36C25619R0073-006.pdf

PDF 18 MB Posted

Attached to
580-320 Construct Spinal Cord Injury Expansion Federal contract opportunity
Solicitation number
36C25619R0073
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

36C25619R0073 ATTACHMENT E - Project Drawings Part 2 - Dated 6-8-18 - 16 pages.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 580-320 Construct Spinal Cord Injury Expansion, newest first.
File Type Posted
36C25619C0124-000.docx DOCX document
36C25619R0073-0002000.docx DOCX document
36C25619R0073-0001002.pdf PDF
36C25619R0073-0001009.pdf PDF
36C25619R0073-0001012.pdf PDF
36C25619R0073-0001005.pdf PDF
36C25619R0073-0001010.pdf PDF
36C25619R0073-0001003.docx DOCX document
36C25619R0073-0001010.pdf PDF
36C25619R0073-0001007.pdf PDF
36C25619R0073-0001011.pdf PDF
36C25619R0073-0001008.pdf PDF
36C25619R0073-0001004.pdf PDF
36C25619R0073-0001000.docx DOCX document
36C25619R0073-0001013.pdf PDF
36C25619R0073-0001002.pdf PDF
36C25619R0073-0001006.pdf PDF
36C25619R0073-0001003.docx DOCX document
36C25619R0073-0001004.pdf PDF
36C25619R0073-0001014.pdf PDF
36C25619R0073-012.pdf PDF
36C25619R0073-016.pdf PDF
36C25619R0073-008.pdf PDF
36C25619R0073-005.pdf PDF
36C25619R0073-017.pdf PDF
36C25619R0073-007.pdf PDF
36C25619R0073-020.pdf PDF
36C25619R0073-002.docx DOCX document
36C25619R0073-011.pdf PDF
36C25619R0073-021.docx DOCX document
36C25619R0073-014.pdf PDF
36C25619R0073-017.pdf PDF
36C25619R0073-005.pdf PDF
36C25619R0073-002.docx DOCX document
36C25619R0073-010.pdf PDF
36C25619R0073-019.pdf PDF
36C25619R0073-023.pdf PDF
36C25619R0073-015.pdf PDF
36C25619R0073-011.pdf PDF
36C25619R0073-020.pdf PDF
36C25619R0073-009.pdf PDF
36C25619R0073-018.pdf PDF
36C25619R0073-016.pdf PDF
36C25619R0073-024.doc DOC document
36C25619R0073-012.pdf PDF
36C25619R0073-014.pdf PDF
36C25619R0073-021.docx DOCX document
36C25619R0073-007.pdf PDF
36C25619R0073-000.docx DOCX document
36C25619R0073-000.docx DOCX document
Show all 50

580-320 Construct Spinal Cord Injury Expansion has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

w c w c w c

PHASE 1A

DEMOLITION

REFER TO

SHEET AD-101

PHASE 1B

DEMOLITION

REFER TO SHEET AD-102

PHASE 4 PHASE 2PHASE 3

REFER TO MEP

DRAWINGS FOR

PHASING OF WORK AT

MECHANICAL ROOM

EXISTING

COURTYARD

CONSTRUCTION

ACCESS

A. REFER TO COVER SHEET GI-001 FOR PROJECT GENERAL NOTES

B. GENERAL CONTRACTOR TO COORDINATE EXACT BOUNDARY OF DEMOLITION WITH VA. COR

AND CONSTRUCTION SCOPE OF WORK.

C. VA. COR TO DETERMINE TIME PERIOD BETWEEN PHASE COMPLETION AND DIRECTION TO

PROCEED TO NEXT PHASE. SUBSEQUENT CONSTRUCTION PHASES CANNOT COMMENCE

UNTIL CONSTRUCTION OF A CURRENT PHASE IS COMPLETED, SYSTEMS VERIFIED,

ACTIVATED, FURNITURE AND EQUIPMENT INSTALLED AND PATIENTS MOVED IN VACATING THE

CONSTRUCTION AREA FOR THE NEXT PHASE. ONCE VACATED, SPACE MUST BE

DECOMMISSIONED, WITH FURNITURE AND EQUIPMENT REMOVED PRIOR TO TURNING SPACE

OVER TO THE CONTRACTOR AND ISSUING DIRECTION TO PROCEED FOR THE NEXT SPACE.

