36C25020B0012-0002004.pdf
PDF Posted
- Attached to
- Demolish Buildings 10 & 11
- Solicitation number
- 36C25020B0012
About this file
This document provides details for a federal contract opportunity to demolish two buildings at a Department of Veterans Affairs medical campus. The solicitation will require demolishing Buildings 10 and 11 at the Chillicothe VA Medical Center located in Chillicothe, Ohio. Work will include asbestos abatement, utility disconnections, building demolition and debris removal, site preparation and grading, installation of curbs, sidewalks, a storm sewer catch basin and piping, new asphalt parking area with markings, and parking lot lighting. Offerors must be registered as a Service-Disabled Veteran-Owned Small Business and certified in relevant websites. The contract value is estimated between $1-2 million under NAICS code 236220 with a small business size standard of $39.5 million. The solicitation will be issued on or around February 14, 2020 with proposals due approximately 30 days later. The performance period is 300 calendar days from notice to proceed. This is a 100% set-aside for SDVOSBs, which must perform a minimum of 15% of the construction work. Bid, payment and performance bonds will be required, and a site visit will be scheduled.
36C25020B0012 0002 538-11-125 G001_Rev.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25020B0012-0006001.pdf | ||
| 36C25020B0012-0006000.docx | DOCX document | |
| 36C25020B0012-0006002.pdf | ||
| 36C25020B0012-0005044.pdf | ||
| 36C25020B0012-0005043.pdf | ||
| 36C25020B0012-0005041.pdf | ||
| 36C25020B0012-0005040.docx | DOCX document | |
| 36C25020B0012-0005042.pdf | ||
| 36C25020B0012-0003001.docx | DOCX document | |
| 36C25020B0012-0004000.docx | DOCX document | |
| 36C25020B0012-0002000.docx | DOCX document | |
| 36C25020B0012-0002001.pdf | ||
| 36C25020B0012-0002002.pdf | ||
| 36C25020B0012-0002003.pdf | ||
| 36C25020B0012-0001000.docx | DOCX document | |
| 36C25020B0012-004.pdf | ||
| 36C25020B0012-002.pdf | ||
| 36C25020B0012-003.pdf | ||
| 36C25020B0012-001.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
EXTERIOR ELEVATION
NOTE
ROOM NAME
ROOM NUMBER
X
X
1/A101
U S 35
US 35
US 35
SR 104
EXIT
S R
N . H
IG
H
S T
R E
E T
C R
SCIO
TO R
IVER
S R
N
B
R
ID
G E
S T
R E
E T
Department of Veterans Affairs Medical Campus
BUILDING 10
BUILDING 11
BUILDING 6
BUILDING 2
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
A R C H I T E C T SJ O H N P O E
3131 NEWMARK DRIVE,
SUITE 200
MIAMISBURG, OHIO 45342
VA Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
937 461 3290 PHONE
jpa@johnpoe.com
Department of Veterans Affairs Medical Center
ARCHITECTURE PLANNING INTERIOR DESIGN
3131 NEWMARK DRIVE, SUITE 200
MIAMISBURG, OHIO 45342
937.461.3290 P
JOHN POE ARCHITECTS
HEAPY ENGINEERING
MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY
1400 WEST DOROTHY LANE
DAYTON, OHIO 45409
937.224.0861 P
937.224.5777 F
LJB, Inc.
CIVIL ENGINEERING
2500 NEWMARK DRIVE
MIAMISBURG, OHIO 45342
937.259.5000 P
Terracon Consultants, Inc.
ENVIRONMENTAL ENGINEERING DIVISION
611 LUNKEN PARK DRIVE
CINCINNATI, OHIO 45226
513.321.5816 P
BUILDINGS 2, 6, 10, & 11
DEMOLITION
08/22/2017
COVER SHEET
G001
VRKR
17001.00
538-11-125
Chillicothe, Ohio
2, 6, 10, & 11
BUILDINGS 2, 6, 10, & 11 DEMOLITION
17273 STATE ROUTE 104 CHILLICOTHE, OHIO 45601
G001 COVER SHEET
C200 DEMOLITION PLAN
C300 SITE GRADING & LAYOUT PLAN
C301 EROSION CONTROL PLAN
C600 CONSTRUCTION DETAILS
AD101 NOT USED
AD102 NOT USED
AD103 NOT USED
AD104 NOT USED
AD105 BUILDING 10 - BSMT, 1ST, & 2ND FLOOR DEMOLITION PLAN
AD106 BUILDING 11 - BSMT, 1ST, & 2ND FLOOR DEMOLITION PLAN
FS1 FIRE SUPPRESSION PLANS
P1 PLUMBING DEMO PLANS
H1 HVAC DEMO PLANS
E1 ELECTRICAL PLANS
GENERAL CONSTRUCTION NOTES
9. IT IS THE INTENT OF THE DOCUMENTS TO INDICATE COMPLETE AND
OPERATIONAL SYSTEMS (I.E. STRUCTURAL, HVAC, PLUMBING, ELECTRICAL,
ETC.) THE CONTRACTOR SHALL PROVIDE THE SYSTEMS AS OPERATIONAL
SYSTEMS WHICH COMPLY WITH APPLICABLE CODES AND REGULATIONS. THIS
NOTE SHALL BE LIMITED TO THE SYSTEMS AS INDICTED BY THE DOCUMENTS
AND SHALL NOT INCLUDE CHANGES TO THE SYSTEMS WHICH ALTER INDICATED
CAPACITIES, OPERATIONAL CHARACTERISTICS, ETC.
10. THE LOCATIONS OF UNDERGROUND FACILITIES SHOWN ON THE PLANS ARE
BASED ON FIELD SURVEYS AND LOCAL UTILITY COMPANY RECORDS. IT SHALL
BE THE CONTRACTOR'S FULL RESPONSIBILITY TO CONTACT THE VARIOUS
UTILITY COMPANIES TO LOCATE THEIR FACILITIES PRIOR TO STARTING
DEMOLITION / CONSTRUCTION. NO ADDITIONAL COMPENSATION SHALL BE PAID
TO THE CONTRACTOR FOR DAMAGE AND REPAIR TO THESE FACILITIES
CAUSED BY HIS WORK FORCE.
11. BEFORE DIGGING CONTRACTOR SHALL HIRE A UTILITY LOCATE SERVICE.
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING MARKING. BEFORE
DIGGING, THE CONTRACTOR SHALL OBTAIN AN APPROVED DIG PERMIT FROM
THE MEDICAL CENTER PER STANDARD OPERATING PROCEDURE 32 DIG
PERMITS. CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING A COPY OF THE
APPROVED DIG PERMIT ON SITE DURING WORK OPERATIONS.
5. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW
MATERIALS.
6. THE PROJECT ENGINEER SHALL PROVIDE TEMPORARY ACCESS TO SERVICES
REQUIRED TO FACILITATE THE WORK INDICATED, INCLUDING BUT NOT LIMITED
TO THE FOLLOWING: POWER, LIGHTING, HEAT, AND WATER.
7. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO NOTIFY THE
PROJECT ENGINEER OF ANY WORK WHICH MIGHT REQUIRE INTERRUPTION OF
UTILITY SERVICES, CAUSE NOISE, OR CREATE VIBRATION. PRIOR TO THE
COMMENCEMENT OF THIS WORK, THE CONTRACTOR'S WORK AND SCHEDULE
SHALL BE APPROVED AND COORDINATED BEFORE HAND WITH THE PROJECT
ENGINEER AND/OR ARCHITECT. SEE GENERAL CONDITIONS FOR FURTHER
DETAILS.
8. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE
PROVISIONS OF THE SPECIFICATIONS, INCLUDING ALL GENERAL CONDITIONS,
SUPPLEMENTARY GENERAL CONDITIONS, AND MATERIAL AND CONSTRUCTION
PROVISIONS, WHICH APPLY TO MATERIALS OR CONSTRUCTION METHODS
REQUIRED BY THIS PROJECT.
* PLEASE NOTE THAT THE TERM, PROJECT ENGINEER, REFERS TO THE
CONTRACTING OFFICER'S REPRESENTATIVE.
1. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND
DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13
WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
2. DURING SOLITATION THE CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE,
EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS
TO BE COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. ALL CONTRACTORS SHALL BE RESPONSIBLE TO PATCH AND REPAIR ALL
SURFACES WHERE EXISTING CONSTRUCTION IS REMOVED OR DISTURBED BY
WORK UNDER THEIR CONTRACT.
4. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF
NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO
REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT
SURFACES TO REMAIN.
DRAWING INDEXVICINITY MAP
GRAPHIC SYMBOLS
N
Scale:
PROJECT
1" = 1'-0"
Campus Plan
Revisions Date
File details come from the government source that posted it. Updated .