This is a presolicitation notice for a construction project to build a Containment Segregated Compounding Area at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project scope includes demolition of existing structures and construction of a new compounding area and associated spaces. The estimated construction cost range is between $500,000 to $1,000,000. The requirement will use sealed bidding procurement per FAR Part 14.101 and is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The NAICS code is 236220 and the small business size standard is $39.5 million. The solicitation is expected to be posted on December 28, 2021 and close on January 26, 2022. Questions must be submitted in writing by email to the named Contract Specialist by the solicitation release date and include the project and solicitation numbers in the subject line. Offerors must have an active registration in the System for Award Management and Central Contractor Registration databases at time of offer submission and award. The awarded contractor must also enroll in VETS-4212.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VSMC
See Location on Floor Plans
H
L
AI - Supply Air Static Pressure
SA
BI - High Static Shutdown
H L
AI - Supply Air Humidity
H L
AI - MERV 13 Prefilter Differential Pressure
AI - Preheat Coil Leaving Air Temp
BO - Preheating ON/OFF Control Valve
LPR
LPS
STM
IFB
OA GENERAL EXHAUST
AI - Supply Air Temp
SF
AO - Cooling Valve
CHWS
CHWR
CHW
BO - Supply Fan Start/Stop
BI - Supply Fan Status
AO - Supply Fan VSMC Speed
BI - Supply Fan VSMC Fault
STM
H L
AI - MERV 8 Prefilter Differential Pressure
BO - Outside Air Damper
BI - Freezestat
30 PSIG STM
ZC
PDS PDS
AO - Humidifier Control Valve
BO - Humidifier Isolation Valve
TT TSL
NC
ZC ZC
ZC
ZC
AI - Chilled Water Coil
Leaving Air Temp
TT
IT
MT TT
HPS
SPSTT
AI - Cooling Coil Leaving Water Temperature
ZC
AO - Air to Air Heat Exchanger Bypass Damper
NC TO
BYPASS
LH
AI - MERV 8 Prefilter Differential Pressure
PDS
VSMC
EF
BO - Exhaust Fan Start/Stop
BI - Exhaust Fan Status
AO - Exhaust Fan VSMC Speed
BI - Exhaust Fan VSMC Fault
IT
AAHX-1
AO - IFB Damper ZC
AI - Entering Exhaust Air Temperature
TT
BO - Exhaust Air Damper
ZC
NC
AI - Outside Air Temperature
TT
AI - Air to Air Heat Exchanger Leaving Air Temperature
TT
TT
AI - Leaving Exhaust Air Temperature
C-SCA
G101E
AI - Space Humidity
MT
AI - Supply AirflowAI - Exhaust Airflow
30 5
AIR HANDLING UNIT SEQUENCE OF OPERATION: AHU-1
GENERAL
THE AIR HANDLING UNIT SHALL FUNCTION CONTINUOUSLY IN ORDER TO MAINTAIN TEMPERATURE, HUMIDITY AND PRESSURIZATION SETPOINTS IN THE NEW SEGREGATED COMPOUNDING PHARMACY. THE UNIT SHALL BE
CONTROLLED WITH DIRECT DIGITAL CONTROL ACCORDING TO THE FOLLOWING SEQUENCES.
H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE. WHEN THE UNIT IS "OFF", THE OUTSIDE AIR DAMPER SHALL BE FULLY CLOSED. WHEN THE UNIT IS "ON" THE OUTSIDE AIR DAMPER SHALL BE FULLY OPEN. THE AIR TO AIR HEAT EXCHANGER BYPASS DAMPER SHALL
BE CLOSED TO THE BYPASS.
ALL SETPOINTS SPECIFIED IN THIS SEQUENCE SHALL BE ADJUSTABLE.
FAN OPERATION
THE SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER (VSMC) SHALL CONTROL THE SUPPLY FAN SPEED TO
MAINTAIN 1" OF STATIC PRESSURE AT THE SUPPLY AIR STATIC PRESSURE SENSOR.
ENABLE STATIC PRESSURE RESET LOGIC 5 MINUTES AFTER THE SUPPLY FAN IS ON. REDUCE THE STATIC PRESSURE SETPOINT BY 0.04” EVERY 2 MINUTES. AS THE STATIC PRESSURE SETPOINT DROPS, THE VAV BOXES DOWNSTREAM WILL OPEN FURTHER. ONCE 1 VAV BOX OPENS MORE THAN 95%, INCREASE THE STATIC PRESSURE SETPOINT BY 0.06” EVERY 2 MINUTES UNTIL ALL VAV BOXES ARE LESS THAN 85% OPEN. BEGIN REDUCING THE STATIC PRESSURE
SETPOINT BY 0.04” EVERY 2 MINUTES TO RESTART THE CONTROL LOOP.
THE HIGH STATIC SHUTDOWN SENSOR SHALL PREVENT THE SUPPLY FAN FROM DEVELOPING OVER 3" OF STATIC PRESSURE. IF STATIC PRESSURE EXCEEDS 3", THE SUPPLY FAN SHALL STOP AND THE UNIT SHALL BE SHUT DOWN.
THE HIGH STATIC SHUTDOWN SENSOR WILL REQUIRE MANUAL RESET AT THE DEVICE.
THE EXHAUST FAN VARIABLE SPEED MOTOR CONTROLLER (VSMC) SHALL CONTROL THE EXHAUST FAN SPEED TO MAINTAIN A CONSTANT EXHAUST AIRFLOW. REFER TO DRAWINGS FOR EXHAUST AIRFLOW SETPOINT.
TEMPERATURE CONTROL
THE AIR HANDLING UNIT SHALL ENTER "COOLING MODE" WHENEVER THE OUTDOOR AIR TEMPERATURE IS ABOVE 48
DEG F AND "HEATING MODE" WHENEVER THE OUTDOOR AIR TEMPERATURE IS BELOW 48 DEG F.
IN COOLING MODE, MODULATE THE COOLING VALVE TO MAINTAIN THE CHILLED WATER COIL LEAVING AIR TEMPERATURE SETPOINT, 48 DEG F. THE PREHEATING VALVE AND HUMIDIFIER ISOLATION VALVE SHALL BE CLOSED.
IN HEATING MODE, THE PREHEATING ON/OFF CONTROL VALVE SHALL OPEN. THE IFB DAMPER SHALL BE OPEN TO THE BYPASS AND SHALL MODULATE CLOSED TO MAINTAIN THE SUPPLY AIR TEMPERATURE SETPOINT, 52 DEG F. THE
COOLING VALVE SHALL BE CLOSED AND THE HUMIDIFIER ISOLATION VALVE SHALL BE OPEN.
AIR TO AIR HEAT EXCHANGER BYPASS DAMPER OPERATION
IN COOLING MODE, WHEN THE OUTDOOR AIR TEMPERATURE IS ABOVE THE EXHAUST AIR TEMPERATURE, CLOSE THE BYPASS DAMPER TO THE BYPASS. WHEN THE OUTDOOR AIR TEMPERATURE IS BELOW THE EXHAUST AIR
TEMPERATURE, OPEN THE BYPASS DAMPER TO THE BYPASS.
IN HEATING MODE, MODULATE THE BYPASS DAMPER TO MAINTAIN THE AIR TO AIR HEAT EXCHANGER BYPASS
TEMPERATURE SETPOINT AT 48 DEG F.
