36C25020B0008-0001003.pdf

PDF Posted

Attached to
Expand East Parking 610-312
Solicitation number
36C25020B0008
Issued by

About this file

This pre-solicitation notice announces an upcoming solicitation for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 will procure expansion of the East parking lot at the Fort Wayne VA Medical Center located at 2121 Lake Avenue in Fort Wayne, Indiana. The contractor will demolish an existing house and build the new parking lot. The project magnitude is between $500,000 and $1,000,000. The solicitation will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses and use NAICS code 236220 for commercial and institutional building construction with a size standard of $39.5M. The IFB will be issued on or around December 20, 2019 via FEDBIZOPPS.gov and include a pre-bid site visit. The point of contact is Nathan Heikkinen who can be reached at Nathan.heikkinen@va.gov or 317-988-1512.

36C25020B0008 0001 610-312_Specs Updated 1.16.2020_Part3.pdf

View the file

Other files

File Type Posted
36C25020B0008-0002001.pdf PDF
36C25020B0008-0002000.docx DOCX document
36C25020B0008-0001001.pdf PDF
36C25020B0008-0001002.pdf PDF
36C25020B0008-0001005.pdf PDF
36C25020B0008-0001000.docx DOCX document
36C25020B0008-0001004.pdf PDF
36C25020B0008-0001006.pdf PDF
36C25020B0008-009.docx DOCX document
36C25020B0008-002.pdf PDF
36C25020B0008-010.pdf PDF
36C25020B0008-004.pdf PDF
36C25020B0008-001.docx DOCX document
36C25020B0008-003.pdf PDF
36C25020B0008-008.doc DOC document
36C25020B0008-007.pdf PDF
36C25020B0008-005.pdf PDF
36C25020B0008-006.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OrderID: 161907079

OrderID: 161907079

OrderID: 161907214

610-312 Expand East Parking 08-01-16

02 83 33.13 - 1

SECTION 02 83 33.13

LEAD-BASED PAINT REMOVAL AND DISPOSAL

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Removing and disposal of peeling and delaminated lead-containing paints and paint debris as indicated in existing conditions report at 2333 Lake Avenue, Fort Wayne, Indiana.

1.2 RELATED REQUIREMENTS

A. Hazardous Material Abatement: Section 02 82 13.41, ASBESTOS ABATEMENT

FOR TOTAL DEMOLITION PROJECTS.

B. Demolition Disturbing Lead-Based Paint: Section 02 41 00, DEMOLITION.

1.3 DEFINITIONS

A. Action Level: Employee exposure, without regard to use of respirator, to lead airborne concentration of 30 micrograms per cubic meter

(0.03 parts per million) of air averaged over 8-hour period. As used in this section, ”30 micrograms per cubic meter of air (0.03 parts per million)" refers to action level.

B. Area Monitoring: Sampling of lead concentrations within lead control area and inside physical boundaries which are representative of airborne lead concentrations which may reach breathing zone of personnel potentially exposed to lead.

C. Breathing Zone: Area within hemisphere, forward of shoulders, with 150 mm to 225 mm (6 to 9 inches) radius and center at nose or mouth of employee.

D. Certified Industrial Hygienist (CIH): As used in this section, refers to an Industrial Hygienist employed by Contractor.

E. Change Rooms and Shower Facilities: Rooms within designated physical boundary around lead control area equipped with separate storage facilities for clean protective work clothing and equipment and for street clothes which prevent cross- contamination.

F. Competent Person: Person capable of identifying lead hazards in work area and authorized by contractor to take corrective action.

G. Decontamination Room: Room for removal of contaminated personal protective equipment (PPE).

H. Eight-Hour Time Weighted Average (TWA): Airborne concentration of lead averaged over 8-hour workday to which an employee is exposed.

02 83 33.13 - 2

I. High Efficiency Particulate Air (HEPA) Filter Equipment:

HEPA filtered vacuuming equipment with UL 586 filter system capable of collecting and retaining lead-contaminated paint dust. HEPA filter means 99.97 percent efficient against 0.3 micron (0.012 mil) size particles.

J. Lead: Metallic lead, inorganic lead compounds, and organic lead soaps.

Excluded from this definition are other organic lead compounds.

K. Lead Control Area: Enclosed area or structure with full containment to prevent spreading lead dust, paint chips, and debris from lead-based paint removal operations. Lead control area is isolated by physical boundaries to prevent unauthorized entry of personnel.

L. Lead Permissible Exposure Limit (PEL): Fifty micrograms per cubic meter

(0.05 parts per million) of air as 8-hour time weighted average as determined by 29 CFR Part 1910.1025. When employee is exposed for more than 8 hours per work day, determine PEL by following formula. PEL micrograms/cubic meter (parts per million) of air = 400/No. of hrs.

worked per day.

M. Personnel Monitoring: Sampling of lead concentrations within employee breathing zone to determine 8-hour time weighted average concentration according to 29 CFR Part 1910.1025. Take samples representative of employee's work tasks.

N. Physical Boundary: Area physically roped or partitioned off around enclosed lead control area to limit unauthorized entry of personnel. As used in this section, "inside boundary" shall mean same as "outside lead control area."

1.4 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. American National Standards Institute (ANSI):

1. Z9.2-12 - Fundamentals Governing the Design & Operation of Local

Exhaust Ventilation Systems.

C. Code of Federal Regulations (CFR):

1. 29 CFR Part 1910 - Occupational Safety and Health Standards.

2. 29 CFR Part 1926 - Safety and Health Regulations for Construction.

3. 40 CFR Part 260 - Hazardous Waste Management System: General.

4. 40 CFR Part 261 - Identification and Listing of Hazardous Waste.

5. 40 CFR Part 262 - Standards Applicable to Generators of Hazardous

Waste.

02 83 33.13 - 3

6. 40 CFR Part 263 - Standards Applicable to Transporters of Hazardous

Waste.

7. 40 CFR Part 264 - Standards for Owners and Operations of Hazardous

Waste Treatment, Storage, and Disposal Facilities.

