36C25619R0073-012.pdf
PDF 19 MB Posted
- Attached to
- 580-320 Construct Spinal Cord Injury Expansion Federal contract opportunity
- Solicitation number
- 36C25619R0073
About this file
36C25619R0073 ATTACHMENT K - Project Drawings Part 8 - Dated 6-8-18 - 20 pages.pdf
View the file
Other files for this federal contract opportunity
Show all 50
580-320 Construct Spinal Cord Injury Expansion has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F.E .C
F .E
.C
F.E.C
F.E .C
F .E
.C
SS
R.8R.8
RR
Q.5Q.5
P.5P.5
PP
N
N
8.1
8.1
11.5
11.5
12.5
12.5
9.5
9.5
8.5
8.5
N.9N.9
M.9M.9
9.1
9.111.4
C1B-103
CORR
1B-154
W/C & SPEC BED STOR
1B-152
BRMS2
1B-152A
TLTS1
1B-148A
TLTS1
1B-148
BRMS2
1B-146
BRMS1
1B-146A
TLTS1
1B-147
STORAGE
1B-144A
TLTS1
1B-144
BRMS2
1B-142
BRMS2
1B-138
BRMS2
1B-136A
TLTS1
1B-136
BRMS1
C1B-107
CORR
C1B-108
CORR
C1B-104
CORR
C1B-109
CORR
1B-142A
TLTS1
1B-138A
TLTS1
1B-134A
MECHANICAL
1B -1
B
1B -1
1B -1
1B -1
1B-146A
1B-136A
1B -1
1B-138A
1B-142A
1B-144A
1B -1
RE: SHEET AE-102
M A
T C
H L
IN
E
1B-152A
1B -1
1B-146B
BRAR1
MATCH LINE
R E
S
H E
E T
A E
-1
P H
A S
E
1B-148A
1B -1
1B -1
AE-401
E1
AE-501
C7
AE-401
E6
1B-134A
RE: SHEET AE-102
MATCH LINE
R E: S
H
EET A
E-1
M
ATC
H L
IN
E
ADDITION
31 37 39
C1B-109
M A
T C
H L
IN
E
R E
S
H E
E T
A E
-1
P H
A S
E
AE-404
E1
SIM, OP HD
TYP
TYP
45 45
100-83 1G1H
100-84
1K 100-85
100-80 1D
100-79 1C
100-78 1B
100-77 1A
100-82 1F 1E
100-81
KEY PLAN
T R
U E
N
P L A
N N
PLAN N
A
T
PATIE
NT U
NIT
S
A. FOR ADDITIONAL ARCHITECTURAL FLOOR PLAN NOTES, REFER TO AE-400.
B. FOR MEPT WORK, REFER TO MEP DRAWINGS.
C. FOR STRUCTURAL WORK, REFER TO 'S' SERIES STRUCTURAL DRAWINGS.
D. FOR GENERAL INFORMATION INCLUDING PROJECT PHASING AND ALTERNATES, REFER TO 'G' SERIES DRAWINGS. ADDITIONAL
DETAILED INFORMATION PERTAINING TO PHASING AND ALTERNATES ARE NOTED THROUGHOUT DRAWING SET.
E. FOR PARTITION TYPES AND DIMENSIONS OF PARTITIONS ON FLOOR PLANS REFER TO AE-111 SERIES DRAWINGS.
F. ALL EXISTING FIREPROOFING TO BE REPAIRED TO ACHIEVE PROTECTION EQUIVALENT TO EXISTING PROTECTION.
G. ALL NEW STRUCTURAL STEEL, PRIMARY AND SECONDARY, TO RECEIVE SPRAY ON FIREPROOFING EQUIVALENT TO PROTECTION
ON EXISTING COLUMNS.
H. NEW CLINIC STEEL ROOF FRAMING, PRIMARY AND SECONDARY, TO RECEIVE 2-HR SPRAY ON FIREPROOFING.
I. PROVIDE VERTICAL GYPSUM BOARD EXPANSION JOINTS WHERE PARTITION FRAMING TRANSITIONS/ CROSSES/ ABUTS BETWEEN
NEW STRUCTURAL ELEMENTS AND EXISTING.
J. REFER TO SHEET AE-566 FOR FRAMING AND CONSTRUCTION REQUIREMENTS WHERE PARTITIONS, RATED AND NON F.R. RATED, ABUT SPRAYED ON FIREPROOFING CONDITIONS.
K. MAINTAIN REQUIRED ADA/ ABA CLEARANCES INCLUDING CLEAR FLOOR SPACE AND CLEARANCES AT DOORS, INCLUDING
CLEARANCES AT STRIKE ON PULL SIDE OF DOORS.
L. PATCH AND REPAIR FIREPROOFING AROUND COLUMN AND ENSURE A 2-HR RATING.
M. DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE.
ARCHITECTURAL FLOOR PLAN GENERAL NOTES
AREA NOT IN CONTRACT. COORDINATE ACCESS TO AREA W/ OWNER.
PREPARE FLOOR SUBSTRATE & INSTALL NEW FLOOR AS SCHEDULED.
PROVIDE SELF LEVELING CONCRETE UNDERLAYMENT AS SPECIFIED OVER EXISTING FLOOR SUBSTRATE.
NEW DOOR FRAME, RE: DOOR SCHEDULE
EXISTING CONSTRUCTION TO REMAIN AS INDICATED, PATCH WALL AS NECESSARY DUE TO RENOVATION WORK, MATCH EXISTING
WALL FINISH.
UPGRADE EXISTING PARTITION TO FIRE RATED PARTITION AS SCHEDULED, REFER TO GI-011 LIFE SAFETY FOR SCHEDULED RATING LOCATION. PATCH, REPAIR AND FILL ALL PENETRATIONS TO COMPLY WITH SCHEDULED RATING AND APPLICABLE UL LISTING AS
SCHEDULED ON AE-601 PARTITION TYPES.
EXISTING FLOOR BASE AND WALLS TO REMAIN THIS ROOM EXCEPT AT NEW PARTITIONS INDICATED. PATCH REPAIR, REPLACE DAMAGED OR MISSING FINISHES DUE TO RENOVATION WORK. MATCH EXISTING FLOOR, BASE AND WALL FINISHES AS NEEDED FOR
LIKE NEW COMPLETE APPEARANCE.
REINSTALL SALVAGED CURTAIN WALL ASSEMBLY TO MATCH ORIGINAL INSTALLATION.
EXISTING DOOR & FRAME TO REMAIN.
PATCH EXISTING WALLS TO REMAIN AS NECESSARY, PROVIDE NEW FINISH AS SCHEDULED, SEE ROOM FINISH SCHEDULE.
NEW HANDRAILS AND CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.
NEW CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.
PREPARE FLOOR SUBSTRATE & INSTALL NEW TO MATCH EXISTING ADJACENT FINISH.
PATCH EXISTING OPENING TO REMAIN AFTER THE REMOVAL OF EXISTING DOOR FRAME AND HARDWARE.
NEW PLUMBING FIXTURES; RE PLUMBING.
PATCH & REPAIR EXISTING CURTAIN WALL ASSEMBLY TO MATCH EXISTING. RESEAL & REPLACE GASKETS AS NEEDED TO ENSURE A
WATER TIGHT ASSEMBLY.
FILL IN EXISTING OPENING MATCH ADJACENT FINISH. ALIGN FINISH FACE W/ EXISTING FINISH.
NEW SHAFT WALL CONSTRUCTION.
ALIGN NEW PARTITION FINISHED FACE WITH EXISTING ADJACENT WALL, TYPICAL. MATCH EXISTING ADJACENT WALL FINISH.
REPAIR EXISTING WATERPROOFING. REINSTALL SALVAGED PAVERS PER ORIGINAL CONSTRUCTION IN PATTERN SHOWN. REFER TO
SHEET AE-301 KEY NOTE #30 FOR ADDITIONAL INFORMATION AND REQUIREMENTS
NEW DOOR, FRAME & HARDWARE, RE: DOOR SCHEDULE.
EXISTING COLUMN ENCLOSURE TO REMAIN; PATCH, REPAIR & CLEAN FOR LIKE NEW APPEARANCE.
NEW WINDOW & ASSEMBLY.
EXISTING STOREFRONT SYSTEM TO REMAIN.
NEW STOREFRONT SYSTEM TO MATCH ADJACENT; RE:
LINE OF PRIVACY CURTAIN TRACK ABOVE.
INFILL CONCRETE SLAB ON METAL DECK AT REMOVED PLANTER. PROVIDE NEW WATERPROOFING OVER NEW CONCRETE TO MATCH
EXISTING. RE: STRUCTURAL
SCHEDULED STAINLESS STEEL LINEAR SHOWER DRAIN AT SHOWER CURTAIN LINE, RE PLUMBING, TYP.
CONCRETE HOUSEKEEPING PAD FOR MECHANICAL EQUIPMENT. RE: MECHANICAL FOR EQUIPMENT CONFIGURATION.
EXISTING STORM DRAIN TO REMAIN, RE PLUMBING.
CONTRACTOR TO RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.
PHASE CONSTRUCTION OF THIS ROOM/AREA UNTIL CONSTRUCTION ACCESS THROUGH THIS AREA IS NO LONGER NEEDED BUT IN NO
CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.
