This document is a set of Questions and Answers regarding Solicitation 36C25024Q0617 for a Roof Top Fall Protection project at the Cleveland VA Medical Center.
The key details are:
- A site visit will be scheduled for June 24, 2024 at 11 am at the Cleveland VA Medical Center.
- There is no specified budget amount, as pricing will be determined by the contracting offers.
- A technical write-up is required, which must include a critical fall protection detail plan, existing safety protocols, JHAs/SOPs, and the ability to use the VA's safety database. The project must be reviewed by a Certified Safety Professional.
- This is a Service-Disabled Veteran-Owned Small Business set-aside solicitation.
- Roof plans will be provided in a future amendment.
- The critical fall protection plan must be submitted prior to contract award, not just prior to the Notice to Proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25024Q0617 0011.docx | DOCX document | |
| 36C25024Q0617 0010.docx | DOCX document | |
| 36C25024Q0617 0009.docx | DOCX document | |
| 36C25024Q0617 0008.docx | DOCX document | |
| 36C25024Q0617 0007.docx | DOCX document | |
| 36C25024Q0617 0006.docx | DOCX document | |
| 36C25024Q0617 0005.docx | DOCX document | |
| 36C25024Q0617 0004.docx | DOCX document | |
| 36C25024Q0617 0003.docx | DOCX document | |
| 36C25024Q0617 0002.docx | DOCX document | |
| 36C25024Q0617 0001.docx | DOCX document | |
| P07. WAGE DETERMINATION LIST-2015-4727-REVISION 23.pdf | ||
| P07. WAGE DETERMINATION LIST-2015-4727-REVISION 22.pdf | ||
| 36C25024Q0617.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS REGARDING SOLICITATION 36C25024Q0617
1. Will a Site Visit be provided?
Answer: A site visit will be scheduled for Monday June 24th, 2024, at 11 am. Please gather at the Atrium Level by the front door at the Cleveland VA Medical Center Wade Park Campus (10701 East Blvd, Cleveland, Ohio 44106)
2. Is there a Budget amount for this project?
Answer: The pricing to complete this requirement will be determined by the contracting submitting a quote for evaluate.
3. Is there a Technical Write Up required with the proposal submission?
Answer:
a. This requirement Authority for this solicitation is FAR Part 13 (Simplified Acquisition Procedures). The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforms to the solicitation requirements. The following factors shall be used to evaluate conforming quotes: (1) Lowest Price Technically Acceptable
b. To be technically acceptable the quote must show:
· Contractor must provide a critical fall protection detail plan associated with this project which will need to be incorporated into the existing VA Cleveland Safety database.
· The plan must include existing safety protocols for Lockout/Tagout, Permit-Required Confined Space Entry and associated Job Hazard Analysis (JHA) and/or Safe Operating Procedure (SOP.)
· The project must be reviewed by a CSP (Certified Safety Professional) from the contractor.
· Contractor must be able to use the required VA Cleveland Safety database Microsoft Access.
· Contractor must provide training to select VA employees that will be interacting and/or modifying procedures using the VA Cleveland Safety Database.
4. Is solicitation 36C25024Q0617 a SDVOSB Set-Aside:
Answer: Yes, it is a Service-Disabled Veteran Owned Small Business Set-Aside
5. Will there by roof plans or drawings available?
Answer: Another amendment (0003) will have the attached roof plans
6. Per amendment 36C25024Q0617-0002 Section 3.B states that offers are required to submit a CRITICAL FALL PROTECTION PLAN prior to contract award. Are contractors required to incur the administrative costs of providing a job specific critical safety plan prior to contract award? In our contracting experience this should be a required submittal prior to the issuance of the NTP (Notice To Proceed).
Answer: In order to be technically acceptable for this requirement, by submitting a quote, a contractor is stating they are able to provide and meet all the requirements that are stated in the solicitation. The Critical Fall Protection Plan should be submitted prior to the issuance of the NTP.