AIR TO AIR HEAT EXCHANGER FROST CONTROL
WHENEVER THE LEAVING EXHAUST AIR TEMPERATURE IS BELOW 30 DEG F, MODULATE THE AIR TO AIR HEAT EXCHANGER BYPASS DAMPER OPEN TO THE BYPASS UNTIL THE LEAVING EXHAUST AIR TEMPERATURE RISES TO 35
DEG F, THEN RETURN TO NORMAL OPERATION.
HUMIDITY CONTROL
THE AIR HANDLING UNIT SHALL ENTER "HUMIDIFICATION MODE" WHENEVER THE AIR HANDLING UNIT IS IN HEATING
MODE AND THE SPACE HUMIDITY IN ROOM G101E C-SCA IS BELOW 35%.
IN HUMIDIFICATION MODE, OPEN THE HUMIDIFIER CONTROL VALVE UNTIL THE EXHAUST AIR HUMIDITY IS ABOVE 40%, THEN CLOSE THE HUMIDIFIER CONTROL VALVE.
THE AIR HANDLING UNIT SHALL ENTER "DEHUMIDIFICATION MODE" WHENEVER THE AIR HANDLING UNIT IS IN
COOLING MODE AND THE SPACE HUMIDITY IN ROOM G101E C-SCA IS ABOVE 55%.
IN DEHUMIDIFICATION MODE, FULLY OPEN THE COOLING COIL CONTROL VALVE UNTIL THE SPACE HUMIDITY IN ROOM
G101E C-SCA IS BELOW 50% THEN RETURN TO COOLING MODE VALVE OPERATION.
ALARMS
WHEN THE FREEZESTAT SENSES A TEMPERATURE BELOW 40F, CLOSE THE COOLING VALVE, OPEN THE PREHEATING VALVE AND SEND AN ALARM TO THE OPERATOR WORKSTATION. IF THE FREEZESTAT SENSES A TEMPERATURE BELOW 35 DEG F, SHUT DOWN THE UNIT. THE FREEZESTAT WILL REQUIRE MANUAL RESET AT THE DEVICE.
SEND ALARM TO THE OPERATOR WORKSTATION UPON FAILURE OF THE VSMC FOR THE SUPPLY AND EXHAUST FANS.
THE SUPPLY OR EXHAUST FAN SHALL BE STARTED/STOPPED MANUALLY AT THE DIGITAL CONTROL PANEL OR THE
STARTER BY-PASS. THE FAN SHALL OPERATE AT CONSANT SPEED.
SEND ALARM TO THE OPERATOR WORKSTATION WHEN EITHER THE MERV 8 OR MERV 13 PREFILTER DIFFERENTIAL PRESSURE SENSOR READS A HIGHER DIFFERENTIAL PRESSURE THAN THE CHANGEOVER DIFFERENTIAL PRESSURE
DETERMINED BY THE AIR HANDLING UNIT MANUFACTURER.
IF COOLING MODE IS NOT ENABLED, SEND ALARM TO THE OPERATOR WORKSTATION IF THE SUPPLY AIR HUMIDITY IS
ABOVE 90%.
SEND ALARM TO THE OPERATOR WORKSTATION IF THE SPACE RELATIVE HUMIDITY IS ABOVE 60% DURING COOLING
MODE OR BELOW 30% DURING HEATING MODE.
SEND ALARM TO THE OPERATOR WORKSTATION WHENEVER THE LEAVING EXHAUST AIR TEMPERATURE IS BELOW 30
DEG F.
C-SCA
G101E
VESTIBULE
G101D
BIO-SAFETY
CABINET
P S2
P S1
P
VAV-1
VAV-2
VV-1
VV-2
SEGREGATED COMPOUNDING PHARMACY PRESSURIZATION AND AIRFLOW CONTROL
GENERAL
THE SEGREGATED COMPOUNDING PHARMACY REQUIRES CONTINUOUS AIRFLOW, TEMPERATURE, HUMIDITY, AND
PRESSURE MONITORING AND CONTROL TO MAINTAIN SPACE FUNCTIONALITY.
REFER TO "CV BOX SEQUENCE OF OPERATION" ON THIS SHEET FOR SPACE TEMPERATURE CONTROL.
ALL SETPOINTS SPECIFIED IN THIS SEQUENCE SHALL BE ADJUSTABLE.
ROOM CONTROL: G101E C-SCA
THE AIR FLOW CONTROL VALVE, VV-1, SHALL RESPOND TO UPSTREAM DUCT STATIC PRESSURE AND MODULATE TO
MAINTAIN A CONSTANT EXHAUST AIRFLOW FROM THE BIO-SAFETY CABINET.
THE VAV BOX, VAV-2, SHALL RESPOND TO UPSTREAM DUCT STATIC PRESSURE TO MAINTAIN ITS AIRFLOW SETPOINT.
THE TAB CONTRACTOR SHALL DETERMINE THE AIRFLOW OFFSET REQUIRED TO MAINTAIN -0.02" BETWEEN G101E C- SCA AND G101D VESTIBULE. UPDATE THE AIRFLOW SETPOINT FOR AIR FLOW CONTROL VALVE, VV-2, TO MAINTAIN THE AIRFLOW OFFSET. THE AIR FLOW CONTROL VALVE, VV-2, SHALL RESPOND TO UPSTREAM DUCT STATIC
PRESSURE TO MAINTAIN ITS AIRFLOW SETPOINT.
ROOM CONTROL: G101D VESTIBULE
THE AIRFLOW SETPOINT FOR THE VAV BOX, VAV-1, SHALL BE EQUAL TO THE AIRFLOW OFFSET. THE VAV BOX, VAV-1, SHALL RESPOND TO UPSTREAM DUCT STATIC PRESSURE TO MAINTAIN ITS AIRFLOW SETPOINT.
ALARMS
SEND ALARM TO THE OPERATOR WORKSTATION WHENEVER THE DIFFERENTIAL PRESSURE BETWEEN ROOM PRESSURE SENSOR 1 AND 2 IS BELOW 0.01" OR ABOVE 0.03". DISABLE ALARM WHENEVER THE DOOR SWITCH SENDS A SIGNAL THAT THE DOOR IS OPEN. ONCE THE DOOR IS CLOSED, PROVIDE A 5 MINUTE DELAY BEFORE ACTIVATING
THE ALARM AGAIN.
SEND ALARM TO THE OPERATOR WORKSTATION WHENEVER THERE IS A 10% DIFFERENCE BETWEEN A TERMINAL
UNIT'S AIRFLOW AND ITS SETPOINT.
BIO-SAFETY
CABINET EXHAUST
ROOM EXHAUST
TO AHU-1
TO AHU-1
PC
CRITICAL ENVIRONMENT
CONTROLLER
DOOR
SWITCH
ROOM THERMOSTAT/SENSOR
WALL MOUNTED
48" [1200mm] AFF.
CV BOX CONTROL SEQUENCE
TU
RHC
HWS
HWR
V-1
REHEAT
COIL
AIR
TERMINAL
UNIT
AIR
FLOW
TE
CRITICAL
ENVIRONMENT
CONTROLLER
PC
TT
A. UPON FALL IN SPACE TEMPERATURE BELOW SET
POINT VALVE V-1 WILL MODULATE TO MAINTAIN SET
POINT ± .5°, THE ADJUSTABLE TOLERANCE OF ± .5°
HAS BEEN SELECTED TO PREVENT VALVE HUNTING.
