36C25619R0073-006.pdf
PDF 18 MB Posted
- Attached to
- 580-320 Construct Spinal Cord Injury Expansion Federal contract opportunity
- Solicitation number
- 36C25619R0073
About this file
36C25619R0073 ATTACHMENT E - Project Drawings Part 2 - Dated 6-8-18 - 16 pages.pdf
View the file
Other files for this federal contract opportunity
Show all 50
580-320 Construct Spinal Cord Injury Expansion has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
w c w c w c
PHASE 1A
DEMOLITION
REFER TO
SHEET AD-101
PHASE 1B
DEMOLITION
REFER TO SHEET AD-102
PHASE 4 PHASE 2PHASE 3
REFER TO MEP
DRAWINGS FOR
PHASING OF WORK AT
MECHANICAL ROOM
EXISTING
COURTYARD
CONSTRUCTION
ACCESS
A. REFER TO COVER SHEET GI-001 FOR PROJECT GENERAL NOTES
B. GENERAL CONTRACTOR TO COORDINATE EXACT BOUNDARY OF DEMOLITION WITH VA. COR
AND CONSTRUCTION SCOPE OF WORK.
C. VA. COR TO DETERMINE TIME PERIOD BETWEEN PHASE COMPLETION AND DIRECTION TO
PROCEED TO NEXT PHASE. SUBSEQUENT CONSTRUCTION PHASES CANNOT COMMENCE
UNTIL CONSTRUCTION OF A CURRENT PHASE IS COMPLETED, SYSTEMS VERIFIED,
ACTIVATED, FURNITURE AND EQUIPMENT INSTALLED AND PATIENTS MOVED IN VACATING THE
CONSTRUCTION AREA FOR THE NEXT PHASE. ONCE VACATED, SPACE MUST BE
DECOMMISSIONED, WITH FURNITURE AND EQUIPMENT REMOVED PRIOR TO TURNING SPACE
OVER TO THE CONTRACTOR AND ISSUING DIRECTION TO PROCEED FOR THE NEXT SPACE.
CONSTRUCTION PHASING GENERAL NOTES
TEMPORARY CONSTRUCTION ACCESS TO COURTYARD FOR ADDITION
CONSTRUCTION. GENERAL CONTRACTOR MAY PROPOSE ALTERNATE ACCESS
ROUTES TO BE CONSIDERED BY VA-COR FOR APPROVAL. CONTRACTOR TO
RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER
TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER
CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED. ALL ADJACENT
OCCUPIED SPACES SHALL MAINTAIN TWO EGRESS ROUTES AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH VA
CONSTRUCTION PHASING LEGEND
100-83 1G1H
100-84
1K 100-85
100-80 1D
100-79 1C
100-78 1B
100-77 1A
100-82 1F 1E
100-81
KEY PLAN
ADDITION
PHASE #1 ----------------------------------- 35 BEDS
PHASE #2 ----------------------------------- 40 BEDS
PHASE #3 ----------------------------------- 38 BEDS
PHASE #4 ----------------------------------- 36 BEDS
CONSTRUCTION COMPLETION ------------- 50 BEDS
BASE BID DURING CONSTRUCTION BED COUNT
6565 West Loop South, Suite 560, Bellaire, TX 77401
713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t
0 Revisions:
IS
S
U E
D F
O R
B
ID
D
IN
G
C O
N S
TR
U
C
TI
O N
Drawing Number
DrawnChecked
Dwg. of Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Drawing Title
Approved: Project Director
Project Title
Location
Date
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Building Number
B100
Project Number
Office of
Construction and Facilities
Management
V eterans Affairs P alo Alto Heal th Ca re Sy stem
S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"
AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem
D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED
T exas Reg. No.G FE Project No.F-571213060
Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18
GI-121
FIRST FLOOR - CONSTRUCTION
PHASING PLAN
CONSTRUCT SPINAL CORD
INJURY BED EXPANSION
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
#580 - 320
0' 16' 24'8'4' 1/16" = 1'-0"
DEMOLITION AND CONSTRUCTION PHASING PLAN
E1
PLAN INDICATES PHASE 1 DEMOLITION
F .E
.C
PHASE 1
CONSTRUCTION
PHASE 1
CONSTRUCTION
PHASE 4 PHASE 2
DEMOLITION
PHASE 3
REFER TO MEP
DRAWINGS FOR
PHASING OF WORK AT
MECHANICAL ROOM
REFER TO MEP
DRAWINGS FOR
PHASING OF WORK AT
MECHANICAL ROOM
A. REFER TO COVER SHEET GI-001 FOR PROJECT GENERAL NOTES
B. GENERAL CONTRACTOR TO COORDINATE EXACT BOUNDARY OF DEMOLITION WITH VA. COR
AND CONSTRUCTION SCOPE OF WORK.
