Demolish Buildings 10 & 11
Solicitation number
36C25020B0012
Issued by

About this file

This pre-solicitation notice describes a federal contract opportunity to demolish two buildings at the Chillicothe VA Medical Center in Ohio. The selected Service-Disabled Veteran-Owned Small Business contractor will be responsible for asbestos abatement, demolition of Buildings 10 and 11 including removal of debris, exterior site preparation such as grading and utility modifications, installation of new concrete curbs and sidewalks, a storm sewer catch basin and piping, asphalt parking area with markings, and new parking lot lighting. The work must be completed within 300 calendar days of receiving the notice to proceed. Interested offerors should register at SAM.gov to receive updates. The solicitation will be posted on or around February 14, 2020 with proposals due approximately 30 days later. The contract has a set-aside for SDVOSBs and has an estimated value between $1-2 million.

36C25020B0012 0005 Questions _ Answers Project 538-11-125.pdf

View the file

Other files

File Type Posted
36C25020B0012-0006001.pdf PDF
36C25020B0012-0006000.docx DOCX document
36C25020B0012-0006002.pdf PDF
36C25020B0012-0005044.pdf PDF
36C25020B0012-0005043.pdf PDF
36C25020B0012-0005041.pdf PDF
36C25020B0012-0005040.docx DOCX document
36C25020B0012-0003001.docx DOCX document
36C25020B0012-0004000.docx DOCX document
36C25020B0012-0002004.pdf PDF
36C25020B0012-0002000.docx DOCX document
36C25020B0012-0002001.pdf PDF
36C25020B0012-0002002.pdf PDF
36C25020B0012-0002003.pdf PDF
36C25020B0012-0001000.docx DOCX document
36C25020B0012-004.pdf PDF
36C25020B0012-002.pdf PDF
36C25020B0012-003.pdf PDF
36C25020B0012-001.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

Project 538-11-125 Demolish Buildings 10 & 11

Chillicothe VAMC

(Contractor submitted questions are italicized. VA answers to questions are in red.)

At what location does the Concrete Barrier Curb (Dwg C-600) occur?

See north edge of the sidewalk where depressed for ABA access.

Can you please clarify the B-11 Steam and Condensate piping that is to be removed vs abandoned in place on Dwg. H1.

The extent of steam vault to be demolished and the number of bulkheads to be installed shall be as depicted by drawing C200. See Bid Addendum 02 which modifies drawing H1 to agree with C200.

As this is an exterior project, will security badging be required?

Yes.

Can you tell us if Spec Section 21 13 13 Wet Pipe Sprinkler Systems, is applicable to any work other than cut-off/removal of same?

None other.

Can you tell us if Spec Section 22 02 11 Common Work Results for Plumbing, is applicable to any work other than cut-off/removal of same?

None other.

Can you tell us if Spec Section 22 13 00 Facility Sanitary & Vent Piping, is applicable to any work other than cut-off/removal of same?

Capping (Sheet P1).

Can you tell us if Spec Section 22 13 00 Facility Sanitary & Vent Piping, is applicable to any work other than cut-off/removal of same?

Capping (Sheet P1).

Can you tell us if Spec Section 22 05 11 Common Work Results for HVAC, is applicable to any work other than cut-off/removal of steam piping?

Capping (Sheet H1).

Can you tell us if Spec Section 26 05 19 LV Elec Power Conductors & Cables, is applicable to any work other than cut-off/removal of same?

Site Lighting (Sheet E1).

Are prime contractors to retain and include the cost of a VPIH in our proposals per 02 82 11 page 3? If so, can the VPIH and the CPIH be the same person?

See IMPORTANT NOTE in paragraph 1.1.2 C. of the referenced specification, and in the same location in spec 02 82 13.41 ASBESTOS ABATEMENT FOR TOTAL DEMOLITION PROJECTS. The VPIH shall be under the direct hire of the General Contractor. This responsibility to hire shall not be assigned to any sub-contractor, most particularly not to the asbestos abatement subcontractor. The VPIH may be either an employee of the General Contractor or may work for an independent firm sub-contracted by the General Contractor. It is not prohibited for the VPIH to also assume the duties and responsibilities of the CPIH if the General Contractor and the Asbestos Abatement Contractor agree to terms for this arrangement; however, the requirement stated in

1.1.2 C. shall govern, and the combined VPIH/CPIH shall be the direct hire of the General Contractor.

In the RFP, the A3. Price/Cost Schedule only has a space for the Grand Total and on pages 7 and 8, it states: Bid Item I (Base Bid) – Contractor to provide all labor material and equipment necessary to perform the work as described in the “Project Description” as stated above.