CONSTRUCTION PHASING GENERAL NOTES

TEMPORARY CONSTRUCTION ACCESS TO COURTYARD FOR ADDITION

CONSTRUCTION. GENERAL CONTRACTOR MAY PROPOSE ALTERNATE ACCESS

ROUTES TO BE CONSIDERED BY VA-COR FOR APPROVAL. CONTRACTOR TO

RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER

TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER

CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED. ALL ADJACENT

OCCUPIED SPACES SHALL MAINTAIN TWO EGRESS ROUTES AT ALL TIMES DURING

CONSTRUCTION. COORDINATE WITH VA

CONSTRUCTION PHASING LEGEND

100-83 1G1H

100-84

1K 100-85

100-80 1D

100-79 1C

100-78 1B

100-77 1A

100-82 1F 1E

100-81

KEY PLAN

ADDITION

PHASE #1 ----------------------------------- 35 BEDS

PHASE #2 ----------------------------------- 40 BEDS

PHASE #3 ----------------------------------- 38 BEDS

PHASE #4 ----------------------------------- 36 BEDS

CONSTRUCTION COMPLETION ------------- 50 BEDS

BASE BID DURING CONSTRUCTION BED COUNT

6565 West Loop South, Suite 560, Bellaire, TX 77401

713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t

0 Revisions:

IS

S

U E

D F

O R

B

ID

D

IN

G

C O

N S

TR

U

C

TI

O N

Drawing Number

DrawnChecked

Dwg. of Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

VA FORM 08-6231

Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Drawing Title

Approved: Project Director

Project Title

Location

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Building Number

B100

Project Number

Office of

Construction and Facilities

Management

V eterans Affairs P alo Alto Heal th Ca re Sy stem

S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"

AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem

D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED

T exas Reg. No.G FE Project No.F-571213060

Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18

GI-121

FIRST FLOOR - CONSTRUCTION

PHASING PLAN

CONSTRUCT SPINAL CORD

INJURY BED EXPANSION

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

#580 - 320

0' 16' 24'8'4' 1/16" = 1'-0"

DEMOLITION AND CONSTRUCTION PHASING PLAN

E1

PLAN INDICATES PHASE 1 DEMOLITION

F .E

.C

PHASE 1

CONSTRUCTION

PHASE 1

CONSTRUCTION

PHASE 4 PHASE 2

DEMOLITION

PHASE 3

REFER TO MEP

DRAWINGS FOR

PHASING OF WORK AT

MECHANICAL ROOM

REFER TO MEP

DRAWINGS FOR

PHASING OF WORK AT

MECHANICAL ROOM

A. REFER TO COVER SHEET GI-001 FOR PROJECT GENERAL NOTES

B. GENERAL CONTRACTOR TO COORDINATE EXACT BOUNDARY OF DEMOLITION WITH VA. COR

AND CONSTRUCTION SCOPE OF WORK.

C. VA. COR TO DETERMINE TIME PERIOD BETWEEN PHASE COMPLETION AND DIRECTION TO

PROCEED TO NEXT PHASE. SUBSEQUENT CONSTRUCTION PHASES CANNOT COMMENCE

UNTIL CONSTRUCTION OF A CURRENT PHASE IS COMPLETED, SYSTEMS VERIFIED,

ACTIVATED, FURNITURE AND EQUIPMENT INSTALLED AND PATIENTS MOVED IN VACATING THE

CONSTRUCTION AREA FOR THE NEXT PHASE. ONCE VACATED, SPACE MUST BE

DECOMMISSIONED, WITH FURNITURE AND EQUIPMENT REMOVED PRIOR TO TURNING SPACE

OVER TO THE CONTRACTOR AND ISSUING DIRECTION TO PROCEED FOR THE NEXT SPACE.