C. VA. COR TO DETERMINE TIME PERIOD BETWEEN PHASE COMPLETION AND DIRECTION TO
PROCEED TO NEXT PHASE. SUBSEQUENT CONSTRUCTION PHASES CANNOT COMMENCE
UNTIL CONSTRUCTION OF A CURRENT PHASE IS COMPLETED, SYSTEMS VERIFIED,
ACTIVATED, FURNITURE AND EQUIPMENT INSTALLED AND PATIENTS MOVED IN VACATING THE
CONSTRUCTION AREA FOR THE NEXT PHASE. ONCE VACATED, SPACE MUST BE
DECOMMISSIONED, WITH FURNITURE AND EQUIPMENT REMOVED PRIOR TO TURNING SPACE
OVER TO THE CONTRACTOR AND ISSUING DIRECTION TO PROCEED FOR THE NEXT SPACE.
CONSTRUCTION PHASING GENERAL NOTES
TEMPORARY CONSTRUCTION ACCESS TO COURTYARD FOR ADDITION
CONSTRUCTION. GENERAL CONTRACTOR MAY PROPOSE ALTERNATE ACCESS
ROUTES TO BE CONSIDERED BY VA-COR FOR APPROVAL. CONTRACTOR TO
RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER
TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER
CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED. ALL ADJACENT
OCCUPIED SPACES SHALL MAINTAIN TWO EGRESS ROUTES AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH VA
CONSTRUCTION PHASING LEGEND
100-83 1G1H
100-84
1K 100-85
100-80 1D
100-79 1C
100-78 1B
100-77 1A
100-82 1F 1E
100-81
KEY PLAN
ADDITION
PHASE #1 ----------------------------------- 35 BEDS
PHASE #2 ----------------------------------- 40 BEDS
PHASE #3 ----------------------------------- 38 BEDS
PHASE #4 ----------------------------------- 36 BEDS
CONSTRUCTION COMPLETION ------------- 50 BEDS
BASE BID DURING CONSTRUCTION BED COUNT
6565 West Loop South, Suite 560, Bellaire, TX 77401
713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t
0 Revisions:
IS
S
U E
D F
O R
B
ID
D
IN
G
C O
N S
TR
U
C
TI
O N
Drawing Number
DrawnChecked
Dwg. of Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Drawing Title
Approved: Project Director
Project Title
Location
Date
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Building Number
B100
Project Number
Office of
Construction and Facilities
Management
V eterans Affairs P alo Alto Heal th Ca re Sy stem
S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"
AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem
D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED
T exas Reg. No.G FE Project No.F-571213060
Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18
GI-122
FIRST FLOOR - CONSTRUCTION
PHASING PLAN
CONSTRUCT SPINAL CORD
INJURY BED EXPANSION
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
#580 - 320
0' 16' 24'8'4' 1/16" = 1'-0"
DEMOLITION AND CONSTRUCTION PHASING PLAN
E1
PLAN INDICATES PHASE 1 CONSTRUCTION AND
PHASE 2 DEMOLITION AFTER PHASE 1
CONSTRUCTION IS COMPLETED AND OCCUPIED.
PHASE 2 WILL NOT COMMENCE UNTIL PHASE 1 IS
COMPLETED, SYSTEMS VERIFIED, FURNITURE
AND EQUIPMENT INSTALLED, MOVE IN
COMPLETED AND VACATED PHASE 2 SPACE
DECOMMISSIONED BY THE V.A. VERIFY DURATION
BETWEEN CONSTRUCTION PHASES WITH VA-
COR.