REINSTALL SALVAGED WINDOW SYSTEM AS ORIGINALLY CONSTRUCTED WITH EXISTING WINDOW GLAZING, STONE, AND PRECAST COMPONENTS. PROVIDE NEW WALL FRAMING, SHEATHING, DAMP PROOFING, FLASHING, SEALANTS, GYPSUM BOARD, FIRE SAFING AND OTHER COMPONENTS UTILIZED IN THE EXISTING CONSTRUCTION. ALL WORK TO MATCH EXISTING RESULTING IN A UNIFORM APPEARANCE OF THE BUILDING ELEVATION. PRIOR TO REINSTALLATION, REPAIR ANY AND ALL BUILDING ELEMENTS DAMAGED DUE
TO WORK IN THIS CONTRACT. RESTORE SITE WORK TO ORIGINAL CONDITION.
PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT REMOVED DOOR TO MATCH EXISTING FINISHES.
PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT NEW DOOR AND FRAME TO MATCH EXISTING FINISHES.
REINSTALL EXISTING GLASS DOOR SYSTEM TO MATCH ORIGINAL INSTALLATION. PATCH AND REPAIR ADJACENT SURFACES TO MATCH
EXISTING FINISHES.
REPLACE FLOOR FINISHES, BASE, AND PAINT WALLS TO MATCH EXISTING, PRIOR TO NEW FINISHES, PATCH AND PREPARE AND REPAIR SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES. REPAINT H.M. DOOR FRAME. REPLACE DOOR AND HARDWARE
IF DAMAGED DURING CONSTRUCTION.
PAINT NEW PARTITIONS TO MATCH EXISTING, PROVIDE NEW BASE TO MATCH EXISTING. PRIOR TO THE INSTALLATION OF NEW FINISHES, PATCH, REPAIR AND PREPARE SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES, INCLUDING REWORKING
CEILING, FUR DOWNS AND FLOOR FINISHES TO MATCH EXISTING.
REPAIR FLOOR, CEILING AND WALL CONSTRUCTION TO MATCH EXISTING AT REMOVED TEMPORARY CONSTRUCTION PARTITION.
REFER TO MEP DRAWINGS FOR WORK IN THIS ROOM. VERIFY AND CONSTRUCT ALTERATIONS/CONSTRUCTION OF HOUSEKEEPING
PADS FOR MEP EQUIPMENT.
COORDINATE WORK IN THIS AREA ACCORDING TO CONSTRUCTION PHASING PLANS.
EXISTING FLOOR FINISH TO REMAIN IN THIS AREA UNTIL PHASE 4 IS CONSTRUCTED. PATCH, REPAIR FLOOR FINISH AND WALL BASE
WHERE WALLS HAVE BEEN REMOVED AS PART OF PREVIOUS PHASES.
PROVIDE MATCHING FLOOR FINISH THIS AREA UNTIL FINAL SCHEDULED FLOOR AND BASE FINISH IS INSTALLED AS PART OF PHASE 4 CONSTRUCTION. INSTALL HANDRAILS, CRASH RAILS, CORNER GUARDS AND WALL GUARDS AT PHASE 1 CONSTRUCTION.
2 HOUR FIRE RESISTIVE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1 & 4. SEE GI-130 FOR 2 HOUR PARTITION
REQUIREMENT W/ BID OPTION #2
2 HOUR FIRE SMOKE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1.
RELOCATED INTERIOR FIXED GLAZING SYSTEM FROM EXISTING INTERNET CAFE. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING GLAZING TO REMAIN W/ DEDUCT #1 W/ OPENING CLOSED W/ CONTINUATION OF SCHEDULED PARTITION.
RELOCATED INTERIOR HORIZONTAL SLIDING GLASS DOOR AND SIDE LIGHTS FROM EXISTING INTERNET CAFE. CONNECT AND ADJUST AUTO OPENER TO BE FULLY FUNCTIONAL AS EXISTING INSTALLATION. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING DOOR TO REMAIN W/ DEDUCT ALT #1 AND ALTERNATE EXISTING HORIZONTAL SLIDING GLASS DOOR FROM EXISTING DAYROOM ENTRY TO BE RELOCATED INSTEAD. ADJUST OPENING SIZE AND AUTO OPENER CONNECTIONS AS REQUIRED.
ALL ELECTRICAL RECEPTACLES THIS ROOM TO BE 48" A.F.F. UNLESS NOTED OTHERWISE ON ELECTRICAL DWGS.
EXISTING COURTYARD UNDER PAVERS. REINSTALL/REPAIR WATERPROOFING AND INSTALL PAVERS PER ORIGINAL CONSTRUCTION TO ALLOW DRAINAGE FLOW TO DRAINS. WHERE DRAINS ARE IN EXISTING PLANTERS, RAISE DRAIN TO NEW LEVEL OF COURTYARD
CONCRETE SLAB ELEVATION.
EXISTING DRAIN AT PERIMETER TRENCH DRAIN UNDER PAVERS. TERMINATE EXISTING TRENCH DRAIN AT FACE OF ADDITION CONCRETE. REPAIR WATER PROOFING. INSURE ALL SECTIONS OF TRENCH DRAIN HAVE PROPER FLOW TO DRAIN. INSTALL PAVERS PER ORIGINAL CONSTRUCTION BRIDGING OVER TRENCH AND ALLOWING DRAINAGE FLOW INTO TRENCH.
PROTECT EXISTING CONSTRUCTION, SEE NOTES 31 & 37 FOR ADDITIONAL INFORMATION.
MED GAS, REFER TO M.E.P. DRAWINGS.
ROOF ACCESS LADDER
FLOOR PLAN KEY NOTES
NOT ALL USED ON THIS SHEET
LINE TYPE LEGEND
PROJECT SCOPE BOUNDARIES
DETAIL AND PLAN ENLARGEMENT REFERENCE
2 HOUR FIRE RESISTIVE PARTITION
2 HOUR FIRE SMOKE PARTITION
6565 West Loop South, Suite 560, Bellaire, TX 77401
713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t
0 Revisions:
IS
S
U E
D F
O R
B
ID
D
IN
G
C O
N S
TR
U
C
TI
O N
Drawing Number
DrawnChecked
Dwg. of Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Drawing Title
Approved: Project Director
Project Title
Location
Date
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Building Number
B100
Project Number
Office of
Construction and Facilities
Management
V eterans Affairs P alo Alto Heal th Ca re Sy stem
S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"
AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem
D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED
T exas Reg. No.G FE Project No.F-571213060
Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18
AE-101
ARCHITECTURAL PLAN - FIRST FLOOR -
PHASE 1 - NOTES
CONSTRUCT SPINAL CORD
INJURY BED EXPANSION
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
#580 - 320
0' 8' 12'4' 1/8" = 1'-0"
ARCHITECTURAL PLAN - FIRST FLOOR - PHASE 1 - NOTES
F1
CONSTRUCTION
ACCESS TO ATRIUM,
RE: PHASING AND
DEMOLITION PLANS
CONSTRUCTION
ACCESS TO ATRIUM,
RE: PHASING AND
DEMOLITION PLANS
P L A
N N
T R
U E
N
PLA
N N
A T
PATIE
N T U
N
IT
S
F.E.C.F.E.C.
F.E.C
F.E .C
F .E
.C
PP
NN
MM
LL
N.9N.9
L.1L.1
M.9M.9
9.1
9.1
F1
AE-302
1B-119
DAYROOM
1B-427
MECHANICAL
1B-413A
STORAGE
C1B-123
CORR
COURTYARD
1B-443
OFDC1
1B-441
OFD01
1B-439
OFM03
1B-437
OFD01
1B-435
OFD01
1B-433
OFD01
1B-444
OFDC1
1B-442
OFD01
1B-425
USCL1
1B-426
UCCL1
1B-424
TRGS1
1B-423
OFD01
1B-420
MEDP1
1B-419
TLTU1
1B-422
TRGS1
1B-418
TRGS1
1B-416
TRGS1
1B-417
NSTA1
1B-415
TRGS1
1B-438
OFDC1
1B-436
OFD01
1B-434
OFD01
1B-432
SEC01
1B-411
WRC01
C1B-117
CORR
1B-413
SRLB1
1B-414
SL001
1B-412
TLTU1
C1B-121
CORR
C1B-119
CORR
1B-431
OFD01
C1B-120
CORR
MATCH LINE
W1
W1
W1
W1
W1
1B-431
1B-433
1B-435
1B-437
1B-439
1B-441
1B-443
C
1B-444
C
1B-425 1B-426
1B-423
1B-424
1B-422
1B-419
B
-4
1B-438 1B-417
1B-418
1B-415
1B-416
1B-410
1B-436
1B-434
B
-4
B
-4
1B-414
B
-4 A
B
-4
C A
AE-201 D4
1B-410
RECP1
1B-135
RESP THERAPY
1B-137
LR002
TOILET
1B-139
B
-1
AE-502
B1
AE-503
F3
AE-503
F2
AE-503
F8
AE-405
D6
11.4
11.4
AE-502
F1
AE-502
B8
E1
AE-301
AE-502
B5
AE-405
C4
C
AE-201
F7
1B-139
RE: SHEET AE-101
MATCH LINE
RE: SHEET AE-101
F1
AE-312
AE-405
F3
B6
AE-521
F1
AE-512
F4
AE-512
F1
AE-503
C6
Z2E02
Z2E01
1B-411
1B-119B
F5
AE-502
ABOVE AT
INTERSTITIAL
F5
AE-502
ABOVE AT
INTERSTITIAL
AREA NOT IN CONTRACT. COORDINATE ACCESS TO AREA W/ OWNER.