CONSTRUCTION PHASING GENERAL NOTES

TEMPORARY CONSTRUCTION ACCESS TO COURTYARD FOR ADDITION

CONSTRUCTION. GENERAL CONTRACTOR MAY PROPOSE ALTERNATE ACCESS

ROUTES TO BE CONSIDERED BY VA-COR FOR APPROVAL. CONTRACTOR TO

RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER

TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER

CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED. ALL ADJACENT

OCCUPIED SPACES SHALL MAINTAIN TWO EGRESS ROUTES AT ALL TIMES DURING

CONSTRUCTION. COORDINATE WITH VA

CONSTRUCTION PHASING LEGEND

100-83 1G1H

100-84

1K 100-85

100-80 1D

100-79 1C

100-78 1B

100-77 1A

100-82 1F 1E

100-81

KEY PLAN

ADDITION

PHASE #1 ----------------------------------- 35 BEDS

PHASE #2 ----------------------------------- 40 BEDS

PHASE #3 ----------------------------------- 38 BEDS

PHASE #4 ----------------------------------- 36 BEDS

CONSTRUCTION COMPLETION ------------- 50 BEDS

BASE BID DURING CONSTRUCTION BED COUNT

6565 West Loop South, Suite 560, Bellaire, TX 77401

713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t

0 Revisions:

IS

S

U E

D F

O R

B

ID

D

IN

G

C O

N S

TR

U

C

TI

O N

Drawing Number

DrawnChecked

Dwg. of Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

VA FORM 08-6231

Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Drawing Title

Approved: Project Director

Project Title

Location

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Building Number

B100

Project Number

Office of

Construction and Facilities

Management

V eterans Affairs P alo Alto Heal th Ca re Sy stem

S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"

AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem

D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED

T exas Reg. No.G FE Project No.F-571213060

Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18

GI-122

FIRST FLOOR - CONSTRUCTION

PHASING PLAN

CONSTRUCT SPINAL CORD

INJURY BED EXPANSION

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

#580 - 320

0' 16' 24'8'4' 1/16" = 1'-0"

DEMOLITION AND CONSTRUCTION PHASING PLAN

E1

PLAN INDICATES PHASE 1 CONSTRUCTION AND

PHASE 2 DEMOLITION AFTER PHASE 1

CONSTRUCTION IS COMPLETED AND OCCUPIED.

PHASE 2 WILL NOT COMMENCE UNTIL PHASE 1 IS

COMPLETED, SYSTEMS VERIFIED, FURNITURE

AND EQUIPMENT INSTALLED, MOVE IN

COMPLETED AND VACATED PHASE 2 SPACE

DECOMMISSIONED BY THE V.A. VERIFY DURATION

BETWEEN CONSTRUCTION PHASES WITH VA-

COR.

.C

PHASE 1

COMPLETED

PHASE 1

COMPLETED

PHASE 4 PHASE 2

CONSTRUCTION

PHASE 3

DEMOLITION

REFER TO MEP

DRAWINGS FOR

PHASING OF WORK AT

MECHANICAL ROOM

REFER TO MEP

DRAWINGS FOR

PHASING OF WORK AT

MECHANICAL ROOM

A. REFER TO COVER SHEET GI-001 FOR PROJECT GENERAL NOTES

B. GENERAL CONTRACTOR TO COORDINATE EXACT BOUNDARY OF DEMOLITION WITH VA. COR

AND CONSTRUCTION SCOPE OF WORK.