.C
PHASE 1
COMPLETED
PHASE 1
COMPLETED
PHASE 4 PHASE 2
CONSTRUCTION
PHASE 3
DEMOLITION
REFER TO MEP
DRAWINGS FOR
PHASING OF WORK AT
MECHANICAL ROOM
REFER TO MEP
DRAWINGS FOR
PHASING OF WORK AT
MECHANICAL ROOM
A. REFER TO COVER SHEET GI-001 FOR PROJECT GENERAL NOTES
B. GENERAL CONTRACTOR TO COORDINATE EXACT BOUNDARY OF DEMOLITION WITH VA. COR
AND CONSTRUCTION SCOPE OF WORK.
C. VA. COR TO DETERMINE TIME PERIOD BETWEEN PHASE COMPLETION AND DIRECTION TO
PROCEED TO NEXT PHASE. SUBSEQUENT CONSTRUCTION PHASES CANNOT COMMENCE
UNTIL CONSTRUCTION OF A CURRENT PHASE IS COMPLETED, SYSTEMS VERIFIED,
ACTIVATED, FURNITURE AND EQUIPMENT INSTALLED AND PATIENTS MOVED IN VACATING THE
CONSTRUCTION AREA FOR THE NEXT PHASE. ONCE VACATED, SPACE MUST BE
DECOMMISSIONED, WITH FURNITURE AND EQUIPMENT REMOVED PRIOR TO TURNING SPACE
OVER TO THE CONTRACTOR AND ISSUING DIRECTION TO PROCEED FOR THE NEXT SPACE.
CONSTRUCTION PHASING GENERAL NOTES
TEMPORARY CONSTRUCTION ACCESS TO COURTYARD FOR ADDITION
CONSTRUCTION. GENERAL CONTRACTOR MAY PROPOSE ALTERNATE ACCESS
ROUTES TO BE CONSIDERED BY VA-COR FOR APPROVAL. CONTRACTOR TO
RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER
TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER
CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED. ALL ADJACENT
OCCUPIED SPACES SHALL MAINTAIN TWO EGRESS ROUTES AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH VA
CONSTRUCTION PHASING LEGEND
100-83 1G1H
100-84
1K 100-85
100-80 1D
100-79 1C
100-78 1B
100-77 1A
100-82 1F 1E
100-81
KEY PLAN
ADDITION
PHASE #1 ----------------------------------- 35 BEDS
PHASE #2 ----------------------------------- 40 BEDS
PHASE #3 ----------------------------------- 38 BEDS
PHASE #4 ----------------------------------- 36 BEDS
CONSTRUCTION COMPLETION ------------- 50 BEDS
BASE BID DURING CONSTRUCTION BED COUNT
6565 West Loop South, Suite 560, Bellaire, TX 77401
713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t
0 Revisions:
IS
S
U E
D F
O R
B
ID
D
IN
G
C O
N S
TR
U
C
TI
O N
Drawing Number
DrawnChecked
Dwg. of Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Drawing Title
Approved: Project Director
Project Title
Location
Date
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Building Number
B100
Project Number
Office of
Construction and Facilities
Management
V eterans Affairs P alo Alto Heal th Ca re Sy stem
S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"
AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem
D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED
T exas Reg. No.G FE Project No.F-571213060
Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18
GI-123
FIRST FLOOR - CONSTRUCTION
PHASING PLAN
CONSTRUCT SPINAL CORD
INJURY BED EXPANSION
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
#580 - 320
0' 16' 24'8'4' 1/16" = 1'-0"
FIRST FLOOR CONSTRUCTION PHASING PLAN
E1
PLAN INDICATES PHASE 2 CONSTRUCTION AND
PHASE 3 DEMOLITION AFTER PHASE 2
CONSTRUCTION IS COMPLETED AND OCCUPIED.
PHASE 3 WILL NOT COMMENCE UNTIL PHASE 2 IS
COMPLETED, SYSTEMS VERIFIED, FURNITURE AND
EQUIPMENT INSTALLED, MOVE IN COMPLETED
AND VACATED PHASE 3 SPACE DECOMMISSIONED
BY THE V.A. VERIFY DURATION BETWEEN
CONSTRUCTION PHASES WITH VA-COR.