PREPARE FLOOR SUBSTRATE & INSTALL NEW FLOOR AS SCHEDULED.
PROVIDE SELF LEVELING CONCRETE UNDERLAYMENT AS SPECIFIED OVER EXISTING FLOOR SUBSTRATE.
NEW DOOR FRAME, RE: DOOR SCHEDULE
EXISTING CONSTRUCTION TO REMAIN AS INDICATED, PATCH WALL AS NECESSARY DUE TO RENOVATION WORK, MATCH EXISTING
WALL FINISH.
UPGRADE EXISTING PARTITION TO FIRE RATED PARTITION AS SCHEDULED, REFER TO GI-011 LIFE SAFETY FOR SCHEDULED RATING LOCATION. PATCH, REPAIR AND FILL ALL PENETRATIONS TO COMPLY WITH SCHEDULED RATING AND APPLICABLE UL LISTING AS
SCHEDULED ON AE-601 PARTITION TYPES.
EXISTING FLOOR BASE AND WALLS TO REMAIN THIS ROOM EXCEPT AT NEW PARTITIONS INDICATED. PATCH REPAIR, REPLACE DAMAGED OR MISSING FINISHES DUE TO RENOVATION WORK. MATCH EXISTING FLOOR, BASE AND WALL FINISHES AS NEEDED FOR
LIKE NEW COMPLETE APPEARANCE.
REINSTALL SALVAGED CURTAIN WALL ASSEMBLY TO MATCH ORIGINAL INSTALLATION.
EXISTING DOOR & FRAME TO REMAIN.
PATCH EXISTING WALLS TO REMAIN AS NECESSARY, PROVIDE NEW FINISH AS SCHEDULED, SEE ROOM FINISH SCHEDULE.
NEW HANDRAILS AND CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.
NEW CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.
PREPARE FLOOR SUBSTRATE & INSTALL NEW TO MATCH EXISTING ADJACENT FINISH.
PATCH EXISTING OPENING TO REMAIN AFTER THE REMOVAL OF EXISTING DOOR FRAME AND HARDWARE.
NEW PLUMBING FIXTURES; RE PLUMBING.
PATCH & REPAIR EXISTING CURTAIN WALL ASSEMBLY TO MATCH EXISTING. RESEAL & REPLACE GASKETS AS NEEDED TO ENSURE A
WATER TIGHT ASSEMBLY.
FILL IN EXISTING OPENING MATCH ADJACENT FINISH. ALIGN FINISH FACE W/ EXISTING FINISH.
NEW SHAFT WALL CONSTRUCTION.
ALIGN NEW PARTITION FINISHED FACE WITH EXISTING ADJACENT WALL, TYPICAL. MATCH EXISTING ADJACENT WALL FINISH.
REPAIR EXISTING WATERPROOFING. REINSTALL SALVAGED PAVERS PER ORIGINAL CONSTRUCTION IN PATTERN SHOWN. REFER TO
SHEET AE-301 KEY NOTE #30 FOR ADDITIONAL INFORMATION AND REQUIREMENTS
NEW DOOR, FRAME & HARDWARE, RE: DOOR SCHEDULE.
EXISTING COLUMN ENCLOSURE TO REMAIN; PATCH, REPAIR & CLEAN FOR LIKE NEW APPEARANCE.
NEW WINDOW & ASSEMBLY.
EXISTING STOREFRONT SYSTEM TO REMAIN.
NEW STOREFRONT SYSTEM TO MATCH ADJACENT; RE:
LINE OF PRIVACY CURTAIN TRACK ABOVE.
INFILL CONCRETE SLAB ON METAL DECK AT REMOVED PLANTER. PROVIDE NEW WATERPROOFING OVER NEW CONCRETE TO MATCH
EXISTING. RE: STRUCTURAL
SCHEDULED STAINLESS STEEL LINEAR SHOWER DRAIN AT SHOWER CURTAIN LINE, RE PLUMBING, TYP.
CONCRETE HOUSEKEEPING PAD FOR MECHANICAL EQUIPMENT. RE: MECHANICAL FOR EQUIPMENT CONFIGURATION.
EXISTING STORM DRAIN TO REMAIN, RE PLUMBING.
CONTRACTOR TO RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.
PHASE CONSTRUCTION OF THIS ROOM/AREA UNTIL CONSTRUCTION ACCESS THROUGH THIS AREA IS NO LONGER NEEDED BUT IN NO
CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.
REINSTALL SALVAGED WINDOW SYSTEM AS ORIGINALLY CONSTRUCTED WITH EXISTING WINDOW GLAZING, STONE, AND PRECAST COMPONENTS. PROVIDE NEW WALL FRAMING, SHEATHING, DAMP PROOFING, FLASHING, SEALANTS, GYPSUM BOARD, FIRE SAFING AND OTHER COMPONENTS UTILIZED IN THE EXISTING CONSTRUCTION. ALL WORK TO MATCH EXISTING RESULTING IN A UNIFORM APPEARANCE OF THE BUILDING ELEVATION. PRIOR TO REINSTALLATION, REPAIR ANY AND ALL BUILDING ELEMENTS DAMAGED DUE
TO WORK IN THIS CONTRACT. RESTORE SITE WORK TO ORIGINAL CONDITION.
PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT REMOVED DOOR TO MATCH EXISTING FINISHES.
PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT NEW DOOR AND FRAME TO MATCH EXISTING FINISHES.
REINSTALL EXISTING GLASS DOOR SYSTEM TO MATCH ORIGINAL INSTALLATION. PATCH AND REPAIR ADJACENT SURFACES TO MATCH
EXISTING FINISHES.
REPLACE FLOOR FINISHES, BASE, AND PAINT WALLS TO MATCH EXISTING, PRIOR TO NEW FINISHES, PATCH AND PREPARE AND REPAIR SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES. REPAINT H.M. DOOR FRAME. REPLACE DOOR AND HARDWARE
IF DAMAGED DURING CONSTRUCTION.
PAINT NEW PARTITIONS TO MATCH EXISTING, PROVIDE NEW BASE TO MATCH EXISTING. PRIOR TO THE INSTALLATION OF NEW FINISHES, PATCH, REPAIR AND PREPARE SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES, INCLUDING REWORKING
CEILING, FUR DOWNS AND FLOOR FINISHES TO MATCH EXISTING.
REPAIR FLOOR, CEILING AND WALL CONSTRUCTION TO MATCH EXISTING AT REMOVED TEMPORARY CONSTRUCTION PARTITION.
REFER TO MEP DRAWINGS FOR WORK IN THIS ROOM. VERIFY AND CONSTRUCT ALTERATIONS/CONSTRUCTION OF HOUSEKEEPING
PADS FOR MEP EQUIPMENT.
COORDINATE WORK IN THIS AREA ACCORDING TO CONSTRUCTION PHASING PLANS.
EXISTING FLOOR FINISH TO REMAIN IN THIS AREA UNTIL PHASE 4 IS CONSTRUCTED. PATCH, REPAIR FLOOR FINISH AND WALL BASE
WHERE WALLS HAVE BEEN REMOVED AS PART OF PREVIOUS PHASES.
PROVIDE MATCHING FLOOR FINISH THIS AREA UNTIL FINAL SCHEDULED FLOOR AND BASE FINISH IS INSTALLED AS PART OF PHASE 4 CONSTRUCTION. INSTALL HANDRAILS, CRASH RAILS, CORNER GUARDS AND WALL GUARDS AT PHASE 1 CONSTRUCTION.
2 HOUR FIRE RESISTIVE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1 & 4. SEE GI-130 FOR 2 HOUR PARTITION
REQUIREMENT W/ BID OPTION #2
2 HOUR FIRE SMOKE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1.
RELOCATED INTERIOR FIXED GLAZING SYSTEM FROM EXISTING INTERNET CAFE. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING GLAZING TO REMAIN W/ DEDUCT #1 W/ OPENING CLOSED W/ CONTINUATION OF SCHEDULED PARTITION.
RELOCATED INTERIOR HORIZONTAL SLIDING GLASS DOOR AND SIDE LIGHTS FROM EXISTING INTERNET CAFE. CONNECT AND ADJUST AUTO OPENER TO BE FULLY FUNCTIONAL AS EXISTING INSTALLATION. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING DOOR TO REMAIN W/ DEDUCT ALT #1 AND ALTERNATE EXISTING HORIZONTAL SLIDING GLASS DOOR FROM EXISTING DAYROOM ENTRY TO BE RELOCATED INSTEAD. ADJUST OPENING SIZE AND AUTO OPENER CONNECTIONS AS REQUIRED.
ALL ELECTRICAL RECEPTACLES THIS ROOM TO BE 48" A.F.F. UNLESS NOTED OTHERWISE ON ELECTRICAL DWGS.
EXISTING COURTYARD UNDER PAVERS. REINSTALL/REPAIR WATERPROOFING AND INSTALL PAVERS PER ORIGINAL CONSTRUCTION TO ALLOW DRAINAGE FLOW TO DRAINS. WHERE DRAINS ARE IN EXISTING PLANTERS, RAISE DRAIN TO NEW LEVEL OF COURTYARD
CONCRETE SLAB ELEVATION.