C. VA. COR TO DETERMINE TIME PERIOD BETWEEN PHASE COMPLETION AND DIRECTION TO

PROCEED TO NEXT PHASE. SUBSEQUENT CONSTRUCTION PHASES CANNOT COMMENCE

UNTIL CONSTRUCTION OF A CURRENT PHASE IS COMPLETED, SYSTEMS VERIFIED,

ACTIVATED, FURNITURE AND EQUIPMENT INSTALLED AND PATIENTS MOVED IN VACATING THE

CONSTRUCTION AREA FOR THE NEXT PHASE. ONCE VACATED, SPACE MUST BE

DECOMMISSIONED, WITH FURNITURE AND EQUIPMENT REMOVED PRIOR TO TURNING SPACE

OVER TO THE CONTRACTOR AND ISSUING DIRECTION TO PROCEED FOR THE NEXT SPACE.

CONSTRUCTION PHASING GENERAL NOTES

TEMPORARY CONSTRUCTION ACCESS TO COURTYARD FOR ADDITION

CONSTRUCTION. GENERAL CONTRACTOR MAY PROPOSE ALTERNATE ACCESS

ROUTES TO BE CONSIDERED BY VA-COR FOR APPROVAL. CONTRACTOR TO

RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER

TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER

CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED. ALL ADJACENT

OCCUPIED SPACES SHALL MAINTAIN TWO EGRESS ROUTES AT ALL TIMES DURING

CONSTRUCTION. COORDINATE WITH VA

CONSTRUCTION PHASING LEGEND

100-83 1G1H

100-84

1K 100-85

100-80 1D

100-79 1C

100-78 1B

100-77 1A

100-82 1F 1E

100-81

KEY PLAN

ADDITION

PHASE #1 ----------------------------------- 35 BEDS

PHASE #2 ----------------------------------- 40 BEDS

PHASE #3 ----------------------------------- 38 BEDS

PHASE #4 ----------------------------------- 36 BEDS

CONSTRUCTION COMPLETION ------------- 50 BEDS

BASE BID DURING CONSTRUCTION BED COUNT

6565 West Loop South, Suite 560, Bellaire, TX 77401

713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t

0 Revisions:

IS

S

U E

D F

O R

B

ID

D

IN

G

C O

N S

TR

U

C

TI

O N

Drawing Number

DrawnChecked

Dwg. of Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

VA FORM 08-6231

Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Drawing Title

Approved: Project Director

Project Title

Location

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Building Number

B100

Project Number

Office of

Construction and Facilities

Management

V eterans Affairs P alo Alto Heal th Ca re Sy stem

S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"

AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem

D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED

T exas Reg. No.G FE Project No.F-571213060

Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18

GI-123

FIRST FLOOR - CONSTRUCTION

PHASING PLAN

CONSTRUCT SPINAL CORD

INJURY BED EXPANSION

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

#580 - 320

0' 16' 24'8'4' 1/16" = 1'-0"

FIRST FLOOR CONSTRUCTION PHASING PLAN

E1

PLAN INDICATES PHASE 2 CONSTRUCTION AND

PHASE 3 DEMOLITION AFTER PHASE 2

CONSTRUCTION IS COMPLETED AND OCCUPIED.

PHASE 3 WILL NOT COMMENCE UNTIL PHASE 2 IS

COMPLETED, SYSTEMS VERIFIED, FURNITURE AND

EQUIPMENT INSTALLED, MOVE IN COMPLETED

AND VACATED PHASE 3 SPACE DECOMMISSIONED

BY THE V.A. VERIFY DURATION BETWEEN

CONSTRUCTION PHASES WITH VA-COR.

.C

PHASE 1

COMPLETED

PHASE 1

COMPLETED

PHASE 4

DEMOLITION

PHASE 2

COMPLETED

PHASE 3

CONSTRUCTION

REFER TO MEP

DRAWINGS FOR

PHASING OF WORK AT

MECHANICAL ROOM

REFER TO MEP

DRAWINGS FOR

PHASING OF WORK AT

MECHANICAL ROOM

A. REFER TO COVER SHEET GI-001 FOR PROJECT GENERAL NOTES

B. GENERAL CONTRACTOR TO COORDINATE EXACT BOUNDARY OF DEMOLITION WITH VA. COR

AND CONSTRUCTION SCOPE OF WORK.