.C
PHASE 1
COMPLETED
PHASE 1
COMPLETED
PHASE 4
DEMOLITION
PHASE 2
COMPLETED
PHASE 3
CONSTRUCTION
REFER TO MEP
DRAWINGS FOR
PHASING OF WORK AT
MECHANICAL ROOM
REFER TO MEP
DRAWINGS FOR
PHASING OF WORK AT
MECHANICAL ROOM
A. REFER TO COVER SHEET GI-001 FOR PROJECT GENERAL NOTES
B. GENERAL CONTRACTOR TO COORDINATE EXACT BOUNDARY OF DEMOLITION WITH VA. COR
AND CONSTRUCTION SCOPE OF WORK.
C. VA. COR TO DETERMINE TIME PERIOD BETWEEN PHASE COMPLETION AND DIRECTION TO
PROCEED TO NEXT PHASE. SUBSEQUENT CONSTRUCTION PHASES CANNOT COMMENCE
UNTIL CONSTRUCTION OF A CURRENT PHASE IS COMPLETED, SYSTEMS VERIFIED,
ACTIVATED, FURNITURE AND EQUIPMENT INSTALLED AND PATIENTS MOVED IN VACATING THE
CONSTRUCTION AREA FOR THE NEXT PHASE. ONCE VACATED, SPACE MUST BE
DECOMMISSIONED, WITH FURNITURE AND EQUIPMENT REMOVED PRIOR TO TURNING SPACE
OVER TO THE CONTRACTOR AND ISSUING DIRECTION TO PROCEED FOR THE NEXT SPACE.
CONSTRUCTION PHASING GENERAL NOTES
TEMPORARY CONSTRUCTION ACCESS TO COURTYARD FOR ADDITION
CONSTRUCTION. GENERAL CONTRACTOR MAY PROPOSE ALTERNATE ACCESS
ROUTES TO BE CONSIDERED BY VA-COR FOR APPROVAL. CONTRACTOR TO
RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER
TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER
CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED. ALL ADJACENT
OCCUPIED SPACES SHALL MAINTAIN TWO EGRESS ROUTES AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH VA
CONSTRUCTION PHASING LEGEND
100-83 1G1H
100-84
1K 100-85
100-80 1D
100-79 1C
100-78 1B
100-77 1A
100-82 1F 1E
100-81
KEY PLAN
ADDITION
PHASE #1 ----------------------------------- 35 BEDS
PHASE #2 ----------------------------------- 40 BEDS
PHASE #3 ----------------------------------- 38 BEDS
PHASE #4 ----------------------------------- 36 BEDS
CONSTRUCTION COMPLETION ------------- 50 BEDS
BASE BID DURING CONSTRUCTION BED COUNT
6565 West Loop South, Suite 560, Bellaire, TX 77401
713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t
0 Revisions:
IS
S
U E
D F
O R
B
ID
D
IN
G
C O
N S
TR
U
C
TI
O N
Drawing Number
DrawnChecked
Dwg. of Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Drawing Title
Approved: Project Director
Project Title
Location
Date
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Building Number
B100
Project Number
Office of
Construction and Facilities
Management
V eterans Affairs P alo Alto Heal th Ca re Sy stem
S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"
AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem
D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED
T exas Reg. No.G FE Project No.F-571213060
Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18
GI-124
FIRST FLOOR - CONSTRUCTION
PHASING PLAN
CONSTRUCT SPINAL CORD
INJURY BED EXPANSION
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
#580 - 320
0' 16' 24'8'4' 1/16" = 1'-0"
DEMOLITION AND CONSTRUCTION PHASING PLAN
E1
PLAN INDICATES PHASE 3 CONSTRUCTION AND
PHASE 4 DEMOLITION AFTER PHASE 3
CONSTRUCTION IS COMPLETED AND OCCUPIED.
PHASE 4 WILL NOT COMMENCE UNTIL PHASE 3 IS
COMPLETED, SYSTEMS VERIFIED, FURNITURE
AND EQUIPMENT INSTALLED, MOVE IN
COMPLETED AND VACATED PHASE 4 SPACE
DECOMMISSIONED BY THE V.A. VERIFY
DURATION BETWEEN CONSTRUCTION PHASES
WITH VA-COR.