EXISTING DRAIN AT PERIMETER TRENCH DRAIN UNDER PAVERS. TERMINATE EXISTING TRENCH DRAIN AT FACE OF ADDITION CONCRETE. REPAIR WATER PROOFING. INSURE ALL SECTIONS OF TRENCH DRAIN HAVE PROPER FLOW TO DRAIN. INSTALL PAVERS PER ORIGINAL CONSTRUCTION BRIDGING OVER TRENCH AND ALLOWING DRAINAGE FLOW INTO TRENCH.
PROTECT EXISTING CONSTRUCTION, SEE NOTES 31 & 37 FOR ADDITIONAL INFORMATION.
MED GAS, REFER TO M.E.P. DRAWINGS.
ROOF ACCESS LADDER
FLOOR PLAN KEY NOTES
NOT ALL USED ON THIS SHEET
100-83 1G1H
100-84
1K 100-85
100-80 1D
100-79 1C
100-78 1B
100-77 1A
100-82 1F 1E
100-81
T R
U E
N
ADDITION
KEY PLAN
P L A
N N
PLAN N
A
T
PATIE
NT U
NIT
S
LINE TYPE LEGEND
PROJECT SCOPE BOUNDARIES
DETAIL AND PLAN ENLARGEMENT REFERENCE
2 HOUR FIRE RESISTIVE PARTITION
2 HOUR FIRE SMOKE PARTITION
A. FOR ADDITIONAL ARCHITECTURAL FLOOR PLAN NOTES, REFER TO AE-400.
B. FOR MEPT WORK, REFER TO MEP DRAWINGS.
C. FOR STRUCTURAL WORK, REFER TO 'S' SERIES STRUCTURAL DRAWINGS.
D. FOR GENERAL INFORMATION INCLUDING PROJECT PHASING AND ALTERNATES, REFER TO 'G' SERIES DRAWINGS. ADDITIONAL
DETAILED INFORMATION PERTAINING TO PHASING AND ALTERNATES ARE NOTED THROUGHOUT DRAWING SET.
E. FOR PARTITION TYPES AND DIMENSIONS OF PARTITIONS ON FLOOR PLANS REFER TO AE-111 SERIES DRAWINGS.
F. ALL EXISTING FIREPROOFING TO BE REPAIRED TO ACHIEVE PROTECTION EQUIVALENT TO EXISTING PROTECTION.
G. ALL NEW STRUCTURAL STEEL, PRIMARY AND SECONDARY, TO RECEIVE SPRAY ON FIREPROOFING EQUIVALENT TO PROTECTION
ON EXISTING COLUMNS.
H. NEW CLINIC STEEL ROOF FRAMING, PRIMARY AND SECONDARY, TO RECEIVE 2-HR SPRAY ON FIREPROOFING.
I. PROVIDE VERTICAL GYPSUM BOARD EXPANSION JOINTS WHERE PARTITION FRAMING TRANSITIONS/ CROSSES/ ABUTS BETWEEN
NEW STRUCTURAL ELEMENTS AND EXISTING.
J. REFER TO SHEET AE-566 FOR FRAMING AND CONSTRUCTION REQUIREMENTS WHERE PARTITIONS, RATED AND NON F.R. RATED, ABUT SPRAYED ON FIREPROOFING CONDITIONS.
K. MAINTAIN REQUIRED ADA/ ABA CLEARANCES INCLUDING CLEAR FLOOR SPACE AND CLEARANCES AT DOORS, INCLUDING
CLEARANCES AT STRIKE ON PULL SIDE OF DOORS.
L. PATCH AND REPAIR FIREPROOFING AROUND COLUMN AND ENSURE A 2-HR RATING.
M. DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE.
ARCHITECTURAL FLOOR PLAN GENERAL NOTES
6565 West Loop South, Suite 560, Bellaire, TX 77401
713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t
0 Revisions:
IS
S
U E
D F
O R
B
ID
D
IN
G
C O
N S
TR
U
C
TI
O N
Drawing Number
DrawnChecked
Dwg. of Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Drawing Title
Approved: Project Director
Project Title
Location
Date
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Building Number
B100
Project Number
Office of
Construction and Facilities
Management
V eterans Affairs P alo Alto Heal th Ca re Sy stem
S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"
AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem
D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED
T exas Reg. No.G FE Project No.F-571213060
Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18
AE-102
ARCHITECTURAL PLAN - FIRST FLOOR -
PHASE 1 ADDITION - NOTES
CONSTRUCT SPINAL CORD
INJURY BED EXPANSION
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
#580 - 320
0' 8' 12'4' 1/8" = 1'-0"
ARCHITECTURAL PLAN -
FIRST FLOOR - PHASE 1 ADDITION - NOTES
F1
P L A
N N
T R
U E
N
PLA
N N
A T
PATIE
N T U
N
F.E.C.
F .E
.C
F.E .C
F.E .C
SS
R.8R.8
RR
Q.5Q.5
P.5P.5
PP
1.8
1.82
2.5
2.5
3.5
3.5
55.2
5.25.5
5.5
6.5
6.5
6.9
6.9
C1B-206
CORR
1B-248A
TLTS1
1B-242A
TLTS1
C1B-203
CORR
1B-236
MECHANICAL
1B-237A
TLTS1
1B-237
BRMS1
1B-238A
TLTS1
1B-238
BRMS2
1B-242
BRMS2
1B-244A
TLTS1
1B-246A
TLTS1
1B-246
BRMS2
1B-248
BRMS2
1B-252
TLTS2
1B-256
STORAGE
1B-254
GU LAB
1B-266
HC STAFF
1B-264
BREAK ROOM
1B-212
CORR
C1B-209
CORR
C1B-204
CORR
C1B-208
CORR
1B-237A
1B-237
1B -2
A
1B-238
1B-242
1B -2
A
1B-244
1B -2
A
1B -2
A
1B-246
1B-248
1B -2
A
1B-244
BRMS2
1B-212A
CORR
1B-266
AE-401
E6 SIM, OP HD
C 1B
-2
M A
T C
H L
IN
E
R E
S
H E
E T
A E
-1
P H
A S
E
R
E S
H E
E T
A E
-1
P H
A S
E
AE-402
C1
07 10
07 10
07 10
AE-404
E1
15 16
15 16
15 16
15 16
15 16
15 16
AE-404
E6
LINE TYPE LEGEND
PROJECT SCOPE BOUNDARIES
DETAIL AND PLAN ENLARGEMENT REFERENCE
2 HOUR FIRE RESISTIVE PARTITION
2 HOUR FIRE SMOKE PARTITION
100-83 1G1H
100-84
1K 100-85
100-80 1D
100-79 1C
100-78 1B
100-77 1A
100-82 1F 1E
100-81
KEY PLAN
T R
U E
N
P L A
N N
PLAN N
A
T
PATIE
NT U
NIT
S
A. FOR ADDITIONAL ARCHITECTURAL FLOOR PLAN NOTES, REFER TO AE-400.
B. FOR MEPT WORK, REFER TO MEP DRAWINGS.
C. FOR STRUCTURAL WORK, REFER TO 'S' SERIES STRUCTURAL DRAWINGS.
D. FOR GENERAL INFORMATION INCLUDING PROJECT PHASING AND ALTERNATES, REFER TO 'G' SERIES DRAWINGS. ADDITIONAL
DETAILED INFORMATION PERTAINING TO PHASING AND ALTERNATES ARE NOTED THROUGHOUT DRAWING SET.
E. FOR PARTITION TYPES AND DIMENSIONS OF PARTITIONS ON FLOOR PLANS REFER TO AE-111 SERIES DRAWINGS.
F. ALL EXISTING FIREPROOFING TO BE REPAIRED TO ACHIEVE PROTECTION EQUIVALENT TO EXISTING PROTECTION.
G. ALL NEW STRUCTURAL STEEL, PRIMARY AND SECONDARY, TO RECEIVE SPRAY ON FIREPROOFING EQUIVALENT TO PROTECTION
ON EXISTING COLUMNS.
H. NEW CLINIC STEEL ROOF FRAMING, PRIMARY AND SECONDARY, TO RECEIVE 2-HR SPRAY ON FIREPROOFING.
I. PROVIDE VERTICAL GYPSUM BOARD EXPANSION JOINTS WHERE PARTITION FRAMING TRANSITIONS/ CROSSES/ ABUTS BETWEEN
NEW STRUCTURAL ELEMENTS AND EXISTING.
J. REFER TO SHEET AE-566 FOR FRAMING AND CONSTRUCTION REQUIREMENTS WHERE PARTITIONS, RATED AND NON F.R. RATED, ABUT SPRAYED ON FIREPROOFING CONDITIONS.
K. MAINTAIN REQUIRED ADA/ ABA CLEARANCES INCLUDING CLEAR FLOOR SPACE AND CLEARANCES AT DOORS, INCLUDING
CLEARANCES AT STRIKE ON PULL SIDE OF DOORS.
L. PATCH AND REPAIR FIREPROOFING AROUND COLUMN AND ENSURE A 2-HR RATING.
M. DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE.
ARCHITECTURAL FLOOR PLAN GENERAL NOTES
AREA NOT IN CONTRACT. COORDINATE ACCESS TO AREA W/ OWNER.
PREPARE FLOOR SUBSTRATE & INSTALL NEW FLOOR AS SCHEDULED.