C. VA. COR TO DETERMINE TIME PERIOD BETWEEN PHASE COMPLETION AND DIRECTION TO

PROCEED TO NEXT PHASE. SUBSEQUENT CONSTRUCTION PHASES CANNOT COMMENCE

UNTIL CONSTRUCTION OF A CURRENT PHASE IS COMPLETED, SYSTEMS VERIFIED,

ACTIVATED, FURNITURE AND EQUIPMENT INSTALLED AND PATIENTS MOVED IN VACATING THE

CONSTRUCTION AREA FOR THE NEXT PHASE. ONCE VACATED, SPACE MUST BE

DECOMMISSIONED, WITH FURNITURE AND EQUIPMENT REMOVED PRIOR TO TURNING SPACE

OVER TO THE CONTRACTOR AND ISSUING DIRECTION TO PROCEED FOR THE NEXT SPACE.

CONSTRUCTION PHASING GENERAL NOTES

TEMPORARY CONSTRUCTION ACCESS TO COURTYARD FOR ADDITION

CONSTRUCTION. GENERAL CONTRACTOR MAY PROPOSE ALTERNATE ACCESS

ROUTES TO BE CONSIDERED BY VA-COR FOR APPROVAL. CONTRACTOR TO

RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER

TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER

CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED. ALL ADJACENT

OCCUPIED SPACES SHALL MAINTAIN TWO EGRESS ROUTES AT ALL TIMES DURING

CONSTRUCTION. COORDINATE WITH VA

CONSTRUCTION PHASING LEGEND

100-83 1G1H

100-84

1K 100-85

100-80 1D

100-79 1C

100-78 1B

100-77 1A

100-82 1F 1E

100-81

KEY PLAN

ADDITION

PHASE #1 ----------------------------------- 35 BEDS

PHASE #2 ----------------------------------- 40 BEDS

PHASE #3 ----------------------------------- 38 BEDS

PHASE #4 ----------------------------------- 36 BEDS

CONSTRUCTION COMPLETION ------------- 50 BEDS

BASE BID DURING CONSTRUCTION BED COUNT

6565 West Loop South, Suite 560, Bellaire, TX 77401

713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t

0 Revisions:

IS

S

U E

D F

O R

B

ID

D

IN

G

C O

N S

TR

U

C

TI

O N

Drawing Number

DrawnChecked

Dwg. of Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

VA FORM 08-6231

Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Drawing Title

Approved: Project Director

Project Title

Location

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Building Number

B100

Project Number

Office of

Construction and Facilities

Management

V eterans Affairs P alo Alto Heal th Ca re Sy stem

S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"

AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem

D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED

T exas Reg. No.G FE Project No.F-571213060

Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18

GI-124

FIRST FLOOR - CONSTRUCTION

PHASING PLAN

CONSTRUCT SPINAL CORD

INJURY BED EXPANSION

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

#580 - 320

0' 16' 24'8'4' 1/16" = 1'-0"

DEMOLITION AND CONSTRUCTION PHASING PLAN

E1

PLAN INDICATES PHASE 3 CONSTRUCTION AND

PHASE 4 DEMOLITION AFTER PHASE 3

CONSTRUCTION IS COMPLETED AND OCCUPIED.

PHASE 4 WILL NOT COMMENCE UNTIL PHASE 3 IS

COMPLETED, SYSTEMS VERIFIED, FURNITURE

AND EQUIPMENT INSTALLED, MOVE IN

COMPLETED AND VACATED PHASE 4 SPACE

DECOMMISSIONED BY THE V.A. VERIFY

DURATION BETWEEN CONSTRUCTION PHASES

WITH VA-COR.