.C
PHASE 1A
COMPLETED
PHASE 1B
COMPLETED
PHASE 4
CONSTRUCTION
PHASE 2
COMPLETEDPHASE 3
COMPLETED
REFER TO MEP
DRAWINGS FOR
PHASING OF WORK AT
MECHANICAL ROOM
REFER TO MEP
DRAWINGS FOR
PHASING OF WORK AT
MECHANICAL ROOM
A. REFER TO COVER SHEET GI-001 FOR PROJECT GENERAL NOTES
B. GENERAL CONTRACTOR TO COORDINATE EXACT BOUNDARY OF DEMOLITION WITH VA. COR
AND CONSTRUCTION SCOPE OF WORK.
C. VA. COR TO DETERMINE TIME PERIOD BETWEEN PHASE COMPLETION AND DIRECTION TO
PROCEED TO NEXT PHASE. SUBSEQUENT CONSTRUCTION PHASES CANNOT COMMENCE
UNTIL CONSTRUCTION OF A CURRENT PHASE IS COMPLETED, SYSTEMS VERIFIED,
ACTIVATED, FURNITURE AND EQUIPMENT INSTALLED AND PATIENTS MOVED IN VACATING THE
CONSTRUCTION AREA FOR THE NEXT PHASE. ONCE VACATED, SPACE MUST BE
DECOMMISSIONED, WITH FURNITURE AND EQUIPMENT REMOVED PRIOR TO TURNING SPACE
OVER TO THE CONTRACTOR AND ISSUING DIRECTION TO PROCEED FOR THE NEXT SPACE.
CONSTRUCTION PHASING GENERAL NOTES
TEMPORARY CONSTRUCTION ACCESS TO COURTYARD FOR ADDITION
CONSTRUCTION. GENERAL CONTRACTOR MAY PROPOSE ALTERNATE ACCESS
ROUTES TO BE CONSIDERED BY VA-COR FOR APPROVAL. CONTRACTOR TO
RESTORE ALL CONSTRUCTION AND FINISHES USED FOR ACCESS AND TURN OVER
TO VA FOR USE AS SOON AS ACCESS IS NO LONGER NEEDED BUT IN NO CASE AFTER
CONSTRUCTION PHASE REQUIRING ACCESS IS COMPLETED. ALL ADJACENT
OCCUPIED SPACES SHALL MAINTAIN TWO EGRESS ROUTES AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH VA
CONSTRUCTION PHASING LEGEND
100-83 1G1H
100-84
1K 100-85
100-80 1D
100-79 1C
100-78 1B
100-77 1A
100-82 1F 1E
100-81
KEY PLAN
ADDITION
PHASE #1 ----------------------------------- 35 BEDS
PHASE #2 ----------------------------------- 40 BEDS
PHASE #3 ----------------------------------- 38 BEDS
PHASE #4 ----------------------------------- 36 BEDS
CONSTRUCTION COMPLETION ------------- 50 BEDS
BASE BID DURING CONSTRUCTION BED COUNT
6565 West Loop South, Suite 560, Bellaire, TX 77401
713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t
0 Revisions:
IS
S
U E
D F
O R
B
ID
D
IN
G
C O
N S
TR
U
C
TI
O N
Drawing Number
DrawnChecked
Dwg. of Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Drawing Title
Approved: Project Director
Project Title
Location
Date
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Building Number
B100
Project Number
Office of
Construction and Facilities
Management
V eterans Affairs P alo Alto Heal th Ca re Sy stem
S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"
AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem
D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED
T exas Reg. No.G FE Project No.F-571213060
Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18
GI-125
FIRST FLOOR - CONSTRUCTION
PHASING PLAN
CONSTRUCT SPINAL CORD
INJURY BED EXPANSION
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
#580 - 320
0' 16' 24'8'4' 1/16" = 1'-0"
FIRST FLOOR CONSTRUCTION PHASING PLAN
PLAN INDICATES PHASE 4 CONSTRUCTION
w c w c w c
88 SF
CORR.
1B-212A?