Is there only Grand Total 1 price for this response?

Yes.

Besides the SF1442, A3. Price/Cost, Bid Bond and Reps and Certs, what is required for submission?

Please refer to solicitation for proposal requirements.

Is this project Tax Exempt?

Reference FAR Clause 52.229-3 regarding all Federal, State, and Local Tax requirements.

What is the ICRA level which we are to expect for the project?

Work for this project, excluding asbestos abatement prior to building demolition, is considered exterior construction. See Part 1.12 J. of specification 01 35 26 SAFETY REQUIREMENTS for infection control requirements associated with exterior construction. Site controls during asbestos abatement shall be as defined by specification 02 82 13.41 ASBESTOS ABATEMENT FOR TOTAL

DEMOLITION PROJECT.

Soil boring testing for the proposed areas which are to become parking areas? Will a report be issued?

No soil boring testing was performed. No report will be issued.

Will there be charging stations added to this SOW?

Addressed by Amendment 3.

Are we to now hire engineers for the addition of charging stations?

Addressed by Amendment 3.

Sheet C200:

Are signs and posts which are being removed to be turned over to the VA or disposed of?

Removal and disposal shall be the responsibility of the Contractor as defined in the plans and specifications. VA reserves the right to salvage some or all of the signs and posts.

Existing water service to bldg. 28. Provide size of existing line and approx. depth?

Water service to Bldg. 28 is 4-inch at approximately 42” to 48” below grade.

Existing water service to bldgs. 10 (1 line) & 11 (2 lines) Provide size of existing line and approx. depth?

Water service to Bldg. 28 is 4-inch at approximately 42” to 48” below grade.

Provide approx. depth of existing tunnels to bottom of tunnel.

Actual depth not field verified. Historical records indicate the tunnels to be approximately 3-5 feet deep.

Existing steam tunnels and piping to be removed. Provide size of tunnels and existing piping (size and quantity).

Based on historical records the steam trenches are approximately 18 inches deep and 30 to 50 inches wide. There should be a maximum of 3 pipes. Records indicate 2” M.P. Steam pipe, 1 ¼” Vacuum, & 1” Drip Return.

Sheet C300: Area of existing fire hydrant. Is the interior of this curb to be concrete or landscaped?

Landscaped- grass

Is any new curb to be painted red with “fire lane” markings for no parking?

No

Barrier curb as shown at HC ramp:

What is top of curb elevation?

Curb height is 6” above finish grade at ramp, tapers to match finish grade at walk.

Is this curb to have internal reinforcing?

No reinforcing in the curb.

HC ramp indicates ADA tactile warning at bottom of ramp.

Provide size of this area.

Conform to ABA standards.

Provide specification of ADA tactile units and color.

Conform to ABA standards.

Sheet C600; Steam Tunnel Bulkhead; Provide dimensions for existing steam tunnel.

Based on historical records the steam trenches are approximately 18 inches deep and 30 to 50 inches wide.

What is thickness of new bulkhead to be poured?

8” thick.

Is concrete bulkhead to contain any reinforcing bars?

None other than the dowels shown.

Are there to be precast concrete wheel bumper blocks on both sides of parking stalls with HC parking?

No.

Are new HC parking signs to be breakaway posts or set in 6” dia. concrete filled steel bollard (36” H) and painted safety yellow?

See detail on C600.

Curb Construction Along Walk Detail: * = 6” exposed curb or as determined by Engineer. Provide/confirm this dimension for estimating purposes.

Assume 6”

HC ramp indicates ADA tactile warning at bottom of ramp.

See detail on C600.

Provide size of this area. Note that flat at bottom of ramp calls for this area to be 36’-0” wide. Is this to be 36” wide?

See detail on C600 - Intent of detail is 3’-0” wide or 36”, not 36’-0” wide.

Provide depth of ADA tactile paver Tactile “paver” not required.

Provide specification of ADA tactile units and color.