PROVIDE SELF LEVELING CONCRETE UNDERLAYMENT AS SPECIFIED OVER EXISTING FLOOR SUBSTRATE.
NEW DOOR FRAME, RE: DOOR SCHEDULE
EXISTING CONSTRUCTION TO REMAIN AS INDICATED, PATCH WALL AS NECESSARY DUE TO RENOVATION WORK, MATCH EXISTING
WALL FINISH.
UPGRADE EXISTING PARTITION TO FIRE RATED PARTITION AS SCHEDULED, REFER TO GI-011 LIFE SAFETY FOR SCHEDULED RATING LOCATION. PATCH, REPAIR AND FILL ALL PENETRATIONS TO COMPLY WITH SCHEDULED RATING AND APPLICABLE UL LISTING AS
SCHEDULED ON AE-601 PARTITION TYPES.
EXISTING FLOOR BASE AND WALLS TO REMAIN THIS ROOM EXCEPT AT NEW PARTITIONS INDICATED. PATCH REPAIR, REPLACE DAMAGED OR MISSING FINISHES DUE TO RENOVATION WORK. MATCH EXISTING FLOOR, BASE AND WALL FINISHES AS NEEDED FOR
LIKE NEW COMPLETE APPEARANCE.
REINSTALL SALVAGED CURTAIN WALL ASSEMBLY TO MATCH ORIGINAL INSTALLATION.
EXISTING DOOR & FRAME TO REMAIN.
PATCH EXISTING WALLS TO REMAIN AS NECESSARY, PROVIDE NEW FINISH AS SCHEDULED, SEE ROOM FINISH SCHEDULE.
NEW HANDRAILS AND CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.
NEW CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.
PREPARE FLOOR SUBSTRATE & INSTALL NEW TO MATCH EXISTING ADJACENT FINISH.
PATCH EXISTING OPENING TO REMAIN AFTER THE REMOVAL OF EXISTING DOOR FRAME AND HARDWARE.
NEW PLUMBING FIXTURES; RE PLUMBING.
PATCH & REPAIR EXISTING CURTAIN WALL ASSEMBLY TO MATCH EXISTING. RESEAL & REPLACE GASKETS AS NEEDED TO ENSURE A
WATER TIGHT ASSEMBLY.
FILL IN EXISTING OPENING MATCH ADJACENT FINISH. ALIGN FINISH FACE W/ EXISTING FINISH.
NEW SHAFT WALL CONSTRUCTION.
ALIGN NEW PARTITION FINISHED FACE WITH EXISTING ADJACENT WALL, TYPICAL. MATCH EXISTING ADJACENT WALL FINISH.
REPAIR EXISTING WATERPROOFING. REINSTALL SALVAGED PAVERS PER ORIGINAL CONSTRUCTION IN PATTERN SHOWN. REFER TO
SHEET AE-301 KEY NOTE #30 FOR ADDITIONAL INFORMATION AND REQUIREMENTS
NEW DOOR, FRAME & HARDWARE, RE: DOOR SCHEDULE.
EXISTING COLUMN ENCLOSURE TO REMAIN; PATCH, REPAIR & CLEAN FOR LIKE NEW APPEARANCE.
NEW WINDOW & ASSEMBLY.
EXISTING STOREFRONT SYSTEM TO REMAIN.
NEW STOREFRONT SYSTEM TO MATCH ADJACENT; RE:
LINE OF PRIVACY CURTAIN TRACK ABOVE.
INFILL CONCRETE SLAB ON METAL DECK AT REMOVED PLANTER. PROVIDE NEW WATERPROOFING OVER NEW CONCRETE TO MATCH
EXISTING. RE: STRUCTURAL
SCHEDULED STAINLESS STEEL LINEAR SHOWER DRAIN AT SHOWER CURTAIN LINE, RE PLUMBING, TYP.
CONCRETE HOUSEKEEPING PAD FOR MECHANICAL EQUIPMENT. RE: MECHANICAL FOR EQUIPMENT CONFIGURATION.
EXISTING STORM DRAIN TO REMAIN, RE PLUMBING.
CONTRACTOR TO RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.
PHASE CONSTRUCTION OF THIS ROOM/AREA UNTIL CONSTRUCTION ACCESS THROUGH THIS AREA IS NO LONGER NEEDED BUT IN NO
CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.
REINSTALL SALVAGED WINDOW SYSTEM AS ORIGINALLY CONSTRUCTED WITH EXISTING WINDOW GLAZING, STONE, AND PRECAST COMPONENTS. PROVIDE NEW WALL FRAMING, SHEATHING, DAMP PROOFING, FLASHING, SEALANTS, GYPSUM BOARD, FIRE SAFING AND OTHER COMPONENTS UTILIZED IN THE EXISTING CONSTRUCTION. ALL WORK TO MATCH EXISTING RESULTING IN A UNIFORM APPEARANCE OF THE BUILDING ELEVATION. PRIOR TO REINSTALLATION, REPAIR ANY AND ALL BUILDING ELEMENTS DAMAGED DUE
TO WORK IN THIS CONTRACT. RESTORE SITE WORK TO ORIGINAL CONDITION.
PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT REMOVED DOOR TO MATCH EXISTING FINISHES.
PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT NEW DOOR AND FRAME TO MATCH EXISTING FINISHES.
REINSTALL EXISTING GLASS DOOR SYSTEM TO MATCH ORIGINAL INSTALLATION. PATCH AND REPAIR ADJACENT SURFACES TO MATCH
EXISTING FINISHES.
REPLACE FLOOR FINISHES, BASE, AND PAINT WALLS TO MATCH EXISTING, PRIOR TO NEW FINISHES, PATCH AND PREPARE AND REPAIR SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES. REPAINT H.M. DOOR FRAME. REPLACE DOOR AND HARDWARE
IF DAMAGED DURING CONSTRUCTION.
PAINT NEW PARTITIONS TO MATCH EXISTING, PROVIDE NEW BASE TO MATCH EXISTING. PRIOR TO THE INSTALLATION OF NEW FINISHES, PATCH, REPAIR AND PREPARE SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES, INCLUDING REWORKING
CEILING, FUR DOWNS AND FLOOR FINISHES TO MATCH EXISTING.
REPAIR FLOOR, CEILING AND WALL CONSTRUCTION TO MATCH EXISTING AT REMOVED TEMPORARY CONSTRUCTION PARTITION.
REFER TO MEP DRAWINGS FOR WORK IN THIS ROOM. VERIFY AND CONSTRUCT ALTERATIONS/CONSTRUCTION OF HOUSEKEEPING
PADS FOR MEP EQUIPMENT.
COORDINATE WORK IN THIS AREA ACCORDING TO CONSTRUCTION PHASING PLANS.
EXISTING FLOOR FINISH TO REMAIN IN THIS AREA UNTIL PHASE 4 IS CONSTRUCTED. PATCH, REPAIR FLOOR FINISH AND WALL BASE
WHERE WALLS HAVE BEEN REMOVED AS PART OF PREVIOUS PHASES.
PROVIDE MATCHING FLOOR FINISH THIS AREA UNTIL FINAL SCHEDULED FLOOR AND BASE FINISH IS INSTALLED AS PART OF PHASE 4 CONSTRUCTION. INSTALL HANDRAILS, CRASH RAILS, CORNER GUARDS AND WALL GUARDS AT PHASE 1 CONSTRUCTION.
2 HOUR FIRE RESISTIVE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1 & 4. SEE GI-130 FOR 2 HOUR PARTITION
REQUIREMENT W/ BID OPTION #2
2 HOUR FIRE SMOKE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1.
RELOCATED INTERIOR FIXED GLAZING SYSTEM FROM EXISTING INTERNET CAFE. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING GLAZING TO REMAIN W/ DEDUCT #1 W/ OPENING CLOSED W/ CONTINUATION OF SCHEDULED PARTITION.
RELOCATED INTERIOR HORIZONTAL SLIDING GLASS DOOR AND SIDE LIGHTS FROM EXISTING INTERNET CAFE. CONNECT AND ADJUST AUTO OPENER TO BE FULLY FUNCTIONAL AS EXISTING INSTALLATION. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING DOOR TO REMAIN W/ DEDUCT ALT #1 AND ALTERNATE EXISTING HORIZONTAL SLIDING GLASS DOOR FROM EXISTING DAYROOM ENTRY TO BE RELOCATED INSTEAD. ADJUST OPENING SIZE AND AUTO OPENER CONNECTIONS AS REQUIRED.
ALL ELECTRICAL RECEPTACLES THIS ROOM TO BE 48" A.F.F. UNLESS NOTED OTHERWISE ON ELECTRICAL DWGS.
EXISTING COURTYARD UNDER PAVERS. REINSTALL/REPAIR WATERPROOFING AND INSTALL PAVERS PER ORIGINAL CONSTRUCTION TO ALLOW DRAINAGE FLOW TO DRAINS. WHERE DRAINS ARE IN EXISTING PLANTERS, RAISE DRAIN TO NEW LEVEL OF COURTYARD
CONCRETE SLAB ELEVATION.
EXISTING DRAIN AT PERIMETER TRENCH DRAIN UNDER PAVERS. TERMINATE EXISTING TRENCH DRAIN AT FACE OF ADDITION CONCRETE. REPAIR WATER PROOFING. INSURE ALL SECTIONS OF TRENCH DRAIN HAVE PROPER FLOW TO DRAIN. INSTALL PAVERS PER ORIGINAL CONSTRUCTION BRIDGING OVER TRENCH AND ALLOWING DRAINAGE FLOW INTO TRENCH.