B. THE REVERSE SHALL OCCUR ON RISE IN SPACE
TEMPERATURE.
FE
P-1
NOTES:
1. PIPING DIAGRAM PROVIDES OVERVIEW OF SYSTEM AND MAJOR
COMPONENTS. EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH
THIS DIAGRAM IN ADDITION TO EQUIPMENT DETAILS, SPECIFICATIONS, AND
MANUFACTURER'S INSTALLATION REQUIREMENTS.
2. IF BID ITEM #2 IS, ACCEPTED REMOVE WORK ENCLOSED IN BOX ALL
ASSOCIATED POINTS.
P-2
ACCH-1
TT
TT
FS
FT
BI - Pump 1 Status
BO - Pump 1 Start/Stop
AO - Pump 1 ECM Speed
BI - Pump 1 ECM Fault
IT
VSMC
To AHU-1
From AHU-1
BI - Chiller Flow Switch
AI - Chiller Flow
AI - Chiller Entering Water Temperature
AI - Chiller Leaving Water Temperature
BI - Chiller Status
IT
BO - Chiller Start/Stop
To Plant From Plant
NC
NC NC
NO
ZC
BO - Chiller Plant Bypass Valve
ZC
ZC
BO - Chiller Plant Supply Valve
BO - Chiller Plant Return Valve
ZC
BO - Chiller Bypass Valve
BI - Pump 2 Status
BO - Pump 2 Start/Stop
AO - Pump 2 ECM Speed
BI - Pump 2 ECM Fault
IT
VSMC
DP NC
ZC
AO - AHU Bypass Valve
AI - Cooling Coil Differential Pressure Sensor
CHILLED WATER LOOP SEQUENCE OF OPERATION
GENERAL
THE CHILLED WATER SYSTEM SHALL BE ENABLED WHENEVER AHU-1 CALLS FOR MECHANICAL COOLING. UPON RECEIVING THE SIGNAL, THE CHILLED WATER PUMP SHALL START. ONCE CHILLED WATER FLOW THROUGH THE CHILLER IS PROVEN BY THE CHILLER FLOW SWITCH, THE CHILLER SHALL START.
ALL SETPOINTS SPECIFIED IN THIS SEQUENCE SHALL BE ADJUSTABLE.
PUMP OPERATION
THE CHILLED WATER PUMPS, P-1 AND P-2, SHALL OPERATE IN LEAD/STANDBY CONFIGURATION. THE LEAD PUMP SHALL RUN FIRST. UPON FAILURE OF THE LEAD PUMP, THE STANDBY PUMP SHALL RUN AND THE LEAD PUMP SHALL TURN OFF. THE DESIGNATED LEAD PUMP SHALL ROTATE UPON ONE OF THE FOLLOWING CONDITIONS: USER SELECTABLE MANUALLY THROUGH A SOFTWARE
SWITCH, IF PUMP RUNTIME IS EXCEEDED, AND SCHEDULED (DAILY / WEEKLY / MONTHLY).
THE ENABLED PUMP SHALL MODULATE ECM SPEED TO MAINTAIN A CONSTANT DIFFERENTIAL PRESSURE MEASURED BY THE COOLING COIL DIFFERENTIAL PRESSURE SENSOR. DIFFERENTIAL
PRESSURE SETPOINT SHALL BE DETERMINED IN THE FIELD BY THE TAB CONTRACTOR.
CHILLER OPERATION
THE CHILLER SHALL RESPOND TO CHANGES IN CHILLER ENTERING WATER TEMPERATURE AND STAGE COMPRESSORS ON AND OFF TO MAINTAIN CHILLER LEAVING WATER TEMPERATURE
SETPOINT.
MODULATE THE AHU BYPASS VALVE TO MAINTAIN THE CHILLER MINIMUM FLOW RATE. WHEN THE CHILLED WATER FLOW IS ABOVE THE CHILLER MINIMUM FLOW RATE, CLOSE THE AHU BYPASS
VALVE.
EMERGENCY CHILLED WATER CENTRAL PLANT OPERATION
THE NEW DEDICATED CHILLED WATER LOOP SHALL BE CONNECTED TO THE CENTRAL CHILLED WATER PLANT. UPON FAILURE OF THE NEW CHILLER, OPEN THE CHILLER BYPASS VALVE, OPEN THE CHILLER PLANT RETURN VALVE, OPEN THE CHILLER PLANT SUPPLY VALVE, CLOSE THE CHILLER PLANT BYPASS VALVE, AND CLOSE THE AHU BYPASS VALVE TO UTILIZE CENTRAL PLANT CHILLED
WATER DURING THE SHUTDOWN.
DURING EMERGENCY CHILLED WATER CENTRAL PLANT OPERATION, THE CHILLED WATER PUMP CONTROL SHALL REMAIN THE SAME.
ALARMS
SEND ALARM TO THE OPERATOR WORKSTATION WHEN THE CHILLER LEAVING WATER TEMPERATURE RISES 2 DEG F ABOVE SETPOINT. ACTIVATE ALARM 15 MINUTES AFTER THE CHILLER IS
COMMANDED TO RUN.
SEND ALARM TO THE OPERATOR WORKSTATION WHEN UPON FAILURE OF THE PUMPS OR CHILLER.
VFD
See Location on Floor Plans
EF-1
IT
SPS
BI - Exhaust Fan Status
BO - Exhaust Fan Start/Stop
AO - Exhaust Fan VFD Speed
BI - Exhaust Fan VFD Fault
AI - Exhaust Air Static Pressure
To VV-1
To VV-2
EXHAUST FAN SEQUENCE OF OPERATION: EF-1
GENERAL
THE EXHAUST FAN SHALL FUNCTION CONTINUOUSLY. THE UNIT SHALL BE CONTROLLED WITH DIRECT DIGITAL
CONTROL ACCORDING TO THE FOLLOWING SEQUENCES.
H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR
MAINTENANCE.
ALL SETPOINTS SPECIFIED IN THIS SEQUENCE SHALL BE ADJUSTABLE.
FAN OPERATION
THE EXHAUST FAN VARIABLE FREQUENCY DRIVE (VFD) SHALL CONTROL THE EXHAUST FAN SPEED TO MAINTAIN 0.5"
OF STATIC PRESSURE AT THE EXHAUST AIR STATIC PRESSURE SENSOR.
ALARMS
SEND ALARM TO THE OPERATOR WORKSTATION UPON FAILURE OF THE VSMC FOR THE EXHAUST FAN. THE EXHAUST FAN SHALL BE STARTED/STOPPED MANUALLY AT THE DIGITAL CONTROL PANEL OR THE STARTER BY-PASS. THE FAN
SHALL OPERATE AT CONSANT SPEED.
SEND ALARM TO THE OPERATOR WORKSTATION AND SHUT DOWN THE EXHAUST FAN IF THE EXHAUST AIR STATIC
PRESSURE FALLS BELOW -3".
