1E

100-81

KEY PLAN

T R

U E

N

P L A

N N

PLAN N

A

T

PATIE

NT U

NIT

S

LINE TYPE LEGEND

PROJECT SCOPE BOUNDARIES

DETAIL AND PLAN ENLARGEMENT REFERENCE

2 HOUR FIRE RESISTIVE PARTITION

2 HOUR FIRE SMOKE PARTITION

6565 West Loop South, Suite 560, Bellaire, TX 77401

713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t

0 Revisions:

IS

S

U E

D F

O R

B

ID

D

IN

G

C O

N S

TR

U

C

TI

O N

Drawing Number

DrawnChecked

Dwg. of Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

VA FORM 08-6231

Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Drawing Title

Approved: Project Director

Project Title

Location

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Building Number

B100

Project Number

Office of

Construction and Facilities

Management

V eterans Affairs P alo Alto Heal th Ca re Sy stem

S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"

AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem

D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED

T exas Reg. No.G FE Project No.F-571213060

Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18

AE-104

ARCHITECTURAL PLAN - FIRST FLOOR -

PHASE 3 - NOTES

CONSTRUCT SPINAL CORD

INJURY BED EXPANSION

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

#580 - 320

0' 8' 12'4' 1/8" = 1'-0"

ARCHITECTURAL PLAN - FIRST FLOOR - PHASE 3 - NOTES

F1

P L A

N N

T R

U E

N

PLA

N N

A T

PATIE

N T U

N

F .E

.C

F.E.C

F.E .C

F .E

.C

SS

R.8R.8

RR

Q.5Q.5

QQ

P.5P.5

PP

NN

8.1

8.1

11.5

11.5

12.5

12.5

9.5

9.5

8.5

8.5

N.9N.9

M.9M.9

9.1

9.1

C1B-103

CORR

1B-134

STORAGE

C1B-123

CORR

1B-117

BRMS2

1B-118

BRMS2

1B-122

BRMS2

1B-124

BRMS2

1B-126

BRMS2

1B-126A

TLTS1

1B-124A

TLTS1

1B-122A

TLTS1

1B-118A

TLTS1

1B-116

HD NUR

1B-128

BRMS2

1B-128A

TLTS1

1B-132A

TLTS1

1B-132

BRMS2

C1B-107

CORR

C1B-108

CORR

C1B-104

CORR

C1B-109

CORR

1B-134A

MECHANICAL

05 10

05 06 10

131B-126

1B-124

1B-132

1B-128

1B-134

1B -1

A

1B -1

A

1B -1

A

1B -1

A

1B -1

A

1B -1

A

1B-122

1B-118

1B-117

RE: SHEET AE-102

M A

T C

H L

IN

E

56' - 0" EL

1B-117A

TLTS1

AE-502

F9

11.4

AE-402

E6

AE-501

F1

MATCH LINE

1B -1

A

1B-114

QUIET

C 1B

-1

1B-137

B

-1 A

RE: SHEET AE-102

MATCH LINE

M A

T C

H L

IN

E

R E

S

H E

E T

A E

-1

R E

S

H E

E T

A E

-1

P H

A S

E

R

E S

H E

E T

A E

-1

P H

A S

E

AE-403

D5

SIM, OP HD

1B-119

DAYROOM

C B

-1

AE-222

A1

AE-222

F1

AREA NOT IN CONTRACT. COORDINATE ACCESS TO AREA W/ OWNER.

PREPARE FLOOR SUBSTRATE & INSTALL NEW FLOOR AS SCHEDULED.

PROVIDE SELF LEVELING CONCRETE UNDERLAYMENT AS SPECIFIED OVER EXISTING FLOOR SUBSTRATE.

NEW DOOR FRAME, RE: DOOR SCHEDULE

EXISTING CONSTRUCTION TO REMAIN AS INDICATED, PATCH WALL AS NECESSARY DUE TO RENOVATION WORK, MATCH EXISTING

WALL FINISH.

UPGRADE EXISTING PARTITION TO FIRE RATED PARTITION AS SCHEDULED, REFER TO GI-011 LIFE SAFETY FOR SCHEDULED RATING LOCATION. PATCH, REPAIR AND FILL ALL PENETRATIONS TO COMPLY WITH SCHEDULED RATING AND APPLICABLE UL LISTING AS

SCHEDULED ON AE-601 PARTITION TYPES.

EXISTING FLOOR BASE AND WALLS TO REMAIN THIS ROOM EXCEPT AT NEW PARTITIONS INDICATED. PATCH REPAIR, REPLACE DAMAGED OR MISSING FINISHES DUE TO RENOVATION WORK. MATCH EXISTING FLOOR, BASE AND WALL FINISHES AS NEEDED FOR

LIKE NEW COMPLETE APPEARANCE.

REINSTALL SALVAGED CURTAIN WALL ASSEMBLY TO MATCH ORIGINAL INSTALLATION.

EXISTING DOOR & FRAME TO REMAIN.

PATCH EXISTING WALLS TO REMAIN AS NECESSARY, PROVIDE NEW FINISH AS SCHEDULED, SEE ROOM FINISH SCHEDULE.

NEW HANDRAILS AND CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.

NEW CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.

PREPARE FLOOR SUBSTRATE & INSTALL NEW TO MATCH EXISTING ADJACENT FINISH.

PATCH EXISTING OPENING TO REMAIN AFTER THE REMOVAL OF EXISTING DOOR FRAME AND HARDWARE.

NEW PLUMBING FIXTURES; RE PLUMBING.

PATCH & REPAIR EXISTING CURTAIN WALL ASSEMBLY TO MATCH EXISTING. RESEAL & REPLACE GASKETS AS NEEDED TO ENSURE A

WATER TIGHT ASSEMBLY.

FILL IN EXISTING OPENING MATCH ADJACENT FINISH. ALIGN FINISH FACE W/ EXISTING FINISH.

NEW SHAFT WALL CONSTRUCTION.

ALIGN NEW PARTITION FINISHED FACE WITH EXISTING ADJACENT WALL, TYPICAL. MATCH EXISTING ADJACENT WALL FINISH.

REPAIR EXISTING WATERPROOFING. REINSTALL SALVAGED PAVERS PER ORIGINAL CONSTRUCTION IN PATTERN SHOWN. REFER TO

SHEET AE-301 KEY NOTE #30 FOR ADDITIONAL INFORMATION AND REQUIREMENTS

NEW DOOR, FRAME & HARDWARE, RE: DOOR SCHEDULE.

EXISTING COLUMN ENCLOSURE TO REMAIN; PATCH, REPAIR & CLEAN FOR LIKE NEW APPEARANCE.

NEW WINDOW & ASSEMBLY.

EXISTING STOREFRONT SYSTEM TO REMAIN.

NEW STOREFRONT SYSTEM TO MATCH ADJACENT; RE:

LINE OF PRIVACY CURTAIN TRACK ABOVE.

INFILL CONCRETE SLAB ON METAL DECK AT REMOVED PLANTER. PROVIDE NEW WATERPROOFING OVER NEW CONCRETE TO MATCH

EXISTING. RE: STRUCTURAL

SCHEDULED STAINLESS STEEL LINEAR SHOWER DRAIN AT SHOWER CURTAIN LINE, RE PLUMBING, TYP.

CONCRETE HOUSEKEEPING PAD FOR MECHANICAL EQUIPMENT. RE: MECHANICAL FOR EQUIPMENT CONFIGURATION.

EXISTING STORM DRAIN TO REMAIN, RE PLUMBING.

CONTRACTOR TO RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.

PHASE CONSTRUCTION OF THIS ROOM/AREA UNTIL CONSTRUCTION ACCESS THROUGH THIS AREA IS NO LONGER NEEDED BUT IN NO

CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.