1B 1A
BEDS
EXISTING BEDS
BEDS BEDSBID
O
PTIO
N
2-
A
BID OPTION 2-B 2 HOUR
FIRE PARTITION TO BE
CONSTRUCTED AS PART
OF CONSTRUCTION
CONTRACT WHETHER
BASE OR WITH ANY OR
ALL OPTIONS
BID
O
PTIO
N #3-A
BID OPTION #1-B
1B-417
1B-410
1B-432
BID OPTION #1-A
BID OPTION #1-D
BID OPTION #1-C
BID OPTION #1-F
1B-411
BID OPTION #1-G
TYPICAL ALL
PATIENT
ROOMS
1-A. EXISTING INTERNET CAFE TO REMAIN AS INDICATED ON PLAN. EXISTING CURTAIN WALL
LOCATED BETWEEN INTERNET CAFE AND PROPOSED BREAK ROOM TO BE REMOVED.
PROVIDE NEW SMOKE PARTITION IN SAME LOCATION AS THE CURTAIN WALL BEING
REMOVED.
1-B. SCHEDULED MILLWORK FOR NURSE STATION ROOM 1B-417 TO BE DELETED FROM
SCOPE OF WORK. SCHEDULED ELECTRICAL & DATA OUTLETS TO REMAIN AS PART OF
WORK.
1-C. SCHEDULED MILLWORK FOR SECRETARY ROOM 1B-432 TO BE DELETED FROM SCOPE
OF WORK. SCHEDULED ELECTRICAL & DATA OUTLETS TO BE INSTALLED AT EAST WALL
OF SPACE. ELIMINATE SCHEDULED FUR DOWN AND CONTINUE SCHEDULED CEILING IN
C1B-119 INTO RECEPTION SPACE.
1-D. DELETE 3 FORM MATERIAL AND ASSOCIATED STAND OFFS FROM MILLWORK SHOWN ON
SHEET AE-213 DETAIL D1 FOR RECEPTION 1B-410. DELETE LED ELECTRICAL LIGHTING &
ASSOCIATED ELECTRICAL POWER AND SWITCHES.
1-E. RELOCATION OF EXISTING INTERIOR INTERNET CAFE FIXED GLAZING AND HORIZONTAL
AUTOMATIC SLIDING GLASS DOOR SYSTEMS TO BE DELETED. RELOCATE EXISTING
DAYROOM HORIZONTAL AUTOMATIC SLIDING GLASS DOOR AT OPENING FOR DELETED
DOOR. EXTEND PARTITION CONSTRUCTION TO CLOSE OPENING AT DELETED FIXED
GLAZING. PROVIDE HR-1 HANDRAIL & CRASHRAIL @ HALLWAY WALL SURFACES
1-F. WORK INCLUDES INSTALLATION OF 2 HOUR FIRE SMOKE PARTITION SCHEDULED
AT EAST END OF 1B SPACE, CONTINUING AS SHOWN INCLUDING THROUGH BOTH 1B AND
ADDITION SPACES CONSTRUCTED WHETHER OR NOT ANY DEDUCT IS TAKEN.
1-G. REFER TO AE-221 FOR BASE BID PATIENT ROOM FINISH TRIM AT HEADWALL. REFER TO
AE-222 FOR PATIENT ROOM HEAD WALL CONSTRUCTION TO BE BUILT WITH DEDUCT
OPTION #1.
1-H. DELETE LVT-3 FINISH AS PART OF THIS DEDUCT. EXPAND ADJACENT LVT-2 FINISH INTO
DELETED LTV-3 AREAS. SEE IN-101, IN-102 & IN-103 FOR LVT FLOOR PATTERNS.
BID DEDUCT OPTION #1 DESCRIPTION
BID DEDUCT OPTION #2 DESCRIPTION
2-A. REMOVE PHASE 4 FROM SCOPE OF WORK WITH EXCEPTION TO HVAC & CEILING.
REMOVE EXISTING AND PROVIDE NEW HVAC SYSTEM TO ROOMS AS SCHEDULED AND
NEW ACOUSTICAL CEILING SYSTEM IN PATIENT ROOM. REINSTALL EXISTING CURTAIN
TRACKS, LIGHT FIXTURES AND OTHER EXISTING CEILING MOUNTED FIXTURES AND
ACCESSORIES. PATCH, REPAIR AND PAINT PATIENT ROOM TOILET CEILINGS AFFECTED
BY CONSTRUCTION.