.C

PHASE 1A

COMPLETED

PHASE 1B

COMPLETED

PHASE 4

CONSTRUCTION

PHASE 2

COMPLETEDPHASE 3

COMPLETED

REFER TO MEP

DRAWINGS FOR

PHASING OF WORK AT

MECHANICAL ROOM

REFER TO MEP

DRAWINGS FOR

PHASING OF WORK AT

MECHANICAL ROOM

A. REFER TO COVER SHEET GI-001 FOR PROJECT GENERAL NOTES

B. GENERAL CONTRACTOR TO COORDINATE EXACT BOUNDARY OF DEMOLITION WITH VA. COR

AND CONSTRUCTION SCOPE OF WORK.

C. VA. COR TO DETERMINE TIME PERIOD BETWEEN PHASE COMPLETION AND DIRECTION TO

PROCEED TO NEXT PHASE. SUBSEQUENT CONSTRUCTION PHASES CANNOT COMMENCE

UNTIL CONSTRUCTION OF A CURRENT PHASE IS COMPLETED, SYSTEMS VERIFIED,

ACTIVATED, FURNITURE AND EQUIPMENT INSTALLED AND PATIENTS MOVED IN VACATING THE

CONSTRUCTION AREA FOR THE NEXT PHASE. ONCE VACATED, SPACE MUST BE

DECOMMISSIONED, WITH FURNITURE AND EQUIPMENT REMOVED PRIOR TO TURNING SPACE

OVER TO THE CONTRACTOR AND ISSUING DIRECTION TO PROCEED FOR THE NEXT SPACE.

CONSTRUCTION PHASING GENERAL NOTES

TEMPORARY CONSTRUCTION ACCESS TO COURTYARD FOR ADDITION

CONSTRUCTION. GENERAL CONTRACTOR MAY PROPOSE ALTERNATE ACCESS

ROUTES TO BE CONSIDERED BY VA-COR FOR APPROVAL. CONTRACTOR TO

RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER

TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER

CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED. ALL ADJACENT

OCCUPIED SPACES SHALL MAINTAIN TWO EGRESS ROUTES AT ALL TIMES DURING

CONSTRUCTION. COORDINATE WITH VA

CONSTRUCTION PHASING LEGEND

100-83 1G1H

100-84

1K 100-85

100-80 1D

100-79 1C

100-78 1B

100-77 1A

100-82 1F 1E

100-81

KEY PLAN

ADDITION

PHASE #1 ----------------------------------- 35 BEDS

PHASE #2 ----------------------------------- 40 BEDS

PHASE #3 ----------------------------------- 38 BEDS

PHASE #4 ----------------------------------- 36 BEDS

CONSTRUCTION COMPLETION ------------- 50 BEDS

BASE BID DURING CONSTRUCTION BED COUNT

6565 West Loop South, Suite 560, Bellaire, TX 77401

713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t

0 Revisions:

IS

S

U E

D F

O R

B

ID

D

IN

G

C O

N S

TR

U

C

TI

O N

Drawing Number

DrawnChecked

Dwg. of Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

VA FORM 08-6231

Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Drawing Title

Approved: Project Director

Project Title

Location

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Building Number

B100

Project Number

Office of

Construction and Facilities

Management

V eterans Affairs P alo Alto Heal th Ca re Sy stem

S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"

AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem

D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED

T exas Reg. No.G FE Project No.F-571213060

Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18

GI-125

FIRST FLOOR - CONSTRUCTION

PHASING PLAN

CONSTRUCT SPINAL CORD

INJURY BED EXPANSION

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

#580 - 320

0' 16' 24'8'4' 1/16" = 1'-0"

FIRST FLOOR CONSTRUCTION PHASING PLAN

PLAN INDICATES PHASE 4 CONSTRUCTION

w c w c w c

88 SF

CORR.