8. 40 CFR Part 265 - Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.

9. 40 CFR Part 268 - Land Disposal Restrictions.

10. 49 CFR Part 172 - Hazardous Material Table, Special Provisions, Hazardous Material Communications, Emergency Response Information, and Training Requirements, and Security Plans.

11. 49 CFR Part 178 - Specifications for Packagings.

D. Underwriters Laboratories (UL):

1. 586-09 - High-Efficiency, Particulate, Air Filter Units.

1.5 PRE-REMOVAL MEETINGS

A. Conduct pre-removal meeting at project site minimum 30 days before beginning Work of this section.

1. Required Participants:

a. Contracting Officer's Representative.

b. Certified Industrial Hygienist.

c. Architect/Engineer.

d. Contractor.

e. Paint removal contractor.

2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.

a. Respiratory protection program.

b. Hazard communication program.

c. Hazardous waste management plan.

d. Safety and health regulation compliance.

e. Employee training.

f. Removal schedule.

g. Removal sequence.

h. Preparatory work.

i. Protection before, during, and after removal.

j. Removal.

k. Inspecting and testing.

l. Other items affecting successful completion.

3. Document and distribute meeting minutes to participants to record decisions affecting installation.

02 83 33.13 - 4

1.6 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Manufacturer's Literature and Data:

1. Description of each product.

a. Paint removal products.

b. Vacuum filters.

c. Respirators.

2. Safety data sheet for each paint removal product.

3. Installation instructions.

a. Paint removal products.

C. Test Reports: Submit testing laboratory reports.

1. Submit air monitoring results within three working days, signed by testing laboratory employee performing air monitoring, employee analyzing sample, and CIH.

D. Certificates: Certify completed training.

1. Submit certificate for each employee signed and dated by CIH and employee stating employee was trained.

E. Qualifications: Substantiate qualifications comply with specifications.

1. Paint removal contractor.

2. Testing laboratory.

a. Name, address, and telephone number.

b. Current evidence of participation in NIOSH PAT Program.

c. Copy of current AIHA accreditation certificate.

3. Industrial hygienist.

a. Name, address, and telephone number.

b. Resume showing previous experience.

c. Copy of current ABIH CIH certification.

4. Paint disposal facility.

a. Name, address, and telephone number.

b. Current license or authorization to receive and dispose lead contaminated waste.

F. Record Documents:

1. Completed and signed hazardous waste manifest from waste transporter.

2. Paint disposal facility receipts and disposition reports.

3. Certification of medical examinations.

4. Employee training certification.

02 83 33.13 - 5

1.7 QUALITY ASSURANCE

A. Safety and Health Regulation Compliance:

1. Comply with laws, ordinances, rules, and regulations of federal, state, and local authorities having jurisdiction regarding removing, handling, storing, transporting, and disposing lead waste materials.

a. Comply with applicable requirements of 29 CFR Part 1910.1025.

b. Notify Contracting Officer's Representative and request resolution of conflicts between regulations and specified requirements before starting work.

2. Comply with the following local laws, ordinances, criteria, rules and regulations regarding removing, handling, storing, transporting, and disposing lead-contaminated materials:

a. There are no local regulations that apply to this project.

B. Paint Removal Contractor: Experienced contractor, registered or licensed by applicable state agency regulating lead-based paint removal.

C. Testing Laboratory: State certified independent testing laboratory experienced in airborne lead monitoring, testing, and reporting.

1. Successful participant in NIOSH Proficiency Analytical Testing (PAT)

Program within prior 12 months.

2. Accredited by American Industrial Hygiene Association (AIHA).

D. Certified Industrial Hygienist: Certified as CIH by American Board of

Industrial Hygiene in comprehensive practice and responsible for:

1. Certify Training.

2. Review and approve lead-based paint removal plan for conformance to applicable referenced standards.

3. Inspect lead-based paint removal work for conformance with approved plan.

4. Direct monitoring.

5. Ensure work is performed according to specifications.

6. Ensure personnel and environment hazardous exposures are adequately controlled.

E. Paint Disposal Facility: State certified disposal facility qualified to receive and dispose lead-based paint.

F. Lead-based Paint Removal Plan:

1. Submit detailed, site-specific plan describing lead-based paint removal procedures.

02 83 33.13 - 6

2. Include sketch showing location, size, and details of lead control areas, decontamination rooms, change rooms, shower facilities, and mechanical ventilation system.

3. Include eating, drinking, and restroom procedures, interface of trades, work sequencing, collected wastewater and paint debris disposal plan, air sampling plan, respirators, protective equipment, and detailed description of containment methods ensuring airborne lead concentrations do not exceed action level outside lead control area.

a. Eating, drinking, and smoking are not acceptable within lead control area.

4. Include air sampling, training and strategy, sampling methodology, frequency, duration, and qualifications of air monitoring personnel.

G. Respiratory Protection Program: Establish and implement program required by 29 CFR Part 1910.134, 29 CFR Part 1910.1025, and

29 CFR Part 1926.62.

1. Provide each employee negative pressure or other appropriate respirator.

a. Test fit each employee's respirator at initial fitting and maximum 6 month intervals, as required by 29 CFR Part 1926.62.

H. Hazard Communication Program: Establish and implement program required by 29 CFR Part 1910.1200.

I. Hazardous Waste Management Plan: Establish and implement plan according to applicable requirements of Federal, State, and local hazardous waste regulations including the following:

1. Identification of hazardous wastes associated with work.

2. Estimated quantities of generated and disposed waste.

3. Names and qualifications of each contractor transporting, storing, treating, and disposing wastes. Include facility location and

24-hour point of contact.