EF-1 Hardware Points Software Points
Point # Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On Graphic
1 Exhaust Air Static Pressure x x x x
2 Exhaust Fan VFD Speed x x x
3 Exhaust Fan Status x x x
4 Exhaust Fan VFD Fault x x x
5 Exhaust Fan Start/Stop x x x
- Exhaust Air Static Pressure Setpoint x x x
AIR TERMINAL UNITS Hardware Points Software Points
Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On Graphic
VAV Box
Airflow x x x x
Zone Damper x x x
Discharge Air Temperature x x x
Control Valve x x x
Room Temperature x x x
Airflow Setpoint x x x
Air Flow Control Valve (VV-1)
Airflow x x x x
Actuator Position x x x
Airflow Setpoint x x x
Air Flow Control Valve (VV-2)
Airflow x x x x
Actuator Position x x x
Room Diffierential Pressure x x x x
Airflow Offset Setpoint x x x
AHU-1 Hardware Points Software Points
Point # Point Name AI AO BI BO AV BV Loop Sched Trend Alarm
Show On Graphic
1 MERV 8 Supply Prefilter Differential Pressure x x x
2 MERV 13 Supply Prefilter Differential Pressure x x x
3 MERV 8 Exhaust Prefilter Differential Pressure x x x
4 Entering Exhaust Air Temperature x x x
5 Leaving Exhaust Air Temperature x x x x
6 Outside Air Temperature x x x
7 Air to Air Heat Exchanger Leaving Air Temperature x x x
8 Preheat Coil Leaving Air Temp x x x
9 Cooling Coil Leaving Water Temperature x x x
10 Chilled Water Coil Leaving Air Temp x x x
11 Supply Air Humidity x x x
12 Supply Air Static Pressure x x x
13 Supply Air Temp x x x
14 Space Humidity x x x x
15 Supply Airflow x x x
16 Exhaust Airflow x x x
17 Air to Air Heat Exchanger Bypass Damper x x x
18 Cooling Valve x x x
19 Humidifier Control Valve x x x
20 IFB Damper x x x
21 Supply Fan VSMC Speed x x x
22 Exhaust Fan VSMC Speed x x x
23 Freezestat x x x x
24 High Static Shutdown x x x x
25 Supply Fan Status x x x
26 Supply Fan VSMC Fault x x x
27 Exhaust Fan Status x x x
28 Exhaust Fan VSMC Fault x x x
29 Outside Air Damper x x
30 Exhaust Air Damper x
31 Preheating ON/OFF Control Valve x x
32 Humidifier Isolation Valve x x
33 Supply Fan Start/Stop x x x
34 Exhaust Fan Start/Stop x x x
- Space Humidity Setpoint x x
- Supply Air Static Pressure Setpoint x x x
- Supply Air Temperature Setpoint x x x
- Mixed Air Temperature Setpoint x
- Exhaust Airflow Setpoint x
- Emergency Shutdown x x x x
- High Supply Air Humidity x
- High Supply Air Static Pressure x
- MERV 8 Supply Prefilter Change Required x x
- MERV 13 Supply Prefilter Change Required x x
- MERV 8 Exhaust Prefilter Change Required x x
CHILLED WATER SYSTEM Hardware Points Software Points
Point # Point Name AI AO BI BO AV BV Loop Sched Trend Alarm
Show On Graphic
1 Chiller Entering Water Temperature x x x
2 Chiller Leaving Water Temperature x x x x
3 Chiller Flow x x x x
4 Cooling Coil Differential Pressure Sensor x x x
5 AHU Bypass Valve x x x
6 Pump 1 ECM Speed x x x
7 Pump 2 ECM Speed x x x
8 Chiller Flow Switch x x x
9 Chiller Status x x x x
10 Pump 1 Status x x
11 Pump 2 Status x x
12 Pump 1 ECM Fault x x x x
13 Pump 2 ECM Fault x x x x
14 Pump 1 Start/Stop x x x
15 Pump 2 Start/Stop x x x
16 Chiller Start/Stop x x x
17 Chiller Bypass Valve x x x
18 Chiller Plant Bypass Valve x x x
19 Chiller Plant Supply Valve x x x
20 Chiller Plant Return Valve x x x
- Cooling Coil Differential Pressure Setpoint x x
- Chiller Leaving Water Temperature Setpoint x x
CONTROLS GENERAL NOTES
1. POINTS SHOWN ARE INTENDED AS AN AID TO THE CONTRACTOR INDICATING THE MINIMUM POINTS REQUIRED FOR CONTROL AND MONITORING. ALL INPUT AND OUTPUT POINTS, AND THEIR REQUIRED INTERFACE AND ACCESSORY HARDWARE, SHALL BE PROVIDED FOR A COMPLETE AND FUNCTION CONTROL SYSTEM. IF ADDITIONAL POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL SPECIFIED, THESE POINTS, ALONG WITH ADDITIONAL DIRECT DIGITAL CONTROL PANEL(S) (IF REQUIRED), SHALL ALSO BE PROVIDED.
2. POWER SOURCE FOR ALL CONTROLS ASSOCIATED WITH CRITICAL SPACES SHALL BE THE "CRITICAL" BRANCH OF THE EMERGENCY POWER SYSTEM.
3. DIVISION 26 SCOPE OF WORK INCLUDES A POWER SOURCE TO THE MOTOR STARTERS. ALL HVAC POWER SOURCES REQUIRED BEYOND THESE STARTERS OR BEYOND SOURCES EXPLICITLY SHOWN ON THE DIVISION 26 DRAWINGS, SHALL BE PROVIDED UNDER THE TEMPERATURE CONTROLS
WORK.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:0
A
M
M701
MECHANICAL CONTROLS
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
AHU-1 CONTROLS DIAGRAM
EF-1 CONTROLS DIAGRAM
No. Revisions: Date:
BID DOCUMENTS 9/15/2021
CARD READER
AUTOMATIC DOOR MOTOR
HANDICAP DOOR OPERATOR - TOUCHLESS
ACTIVATION SENSORS
ELECTRIC LATCH
SECURITY CAMERA CCTV - DOME
DURESS/PANIC ALARM
PILOT LIGHT / CHIME
DOOR CONTACT
MD MOTION DETECTOR
CC
CR
EL
AP
X
DC
K
DM
HA
WIRELESS ACCESS POINT
KEY PAD
KC KEY PAD / CARD READER
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNCIATOR PANEL
SMOKE DETECTOR
DUCT DETECTOR. "R" INDICATES RETURN DUCT. "S"
INDICATES SUPPLY DUCT.
FACP
FAA
S
S R
FIRE ALARM
DATA/TELEPHONE
SECURITY / ACCESS CONTROL
LIGHTING
POWER
GROUNDING
EMERGENCY LIGHT
EXTERIOR SITE
WIRING ABBREVIATIONS
DATA/TELEPHONE OUTLET. PROVIDE (2) CAT 6a CABLES WITHIN
CONDUIT OR OTHER APPROVED RACEWAY FROM OUTLET TO
NEAREST IT CLOSET OR CABLE TRAY. SUBSCRIPT INDICATES # OF
DATA CABLES.
1' x 4' FIXTURE. UPPERCASE INDICATES TYPE PER THE FIXTURE SCHEDULE.
LOWER CASE LETTER "a" INDICATES SWITCH ZONE.
2' x 4' FIXTURE.
WALL MOUNTED FIXTURE.
INDUSTRIAL FIXTURE.
WALL MOUNTED FIXTURE.
EXIT SIGN WITH DIRECTIONAL ARROWS AS INDICATED
RECESSED FIXTURE, DOWNLIGHT
3-WAY, 20 AMP, 125 VOLT TOGGLE SWITCH MOUNTED 42" AFF.
4-WAY, 20 AMP, 125 VOLT TOGGLE SWITCH MOUNTED 42" AFF.