1B-212A?

1B 1A

BEDS

EXISTING BEDS

BEDS BEDSBID

O

PTIO

N

2-

A

BID OPTION 2-B 2 HOUR

FIRE PARTITION TO BE

CONSTRUCTED AS PART

OF CONSTRUCTION

CONTRACT WHETHER

BASE OR WITH ANY OR

ALL OPTIONS

BID

O

PTIO

N #3-A

BID OPTION #1-B

1B-417

1B-410

1B-432

BID OPTION #1-A

BID OPTION #1-D

BID OPTION #1-C

BID OPTION #1-F

1B-411

BID OPTION #1-G

TYPICAL ALL

PATIENT

ROOMS

1-A. EXISTING INTERNET CAFE TO REMAIN AS INDICATED ON PLAN. EXISTING CURTAIN WALL

LOCATED BETWEEN INTERNET CAFE AND PROPOSED BREAK ROOM TO BE REMOVED.

PROVIDE NEW SMOKE PARTITION IN SAME LOCATION AS THE CURTAIN WALL BEING

REMOVED.

1-B. SCHEDULED MILLWORK FOR NURSE STATION ROOM 1B-417 TO BE DELETED FROM

SCOPE OF WORK. SCHEDULED ELECTRICAL & DATA OUTLETS TO REMAIN AS PART OF

WORK.

1-C. SCHEDULED MILLWORK FOR SECRETARY ROOM 1B-432 TO BE DELETED FROM SCOPE

OF WORK. SCHEDULED ELECTRICAL & DATA OUTLETS TO BE INSTALLED AT EAST WALL

OF SPACE. ELIMINATE SCHEDULED FUR DOWN AND CONTINUE SCHEDULED CEILING IN

C1B-119 INTO RECEPTION SPACE.

1-D. DELETE 3 FORM MATERIAL AND ASSOCIATED STAND OFFS FROM MILLWORK SHOWN ON

SHEET AE-213 DETAIL D1 FOR RECEPTION 1B-410. DELETE LED ELECTRICAL LIGHTING &

ASSOCIATED ELECTRICAL POWER AND SWITCHES.

1-E. RELOCATION OF EXISTING INTERIOR INTERNET CAFE FIXED GLAZING AND HORIZONTAL

AUTOMATIC SLIDING GLASS DOOR SYSTEMS TO BE DELETED. RELOCATE EXISTING

DAYROOM HORIZONTAL AUTOMATIC SLIDING GLASS DOOR AT OPENING FOR DELETED

DOOR. EXTEND PARTITION CONSTRUCTION TO CLOSE OPENING AT DELETED FIXED

GLAZING. PROVIDE HR-1 HANDRAIL & CRASHRAIL @ HALLWAY WALL SURFACES

1-F. WORK INCLUDES INSTALLATION OF 2 HOUR FIRE SMOKE PARTITION SCHEDULED

AT EAST END OF 1B SPACE, CONTINUING AS SHOWN INCLUDING THROUGH BOTH 1B AND

ADDITION SPACES CONSTRUCTED WHETHER OR NOT ANY DEDUCT IS TAKEN.

1-G. REFER TO AE-221 FOR BASE BID PATIENT ROOM FINISH TRIM AT HEADWALL. REFER TO

AE-222 FOR PATIENT ROOM HEAD WALL CONSTRUCTION TO BE BUILT WITH DEDUCT

OPTION #1.

1-H. DELETE LVT-3 FINISH AS PART OF THIS DEDUCT. EXPAND ADJACENT LVT-2 FINISH INTO

DELETED LTV-3 AREAS. SEE IN-101, IN-102 & IN-103 FOR LVT FLOOR PATTERNS.

BID DEDUCT OPTION #1 DESCRIPTION

BID DEDUCT OPTION #2 DESCRIPTION

2-A. REMOVE PHASE 4 FROM SCOPE OF WORK WITH EXCEPTION TO HVAC & CEILING.