2-B. PROVIDE AND INSTALL SCHEDULED 2 HOUR FIRE PARTITION AS SHOWN FROM EXTERIOR
WALL, THROUGH PATIENT ROOM AND ACROSS HALLWAY TO ALIGN W/ 2 HOUR FIRE
SMOKE PARTITION AT CLINIC CONSTRUCTION. 2HR FIRE PARTITION IS TO BE
CONSTRUCTED WHETHER OR NOT DEDUCT IS TAKEN. LOCATION VARIES W/ DEDUCT
AND IS CONSTRUCTED AS PART OF EXISTING PARTITION. EXTEND TO UNDERSIDE OF
INTERSTITIAL DECK ABOVE. FIELD VERIFY DOUBLE EGRESS DOOR LOCATION TO ALLOW
DOORS TO BE ON MAGNETIC HOLD OPENS W/O OBSTRUCTING ACCESS TO ADJACENT
ROOMS. PROVIDE CLOSERS W/ GREATER SWING ANGLE AS NEED. RELOCATE EXISTING
AND ADJACENT STORAGE ROOM DOOR IF NEEDED.
100-83 1G1H
100-84
1K 100-85
100-80 1D
100-79 1C
100-78 1B
100-77 1A
100-82 1F 1E
100-81
KEY PLAN
ADDITION
BID DEDUCT OPTION #3 DESCRIPTION
3-A. REMOVE PHASE 3 FROM SCOPE OF WORK WITH EXCEPTION TO HVAC & CEILING.
REMOVE EXISTING AND PROVIDE NEW HVAC SYSTEM TO ROOMS AS SCHEDULED AND
NEW ACOUSTICAL CEILING IN PATIENT ROOM. REINSTALL EXISTING CURTAIN TRACKS,
LIGHT FIXTURES AND OTHER EXISTING CEILING MOUNTED FIXTURES AND
ACCESSORIES. PATCH, REPAIR AND PAINT PATIENT ROOM TOILET CEILINGS
AFFECTED BY CONSTRUCTION.
BASE BID ----------------------------------- 50 BEDS TOTAL
BID OPTION #1 ----------------------------------- 50 BEDS TOTAL
BID OPTION #2 ----------------------------------- 51 BEDS TOTAL
BID OPTION #3 ----------------------------------- 51 BEDS TOTAL
BED COUNT - TOTALS PER OPTION
6565 West Loop South, Suite 560, Bellaire, TX 77401
713.432.1422 - Fax 713.432.1253 www.garnerfritsche.com th re e i n c h e s o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -e ig h ts i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t o n e -e ig h t in c h o n e f o o t
0 Revisions:
IS
S
U E
D F
O R
B
ID
D
IN
G
C O
N S
TR
U
C
TI
O N
Drawing Number
DrawnChecked
Dwg. of Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
Atriax, pllc 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Drawing Title
Approved: Project Director
Project Title
Location
Date
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Building Number
B100
Project Number
Office of
Construction and Facilities
Management
V eterans Affairs P alo Alto Heal th Ca re Sy stem
S cale: 1 "= 20'-0"S cale: 1-1 /2"= 1'-0"S cale: 1"= 1'-0"S cale: 3/ 32"= 1'-0"S cale: 1/ 16"= 1'-0"S cale: 3/ 16"= 1'-0"S cale: 3/ 4"= 1'-0"S cale: 3/ 8"= 1'-0"S cale: 1/ 2"= 1'-0"S cale: 1/ 4"= 1'-0"
AV P AHC SV eterans Affairs P alo Alto Heal th Ca re Sy stem
D ESIGN DEVE LO PM ENT - NO T FO R CO NSTRUCTIO NF ULLY SPR INKL ERED
T exas Reg. No.G FE Project No.F-571213060
Issued for Bidding & Construction 06/08/18 212AuthorChecker06/08/18
GI-130
DESIGN ALTERNATES - ARCHITECTURE CONSTRUCT SPINAL CORD
INJURY BED EXPANSION
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
#580 - 320
0' 16' 24'8'4' 1/16" = 1'-0"
BID DEDUCT OPTIONS PLAN
File details come from the government source that posted it.