WALL MOUNTED OCCUPANCY SENSOR WITH OVERRIDE SWITCH
CEILING MOUNTED OCCUPANCY SENSOR
20 AMP, 125 VOLT SINGLE-POLE TOGGLE SWITCH MOUNTED 42" AFF.
a - CONTROLS LIGHTS WITH "a" DESIGNATION
LIGHTING CONTROLLER
20A, 125V DIMMER SWITCH MOUNTED 42" AFF
2' x 2' FIXTURE.
CEILING MOUNTED DAYLIGHT SENSOR
PHOTOCELL
A1 a a
OS
D
OS
DS
LC#
PC
FLUSH FLOOR MOUNTED NEMA 5-20 DUPLEX RECEPTACLE
UNLESS NOTED OTHERWISE
FLUSH FLOOR MOUNTED NEMA 5-20 QUAD RECEPTACLE
UNLESS NOTED OTHERWISE
NEMA 5-20 DUPLEX RECEPTACLE MOUNTED 18" AFF
UNLESS NOTED OTHERWISE
SUBSCRIPT: WP - WEATHERPROOF, GF - GROUND FAULT CIRCUIT
INTERRUPTER
NEMA 5-20 DOUBLE DUPLEX RECEPTACLE MOUNTED 18" AFF
UNLESS NOTED OTHERWISE
NEMA 5-20 DUPLEX RECEPTACLE MOUNTED 44" AFF
UNLESS NOTED OTHERWISE
RECEPTACLE, (NEMA CONFIGURATION AS NOTED)
NEMA 5-20 DUPLEX RECEPTACLE WITH USB CHARGER MOUNTED 18" AFF
UNLESS NOTED OTHERWISE
NEMA 5-20 DUPLEX SPLIT RECEPTACLE MOUNTED 18" AFF
UNLESS NOTED OTHERWISE
NEMA 5-20 SIMPLEX RECEPTACLE MOUNTED 18" AFF
UNLESS NOTED OTHERWISE
JUNCTION BOX
POWER CONNECTION
MOTOR
NON-FUSED DISCONNECT SWITCH. SIZE AS SHOWN
FUSED DISCONNECT SWITCH. SIZE FUSES FOR EQUIPMENT
BASED ON MANUFACTURERS RECOMMENDATIONS
COMBINATION STARTER
SURFACE MOUNTED PANELBOARD OR AUTOMATIC TRANSFER
SWITCH AS INDICATED.
RECESSED MOUNTED PANELBOARD
UNDERGROUND
CONCEALED OR OPEN
FLEXIBLE CONDUIT CONNECTION
EXISTING UNDERGROUND ELECTRICAL LINE.EUP
WP/GF
6-30R
J
EXISTING OVERHEAD ELECTRICAL LINE.
EXISTING UNDERGROUND COMMUNICATION LINE
EXISTING OVERHEAD COMMUNICATION LINE
EXISTING ITEMS TO BE REMOVED
NEW UNDERGROUND PRIMARY
NEW UNDERGROUND SECONDARY
NEW UNDERGROUND COMMUNICATIONS
EXISTING SECTIONALIZER CABINET
NEW PAD MOUNTED TRANSFORMER
NEW ELECTRICAL HANDHOLE
EXISTING COMMUNICATIONS MANHOLE
NEW COMMUNICATIONS MANHOLE
EXISTING POLE MOUNTED LIGHTING FIXTURE
NEW POLE MOUNTED LIGHTING FIXTURE
NEW BOLLARD LIGHT FIXTURE.
EP
EUC
EC
E
UP
US
UC
S
T
H
E
M
M
C
C
AIR TERMINAL
GROUNDING ROD
STATIC GROUNDING RECEPTACLE
CONNECTION TO GROUND
GRID COUNTERPOISE CONDUCTOR
LIGHTNING PROTECTION ROOF CONDUCTOR
LIGHTNING PROTECTION DOWN CONDUCTOR
G
RC
DC
2' x 4' FIXTURE. SOLID FILL INDICATES FIXTURE ON LIFE SAFETY OR
EMERGENCY CIRCUIT.
(WHERE GENERATOR POWER IS NOT AVAILABLE PROVIDE A UNIT
BATTERY AT 1400 LM)
2' x 4' FIXTURE. DIAGONAL FILL INDICATES FIXTURE ON CRITICAL
CIRCUIT.
A AMPERE
AC ABOVE COUNTER, 42"AFF UNLESS OTHERWISE INDICATED
ADA MERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR - TO BOTTOM
AL ALUMINUM
1/C ONE CONDUCTOR
C CONDUIT
CB CIRCUIT BREAKER
CKT CIRCUIT
CU COPPER
E EXISTING
EF EXHAUST FAN
EMT ELECTRICAL METALLIC TUBING
EWC ELECTRIC WATER COOLER
FACP FIRE ALARM CONTROL PANEL
FM FREQUENCY MODULATION
GFI GROUND FAULT CIRCUIT INTERRUPTER
GFP GROUND FAULT PROTECTION
HACR HEATING AIR CONDITIONING REFRIGERATION
HP HORSEPOWER
HPS HIGH PRESSURE SODIUM
HT HEIGHT
HZ HERTZ
IDS INTRUSION DETECTION SYSTEM
J JUNCTION BOX
KWH KILOWATT HOUR
LED LIGHT EMITTING DIODE
MCB MAIN CIRCUIT BREAKER
MH MOUNTING HEIGHT - TO CENTER
MLO MAIN LUGS ONLY
MTD MOUNTED
NEC NATIONAL ELECTRICAL CODE
NF NON FUSED
NO. NUMBER
OS OCCUPANCY SENSOR
PH PHASE
PIR PASSIVE INFRARED
RGS RIGID GALVANIZED STEEL
SM SINGLE MODE
SPD SURGE PROTECTIVE DEVICE
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
UNO UNLESS NOTED OTHERWISE
V VOLT
VA VOLTAMPERE
VVD VARIABLE VOLUME DAMPER
W WATTS
WP WEATHERPROOF
XFMR TRANSFORMER
FIRE ALARM SPEAKER/STROBEF
NOTES
1. DATA - BLUE
2. PHONE - YELLOW
3. BLANK
4. BLANK
1 2
3 4
LABEL
LABEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C
U s e rs \i s s a c \D o c u m e n ts
\F F
E
M t H o m e C
-S C
A is s a c h a r.