REMOVE EXISTING AND PROVIDE NEW HVAC SYSTEM TO ROOMS AS SCHEDULED AND

NEW ACOUSTICAL CEILING SYSTEM IN PATIENT ROOM. REINSTALL EXISTING CURTAIN

TRACKS, LIGHT FIXTURES AND OTHER EXISTING CEILING MOUNTED FIXTURES AND

ACCESSORIES. PATCH, REPAIR AND PAINT PATIENT ROOM TOILET CEILINGS AFFECTED

BY CONSTRUCTION.

2-B. PROVIDE AND INSTALL SCHEDULED 2 HOUR FIRE PARTITION AS SHOWN FROM EXTERIOR

WALL, THROUGH PATIENT ROOM AND ACROSS HALLWAY TO ALIGN W/ 2 HOUR FIRE

SMOKE PARTITION AT CLINIC CONSTRUCTION. 2HR FIRE PARTITION IS TO BE

CONSTRUCTED WHETHER OR NOT DEDUCT IS TAKEN. LOCATION VARIES W/ DEDUCT

AND IS CONSTRUCTED AS PART OF EXISTING PARTITION. EXTEND TO UNDERSIDE OF

INTERSTITIAL DECK ABOVE. FIELD VERIFY DOUBLE EGRESS DOOR LOCATION TO ALLOW

DOORS TO BE ON MAGNETIC HOLD OPENS W/O OBSTRUCTING ACCESS TO ADJACENT

ROOMS. PROVIDE CLOSERS W/ GREATER SWING ANGLE AS NEED. RELOCATE EXISTING

AND ADJACENT STORAGE ROOM DOOR IF NEEDED.

100-83 1G1H

100-84

1K 100-85

100-80 1D

100-79 1C

100-78 1B

100-77 1A

100-82 1F 1E

100-81

KEY PLAN

ADDITION

BID DEDUCT OPTION #3 DESCRIPTION

3-A. REMOVE PHASE 3 FROM SCOPE OF WORK WITH EXCEPTION TO HVAC & CEILING.

REMOVE EXISTING AND PROVIDE NEW HVAC SYSTEM TO ROOMS AS SCHEDULED AND

NEW ACOUSTICAL CEILING IN PATIENT ROOM. REINSTALL EXISTING CURTAIN TRACKS,

LIGHT FIXTURES AND OTHER EXISTING CEILING MOUNTED FIXTURES AND

ACCESSORIES. PATCH, REPAIR AND PAINT PATIENT ROOM TOILET CEILINGS

AFFECTED BY CONSTRUCTION.

BASE BID ----------------------------------- 50 BEDS TOTAL

BID OPTION #1 ----------------------------------- 50 BEDS TOTAL

BID OPTION #2 ----------------------------------- 51 BEDS TOTAL

BID OPTION #3 ----------------------------------- 51 BEDS TOTAL

BED COUNT - TOTALS PER OPTION

6565 West Loop South, Suite 560, Bellaire, TX 77401

713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t

0 Revisions:

IS

S

U E

D F

O R

B

ID

D

IN

G

C O

N S

TR

U

C

TI

O N

Drawing Number

DrawnChecked

Dwg. of Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

VA FORM 08-6231

Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Drawing Title

Approved: Project Director

Project Title

Location

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Building Number

B100

Project Number

Office of

Construction and Facilities

Management

V eterans Affairs P alo Alto Heal th Ca re Sy stem

S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"

AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem

D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED

T exas Reg. No.G FE Project No.F-571213060

Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18

GI-130

DESIGN ALTERNATES - ARCHITECTURE CONSTRUCT SPINAL CORD

INJURY BED EXPANSION

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

#580 - 320

0' 16' 24'8'4' 1/16" = 1'-0"

BID DEDUCT OPTIONS PLAN