PROTECT EXISTING CONSTRUCTION, SEE NOTES 31 & 37 FOR ADDITIONAL INFORMATION.
MED GAS, REFER TO M.E.P. DRAWINGS.
ROOF ACCESS LADDER
FLOOR PLAN KEY NOTES
NOT ALL USED ON THIS SHEET
6565 West Loop South, Suite 560, Bellaire, TX 77401
713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t
0 Revisions:
IS
S
U E
D F
O R
B
ID
D
IN
G
C O
N S
TR
U
C
TI
O N
Drawing Number
DrawnChecked
Dwg. of Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Drawing Title
Approved: Project Director
Project Title
Location
Date
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Building Number
B100
Project Number
Office of
Construction and Facilities
Management
V eterans Affairs P alo Alto Heal th Ca re Sy stem
S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"
AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem
D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED
T exas Reg. No.G FE Project No.F-571213060
Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18
AE-103
ARCHITECTURAL PLAN - FIRST FLOOR -
PHASE 2 - NOTES
CONSTRUCT SPINAL CORD
INJURY BED EXPANSION
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
#580 - 320
0' 8' 12'4' 1/8" = 1'-0"
ARCHITECTURAL PLAN - FIRST FLOOR - PHASE 2 - NOTES
F1
P L A
N N
T R
U E
N
PLA
N N
A T
PATIE
N T U
N
.E
.C
F.E .C
F.E .C
F.E.C
F.E.C
SS
R.8R.8
RR
Q.5Q.5
P.5P.5
PP
1.8
1.82
2.5
2.5
3.5
3.5
55.2
5.25.5
5.5
6.5
6.5
6.9
6.9
AE-403
D1
C1B-206
CORR
1B-232A
TLTS1
1B-230A
TLTS1
1B-228A
TLTS1
1B-226A
TLTS1
1B-224A
TLTS1
1B-220A
TLTS1
C1B-203
CORR
1B-216
TRANS EQ STOR
1B-220
BRMS2
1B-222
BRMS1
1B-224
BRMS2
1B-226
BRMS2
1B-228
BRMS2
1B-230
BRMS2
1B-232
BRMS2
1B-236
MECHANICAL
C1B-204
CORR
C1B-208
CORR
1B-222A
TLTS1
1B-235
STORAGE
1B-220A
1B -2
1B
-2
1B -2
1B-224A
1B -2
1B-226A
1B-228A 1B -2
1B
-2
1B-230A
1B-232A 1B -2
1B
-2
1B-237A
AE-403
D5
090909
1B-222A
1B-222B
STORAGE
1B -2
B
B
-2
M A
T C
H L
IN
E
R E
S
H E
E T
A E
-1
P H
A S
E
R
E S
H E
E T
A E
-1
P H
A S
E
01 01
07 10
AE-404
E1
SIM, OP HD 03
AREA NOT IN CONTRACT. COORDINATE ACCESS TO AREA W/ OWNER.
PREPARE FLOOR SUBSTRATE & INSTALL NEW FLOOR AS SCHEDULED.
PROVIDE SELF LEVELING CONCRETE UNDERLAYMENT AS SPECIFIED OVER EXISTING FLOOR SUBSTRATE.
NEW DOOR FRAME, RE: DOOR SCHEDULE
EXISTING CONSTRUCTION TO REMAIN AS INDICATED, PATCH WALL AS NECESSARY DUE TO RENOVATION WORK, MATCH EXISTING
WALL FINISH.
UPGRADE EXISTING PARTITION TO FIRE RATED PARTITION AS SCHEDULED, REFER TO GI-011 LIFE SAFETY FOR SCHEDULED RATING LOCATION. PATCH, REPAIR AND FILL ALL PENETRATIONS TO COMPLY WITH SCHEDULED RATING AND APPLICABLE UL LISTING AS
SCHEDULED ON AE-601 PARTITION TYPES.
EXISTING FLOOR BASE AND WALLS TO REMAIN THIS ROOM EXCEPT AT NEW PARTITIONS INDICATED. PATCH REPAIR, REPLACE DAMAGED OR MISSING FINISHES DUE TO RENOVATION WORK. MATCH EXISTING FLOOR, BASE AND WALL FINISHES AS NEEDED FOR
LIKE NEW COMPLETE APPEARANCE.
REINSTALL SALVAGED CURTAIN WALL ASSEMBLY TO MATCH ORIGINAL INSTALLATION.
EXISTING DOOR & FRAME TO REMAIN.
PATCH EXISTING WALLS TO REMAIN AS NECESSARY, PROVIDE NEW FINISH AS SCHEDULED, SEE ROOM FINISH SCHEDULE.
NEW HANDRAILS AND CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.
NEW CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.
PREPARE FLOOR SUBSTRATE & INSTALL NEW TO MATCH EXISTING ADJACENT FINISH.
PATCH EXISTING OPENING TO REMAIN AFTER THE REMOVAL OF EXISTING DOOR FRAME AND HARDWARE.
NEW PLUMBING FIXTURES; RE PLUMBING.
PATCH & REPAIR EXISTING CURTAIN WALL ASSEMBLY TO MATCH EXISTING. RESEAL & REPLACE GASKETS AS NEEDED TO ENSURE A
WATER TIGHT ASSEMBLY.
FILL IN EXISTING OPENING MATCH ADJACENT FINISH. ALIGN FINISH FACE W/ EXISTING FINISH.
NEW SHAFT WALL CONSTRUCTION.
ALIGN NEW PARTITION FINISHED FACE WITH EXISTING ADJACENT WALL, TYPICAL. MATCH EXISTING ADJACENT WALL FINISH.
REPAIR EXISTING WATERPROOFING. REINSTALL SALVAGED PAVERS PER ORIGINAL CONSTRUCTION IN PATTERN SHOWN. REFER TO
SHEET AE-301 KEY NOTE #30 FOR ADDITIONAL INFORMATION AND REQUIREMENTS
NEW DOOR, FRAME & HARDWARE, RE: DOOR SCHEDULE.
EXISTING COLUMN ENCLOSURE TO REMAIN; PATCH, REPAIR & CLEAN FOR LIKE NEW APPEARANCE.
NEW WINDOW & ASSEMBLY.
EXISTING STOREFRONT SYSTEM TO REMAIN.
NEW STOREFRONT SYSTEM TO MATCH ADJACENT; RE:
LINE OF PRIVACY CURTAIN TRACK ABOVE.
INFILL CONCRETE SLAB ON METAL DECK AT REMOVED PLANTER. PROVIDE NEW WATERPROOFING OVER NEW CONCRETE TO MATCH
EXISTING. RE: STRUCTURAL
SCHEDULED STAINLESS STEEL LINEAR SHOWER DRAIN AT SHOWER CURTAIN LINE, RE PLUMBING, TYP.
CONCRETE HOUSEKEEPING PAD FOR MECHANICAL EQUIPMENT. RE: MECHANICAL FOR EQUIPMENT CONFIGURATION.
EXISTING STORM DRAIN TO REMAIN, RE PLUMBING.
CONTRACTOR TO RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.
PHASE CONSTRUCTION OF THIS ROOM/AREA UNTIL CONSTRUCTION ACCESS THROUGH THIS AREA IS NO LONGER NEEDED BUT IN NO
CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.
REINSTALL SALVAGED WINDOW SYSTEM AS ORIGINALLY CONSTRUCTED WITH EXISTING WINDOW GLAZING, STONE, AND PRECAST COMPONENTS. PROVIDE NEW WALL FRAMING, SHEATHING, DAMP PROOFING, FLASHING, SEALANTS, GYPSUM BOARD, FIRE SAFING AND OTHER COMPONENTS UTILIZED IN THE EXISTING CONSTRUCTION. ALL WORK TO MATCH EXISTING RESULTING IN A UNIFORM APPEARANCE OF THE BUILDING ELEVATION. PRIOR TO REINSTALLATION, REPAIR ANY AND ALL BUILDING ELEMENTS DAMAGED DUE
TO WORK IN THIS CONTRACT. RESTORE SITE WORK TO ORIGINAL CONDITION.
PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT REMOVED DOOR TO MATCH EXISTING FINISHES.
PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT NEW DOOR AND FRAME TO MATCH EXISTING FINISHES.
REINSTALL EXISTING GLASS DOOR SYSTEM TO MATCH ORIGINAL INSTALLATION. PATCH AND REPAIR ADJACENT SURFACES TO MATCH
EXISTING FINISHES.
REPLACE FLOOR FINISHES, BASE, AND PAINT WALLS TO MATCH EXISTING, PRIOR TO NEW FINISHES, PATCH AND PREPARE AND REPAIR SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES. REPAINT H.M. DOOR FRAME. REPLACE DOOR AND HARDWARE
IF DAMAGED DURING CONSTRUCTION.
PAINT NEW PARTITIONS TO MATCH EXISTING, PROVIDE NEW BASE TO MATCH EXISTING. PRIOR TO THE INSTALLATION OF NEW FINISHES, PATCH, REPAIR AND PREPARE SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES, INCLUDING REWORKING
CEILING, FUR DOWNS AND FLOOR FINISHES TO MATCH EXISTING.
REPAIR FLOOR, CEILING AND WALL CONSTRUCTION TO MATCH EXISTING AT REMOVED TEMPORARY CONSTRUCTION PARTITION.
REFER TO MEP DRAWINGS FOR WORK IN THIS ROOM. VERIFY AND CONSTRUCT ALTERATIONS/CONSTRUCTION OF HOUSEKEEPING
PADS FOR MEP EQUIPMENT.
COORDINATE WORK IN THIS AREA ACCORDING TO CONSTRUCTION PHASING PLANS.
EXISTING FLOOR FINISH TO REMAIN IN THIS AREA UNTIL PHASE 4 IS CONSTRUCTED. PATCH, REPAIR FLOOR FINISH AND WALL BASE
WHERE WALLS HAVE BEEN REMOVED AS PART OF PREVIOUS PHASES.
PROVIDE MATCHING FLOOR FINISH THIS AREA UNTIL FINAL SCHEDULED FLOOR AND BASE FINISH IS INSTALLED AS PART OF PHASE 4 CONSTRUCTION. INSTALL HANDRAILS, CRASH RAILS, CORNER GUARDS AND WALL GUARDS AT PHASE 1 CONSTRUCTION.
2 HOUR FIRE RESISTIVE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1 & 4. SEE GI-130 FOR 2 HOUR PARTITION
REQUIREMENT W/ BID OPTION #2
2 HOUR FIRE SMOKE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1.
RELOCATED INTERIOR FIXED GLAZING SYSTEM FROM EXISTING INTERNET CAFE. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING GLAZING TO REMAIN W/ DEDUCT #1 W/ OPENING CLOSED W/ CONTINUATION OF SCHEDULED PARTITION.
RELOCATED INTERIOR HORIZONTAL SLIDING GLASS DOOR AND SIDE LIGHTS FROM EXISTING INTERNET CAFE. CONNECT AND ADJUST AUTO OPENER TO BE FULLY FUNCTIONAL AS EXISTING INSTALLATION. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING DOOR TO REMAIN W/ DEDUCT ALT #1 AND ALTERNATE EXISTING HORIZONTAL SLIDING GLASS DOOR FROM EXISTING DAYROOM ENTRY TO BE RELOCATED INSTEAD. ADJUST OPENING SIZE AND AUTO OPENER CONNECTIONS AS REQUIRED.
ALL ELECTRICAL RECEPTACLES THIS ROOM TO BE 48" A.F.F. UNLESS NOTED OTHERWISE ON ELECTRICAL DWGS.
EXISTING COURTYARD UNDER PAVERS. REINSTALL/REPAIR WATERPROOFING AND INSTALL PAVERS PER ORIGINAL CONSTRUCTION TO ALLOW DRAINAGE FLOW TO DRAINS. WHERE DRAINS ARE IN EXISTING PLANTERS, RAISE DRAIN TO NEW LEVEL OF COURTYARD
CONCRETE SLAB ELEVATION.
EXISTING DRAIN AT PERIMETER TRENCH DRAIN UNDER PAVERS. TERMINATE EXISTING TRENCH DRAIN AT FACE OF ADDITION CONCRETE. REPAIR WATER PROOFING. INSURE ALL SECTIONS OF TRENCH DRAIN HAVE PROPER FLOW TO DRAIN. INSTALL PAVERS PER ORIGINAL CONSTRUCTION BRIDGING OVER TRENCH AND ALLOWING DRAINAGE FLOW INTO TRENCH.
PROTECT EXISTING CONSTRUCTION, SEE NOTES 31 & 37 FOR ADDITIONAL INFORMATION.
MED GAS, REFER TO M.E.P. DRAWINGS.
ROOF ACCESS LADDER
FLOOR PLAN KEY NOTES
NOT ALL USED ON THIS SHEET
A. FOR ADDITIONAL ARCHITECTURAL FLOOR PLAN NOTES, REFER TO AE-400.
B. FOR MEPT WORK, REFER TO MEP DRAWINGS.
C. FOR STRUCTURAL WORK, REFER TO 'S' SERIES STRUCTURAL DRAWINGS.
D. FOR GENERAL INFORMATION INCLUDING PROJECT PHASING AND ALTERNATES, REFER TO 'G' SERIES DRAWINGS. ADDITIONAL
DETAILED INFORMATION PERTAINING TO PHASING AND ALTERNATES ARE NOTED THROUGHOUT DRAWING SET.
E. FOR PARTITION TYPES AND DIMENSIONS OF PARTITIONS ON FLOOR PLANS REFER TO AE-111 SERIES DRAWINGS.
F. ALL EXISTING FIREPROOFING TO BE REPAIRED TO ACHIEVE PROTECTION EQUIVALENT TO EXISTING PROTECTION.
G. ALL NEW STRUCTURAL STEEL, PRIMARY AND SECONDARY, TO RECEIVE SPRAY ON FIREPROOFING EQUIVALENT TO PROTECTION
ON EXISTING COLUMNS.
H. NEW CLINIC STEEL ROOF FRAMING, PRIMARY AND SECONDARY, TO RECEIVE 2-HR SPRAY ON FIREPROOFING.
I. PROVIDE VERTICAL GYPSUM BOARD EXPANSION JOINTS WHERE PARTITION FRAMING TRANSITIONS/ CROSSES/ ABUTS BETWEEN
NEW STRUCTURAL ELEMENTS AND EXISTING.
J. REFER TO SHEET AE-566 FOR FRAMING AND CONSTRUCTION REQUIREMENTS WHERE PARTITIONS, RATED AND NON F.R. RATED, ABUT SPRAYED ON FIREPROOFING CONDITIONS.
K. MAINTAIN REQUIRED ADA/ ABA CLEARANCES INCLUDING CLEAR FLOOR SPACE AND CLEARANCES AT DOORS, INCLUDING
CLEARANCES AT STRIKE ON PULL SIDE OF DOORS.
L. PATCH AND REPAIR FIREPROOFING AROUND COLUMN AND ENSURE A 2-HR RATING.
M. DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE.
ARCHITECTURAL FLOOR PLAN GENERAL NOTES
100-83 1G1H
100-84
1K 100-85
100-80 1D
100-79 1C
100-78 1B
100-77 1A
100-82 1F 1E
100-81
KEY PLAN
T R
U E
N
P L A
N N
PLAN N
A
T
PATIE
NT U
NIT
S
LINE TYPE LEGEND
PROJECT SCOPE BOUNDARIES
DETAIL AND PLAN ENLARGEMENT REFERENCE
2 HOUR FIRE RESISTIVE PARTITION
2 HOUR FIRE SMOKE PARTITION
6565 West Loop South, Suite 560, Bellaire, TX 77401
713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t
0 Revisions:
IS
S
U E
D F
O R
B
ID
D
IN
G
C O
N S
TR
U
C
TI
O N
Drawing Number
DrawnChecked
Dwg. of Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Drawing Title
Approved: Project Director
Project Title
Location
Date
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Building Number
B100
Project Number
Office of
Construction and Facilities
Management
V eterans Affairs P alo Alto Heal th Ca re Sy stem
S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"
AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem
D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED
T exas Reg. No.G FE Project No.F-571213060
Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18
AE-104
ARCHITECTURAL PLAN - FIRST FLOOR -
PHASE 3 - NOTES
CONSTRUCT SPINAL CORD
INJURY BED EXPANSION
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
#580 - 320
0' 8' 12'4' 1/8" = 1'-0"
ARCHITECTURAL PLAN - FIRST FLOOR - PHASE 3 - NOTES
F1
P L A
N N
T R
U E
N
PLA
N N
A T
PATIE
N T U
N
F .E
.C
F.E.C
F.E .C
F .E
.C
SS
R.8R.8
RR
Q.5Q.5
P.5P.5
PP
NN
8.1
8.1
11.5
11.5
12.5
12.5
9.5
9.5
8.5
8.5
N.9N.9
M.9M.9
9.1
9.1
C1B-103
CORR
1B-134
STORAGE
C1B-123
CORR
1B-117
BRMS2
1B-118
BRMS2
1B-122
BRMS2
1B-124
BRMS2
1B-126
BRMS2
1B-126A
TLTS1
1B-124A
TLTS1
1B-122A
TLTS1
1B-118A
TLTS1
1B-116
HD NUR
1B-128
BRMS2
1B-128A
TLTS1
1B-132A
TLTS1
1B-132
BRMS2
C1B-107
CORR
C1B-108
CORR
C1B-104
CORR
C1B-109
CORR
1B-134A
MECHANICAL
05 10
05 06 10
131B-126
1B-124
1B-132
1B-128
1B-134
1B -1
A
1B -1
A
1B -1
A
1B -1
A
1B -1
A
1B -1
A
1B-122
1B-118
1B-117
RE: SHEET AE-102
M A
T C
H L
IN
E
56' - 0" EL
1B-117A
TLTS1
AE-502
F9
11.4
AE-402
E6
AE-501
F1
MATCH LINE
1B -1
A
1B-114
QUIET
C 1B
-1
1B-137
B
-1 A
RE: SHEET AE-102
MATCH LINE
M A
T C
H L
IN
E
R E
S
H E
E T
A E
-1
R E
S
H E
E T
A E
-1
P H
A S
E
R
E S
H E
E T
A E
-1
P H
A S
E
AE-403
D5
SIM, OP HD
1B-119
DAYROOM
C B
-1
AE-222
A1
AE-222
F1
AREA NOT IN CONTRACT. COORDINATE ACCESS TO AREA W/ OWNER.