Conform to ABA standard.

Sheet AD105 (Building 10): What is approx. depth of existing Basement floor?

Please refer to sheet C200 in Addendum 01, dated 03/26/2020.

Confirm that per note 2.08, existing walls below 24” below exterior finished grade can remain in place?

Per note 2.08, remove existing walls 24” below final grade or as needed for new site work. Due to new construction, there may be some area where the existing walls may need to be removed more than 24” beneath final grade.

Are existing walls which are lower than 24” below exterior finished grade to remain vertical in place or be pulled into the basement void and crushed?

The remaining portions of the foundation walls, which are 24” or lower below final grade, can remain vertical in place.

Has the existing roof system been tested for ACM materials?

Yes. The building has slate roof tiles with underlying tar paper, which tested negative for asbestos.

Has the existing building system been tested for lead based paint?

Based on the age of the buildings and typical paint properties for the associated period in time, VA recognizes it is likely that there is paint with lead throughout both. This is a common condition in the industry and is to be handled by appropriate means and methods in compliance with all applicable statutes and regulations.

Sheet AD106 (Building 11): What is approx. depth of existing Basement floor?

Please refer to sheet C200 in Addendum 01, dated 03/26/2020.

Confirm that per note 2.08, existing walls below 24” below exterior finished grade can remain in place?

Per note 2.08, remove existing walls 24” below final grade or as needed for new site work. Due to new construction, there may be some area where the existing walls may need to be removed more than 24” beneath final grade.

Are existing walls which are lower than 24” below exterior finished grade to remain vertical in place or be pulled into the basement void and crushed?

The remaining portions of the foundation walls, which are 24” or lower below final grade, can remain vertical in place.

Has the existing roof system been tested for ACM materials?

Yes. The building has slate roof tiles with underlying tar paper, which tested negative for asbestos.

Has the existing building system been tested for lead based paint?

Based on the age of the buildings and typical paint properties for the associated period in time, VA recognizes it is likely that there is paint with lead throughout both. This is a common condition in the industry and is to be handled by appropriate means and methods in compliance with all applicable statutes and regulations.

Sheet FS1; General Notes; Note A: Can the VA identify those materials which are to be removed and retained? Where are those materials to be stored on the existing facility grounds?

Determination will not be made in advance. Contractor should assume for bidding purposes that VA will retain none of the materials or equipment and that all will have to be removed for proper disposal.

Confirm that the 2 existing wet sprinkler PIV valves are to remain in place?

Refer to plan note #2 in on sheet FS1, in Addendum 01, dated 03/26/2020.

Sheet P1; Coded note 2 & 4: Clarification that when capped, piping is to also have to be encased in a concrete cap? Provide detail of required capping.

Per General Note E – All pipe stubs that are capped as part of this project shall be completed with pipe caps that match or are compatible with the type of existing piping to remain. Concrete caps are not required for piping indicated on drawing P1.

Sheet E1; Building 10 & 11 Removal Plan: Does any of the electrical demolition require work “off-hours” work?

Yes, the disconnection of PMSG28 load side feeder so the load break connections in MH36 can be removed must be done after hours.

Has it been verified that existing electrical transformers (coded note 2) and removal of primary/secondary feeders (coded note 4) have no electrical tie in with building 28?

They should not have a tie to Building 28 but underground investigation is required per General Note B and E.

Are 6’ tall temporary chain link fence panels an acceptable fencing system during the work for the demolition/abatement and site restoration work?

Yes.

Please quantify the amount of underground Steam vault to be demolished and the number of Steam Tunnel bulkheads to be installed?

The extent of steam vault to be demolished and the number of bulkheads to be installed shall be as depicted by drawing C200. See Bid Addendum 02 which modifies drawing H1 to agree with C200.

Do you have a plan holder’s list for the above referenced project you can send to me?

The process you are referring to is not applicable to Government contract bids, since plans are self-serve over the web.

We are a subcontractor for demo and were looking for a bidder list to contact for the Building Demo at the VA in Chillicothe, if you wouldn’t mind providing that.

Bidding for this project has been delayed due to current “social distancing” / health concerns.

Please check the solicitation for updates.

Looking for clarification if we’re to be mailing this bid or submitting electronically on the 14-May?

Please clarify.

Electronic bids will not be accepted at this time.