REINSTALL SALVAGED WINDOW SYSTEM AS ORIGINALLY CONSTRUCTED WITH EXISTING WINDOW GLAZING, STONE, AND PRECAST COMPONENTS. PROVIDE NEW WALL FRAMING, SHEATHING, DAMP PROOFING, FLASHING, SEALANTS, GYPSUM BOARD, FIRE SAFING AND OTHER COMPONENTS UTILIZED IN THE EXISTING CONSTRUCTION. ALL WORK TO MATCH EXISTING RESULTING IN A UNIFORM APPEARANCE OF THE BUILDING ELEVATION. PRIOR TO REINSTALLATION, REPAIR ANY AND ALL BUILDING ELEMENTS DAMAGED DUE

TO WORK IN THIS CONTRACT. RESTORE SITE WORK TO ORIGINAL CONDITION.

PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT REMOVED DOOR TO MATCH EXISTING FINISHES.

PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT NEW DOOR AND FRAME TO MATCH EXISTING FINISHES.

REINSTALL EXISTING GLASS DOOR SYSTEM TO MATCH ORIGINAL INSTALLATION. PATCH AND REPAIR ADJACENT SURFACES TO MATCH

EXISTING FINISHES.

REPLACE FLOOR FINISHES, BASE, AND PAINT WALLS TO MATCH EXISTING, PRIOR TO NEW FINISHES, PATCH AND PREPARE AND REPAIR SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES. REPAINT H.M. DOOR FRAME. REPLACE DOOR AND HARDWARE

IF DAMAGED DURING CONSTRUCTION.

PAINT NEW PARTITIONS TO MATCH EXISTING, PROVIDE NEW BASE TO MATCH EXISTING. PRIOR TO THE INSTALLATION OF NEW FINISHES, PATCH, REPAIR AND PREPARE SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES, INCLUDING REWORKING

CEILING, FUR DOWNS AND FLOOR FINISHES TO MATCH EXISTING.

REPAIR FLOOR, CEILING AND WALL CONSTRUCTION TO MATCH EXISTING AT REMOVED TEMPORARY CONSTRUCTION PARTITION.

REFER TO MEP DRAWINGS FOR WORK IN THIS ROOM. VERIFY AND CONSTRUCT ALTERATIONS/CONSTRUCTION OF HOUSEKEEPING

PADS FOR MEP EQUIPMENT.

COORDINATE WORK IN THIS AREA ACCORDING TO CONSTRUCTION PHASING PLANS.

EXISTING FLOOR FINISH TO REMAIN IN THIS AREA UNTIL PHASE 4 IS CONSTRUCTED. PATCH, REPAIR FLOOR FINISH AND WALL BASE

WHERE WALLS HAVE BEEN REMOVED AS PART OF PREVIOUS PHASES.

PROVIDE MATCHING FLOOR FINISH THIS AREA UNTIL FINAL SCHEDULED FLOOR AND BASE FINISH IS INSTALLED AS PART OF PHASE 4 CONSTRUCTION. INSTALL HANDRAILS, CRASH RAILS, CORNER GUARDS AND WALL GUARDS AT PHASE 1 CONSTRUCTION.

2 HOUR FIRE RESISTIVE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1 & 4. SEE GI-130 FOR 2 HOUR PARTITION

REQUIREMENT W/ BID OPTION #2

2 HOUR FIRE SMOKE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1.

RELOCATED INTERIOR FIXED GLAZING SYSTEM FROM EXISTING INTERNET CAFE. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING GLAZING TO REMAIN W/ DEDUCT #1 W/ OPENING CLOSED W/ CONTINUATION OF SCHEDULED PARTITION.

RELOCATED INTERIOR HORIZONTAL SLIDING GLASS DOOR AND SIDE LIGHTS FROM EXISTING INTERNET CAFE. CONNECT AND ADJUST AUTO OPENER TO BE FULLY FUNCTIONAL AS EXISTING INSTALLATION. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING DOOR TO REMAIN W/ DEDUCT ALT #1 AND ALTERNATE EXISTING HORIZONTAL SLIDING GLASS DOOR FROM EXISTING DAYROOM ENTRY TO BE RELOCATED INSTEAD. ADJUST OPENING SIZE AND AUTO OPENER CONNECTIONS AS REQUIRED.

ALL ELECTRICAL RECEPTACLES THIS ROOM TO BE 48" A.F.F. UNLESS NOTED OTHERWISE ON ELECTRICAL DWGS.

EXISTING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.