PREPARE FLOOR SUBSTRATE & INSTALL NEW FLOOR AS SCHEDULED.
PROVIDE SELF LEVELING CONCRETE UNDERLAYMENT AS SPECIFIED OVER EXISTING FLOOR SUBSTRATE.
NEW DOOR FRAME, RE: DOOR SCHEDULE
EXISTING CONSTRUCTION TO REMAIN AS INDICATED, PATCH WALL AS NECESSARY DUE TO RENOVATION WORK, MATCH EXISTING
WALL FINISH.
UPGRADE EXISTING PARTITION TO FIRE RATED PARTITION AS SCHEDULED, REFER TO GI-011 LIFE SAFETY FOR SCHEDULED RATING LOCATION. PATCH, REPAIR AND FILL ALL PENETRATIONS TO COMPLY WITH SCHEDULED RATING AND APPLICABLE UL LISTING AS
SCHEDULED ON AE-601 PARTITION TYPES.
EXISTING FLOOR BASE AND WALLS TO REMAIN THIS ROOM EXCEPT AT NEW PARTITIONS INDICATED. PATCH REPAIR, REPLACE DAMAGED OR MISSING FINISHES DUE TO RENOVATION WORK. MATCH EXISTING FLOOR, BASE AND WALL FINISHES AS NEEDED FOR
LIKE NEW COMPLETE APPEARANCE.
REINSTALL SALVAGED CURTAIN WALL ASSEMBLY TO MATCH ORIGINAL INSTALLATION.
EXISTING DOOR & FRAME TO REMAIN.
PATCH EXISTING WALLS TO REMAIN AS NECESSARY, PROVIDE NEW FINISH AS SCHEDULED, SEE ROOM FINISH SCHEDULE.
NEW HANDRAILS AND CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.
NEW CRASH GUARDS, TYP., SEE ROOM FINISH SCHEDULE & IN-111 SERIES DRAWINGS.
PREPARE FLOOR SUBSTRATE & INSTALL NEW TO MATCH EXISTING ADJACENT FINISH.
PATCH EXISTING OPENING TO REMAIN AFTER THE REMOVAL OF EXISTING DOOR FRAME AND HARDWARE.
NEW PLUMBING FIXTURES; RE PLUMBING.
PATCH & REPAIR EXISTING CURTAIN WALL ASSEMBLY TO MATCH EXISTING. RESEAL & REPLACE GASKETS AS NEEDED TO ENSURE A
WATER TIGHT ASSEMBLY.
FILL IN EXISTING OPENING MATCH ADJACENT FINISH. ALIGN FINISH FACE W/ EXISTING FINISH.
NEW SHAFT WALL CONSTRUCTION.
ALIGN NEW PARTITION FINISHED FACE WITH EXISTING ADJACENT WALL, TYPICAL. MATCH EXISTING ADJACENT WALL FINISH.
REPAIR EXISTING WATERPROOFING. REINSTALL SALVAGED PAVERS PER ORIGINAL CONSTRUCTION IN PATTERN SHOWN. REFER TO
SHEET AE-301 KEY NOTE #30 FOR ADDITIONAL INFORMATION AND REQUIREMENTS
NEW DOOR, FRAME & HARDWARE, RE: DOOR SCHEDULE.
EXISTING COLUMN ENCLOSURE TO REMAIN; PATCH, REPAIR & CLEAN FOR LIKE NEW APPEARANCE.
NEW WINDOW & ASSEMBLY.
EXISTING STOREFRONT SYSTEM TO REMAIN.
NEW STOREFRONT SYSTEM TO MATCH ADJACENT; RE:
LINE OF PRIVACY CURTAIN TRACK ABOVE.
INFILL CONCRETE SLAB ON METAL DECK AT REMOVED PLANTER. PROVIDE NEW WATERPROOFING OVER NEW CONCRETE TO MATCH
EXISTING. RE: STRUCTURAL
SCHEDULED STAINLESS STEEL LINEAR SHOWER DRAIN AT SHOWER CURTAIN LINE, RE PLUMBING, TYP.
CONCRETE HOUSEKEEPING PAD FOR MECHANICAL EQUIPMENT. RE: MECHANICAL FOR EQUIPMENT CONFIGURATION.
EXISTING STORM DRAIN TO REMAIN, RE PLUMBING.
CONTRACTOR TO RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.
PHASE CONSTRUCTION OF THIS ROOM/AREA UNTIL CONSTRUCTION ACCESS THROUGH THIS AREA IS NO LONGER NEEDED BUT IN NO
CASE AFTER CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED.
REINSTALL SALVAGED WINDOW SYSTEM AS ORIGINALLY CONSTRUCTED WITH EXISTING WINDOW GLAZING, STONE, AND PRECAST COMPONENTS. PROVIDE NEW WALL FRAMING, SHEATHING, DAMP PROOFING, FLASHING, SEALANTS, GYPSUM BOARD, FIRE SAFING AND OTHER COMPONENTS UTILIZED IN THE EXISTING CONSTRUCTION. ALL WORK TO MATCH EXISTING RESULTING IN A UNIFORM APPEARANCE OF THE BUILDING ELEVATION. PRIOR TO REINSTALLATION, REPAIR ANY AND ALL BUILDING ELEMENTS DAMAGED DUE
TO WORK IN THIS CONTRACT. RESTORE SITE WORK TO ORIGINAL CONDITION.
PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT REMOVED DOOR TO MATCH EXISTING FINISHES.
PATCH AND REPAIR WALL, WALL FINISHES, BASE, HANDRAIL, CRASH RAIL AT NEW DOOR AND FRAME TO MATCH EXISTING FINISHES.
REINSTALL EXISTING GLASS DOOR SYSTEM TO MATCH ORIGINAL INSTALLATION. PATCH AND REPAIR ADJACENT SURFACES TO MATCH
EXISTING FINISHES.
REPLACE FLOOR FINISHES, BASE, AND PAINT WALLS TO MATCH EXISTING, PRIOR TO NEW FINISHES, PATCH AND PREPARE AND REPAIR SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES. REPAINT H.M. DOOR FRAME. REPLACE DOOR AND HARDWARE
IF DAMAGED DURING CONSTRUCTION.
PAINT NEW PARTITIONS TO MATCH EXISTING, PROVIDE NEW BASE TO MATCH EXISTING. PRIOR TO THE INSTALLATION OF NEW FINISHES, PATCH, REPAIR AND PREPARE SURFACES DAMAGED AND/OR REQUIRED FOR NEW FINISHES, INCLUDING REWORKING
CEILING, FUR DOWNS AND FLOOR FINISHES TO MATCH EXISTING.
REPAIR FLOOR, CEILING AND WALL CONSTRUCTION TO MATCH EXISTING AT REMOVED TEMPORARY CONSTRUCTION PARTITION.
REFER TO MEP DRAWINGS FOR WORK IN THIS ROOM. VERIFY AND CONSTRUCT ALTERATIONS/CONSTRUCTION OF HOUSEKEEPING
PADS FOR MEP EQUIPMENT.
COORDINATE WORK IN THIS AREA ACCORDING TO CONSTRUCTION PHASING PLANS.
EXISTING FLOOR FINISH TO REMAIN IN THIS AREA UNTIL PHASE 4 IS CONSTRUCTED. PATCH, REPAIR FLOOR FINISH AND WALL BASE
WHERE WALLS HAVE BEEN REMOVED AS PART OF PREVIOUS PHASES.
PROVIDE MATCHING FLOOR FINISH THIS AREA UNTIL FINAL SCHEDULED FLOOR AND BASE FINISH IS INSTALLED AS PART OF PHASE 4 CONSTRUCTION. INSTALL HANDRAILS, CRASH RAILS, CORNER GUARDS AND WALL GUARDS AT PHASE 1 CONSTRUCTION.
2 HOUR FIRE RESISTIVE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1 & 4. SEE GI-130 FOR 2 HOUR PARTITION
REQUIREMENT W/ BID OPTION #2
2 HOUR FIRE SMOKE WALL THIS LOCATION TO BE CONSTRUCTED AS PART OF PHASE 1.
RELOCATED INTERIOR FIXED GLAZING SYSTEM FROM EXISTING INTERNET CAFE. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING GLAZING TO REMAIN W/ DEDUCT #1 W/ OPENING CLOSED W/ CONTINUATION OF SCHEDULED PARTITION.
RELOCATED INTERIOR HORIZONTAL SLIDING GLASS DOOR AND SIDE LIGHTS FROM EXISTING INTERNET CAFE. CONNECT AND ADJUST AUTO OPENER TO BE FULLY FUNCTIONAL AS EXISTING INSTALLATION. REFER TO DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING DOOR TO REMAIN W/ DEDUCT ALT #1 AND ALTERNATE EXISTING HORIZONTAL SLIDING GLASS DOOR FROM EXISTING DAYROOM ENTRY TO BE RELOCATED INSTEAD. ADJUST OPENING SIZE AND AUTO OPENER CONNECTIONS AS REQUIRED.
ALL ELECTRICAL RECEPTACLES THIS ROOM TO BE 48" A.F.F. UNLESS NOTED OTHERWISE ON ELECTRICAL DWGS.
EXISTING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.