a n d e rs o n ff e
-s e rv .c o m
.r v t
/1
/2
:1
:3
A
M
E001
LEGEND AND ABBREVIATIONS
09/15/2021 JB IA
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
NOTES:
MOTOR & EQUIPMENT SCHEDULE
MOTOR ID
MOTOR STARTER DISCONNECT CONTROLS FEEDER
S E
E N
O T
E
DESCRIPTION H
O
R S
E P
O W
E R
H
P
CHARACTERISTICS
N E
M A
T Y
P E
TYPE LOCATION F
U
R N
IS
H
E D
B Y
D
IV
TYPE N
E
M A
T Y
P E
D
IS
C S
IZ
E
F U
S E
S
IZ
E
LOCATION F
U
R N
IS
H
E D
B Y
D
IV
TYPE F
U
R N
IS
H
E D
B Y
D
IV
S E
E N
O T
E
N U
M B
E R
O F
C O
N D
U C
T O
R S
W
IR
E S
IZ
E
G R
O U
N D
S
IZ
E
C O
N D
U
IT
S
IZ
E
V O
LT
A
G E
P O
LE
LO
A
D kV A
205-RTU-4-EF MOTOR 5 480 V 3 3.16 EC MOTOR 23 DISC SWITCH 3R 30A NF NEAR MOTOR 26 23 3 12 12 3/4
205-RTU-4-SF MOTOR 5 480 V 3 4.24 EC MOTOR 23 DISC SWITCH 3R 30A NF NEAR MOTOR 26 23 3 12 12 3/4
ACCH-1 MOTOR 2 480 V 3 18.29 EC MOTOR 23 DISC SWITCH 3R 30A NF NEAR MOTOR 26 23 3 10 10 3/4
EF-1 EXHAUST FAN 1 480 V 3 0.91 VFD DRIVE MECH RM
G101F
23 DISC SWITCH 3R 30A NF NEAR MOTOR 26 23 3 12 12 3/4
P-1 MOTOR 1 208 V 2 0.78 EC MOTOR 23 DISC SWITCH 1R 30A NF NEAR MOTOR 26 23 2 12 12 3/4"
P-2 MOTOR 1 208 V 2 0.78 EC MOTOR 23 DISC SWITCH 1R 30A NF NEAR MOTOR 26 23 2 12 12 3/4"
LIGHTING FIXTURE SCHEDULE
IMAGE TYPE DESCRIPTION LOAD LAMP(S)
LUMINOUS
FLUX
COLOR
TEMP.
MOUNTING
RECESSED
SUSPENDED
PENDANT
A1 FLUSH 2X4 LED FLAT PANEL WITH SEAMLESS WELDED AND MITERED FRAME ALUMINUM TRIM, DAMP LOCATION, SEALED FIXTURE, WHITE SATIN ACRYLIC LENS 0-10V DIMMING UNIVERSAL 120-277V 90CRI
74 VA 1 8500 lm 3200 K RECESSED
B1 4' SUSPENDED LED STRIPLIGHT, CODE COMPLIANT 22 GUAGE COLD-ROLLED STEEL, LONG-LIFE LEDS WITH HIGH-EFFICENCY DRIVER, LUMINAIRE SURGE LEVEL PROTECTION, DIFFUSE ACRYLIC LENS, HIGH-GLOSS AND BAKED WHITE ENAMEL, WHITE PAINT FINISH. 120V 80CRI.
72 VA 1 4000 lm 3200 K CHAIN HUNG
C1 LED EMERGENCY LIGHTING FIXTURE ESPECIALLY FOR STAIRWAYS AND HALLWAYS, MOLDED
THERMOPLASTIC WHITE HOUSING, WALL MOUNTED 120 OR 277V.
3 VA LED SURFACE
MOUNTED
No. Revisions: Date:
BID DOCUMENTS 9/15/2021
NTS
FACE PLATE DETAIL
09/15/2021
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C
U s e rs \i s s a c \D o c u m e n ts
\F F
E
M t H o m e C
-S C
A is s a c h a r.
a n d e rs o n ff e
-s e rv .c o m
.r v t
/1
/2
:1
:3
A
M
E500
ELECTRICAL DETAILS
09/15/2021 JB IA
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
Notes:
Total Est. Demand: 7 A
Lighting 148 VA 100.00% 148 VA Total Conn.: 7 A
Power 50 VA 100.00% 50 VA Total Est. Demand: 2662 VA
Receptacle 720 VA 100.00% 720 VA Total Conn. Load: 2468 VA
Motor 1550 VA 112.50% 1744 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 15 A 0 A 7 A
Total Load: 1643 VA 50 VA 775 VA
41 42
39 40
37 -- -- -- 775 VA 148 VA 1 20 A NEW EM LIGHTING FIXTURES 38
35 NEW REDUNDANT CHILLER PUMPS MECH R... 20 A 2 775 VA 0 VA 1 20 A NEW AUTOMATIC DOOR OPENER MOTORS 36
33 NEW PIPE HEAT REGULATOR / THERMOSTAT 20 A 1 0 VA 50 VA 1 20 A NEW SENSOR OPERATED FAUCET 34
31 NEW HOOD MOTOR VFD RM G101G 20 A 1 0 VA 720 VA 1 20 A NEW HOOD EM RECEPTACLE 32
29 (EXIST) 20 A 1 0 VA 0 VA 1 20 A (EXIST) 30
27 -- -- -- 0 VA 0 VA 1 20 A (EXIST) 28
25 (EXIST) 20 A 2 0 VA 0 VA 1 20 A (EXIST) 26
23 (EXIST) 20 A 1 0 VA 0 VA 1 20 A (EXIST) 24
21 (EXIST) 20 A 1 0 VA 0 VA 1 20 A (EXIST) AC-6 CONTROL PANEL SB-160 22
19 (EXIST) DENTAL AIR DRYER 20 A 1 0 VA 0 VA 1 20 A (EXIST) INCUBATOR 208 REC. 2ND FLOOR 20
17 (EXIST) DENTAL AIR DRYER 20 A 1 0 VA 0 VA -- -- -- 18
15 (EXIST) AC-6 CONTROL PANEL SB-160 20 A 1 0 VA 0 VA 2 20 A (EXIST) COLD ROOM 208 REC. 2ND FLOOR 16
13 -- -- -- 0 VA 0 VA 1 20 A (EXIST) COLD ROOM RECEPTACLES 14
11 (EXIST) SB - 160 WATER HEATERS / MECH R... 20 A 2 0 VA 0 VA 1 20 A (EXIST) ELECT. RM. FA REC. & BATTERY LIGHT 12
9 (EXIST) AHU - 4.5 DDC CONTROL PAN 20 A 1 0 VA 0 VA 1 20 A (EXIST) MECH RM. LIGHTING 2ND. FLOOR 10
7 (EXIST) FAN PHARMACY 20 A 1 0 VA 0 VA 1 20 A (EXIST) MECH. RM. RECPT.& BATT. LTS. 1ST ... 8
5 (EXIST) WALK IN INCUBATOR 2ND FLOOR 20 A 1 0 VA 0 VA 1 20 A (EXIST) SPARE 10-28-2015 6
3 (EXIST) WALK IN COLD ROOM 2ND FLOOR 20 A 1 0 VA 0 VA 1 20 A (EXIST) RECIR. PUMP MECH RM. SA 132 4
1 (EXIST) COLD RM. COMPRESSOR 2ND FLOOR 20 A 1 0 VA 0 VA 1 20 A (EXIST) WATER HT. MECH RM. SA 132 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
EXISTING 120V CRITICAL PANEL - CONTRACTOR TO PROVIDE NEW CIRCUIT BREAKERS FOR ALL NEW CIRCUITS
Notes:
Enclosure: Type 1 MCB Rating: 100 A
Mounting: Surface Wires: 4 Mains Rating: 100 A
Supply From: Phases: 3 Mains Type: MCB
Location: MECHANICAL 103 Volts: 120/208 Wye A.I.C. Rating: 20,000 A
Branch Panel: 77-1-EP
Notes:
Total Est. Demand: 6 A
Total Conn.: 6 A
Total Est. Demand: 2340 VA
Power 1440 VA 100.00% 1440 VA Total Conn. Load: 2340 VA
Receptacle 900 VA 100.00% 900 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 13 A 0 A 9 A
Total Load: 1440 VA 0 VA 900 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 18
15 NEW ACCH-1 RECEPTACLE CONNECTION 20 A 1 0 VA 0 VA 1 15 A NEW FIRST FLOOR FAN COIL UNITS 1 & 2 16