4. Names and qualifications (experience and training) of personnel working on-site with hazardous wastes.

5. List of required waste handling equipment including cleaning, volume reduction, and transport equipment.

6. Spill prevention, containment, and cleanup contingency implementation measures.

7. Work plan and schedule for waste containment, removal, and disposal with daily waste cleaned up and containerization.

02 83 33.13 - 7

8. Hazardous waste disposal cost.

1.8 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

PART 2 - PRODUCTS

2.1 PAINT REMOVAL PRODUCTS

A. Chemical Stripper: Biodegradable, non-toxic, capable of removing existing paint layers in one application, and acceptable to CIH.

2.2 ACCESSORIES

A. Waste Collection Drums: 49 CFR Part 178; Type 1A2, steel, removable head, 200 L (55 gal.) capacity, capable of containing waste without loss.

B. Vacuum Cleaner: HEPA filtered type.

C. Scrapers:

1. Metal type for use on metal, concrete, and masonry surfaces.

2. Plastic type for use on wood, plaster, gypsum board, and other surfaces.

D. Rinse Water: Potable.

E. Cleaning Cloths: Cotton.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Before exposure to lead-contaminated dust, provide workers with comprehensive medical examination required by 29 CFR Part 1926.62 (I)

(1) (i) and (ii).

1. Exemption: Examination is not required when employee medical records show last examination required by 29 CFR Part 1926.62(I) was completed within previous 12 months.

B. Maintain complete and accurate employee medical records according to

29 CFR Part 1910.20.

C. Train each employee performing paint removal, disposal, and air sampling operations according to 29 CFR Part 1926.62.

1. Certify training is completed before employee is permitted to work on project and enter lead control area.

3.2 PREPARATION

A. Notify Contracting Officer 20 days before starting paint removal work.

02 83 33.13 - 8

B. Boundary Requirements: Provide physical boundaries around lead control area by roping off area or providing curtains, portable partitions or other enclosures to ensure that airborne lead concentrations do not meet or exceed action level outside of lead control area.

C. Change Room and Shower Facilities: Provide clean change rooms and shower facilities within physical boundary around lead control area according to 29 CFR Part 1926.62.

D. Mechanical Ventilation System:

1. Provide ventilation system to control personnel exposure to lead according to 29 CFR Part 1926.57.

2. Design, construct, install, and maintain HEPA filtered fixed local exhaust ventilation system according to ANSI Z9.2 and approved by

CIH.

3. Exhaust ventilation air to exterior wherever possible.

4. When exhaust ventilation air must be recirculated into work area, provide HEPA filter with reliable back-up filter and controls to monitor lead concentration in return air and to bypass recirculation system automatically when system fails.

E. Personnel Protection: Provide and use required protective clothing and equipment within lead control area.

F. Warning Signs: Provide warning signs complying with 29 CFR Part 1926.62 at lead control area approaches. Locate signs so personnel read signs and take necessary precautions before entering lead control area.

3.3 WORK PROCEDURES

A. Remove lead-based paint according to approved lead-based paint removal plan.

1. Perform work only in presence of CIH or Industrial Hygienist (IH)

Technician under direction of CIH ensuring continuous inspection of work in progress and direction of air monitoring activities.

2. Handle, store, transport, and dispose lead or and lead contaminated waste according to 40 CFR Part 260, 40 CFR Part 261, 40 CFR Part 262, 40 CFR Part 263, 40 CFR Part 264, and

40 CFR Part 265. Comply with land disposal restriction notification requirements as required by 40 CFR Part 268.

B. Use procedures and equipment required to limit occupational and environmental lead exposure when lead-based paint is removed according to 29 CFR Part 1926.62.

02 83 33.13 - 9

C. Dispose removed paint and waste according to Environmental Protection

Agency (EPA), federal, state, and local requirements.

D. Personnel Exiting Procedures:

1. When personnel exit lead control area, comply with the following procedures:

a. Vacuum exposed clothing surfaces.

b. Remove protective clothing and equipment in decontamination room. Place clothing in approved impermeable disposal bag.

c. Shower.

d. Dress in clean clothes before leaving lead control area.

E. Monitoring - General:

1. Monitor airborne lead concentrations according to

29 CFR Part 1910.1025by testing laboratory as directed by CIH.

2. Take personal air monitoring samples on employees anticipated to have greatest exposure risk as determined by CIH. Additionally, take air monitoring samples on minimum 25 percent of work crew or minimum of two employees, whichever is greater, during each work shift.

3. Submit results of air monitoring samples, signed by CIH, within 24 hours after taking air samples. Notify Contracting Officer's

Representative immediately of lead exposure at or exceeding action level outside of lead control area.

F. Monitoring During Paint Removal:

1. Perform personal and area monitoring during entire paint removal operation.

2. Conduct area monitoring at physical boundary daily for each work shift to ensure unprotected personnel are not exposed above action level anytime.

3. For outdoor operations, take at least one sample on each shift leeward of lead control area. When adjacent areas are contaminated, clean area of contamination and have CIH visually inspect and certify lead contamination is cleaned.

4. Stop work when outside boundary lead levels meet or exceed action level. Notify Contracting Officer's Representative, immediately.

5. Correct conditions causing increased lead concentration as directed by CIH.

6. Review sampling data collected during work stoppage to determine if conditions require additional work method modifications as determined by CIH.

02 83 33.13 - 10

7. Resume paint removal when approved by CIH.

3.4 LEAD-BASED PAINT REMOVAL

A. Remove paint within areas indicated on drawings completely exposing substrate. Minimize damage to substrate.

B. Comply with paint removal processes described lead paint removal plan.

C. Lead-Based Paint Removal: Select processes for each application to minimize work area lead contamination and waste.

3.5 FIELD QUALITY CONTROL

A. Field Tests: Performed by testing laboratory specified in Section

01 45 29, TESTING LABORATORY SERVICES.

B. Perform sampling and testing for:

1. Air monitoring.

2. Lead based paint.

3.6 CLEANING AND DISPOSAL

A. Cleaning:

1. Maintain lead control area surfaces free of accumulating paint chips and dust. Confine dust, debris, and waste to work area.

2. Vacuum clean work area daily, at end of each shift, and when paint removal operation is complete.

B. CIH Certification: Certify in writing that inside and outside lead control area air monitoring samples are less than action level, employee respiratory protection was adequate, the work was performed according to 29 CFR Part 1926.62, and no visible accumulations of lead-based paint and dust remain on worksite.

1. Do not remove lead control area or roped-off boundary and warning signs before Contracting Officer's Representative's receipt of CIH's certification.

2. Reclean areas showing dust or residual paint chips.

C. Testing: Where indicated and when directed by Contracting Officer's

Representative, test lead-based paint residue and used abrasive according to 40 CFR Part 261 for hazardous waste.

D. Waste Collection:

1. Collect lead-contaminated materials including waste, scrap, debris, bags, containers, equipment, and clothing, which may produce airborne lead contamination.

02 83 33.13 - 11

2. Place lead contaminated materials in waste disposal drums. Label each drum identifying waste type according to 49 CFR Part 172 and date waste materials were first put into drum. Obtain and complete the Uniform Hazardous Waste Manifest forms. Comply with land disposal restriction notification requirements required by

40 CFR Part 268:

3. Coordinate temporary storage location on project site with

Contracting Officer's Representative.

E. Waste Disposal:

1. Minimum 14 days before delivery, notify Contracting Officer's

Representative who will arrange for job site inspection of drums and manifests by paint disposal facility personnel.

2. Contracting Officer's Representative will arrange hazardous wastes removal, transport and delivery to paint disposal facility to ensure drums do not remain on project site longer than 90 calendar days from drum label date.

F. Waste Disposal:

1. Do not store hazardous waste drums in temporary storage location longer than 90 calendar days from drum label date.

2. Remove, transport, and deliver drums to paint disposal facility.

a. Obtain signed receipt including date, time, quantity, and description of materials received according to 40 CFR Part 262.

b. Obtain final report of materials disposition after disposal completion.

- - - E N D - - -

610-312 Expand East Parking 10-01-17

07 92 00 - 1

SECTION 07 92 00

JOINT SEALANTS

PART 1 - GENERAL

1.1 DESCRIPTION:

A. This section covers interior and exterior sealant and their application, wherever required for complete installation of building materials or systems.

1.2 RELATED WORK (INCLUDING BUT NOT LIMITED TO THE FOLLOWING):

A. Sealing of Site Work Concrete Paving: Section 32 05 23, CEMENT AND

CONCRETE FOR EXTERIOR IMPROVEMENTS.

1.3 QUALITY ASSURANCE:

A. Installer Qualifications: An experienced installer with a minimum of three (3) years’ experience and who has specialized in installing joint sealants similar in material, design, and extent to those indicated for this Project and whose work has resulted in joint-sealant installations with a record of successful in-service performance. Submit qualification.

B. Source Limitations: Obtain each type of joint sealant through one (1) source from a single manufacturer.

C. Product Testing: Obtain test results from a qualified testing agency based on testing current sealant formulations within a 12-month period.

1. Testing Agency Qualifications: An independent testing agency qualified according to ASTM C1021.

2. Test elastomeric joint sealants for compliance with requirements specified by reference to ASTM C920, and where applicable, to other standard test methods.

3. Test other joint sealants for compliance with requirements indicated by referencing standard specifications and test methods.

D. Lab Tests: Submit samples of materials that will be in contact or affect joint sealants to joint sealant manufacturers for tests as follows:

1. Adhesion Testing: Before installing elastomeric sealants, test their adhesion to protect joint substrates according to the method in

ASTM C794 to determine if primer or other specific joint preparation techniques are required.

07 92 00 - 2

2. Compatibility Testing: Before installing elastomeric sealants, determine compatibility when in contact with glazing and gasket materials.

3. Stain Testing: Perform testing per ASTM C1248 on interior and exterior sealants to determine if sealants or primers will stain adjacent surfaces. No sealant work is to start until results of these tests have been submitted to the Contracting Officer

Representative (COR) and the COR has given written approval to proceed with the work.

E. Preconstruction Field-Adhesion Testing: Before installing elastomeric sealants, field test their adhesion to joint substrates according to

Method A, Field-Applied Sealant Joint Hand Pull Tab, in Appendix X1.1 in ASTM C1193 or Method A, Tail Procedure, in ASTM C1521.

1. Locate test joints where indicated in construction documents or, if not indicated, as directed by COR.

2. Conduct field tests for each application indicated below:

a. Each type of elastomeric sealant and joint substrate indicated.

b. Each type of non-elastomeric sealant and joint substrate indicated.

3. Notify COR seven (7) days in advance of dates and times when test joints will be erected.

1.4 CERTIFICATION:

A. Contractor is to submit to the COR written certification that joints are of the proper size and design, that the materials supplied are compatible with adjacent materials and backing, that the materials will properly perform to provide permanent watertight, airtight or vapor tight seals (as applicable), and that materials supplied meet specified performance requirements.

1.5 SUBMITTALS:

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Sustainable Design Submittals, as described below:

1. Volatile organic compounds per volume as specified in

PART 2 - PRODUCTS.

C. Installer qualifications.

D. Contractor certification.

E. Manufacturer's installation instructions for each product used.

F. Cured samples of exposed sealants for each color.

07 92 00 - 3

G. Manufacturer's Literature and Data:

1. Primers

2. Sealing compound, each type, including compatibility when different sealants are in contact with each other.

H. Manufacturer warranty.

1.6 PROJECT CONDITIONS:

A. Environmental Limitations:

1. Do not proceed with installation of joint sealants under following conditions:

a. When ambient and substrate temperature conditions are outside limits permitted by joint sealant manufacturer or are below

4.4 degrees C (40 degrees F).

b. When joint substrates are wet.

B. Joint-Width Conditions:

1. Do not proceed with installation of joint sealants where joint widths are less than those allowed by joint sealant manufacturer for applications indicated.

C. Joint-Substrate Conditions:

1. Do not proceed with installation of joint sealants until contaminants capable of interfering with adhesion are removed from joint substrates.

1.7 DELIVERY, HANDLING, AND STORAGE:

A. Deliver materials in manufacturers' original unopened containers, with brand names, date of manufacture, shelf life, and material designation clearly marked thereon.

B. Carefully handle and store to prevent inclusion of foreign materials.

C. Do not subject to sustained temperatures exceeding 32 degrees C (90 degrees F) or less than 5 degrees C (40 degrees F).

1.8 DEFINITIONS:

A. Definitions of terms in accordance with ASTM C717 and as specified.

B. Backing Rod: A type of sealant backing.

C. Bond Breakers: A type of sealant backing.

D. Filler: A sealant backing used behind a back-up rod.

1.9 WARRANTY:

A. Construction Warranty: Comply with FAR clause 52.246-21 "Warranty of

Construction".

07 92 00 - 4

B. Manufacturer Warranty: Manufacturer shall warranty their sealant for a minimum of one (1) year from the date of installation and final acceptance by the Government. Submit manufacturer warranty.

1.10 APPLICABLE PUBLICATIONS:

A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.

B. ASTM International (ASTM):

C509-06.................Elastomeric Cellular Preformed Gasket and

Sealing Material

C612-14.................Mineral Fiber Block and Board Thermal

Insulation

C717-14a................Standard Terminology of Building Seals and

Sealants

C734-06(R2012)..........Test Method for Low-Temperature Flexibility of

Latex Sealants after Artificial Weathering

C794-10.................Test Method for Adhesion-in-Peel of Elastomeric

Joint Sealants

C919-12.................Use of Sealants in Acoustical Applications.

C920-14a................Elastomeric Joint Sealants.

C1021-08(R2014).........Laboratories Engaged in Testing of Building

Sealants

C1193-13................Standard Guide for Use of Joint Sealants.

C1248-08(R2012).........Test Method for Staining of Porous Substrate by

Joint Sealants

C1330-02(R2013).........Cylindrical Sealant Backing for Use with Cold

Liquid Applied Sealants

C1521-13................Standard Practice for Evaluating Adhesion of

Installed Weatherproofing Sealant Joints

D217-10.................Test Methods for Cone Penetration of

Lubricating Grease

D1056-14................Specification for Flexible Cellular Materials—

Sponge or Expanded Rubber

E84-09..................Surface Burning Characteristics of Building

Materials

C. Sealant, Waterproofing and Restoration Institute (SWRI).

The Professionals’ Guide

D. Environmental Protection Agency (EPA):

07 92 00 - 5

40 CFR 59(2014).........National Volatile Organic Compound Emission

Standards for Consumer and Commercial Products

PART 2 - PRODUCTS

SPEC WRITER NOTES:

2.1 SEALANTS:

A. Exterior Sealants:

1. S-1 Vertical surfaces, provide non-staining ASTM C920, Type S or M, Grade NS, Class 25.

2. S-2 Horizontal surfaces, provide ASTM C920, Type S or M, Grade P, Class 25.

3. Provide location(s) of exterior sealant as follows:

a. Voids where items penetrate exterior walls.

B. Interior Sealants:

1. VOC Content of Interior Sealants: Sealants and sealant primers used inside the weatherproofing system are to comply with the following limits for VOC content when calculated according to 40 CFR 59, (EPA

Method 24):

a. Architectural Sealants: 250 g/L.

b. Sealant Primers for Nonporous Substrates: 250 g/L.

c. Sealant Primers for Porous Substrates: 775 g/L.

2. S-3 Vertical and Horizontal Surfaces: ASTM C920, Type S or M, Grade

NS, Class 25, Use NT.

3. Provide location(s) of interior sealant as follows:

a. Interior surfaces of exterior wall penetrations.

2.2 COLOR:

A. Sealants used with exposed masonry are to match color of mortar joints.

B. Sealants used with unpainted concrete are to match color of adjacent concrete.

C. Color of sealants for other locations to be light gray or aluminum, unless otherwise indicated in construction documents.

2.3 JOINT SEALANT BACKING:

A. General: Provide sealant backings of material and type that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing.

07 92 00 - 6

B. Cylindrical Sealant Backings: ASTM C1330, of type indicated below and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance:

1. Type C: Closed-cell material with a surface skin.

C. Elastomeric Tubing Sealant Backings: Neoprene, butyl, EPDM, or silicone tubing complying with ASTM D1056 or synthetic rubber (ASTM C509), nonabsorbent to water and gas, and capable of remaining resilient at temperatures down to minus 32 degrees C (minus 26 degrees F). Provide products with low compression set and of size and shape to provide a secondary seal, to control sealant depth, and otherwise contribute to optimum sealant performance.

D. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint where such adhesion would result in sealant failure. Provide self-adhesive tape where applicable.

2.4 FILLER:

A. Mineral fiberboard: ASTM C612, Class 1.

B. Thickness same as joint width.

C. Depth to fill void completely behind back-up rod.

2.5 PRIMER:

A. As recommended by manufacturer of caulking or sealant material.

B. Stain free type.

2.6 CLEANERS-NON POROUS SURFACES:

A. Chemical cleaners compatible with sealant and acceptable to manufacturer of sealants and sealant backing material. Cleaners to be free of oily residues and other substances capable of staining or harming joint substrates and adjacent non-porous surfaces and formulated to promote adhesion of sealant and substrates.

PART 3 - EXECUTION

3.1 INSPECTION:

A. Inspect substrate surface for bond breaker contamination and unsound materials at adherent faces of sealant.

B. Coordinate for repair and resolution of unsound substrate materials.

C. Inspect for uniform joint widths and that dimensions are within tolerance established by sealant manufacturer.

07 92 00 - 7

3.2 PREPARATIONS:

A. Prepare joints in accordance with manufacturer's instructions and

SWRI (The Professionals’ Guide).

B. Clean surfaces of joint to receive caulking or sealants leaving joint dry to the touch, free from frost, moisture, grease, oil, wax, lacquer paint, or other foreign matter that would tend to destroy or impair adhesion.

1. Clean porous joint substrate surfaces by brushing, grinding, blast cleaning, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants.

2. Remove loose particles remaining from above cleaning operations by vacuuming or blowing out joints with oil-free compressed air. Porous joint surfaces include the following:

a. Concrete.

b. Masonry.

c. Unglazed surfaces of ceramic tile.

3. Remove laitance and form-release agents from concrete.

4. Clean nonporous surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants. Nonporous surfaces include the following:

a. Metal.

b. Glass.

c. Porcelain enamel.

d. Glazed surfaces of ceramic tile.

C. Do not cut or damage joint edges.

D. Apply non-staining masking tape to face of surfaces adjacent to joints before applying primers, caulking, or sealing compounds.

1. Do not leave gaps between ends of sealant backings.

2. Do not stretch, twist, puncture, or tear sealant backings.

3. Remove absorbent sealant backings that have become wet before sealant application and replace them with dry materials.

E. Apply primer to sides of joints wherever required by compound manufacturer's printed instructions or as indicated by pre-construction joint sealant substrate test.

1. Apply primer prior to installation of back-up rod or bond breaker tape.

07 92 00 - 8

2. Use brush or other approved means that will reach all parts of joints. Avoid application to or spillage onto adjacent substrate surfaces.

3.3 BACKING INSTALLATION:

A. Install backing material, to form joints enclosed on three sides as required for specified depth of sealant.

B. Where deep joints occur, install filler to fill space behind the backing rod and position the rod at proper depth.

C. Cut fillers installed by others to proper depth for installation of backing rod and sealants.

D. Install backing rod, without puncturing the material, to a uniform depth, within plus or minus 3 mm (1/8 inch) for sealant depths specified.

E. Where space for backing rod does not exist, install bond breaker tape strip at bottom (or back) of joint so sealant bonds only to two opposing surfaces.

3.4 SEALANT DEPTHS AND GEOMETRY:

A. At widths up to 6 mm (1/4 inch), sealant depth equal to width.

B. At widths over 6 mm (1/4 inch), sealant depth 1/2 of width up to 13 mm

(1/2 inch) maximum depth at center of joint with sealant thickness at center of joint approximately 1/2 of depth at adhesion surface.

3.5 INSTALLATION:

A. General:

1. Apply sealants and caulking only when ambient temperature is between

5 degrees C and 38 degrees C (40 degrees and 100 degrees F).

2. Do not install polysulfide base sealants where sealant may be exposed to fumes from bituminous materials, or where water vapor in continuous contact with cementitious materials may be present.

3. Do not install sealant type listed by manufacture as not suitable for use in locations specified.

4. Apply caulking and sealing compound in accordance with manufacturer's printed instructions.

5. Avoid dropping or smearing compound on adjacent surfaces.

6. Fill joints solidly with compound and finish compound smooth.

7. Tool exposed joints to form smooth and uniform beds, with slightly concave surface conforming to joint configuration per Figure 5A in

ASTM C1193 unless shown or specified otherwise in construction documents. Remove masking tape immediately after tooling of sealant

07 92 00 - 9 and before sealant face starts to “skin” over. Remove any excess sealant from adjacent surfaces of joint, leaving the working in a clean finished condition.

8. Finish paving or floor joints flush unless joint is otherwise detailed.

9. Apply compounds with nozzle size to fit joint width.

10. Test sealants for compatibility with each other and substrate. Use only compatible sealant. Submit test reports.

11. Replace sealant which is damaged during construction process.

B. For application of sealants, follow requirements of ASTM C1193 unless specified otherwise. Take all necessary steps to prevent three-sided adhesion of sealants.

C. Interior Sealants: Where gypsum board partitions are of sound rated, fire rated, or smoke barrier construction, follow requirements of ASTM

C919 only to seal all cut-outs and intersections with the adjoining construction unless specified otherwise.

1. Apply a 6 mm (1/4 inch) minimum bead of sealant each side of runners

(tracks), including those used at partition intersections with dissimilar wall construction.

2. Coordinate with application of gypsum board to install sealant immediately prior to application of gypsum board.

3. Partition intersections: Seal edges of face layer of gypsum board abutting intersecting partitions, before taping and finishing or application of veneer plaster-joint reinforcing.

4. Openings: Apply a 6 mm (1/4 inch) bead of sealant around all cutouts to seal openings of electrical boxes, ducts, pipes and similar penetrations. To seal electrical boxes, seal sides and backs.

5. Control Joints: Before control joints are installed, apply sealant in back of control joint to reduce flanking path for sound through control joint.

3.6 FIELD QUALITY CONTROL:

A. Field-Adhesion Testing: Field-test joint-sealant adhesion to joint substrates according to Method A, Field-Applied Sealant Joint Hand

Pull Tab, in Appendix X1 in ASTM C1193 or Method A, Tail Procedure, in

ASTM C1521.

1. Extent of Testing: Test completed elastomeric sealant joints as follows:

07 92 00 - 10

a. Perform 3 tests for first (6 inches) of joint length for each type of elastomeric sealant and joint substrate.

b. Perform one test for each joint length thereafter or one test per each floor per elevation.

B. Inspect joints for complete fill, for absence of voids, and for joint configuration complying with specified requirements.

C. Repair sealants pulled from test area by applying new sealants following same procedures used to originally seal joints. Ensure that original sealant surfaces are clean and new sealant contacts original sealant.

D. Evaluation of Field-Test Results: Sealants not evidencing adhesive failure from testing or noncompliance with other indicated requirements, will be considered satisfactory. Remove sealants that fail to adhere to joint substrates during testing or to comply with other requirements. Retest failed applications until test results prove sealants comply with indicated requirements.

3.7 CLEANING:

A. Fresh compound accidentally smeared on adjoining surfaces: Scrape off immediately and rub clean with a solvent as recommended by manufacturer of the adjacent material or if not otherwise indicated by the caulking or sealant manufacturer.

B. Leave adjacent surfaces in a clean and unstained condition.

- - - E N D - - -

610-312 Expand East Parking 05-01-15

10 13 00 - 1

SECTION 10 13 00

DIRECTORIES

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies exterior directories.

1.2 RELATED WORK

A. Section 10 14 00, SIGNAGE.

1.3 QUALITY ASSURANCE

A. Manufacturer’s Qualifications: Provide directories that are the product of a single manufacturer, that has provided units as specified for a minimum of three (3) years.

1.4 SUBMITTALS

A. Submit in accordance with Section 01 33 00, SHOP DRAWINGS, PRODUCT DATA

AND SAMPLES.

B. Samples: Directory panels and frames, with letters and symbols, each type.

1. Color samples of each color, 152 mm x 152 mm (6 inches x 6 inches).

Show anticipated range of color and texture.

2. Sample of typeface, arrow and symbols in a typical full size layout.

C. Manufacturer's Literature:

1. Manufacturer’s printed specifications, anchorage details, installation and maintenance instructions.

2. Manufacturer’s qualifications.

D. Directory location plan showing location and type of each directory.

1.5 DELIVERY AND STORAGE

A. Deliver materials to job in manufacturer's original sealed containers with brand name markings. Protect materials from damage.

B. Package to prevent damage or deterioration during shipment, handling, storage and installation. Maintain protective covering in place and in good repair until removal is necessary.

C. Deliver directories only when the site and mounting services are ready for installation work to proceed.

D. Store products in dry condition inside enclosed facilities.

1.6 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

10 13 00 - 2

B. ASTM International (ASTM):

A666-10.................Annealed or Cold-Worked Austenitic Stainless

Steel Sheet, Strip, Plate, and Flat Bar

B209-14.................Aluminum and Aluminum-Alloy Sheet and Plate

B209M-14................Aluminum and Aluminum-Alloy Sheet and Plate

(Metric)

B221-14.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes

B221M-13................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes (Metric)

C1036-11e1..............Flat Glass

C1048-12e1..............Heat-Strengthened and Fully Tempered Flat Glass

D1003-13................Haze and Luminous Transmittance of Transparent

Plastics

D4802-10................Poly(Methyl Methacrylate) Acrylic Plastic Sheet

C. American Architectural Manufacturers Association (AAMA):

611-14..................Anodized Architectural Aluminum

2603-13.................Voluntary Specification, Performance

Requirements and Test Procedures for Pigmented

Organic Coatings on Aluminum Extrusions and

Panels

D. National Association of Architectural Metal Manufacturers (NAAMM):

AMP 500 Series..........Metal Finishes Manual

E. Federal Specifications (Fed Spec):

MIL-PRF-8184F...........Plastic Sheet, Acrylic, Modified.

MIL-P-46144C............Plastic Sheet, Polycarbonate

F. National Fire Protection Association (NFPA):

70-14...................National Electric Code

PART 2 - PRODUCTS

2.1 DIRECTORY TYPE

A. Non-Illuminated Message Strip Directories:

1. Unframed: Directory with modular system of changeable message strips.

2.2 MATERIALS

A. Aluminum:

1. Sheet and Plate: ASTM B209M (B209).

2. Extrusions and Tubing: ASTM B221M (B221) Alloy 6063.

10 13 00 - 3

B. Clear Acrylic Sheet: ASTM D4802, Category A-1 (cell cast sheet) with

Finish 1 (smooth or polished) colorless sheet with visible light transmittance of 92 percent measured according to ASTM D1003.

C. Fasteners: Provide screws, bolts, and other fastening devices made from same material as items being fastened except provide hot dipped galvanized, stainless steel, or aluminum fasteners for exterior applications.

D. Electrical Components: Listed and labeled as defined in NFPA 70, by a qualified testing agency.

2.3 FABRICATION

A. Fabricate directories to requirements indicated for dimensions, design, and thickness and finish of materials. Provide metals and shapes of thickness and reinforcement to produce flat surfaces, free of oil canning.

B. Fabricate directory cabinets and door frames with reinforced corners, mitered and welded to a hairline fit, with no exposed fasteners.

Provide structural reinforcement to prevent racking and misalignment.

C. Message-Strip Directories: Provide message strips with wording and other designations for the locations where wording is indicated.

Include blank message strips as needed to fill out remainder of directory.

2.4 GENERAL FINISH REQUIREMENTS

A. Comply with NAAMM AMP 500 for recommendations for applying and designating finishes.

B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

C. Appearance of Finished Work: Noticeable variations in same piece are unacceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved samples and are assembled or installed to minimize contrast.

2.5 ALUMINUM FINISHES

A. Baked Enamel or Powder-Coat Finish: AAMA 2603 except with minimum dry film thickness of 0.04 mm (1.5 mils).

PART 3 - EXECUTION

3.1 INSTALLATION

A. General: Install directories in locations and at mounting heights indicated on construction documents and approved shop drawings. Keep perimeter lines straight, level, and plumb.

10 13 00 - 4

B. Recessed Directories: Attach directories to wall framing with fasteners at not more than 406 mm (16 inches) centers. Attach aluminum trim over edges of recessed directories, and conceal grounds and clips.

C. Surface-Mounted Directories: Attach directories to wall surfaces with concealed clips, hangers, or grounds fastened at not more than 406 mm

(16 inches) o.c. Secure both top and bottom of directories to walls.

3.2 ADJUSTING AND CLEANING

A. Adjust directory doors to operate smoothly without warp or bind and so that contact points meet accurately. Lubricate operating hardware as recommended by manufacturer.

B. Touch up factory-applied finishes to restore damaged or soiled areas.

- - - END - - -

610-312 Expand East Parking 10-01-15

10 14 00 - 1

SECTION 10 14 00

SIGNAGE

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies directional signs exterior signage and required signs.

B. This section specifies exterior signage.

1.2 RELATED WORK

A. Directories: Section 10 13 00, DIRECTORIES.

1.3 QUALITY ASSURANCE

A. Manufacturer’s Qualifications: Provide signage that is the product of one manufacturer, who has provided signage as specified for a minimum of three (3) years. Submit manufacturer’s qualifications.

B. Installer’s Qualifications: Minimum three (3) years’ experience in the installation of signage of the type as specified in this Section.

Submit installer’s qualifications.

1.4 SUBMITTALS

A. Submit in accordance with Section 01 33 00, SHOP DRAWINGS, PRODUCT DATA

AND SAMPLES.

B. Exterior Sign Samples: 152 x 152 mm (6 x 6 inches) samples of each color and material.

C. Manufacturer's Literature:

1. Showing the methods and procedures proposed for the anchorage of the signage system to each surface type.

2. Manufacturer’s printed specifications and maintenance instructions.

D. Sign Location Plan, showing location, type and total number of signs required.

E. Shop Drawings: Scaled for manufacture and fabrication of sign types.

Identify materials, show joints, welds, anchorage, accessory items, mounting and finishes.

F. Full size layout patterns for dimensional letters.

G. Manufacturer’s qualifications.

H. Installer’s qualifications.

1.5 DELIVERY AND STORAGE

A. Deliver materials to job in manufacturer's original sealed containers with brand name marked thereon. Protect materials from damage.

10 14 00 - 2

B. Package to prevent damage or deterioration during shipment, handling, storage and installation. Maintain protective covering in place and in good repair until removal is necessary.

C. Deliver signs only when the site and mounting services are ready for installation work to proceed.

D. Store products in dry condition inside enclosed facilities.

1.6 WARRANTY

A. Construction Warranty: Comply with FAR clause 52.246-21, “Warranty of

Construction”.

1.7 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. American Architectural Manufacturers Association (AAMA):

611-14..................Anodized Architectural Aluminum

2603-13.................Voluntary Specification, Performance

Requirements and Test Procedures for Pigmented

Organic Coatings on Aluminum Extrusions and

Panels

C. American National Standards Institute (ANSI):

A117.1-09...............Accessible and Usable Buildings and Facilities

D. ASTM International (ASTM):

A36/A36M-14.............Carbon Structural Steel

A240/A240M-15...........Chromium and Chromium-Nickel Stainless Steel

Plate, Sheet, and Strip for Pressure Vessels and for General Applications

A666-10.................Annealed or Cold-Worked Austenitic Stainless

Steel Sheet, Strip, Plate and Flat Bar

A1011/A1011M-14.........Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-

Strength Low-Alloy with Improved Formability, and Ultra-High Strength

B36/B36M-13.............Brass Plate, Sheet, Strip, and Rolled Bar

B152/B152M-13...........Copper Sheet, Strip, Plate, and Rolled Bar

B209-14.................Aluminum and Aluminum-Alloy Sheet and Plate

B209M-14................Aluminum and Aluminum-Alloy Sheet and Plate

(Metric)

10 14 00 - 3

B221-14.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes

B221M-13................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes (Metric)

C1036-11(R2012).........Flat Glass

C1048-12................Heat-Treated Flat Glass-Kind HS, Kind FT Coated and Uncoated Glass

C1349-10................Architectural Flat Glass Clad Polycarbonate

D1003-13................Test Method for Haze and Luminous Transmittance of Transparent Plastics

D4802-10................Poly(Methyl Methacrylate) Acrylic Plastic Sheet

D. Code of Federal Regulation (CFR):

40 CFR 59...............Determination of Volatile Matter Content, Water

Content, Density Volume Solids, and Weight

Solids of Surface Coating

E. Federal Specifications (Fed Spec):

MIL-PRF-8184F...........Plastic Sheet, Acrylic, Modified.

MIL-P-46144C............Plastic Sheet, Polycarbonate

F. National Fire Protection Association (NFPA):

70-14...................National Electrical Code

PART 2 - PRODUCTS

2.1 SIGNAGE GENERAL

A. Provide signs of type, size and design shown on the construction documents.

B. Provide signs complete with lettering, framing and related components for a complete installation.

C. Provide graphics items as completed units produced by a single manufacturer, including necessary mounting accessories, fittings and fastenings.

D. Do not scale construction documents for dimensions. Verify dimensions and coordinate with field conditions. Notify Contracting Officer

Representative (COR) of discrepancies or changes needed to satisfy the requirements of the construction documents.

2.2 EXTERIOR SIGNAGE PERFORMANCE REQUIREMENTS

A. Thermal Movements: For exterior signs, allow for thermal movements from ambient and surface temperature changes 67 degrees C (120 degrees F) ambient and 100 degrees C (180 degrees F) material surfaces.

10 14 00 - 4

B. Provide installed electrical components and sign installations bearing the label and certifications of Underwriter’s Laboratories, Inc., and comply with NFPA 70 as well as applicable federal codes for installation techniques, fabrication methods and general product safety.

2.3 EXTERIOR SIGN MATERIALS

A. Aluminum Sheet and Plate: ASTM B209M (B209).

B. Aluminum Extrusions: ASTM B221M (B221).

C. Steel Products: Structural steel products that conform to

ASTM A36/A36M. Sheet and strip steel products that conform to

ASTM A1011/A1011M.

D. Stainless Steel Sheet: ASTM A240/A240M, stretcher leveled standard of flatness.

E. Finish:

1. Aluminum Finishes:

a. Baked Enamel or Powder Coat Finish: AAMA 2603 with a minimum dry film thickness of 0.04 mm (1.5 mils).

2. Metallic Coated Steel Finish:

a. Baked Enamel or Powder Coat Finish: After cleaning and pretreating, apply manufacturer’s standard two (2) coat baked-on finish consisting of prime coat and thermosetting topcoat to a minimum dry film thickness of 0.05 mm (2 mils).

2.4 EXTERIOR SIGN TYPES

A. General:

1. Fabricate signs that comply with VA Signage Design Guide.

B. Text and Graphics:

1. Illuminated Signs: Form graphics with…

This is the start of the file's text. The full file is on GovTribe.