13 NEW THERMOSTATIC HANDWASHING HEATER 20 A 1 1440... -- 1 -- (EXIST) SPARE TO BE USED FOR BREAKER... 14
11 NEW RECEPTACLES 20 A 1 900 VA 0 VA -- -- -- 12
9 (EXIST) 120V DUPLEX RECEPTACLE + WIFI... 20 A 1 0 VA 0 VA -- -- -- 10
7 (EXIST) EXH. FAN 77-EF 21 -- 1 -- 0 VA 3 20 A (EXIST) SPARE TO BE USED FOR BREAKER... 8
5 (EXIST) SPARE 20 A 1 0 VA 0 VA 1 20 A (EXIST) MECHANICAL ROOM RECEPTACLES 6
3 (EXIST) MECHANICAL RM LIGHTING 1ST... 20 A 1 0 VA 0 VA 1 20 A (EXIST) OUTSIDE LIGHTING 4
1 (EXIST) MECHANICAL RM. LIGHTING 2ND... 20 A 1 0 VA 0 VA 1 20 A (EXIST) 2ND FLOOR MECHANICAL RM
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
EXISTING 120V PANEL - CONTRACTOR TO PROVIDE NEW CIRCUIT BREAKERS FOR ALL NEW CIRCUITS
Notes:
Enclosure: Type 1 MCB Rating: 70 A
Mounting: Surface Wires: 4 Mains Rating: 70 A
Supply From: Phases: 3 Mains Type: MCB
Location: MECHANICAL 103 Volts: 120/208 Wye A.I.C. Rating: 20,000 A
Branch Panel: 77-1-E
Notes:
Total Est. Demand: 38 A
Total Conn.: 32 A
Total Est. Demand: 31177 VA
Power 0 VA 0.00% 0 VA Total Conn. Load: 26604 VA
Motor 26604 VA 117.19% 31177 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 32 A 32 A 32 A
Total Load: 8868 VA 8868 VA 8868 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 SPACE -- 1 -- -- 1 -- Space 30
27 SPACE -- 1 -- -- 1 -- Space 28
25 SPACE -- 1 -- -- 1 -- Space 26
23 SPACE -- 1 -- -- 1 -- Space 24
21 SPACE -- 1 -- -- 1 -- Space 22
19 SPACE -- 1 -- -- 1 -- Space 20
17 SPACE -- 1 -- -- 1 -- SPACE 18
15 SPACE -- 1 -- -- 1 -- SPACE 16
13 SPACE -- 1 -- -- 1 -- SPACE 14
11 -- -- -- 305 VA 6097... -- -- -- 12
9 -- -- -- 305 VA 6097... -- -- -- 10
7 EF-1 20 A 3 305 VA 6097... 3 30 A ACCH-1 8
5 -- -- -- 1413... 1053... -- -- -- 6
3 -- -- -- 1413... 1053... -- -- -- 4
1 205-RTU-4-SF 15 A 3 1413... 1053... 3 15 A 205-RTU-4-EF 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
NEW 480V PANEL - CONTRACTOR TO PROVIDE NEW CIRCUIT BREAKERS FOR ALL NEW CIRCUITS AND SPARE BREAKERS SHOWN
Notes:
Enclosure: Type 1 MCB Rating: 200 A
Mounting: Surface Wires: 4 Mains Rating: 200 A
Supply From: Phases: 3 Mains Type: MCB
Location: ELECTRICAL ROOM FA126A Volts: 480/277 Wye A.I.C. Rating: 10,000 A
New Branch Panel: 77-1-EQ
EXISTING
EXISTING
No. Revisions: Date:
D
D D F F
S
S
B
D
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
AP
AP
AP
MD
EXISTING DATA RACKS
1 1
TELE COMM
FB137
NON-HAZARDOUS
PHARMACY STORAGE
G101
CORRIDOR
PRIVATE INFUSION
J144
PRIVATE INFUSION
J145
PATIENT TOILET
J146
MENS TOILET
J141
MECHANICAL ROOM
FB160
ELECTRICAL ROOM
FA126A
AHU-4 (E)
AHU-5 (E)
CC
CC
CC
77-HE1
77-1-E
77-1-EP
EXISTING MCC-77-1-EP
SQUARE D MODEL 6 MCC
B
D
F
H
K
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
2459 SF
Room
G203H
9274 SF
WAREHOUSE
G201
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C
U s e rs \i s s a c \D o c u m e n ts
\F F
E
M t H o m e C
-S C
A is s a c h a r.
a n d e rs o n ff e
-s e rv .c o m
.r v t
/1
/2
:1
:3
A
M
ED101
FIRST & SECOND FLOOR
DEMOLITION PLAN
09/15/2021 JB IA
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/8" = 1'-0"
FIRST FLOOR ELECTRICAL DEMOLITION PLAN
D R A W I N G N O T E S :
1 TEMPORARILY REMOVE AND STORE LIGHTING FIXTURES IN A COOL AND DRY LOCATION WHILE PIPE AND DUCTWORK IS BEING INSTALLED. FIXTURE TO BE REINSTALLED IN SAME LOCATION WHEN MECHANICAL INSTALLATIONS ARE FINISHED.
INSTALL FIXTURE AS HIGH AS POSSIBLE TO THE CEILING. MAINTAIN EXISTING CIRCUIT FOR REINSTALLATION OF
LIGHTING FIXTURE.
2 REMOVE AND SALVAGE EXISTING CEILING MOUNTED WIRELESS ACCESS POINT. STORE IN A DRY, COOL LOCATION FOR
LATER INSTALLATION.
3 REMOVE CAMERA AND TERMINATE CABLING AND RETURN CAMERA TO THE VA HOSPITAL.
1/8" = 1'-0"
SECOND FLOOR ELECTRICAL DEMOLITION PLAN
No. Revisions: Date:
A
OS
OS
B
D
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
77-1-EQ
A1
A1
B1 1 1
AHU-4 (E)
AHU-5 (E)
MECHANICAL ROOM
FB160
ELECTRICAL ROOM
FA126A
EQUIPMENT ROOM
G101F
C-SCA
G101E
VESTIBULE
G101D
NON-HAZARDOUS
PHARMACY STORAGE
G101
CORRIDOR
TELE COMM
FB137
PRIVATE INFUSION
J144
PRIVATE INFUSION
J145
PATIENT TOILET
J146
MENS TOILET
J141
E E
E
E
E
E
E
E
E
E
E
C1
EXISTING MCC-77-1-EP
SQUARE D MODEL 6 MCC
77-1-EP
77-1-E
77-HE1
77-1-EP-38
77-1-EP-38
E
E
E
E
B
D
F
H
K
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
9274 SF
WAREHOUSE
G201
2459 SF
Room
G203H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C
U s e rs \i s s a c \D o c u m e n ts
\F F
E
M t H o m e C
-S C
A is s a c h a r.
a n d e rs o n ff e
-s e rv .c o m
.r v t
/1
/2
:1
:4
A
M
EL101
FIRST & SECOND FLOOR NEW
LIGHTING PLAN
09/15/2021 JB IA
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/8" = 1'-0"
FIRST FLOOR NEW LIGHTING PLAN
D R A W I N G N O T E S :
1 REINSTALL LIGHTING FIXTURE IN SAME LOCATION. INSTALL FIXTURE AS HIGH AS POSSIBLE TO THE CEILING. CLEAN AND RE-LAMP FIXTURE PRIOR TO INSTALLATION. CIRCUIT TO LOCAL EXISTING LIGHTING CIRCUIT MAINTAINED DURING
DEMOLITION.
2 CONNECT EMERGENCY LIGHTING FIXTURE TO NEARBY EXISTING LIGHTING FIXTURE CIRCUIT IN ROOM G101
1/8" = 1'-0"
SECOND FLOOR NEW LIGHTING PLAN
No. Revisions: Date:
GF
J J
B
D
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
77-1-EQ
ADD NEW 200A BUCKET FOR 77-1-EQ.
PROVIDE 200A/3P CIRCUIT BREAKER.EXISTING MCC-77-1-EP
SQUARE D MODEL 6 MCC
P-1
77-1-EP - 31
77-1-E - 11
77-1-E - 11
77-1-EP - 32
77-1-EP - 32
77-1-E - 11
77-1-EP - 32
77-1-EP
77-1-E
77-HE1
EQUIPMENT ROOM
G101F
77-1-E - 11
MECHANICAL ROOM
FB160
ELECTRICAL ROOM
FA126A
77-1-EP - 34
C-SCA
G101E
VESTIBULE
G101D
77-1-E - 13
(3) 3/0, #6 GND, 2"C
77-1-E - 11
77-1-EP - 35,37 EF-1 VFD
77-1-EP - 36
77-1-EP - 36
TELE COMM
FB137
CORRIDOR
PRIVATE INFUSION
J144
PRIVATE INFUSION
J145
PATIENT TOILET
J146
MENS TOILET
J141
NON-HAZARDOUS
PHARMACY STORAGE
G101
77-1-E - 16
77-1-E - 16
77-1-EP - 35,37 P-2
AHU-4 (E)
AHU-5 (E)
77-1-EP - 32
E
E
E
E
E E
E
FCU-1
FCU-2
E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C
U s e rs \i s s a c \D o c u m e n ts
\F F
E
M t H o m e C
-S C
A is s a c h a r.
a n d e rs o n ff e
-s e rv .c o m
.r v t
/1
/2
:1
:4
A
M
EP101
FIRST FLOOR NEW POWER PLAN
09/15/2021 JB IA
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/8" = 1'-0"
FIRST FLOOR NEW POWER PLAN
D R A W I N G N O T E S :
1 120V RECEPTACLE SUPPLIED FOR NEW PHARMACY HOOD.
2 LOW VOLTAGE TRANSFORMER (BY DIVISION 22) BELOW SINK FIXTURE FOR SENSOR OPERATED FAUCET. PROVIDE RECESSED SINGLE GANG J-BOX AT EACH SENSOR OPERATED FAUCET. PROVIDE 0.75" C. FROM J-BOX TO ABOVE ACCESSIBLE CEILING FOR LOW VOLTAGE WIRING. LOW VOLTAGE WIRING BY DIVISION 22. PROVIDE GROMMETED
OPENING. COORDINATE EXACT MOUNTING HEIGHT WITH DIVISION 22 PRIOR TO ROUGH-IN.
3 120V RECEPTACLE SUPPLIED FOR ELECTRONIC TRAP PRIMING DEVICE
4 PROVIDE 120V CIRCUIT TO SUPPLY THERMOSTATIC HANDWASHING HEATER LOCATED ABOVE THE CEILING ABOVE SINK
FIXTURE.
5 AUTOMATIC DOOR OPENER MOTOR CONNECTION
6 PROVIDE AN INTERNAL SPD (SURGE PROTECTIVE DEVICE) TO PANEL 77-1-EQ
7 PROVIDE CORD AND CAP WITH RECEPTACLE FOR DISCONNECT MEANS.
No. Revisions: Date:
D D F F
S
S
D
D 30 F
B
D
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
AP
AP
MD
77-1-EQ
EXISTING DATA RACKS
DM
CC
CC
DM
E
E
E
E E
HA
HA
HA
HA
AP
TELE COMM
FB137
PRIVATE INFUSION
J144
PRIVATE INFUSION
J145
PATIENT TOILET
J146
MENS TOILET
J141
CORRIDOR
NON-HAZARDOUS
PHARMACY STORAGE
G101
MECHANICAL ROOM
FB160
ELECTRICAL ROOM
FA126A
EQUIPMENT ROOM
G101F
C-SCA
G101E
VESTIBULE
G101DE
E
E
E
E
CC
77-HE1
77-1-E
77-1-EPE
E
E
EXISTING MCC-77-1-EP
SQUARE D MODEL 6 MCC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C
U s e rs \i s s a c \D o c u m e n ts
\F F
E
M t H o m e C
-S C
A is s a c h a r.
a n d e rs o n ff e
-s e rv .c o m
.r v t
/1
/2
:1
:3
A
M
EY101
FIRST FLOOR NEW TECHNOLOGY
PLAN
09/15/2021 JB IA
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/8" = 1'-0"
FIRST FLOOR NEW TECHNOLOGY PLAN
D R A W I N G N O T E S :
1 VA PROVIDED AND VA INSTALLED FISHEYE CAMERA AND CABLING. CONTRACTOR TO PROVIDE DATA AND POWER OF
ETHERNET.
2 INSTALL SALVAGED WIRELESS ACCESS POINT IN NEW LOCATION TO DIV. 27 SPECIFICATIONS.
3 MATCH AND CONNECT NEW FIRE ALARM SPEAKER/STROBE WITH EXISTING FIRE ALARM SYSTEM
No. Revisions: Date:
B
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2
205-RTU-4-SF
205-RTU-4-EF
EF-1
ACCH-1
77-1-EQ - 1,3,5
77-1-EQ - 2,4,6
77-1-EQ - 7,9,11
77-1-EQ - 8,10,12
77-1-EP - 33
PIPE HEAT REGULATOR /
THERMOSTAT
RC
WP
77-1-E - 15
UP
UP
RC
RC
RC
RC
RC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C
U s e rs \i s s a c \D o c u m e n ts
\F F
E
M t H o m e C
-S C
A is s a c h a r.
a n d e rs o n ff e
-s e rv .c o m
.r v t
/1
/2
:1
:4
A
M
EP103
ROOF NEW POWER PLAN
09/15/2021 JB IA
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/8" = 1'-0"
ROOF NEW POWER PLAN
D R A W I N G N O T E S :
1 CONNECTION POINT FEED TO ACCH-1 TO SUPPLY THE INCORPORATED RECEPTACLE
2 EXISTING LIGHTNING PROTECTION ROOF CONDUCTOR
3 CONNECT NEW CABLE TO EXISTING LIGHTNING ROOF CONDUCTOR
GENERAL NOTES
A. LIGHTNING TERMINALS TO BE INSTALLED ON TOP OF ALL ROOF MOUNTED EQUIPMENT AND INTERCONNECTED WITH EXISTING
LIGHTNING PROTECTION SYSTEM.
B. LIGHTNING TERMINALS TO BE INSTALLED BY SPLICING ON TO THE HORIZONTAL CONDUCTOR BETWEEN THE AIR TERMINALS
ALONG THE ROOF EDGE.
No. Revisions: Date: