Drawings Part 2 of 3 C-SCA 621-22-106 .pdf
PDF 3 MB Posted
- Solicitation number
- 36C24922B0009
About this file
This is a presolicitation notice for a construction project to build a Containment Segregated Compounding Area at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project has an estimated value between $500,000 and $1,000,000 and will be procured using sealed bidding per FAR Part 14.101. The solicitation is expected to publish on December 28, 2021 with a closing date of January 26, 2022. This is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. Offerors must be listed on beta.SAM.gov and VIP.VetBiz.gov databases at time of proposal submission and prior to award. Questions must be submitted in writing by December 28, 2021 referencing the project name, number, and solicitation number.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BIW BACKWARD INCLINED WHEEL (FAN)
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CENT CENTRIFICAL
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
COP COEFFICIENT OF PERFORMANCE
CR CEILING REGISTER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
E EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFER
HB HOSE BIBB
HC HEATING COIL
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRD HEAT RECOVERY DEVICE
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HW HOT WATER
HWC HOT WATER COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IV INLET VANES
J INTENTIALLY LEFT BLANK
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
ABBREVIATIONS
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPS LOW PRESSURE STEAM
LSD LINEAR SLOT DIFFUSER
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MIN MINIMUM
MM MILLIMETER
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
Nm NEWTON METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OD OUTSIDE DIAMETER
P PUMP
Pa PASCAL
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
ST STEAM TRAP
SVS STEAM VENT SILENCER
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TG TRANSFER GRILLE
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
U UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
W WATTS
Wb WET-BULB (TEMPERATURE)
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
M
H4
H7
A
COLD WATER (CITY WATER)
HOT WATER
QUICK-COUPLE HOSE CONNECTOR
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
HOSE CONNECTOR
FLOW METER
DRAWING SYMBOLS
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
DUCTWORK SYMBOLS
LIMIT OF DEMOLITION
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
SQUARE 4-WAY CEILING DIFFUSERS
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
DNUP RETURN DUCT (UP & DOWN)
FC
10x8
FLEXIBLE CONNECTION, EQUIPMENT,
VIBRATION, OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
FIRE DAMPER
FD
FLEXIBLE DUCTWORK (INSULATED)
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
2 1 POINT OF CHANGE IN DUCT CONSTRUCTION BY
STATIC PRESSURE CLASS. THE NUMBER ASSIGNS
PRESSURE CLASS (IN. OF WATER) WHICH WILL
ACCOMMODATE MAXIMUM OPERATING PRESSURE
IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES
THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR
ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT
INDICATES NEGATIVE PRESSURE.
1/24
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
AIR TERMINAL SYMBOLS
TERMINAL UNIT WITH REHEAT COIL
PIPING SYMBOLS
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HOT WATER HEATING SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
VENT LINE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN LINE
HOT WATER HEATING RETURN
HPS
HPR
MPS
MPR
LPS
LPR
HWS
HWR
V
CHR
CHS
D
HW
CW
GENERAL PIPING SYMBOLS
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
FLOW ELEMENTFE
PIPE UP
PIPE DOWN
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
AV
MANUAL AIR VENTMV
VALVE SYMBOLS
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
CONTROLS SYMBOLS
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
SPS STATIC PRESSURE SENSOR
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
MG MAGNEHLIC PRESSURE GAUGE
PDS PRESSURE DIFFERENTIAL SWITCH
A
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm] MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
MOTOR STARTER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
T
ES END SWITCH
(FC) FAIL CLOSED
(FO) FAIL OPEN
(FLP) FAIL LAST POSITION
T STEAM TRAP
CP CONDENSATE PUMP
GENERAL SYMBOLS
ACCESS PANEL
TERMINAL UNIT W/ REHEAT COIL AND AIR DEVICE
SD
SMOKE DETECTOR
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
FAN COIL UNIT
AIR FLOW CONTROL VALVE
1. FOR TYPICAL STEAM, WATER, AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING SCHEMATICS.
2. PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN HEATING/COOLING MEDIUM AND AIR.
3. WHERE DUCTS OR PIPES ARE REMOVED THRU BUILDING ELEMENT THAT IS TO REMAIN, PATCH BUILDING OPENING TO MATCH EXISTING WHERE OPENING IS NOT RE-
USED.
4. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
5. ALL CUTTING AND PATCHING REQUIRED FOR THE PROJECT WORK SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE DISTURBED UNDER THIS WORK
TO MATCH EXISTING.
6. ALL WALL & FLOOR PENETRATIONS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.
7. UNLESS NOTED OTHERWISE, ALL WORK IN OCCUPIED AREAS OF THE BUILDING, OR WORK THAT REQUIRES SHUTDOWN OF SYSTEMS, SHALL TAKE PLACE AT NIGHT
(GENERALLY BETWEEN 7PM AND 5AM) OR ON WEEKENDS - COORDINATE WITH COR.
8. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF
PROPERLY BY THE CONTRACTOR.
9. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO INSTALL THE SYSTEMS.
COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY ANTICIPATED INSTALLATION ISSUES.
10. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO PERFORMING WORK.
11. WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO ACTIVE MAIN AND CAPPED, AND CONTROL WIRING AND CONDUIT SHALL
BE REMOVED BACK TO SOURCE.
12. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK TO BE REMOVED IS SHOWN.
REMOVE ALL INCIDENTAL ABANDONED UTILITY ITEMS THAT MAY NOT BE SHOWN BUT ARE ASSOCIATED WITH THE REMOVAL WORK.
13. RE-INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED OR REMOVED IN THE PERFORMANCE OF WORK IN THIS PROJECT, INCLUDING INSULATION REMOVAL FOR ASBESTOS ABATEMENT.
14. ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.
15. EXISTING CONDITIONS SHOWN ARE BASED UPON AVAILABLE EXISTING DRAWINGS, AND MAY DIFFER FROM ACTUAL WORK IN PLACE. THE CONTRACTOR SHALL TAKE
ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY VARIATION BETWEEN EXISTING
CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION
OF THE CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.
16. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS SHALL BE COORDINATED WITH THE
COR.
17. DUCT RUNOUT SIZE TO INDIVIDUAL DIFFUSER/GRILLE SHALL BE THE SAME SIZE AS THE DIFFUSER/GRILLE NECK SIZE, UNLESS NOTED OTHERWISE.
18. PIPING RUNOUT SIZE TO INDIVIDUAL FAN COIL UNIT OR TERMINAL UNIT SHALL BE 0.75" UNLESS NOTED OTHERWISE.
19. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH THE MANUFACTURER'S RECOMMENDED STRAIGHT PIPE
OR DUCT RECOMMENDATIONS.
20. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS
REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENTS. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE
FABRICATION.
21. LOCATE ALL MECHANICAL EQUIPMENT TO MAINTAIN UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.
GENERAL NOTES
FS FLOW SWITCH
STAINLESS STEEL DUCTWORK
P ROOM DIFFERENTIAL PRESSURE SENSOR - WALL MOUNT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:0
A
M
M001
MECHANICAL LEGEND
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
No. Revisions: Date:
BID DOCUMENTS 9/15/2021
B
D
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
CANTEEN RETAIL
G101
MECHANICAL
FB160
AHU-5 (E)
AHU-4 (E)
ELECTRICAL
FA126A
(E)12"x10" SA
(E)15"x8" SA
(E)15"x8" SA
(E)24"x16" SA
(E )1
8" x1
5" R
A
(E)24"x14" RA
(E)24"x14" SA
(E )1
2" x1
0" S
A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:0
A
M
MD101
FIRST FLOOR MECHANICAL
DEMOLITION PLAN
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/8" = 1'-0"
FIRST FLOOR MECHANICAL DEMOLITION PLAN
D R A W I N G N O T E S :
1 REMOVE EXISTING AIR DEVICE AND REPAIR WALL TO MATCH EXISTING.
2 REMOVE EXISTING AIR DEVICE AND CAP DUCT. SEAL AIR TIGHT AND INSULATE.
3 REMOVE EXISTING DUCT BACK TO MAIN. CAP DUCT AND INSULATE.
P
SPS
SPS
01-FIRST FLOOR
11' - 0"
02-SECOND
FLOOR
26' - 0"
03-ROOF
41' - 8"
F
FD-3
FD-1
10"ø EA
8"ø EA 8"ø EA
VV-2
EG-2
175 CFM
6"x10" EA
SD-2
40 CFM
FD-2
8"ø SA
SD-1
175 CFM
C-SCA
G101E
EQUIP.
G101G
8"ø EA
"x
E A
"x
S A
"ø
E A
8"ø EA
B
D
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
C-SCA
G101E
VESTIBULE
G101D
EQUIP.
G101G
NON-HAZARDOUS
PHARMACY STORAGE
G101F
VAV-1
VAV-2
VV-1
VV-2
VAV-3
FCU-1
FCU-2
10"ø EA
14"x12" SA
14"x12" EA
AHU-4 (E)
AHU-5 (E)
MECHANICAL
FB160
ELECTRICAL
FA126A
14"x12" SA
10"ø SA 10"ø SA
10"ø SA
8"x8" SA
6"ø SA
6"ø SA
SD-1
200 CFM
SD-1
175 CFM
8"ø
8"ø
12"x10" SA
12"x10" SA
8"ø EA 8"ø EA
10"ø
EG-2
175 CFM
(E)12"x10" SA
SD-3
310 CFM
SD-3
310 CFM
SD-3
310 CFM
EG-3
930 CFM
EG-1
40 CFM
SD-2
40 CFM6"ø SA
MH101
(E)24"x16" SA
(E )1
8" x1
5" R
A
(E)24"x14" RA
(E)24"x14" SA
(E )1
2" x1
0" S
A
G E N E R A L N O T E S :
A. SUPPLY AIRFLOW TO ROOM G101D VESTIBULE AND ROOM EXHAUST AIRFLOW FROM G101E C-SCA ARE SELECTED TO ACHIEVE A +0.02" PRESSURE DIFFERENTIAL BETWEEN G101D VESTIBULE AND G101E C-SCA. IF THAT PRESSURE DIFFERENTIAL IS NOT MET WITH THE AIRFLOWS SHOWN, THE TAB CONTRACTOR SHALL DETERMINE THE AIRFLOW OFFSET REQUIRED TO ACHIEVE +0.02" PRESSURE DIFFERENTIAL AND PROGRAM THE AIRFLOW SETPOINTS FOR VAV-1 AND VV-2 TO ACHIEVE THIS OFFSET. DO NOT SET THE AIRFLOW SETPOINT FOR VAV-1 BELOW 60 CFM AND DO NOT SET THE AIRFLOW SETPOINT FOR VV-2 BELOW 50 CFM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:1
A
M
MH101
FIRST FLOOR MECHANICAL PLAN -
HVAC
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/4" = 1'-0"
FIRST AND SECOND FLOOR MECHANICAL SECTION
D R A W I N G N O T E S :
1 STAINLESS STEEL EXHAUST DUCT DOWN, CONNECT TO BIO-SAFETY CABINET. BIO-SAFETY CABINET PROVIDED BY
OWNER AND INSTALLED BY CONTRACTOR. PROVIDE FLEXIBLE CONNECTIONS IN ACCORDANCE WITH MANUFACTURER'S
INSTALLATION REQUIREMENTS. BALANCE BIO-SAFETY CABINET AIRFLOW TO 200 CFM.
2 MOUNT EXHAUST GRILLE 7" AFF. PROVIDE TRANSITION, TURN DUCT UP, AND CONNECT TO VERTICAL AIR FLOW CONTROL
VALVE.
3 EXHAUST DUCT UP TO SECOND FLOOR THROUGH CHASE. REFER TO SHEET MH102 FOR CONTINUATION.
4 SUPPLY DUCT DOWN FROM SECOND FLOOR THROUGH CHASE. REFER TO SHEET MH102 FOR CONTINUATION.
5 PROVIDE DUCTLESS HORIZONTAL EXPOSED FAN COIL UNIT WITH INLET AND OUTLET GRILLES.
1/8" = 1'-0"
FIRST FLOOR MECHANICAL PLAN
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
14"x12" EA
14"x12" SA
10"ø EA
WAREHOUSE
G201
FD-1
FD-3
FD-2
MH101
(E)24"x16" SA
(E)14"x24" SA
(E)24"x14" RA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:1
A
M
MH102
SECOND FLOOR MECHANICAL
PLAN - HVAC
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/8" = 1'-0"
SECOND FLOOR MECHANICAL PLAN
D R A W I N G N O T E S :
1 EXHAUST DUCT UP THROUGH ROOF. COORDINATE EXACT LOCATION WITH EXISTING STRUCTURE. REFER TO SHEET
MH103 FOR CONTINUATION.
2 SUPPLY DUCT UP THROUGH THE ROOF. PROVIDE DUCT TRANSITION TO AIR HANDLING UNIT OUTLET OPENING.
COORDINATE EXACT LOCATION WITH EXISTING STRUCTURE AND AIR HANDLING UNIT PLACEMENT. REFER TO SHEET
MH103 FOR CONTINUATION.
3 SUPPLY DUCT FROM FLOOR BELOW. PROVIDE FIRE DAMPER AT FLOOR PENETRATION. PROVIDE DUCT ACCESS PANEL
FOR FIRE DAMPER MAINTENANCE. REFER TO SHEET MH101 FOR CONTINUATION.
4 EXHAUST DUCT UP THROUGH ROOF. COORDINATE EXACT LOCATION WITH EXISTING STRUCTURE AND EXHAUST FAN.
REFER TO SHEET MH103 FOR CONTINUATION.
5 EXHAUST DUCT FROM FLOOR BELOW. PROVIDE FIRE DAMPER AT FLOOR PENETRATION. PROVIDE DUCT ACCESS PANEL
FOR FIRE DAMPER MAINTENANCE. REFER TO SHEET MH101 FOR CONTINUATION.
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
14"x12" EA
ACCH-1
EF-1
205-RTU-4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:1
A
M
MH103
MECHANICAL ROOF PLAN - HVAC
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/8" = 1'-0"
ROOF MECHANICAL PLAN
D R A W I N G N O T E S :
1 EXISTING PACKAGED ROOFTOP UNIT TO REMAIN.
2 PROVIDE NEW EXHAUST FAN. COORDINATE EXACT LOCATION WITH EXHAUST DUCT DOWN THROUGH ROOF. REFER TO
SHEET MH102 FOR CONTINUATION.
3 PROVIDE NEW AIR HANDLING UNIT. COORDINATE EXACT LOCATION WITH SUPPLY DUCT DOWN THROUGH ROOF. REFER
TO SHEET MH102 FOR CONTINUATION.
4 EXHAUST DUCTWORK DOWN TO SECOND FLOOR. REFER TO SHEET MH102 FOR CONTINUATION.
5 EXISTING GRAVITY HOOD TO REMAIN.
6 EXISTING EXHAUST FAN TO REMAIN
7 EXISTING ROOF DRAIN TO REMAIN.
8 MAINTAIN 25 FOOT CLEARANCE BETWEEN OUTDOOR AIR INTAKES AND EF-1.
T
T
T
M
B
D
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
VAV-3
VAV-2
VAV-1
CHT-1PFF-1
AS-1
ET-1
1 1/4" HWS
1 1/4" HWR
NON-HAZARDOUS
PHARMACY STORAGE
G101F
VESTIBULE
G101D
C-SCA
G101E
EQUIP.
G101G
AHU-5 (E)
MECHANICAL
FB160
AHU-4 (E)
ELECTRICAL
FA126A3/4" HWR
3/4" HWS
1" HWR
1" HWS
3/4" HWS
3/4" HWR
MP101
1" HWR
1" HWS
P-2
2" CHR
01-FIRST FLOOR
11' - 0"
02-SECOND
FLOOR
26' - 0"
03-ROOF
41' - 8"
F
C-SCA
G101E
EQUIP.
G101G
P-2
P-1
CHT-1
PFF-1
1 1/4" HWR
1 1/4" HWS
1 1/4" LPS
3/4" LPR
ET-1
AS-1
2" C
H R
2" C
H R
2" CHR
2" CHR
2" CHR
2" CHS
2" CHR
3/4" DCW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:1
A
M
MP101
FIRST FLOOR MECHANICAL PLAN -
PIPING
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/8" = 1'-0"
FIRST FLOOR MECHANICAL PIPING PLAN
D R A W I N G N O T E S :
1 CHILLED WATER RETURN DOWN FROM THE FLOOR ABOVE. REFER TO CONTINUATION ON SHEET MP102.
2 CHILLED WATER RETURN UP TO FLOOR ABOVE. REFER TO CONTINUATION ON SHEET MP102.
3 DOMESTIC COLD WATER FROM BACKFLOW PREVENTER FOR CHILLED WATER SYSTEM MAKE-UP. REFER TO
CONTINUATION ON SHEET PL101.
4 CONNECT DOMESTIC COLD WATER MAKE-UP TO CHILLED WATER SYSTEM AT THIS POINT. REFER TO "FLOOR MOUNTED EXPANSION TANK - PIPING CONNECTIONS" ON SHEET M502 FOR INSTALLATION REQUIREMENTS.
1/4" = 1'-0"
FIRST AND SECOND FLOOR MECHANICAL PIPING SECTION
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
2" C
H S
1 1/4" LPS
3/4" LPR
3/ 4"
L P
R
1/ 4"
L P
S
WAREHOUSE
G201
MP101
2" CHS
2" CHR
2" C
H R
1" LPS
3/4" LPR
3/4" LPR
3/4" LPS
ST-3
ST-4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:1
A
M
MP102
SECOND FLOOR MECHANICAL
PLAN - PIPING
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/8" = 1'-0"
SECOND FLOOR MECHANICAL PIPING PLAN
D R A W I N G N O T E S :
1 CHILLED WATER RETURN DOWN TO FLOOR BELOW. REFER TO CONTINUATION ON SHEET MP101.
2 CHILLED WATER RETURN UP FROM FLOOR BELOW. REFER TO CONTINUATION ON SHEET MP101.
3 CHILLED WATER SUPPLY AND RETURN UP TO AIR COOLED CHILLER ON THE ROOF. REFER CONTINUATION ON SHEET
MP103.
4 CHILLED WATER SUPPLY AND RETURN UP TO AIR HANDLING UNIT ON THE ROOF. COORDINATE EXACT LOCATION WITH
PIPE CABINET. REFER CONTINUATION ON SHEET MP103.
5 LOW PRESSURE STEAM AND CONDENSATE UP TO AIR HANDLING UNIT ON THE ROOF ABOVE. PROVIDE DRIP LEG AT THE BASE OF EACH SUPPLY RISER. COORDINATE EXACT LOCATION WITH PIPE CABINET. REFER TO CONTINUATION ON SHEET
MP103.
6 IF BID ITEM #2 IS ACCEPTED, REMOVE WORK IN ENCLOSED BOX ASSOCIATED WITH CROSS-CONNECTION BETWEEN NEW
CHILLED WATER LOOP AND EXISTING CHILLED WATER PLANT.
F
H
K
N
T
1 2 3 4 5 6
ZZ
YY
XX
7.1 6.1 5.2 4.2
G
ACCH-1
EF-1
205-RTU-4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:1
A
M
MP103
MECHANICAL ROOF PLAN - PIPING
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/8" = 1'-0"
ROOF MECHANICAL PIPING PLAN
D R A W I N G N O T E S :
1 EXISTING PACKAGED ROOFTOP UNIT TO REMAIN.
2 CHILLED WATER SUPPLY AND RETURN DOWN THRU ROOF. INSULATE AND HEAT TRACE ALL OUTDOOR CHILLED WATER
PIPING. REFER TO SHEET MP102 FOR CONTINUATION.
3 ROUTE PIPING FOR PREHEAT COIL, HUMIDIFIER, AND COOLING COIL UP THROUGH PIPE CABINET. COORDINATE EXACT
PIPE PENETRATION LOCATIONS WITH PIPE CABINET.
4 EXISTING EXHAUST FAN TO REMAIN
5 EXISTING GRAVITY HOOD TO REMAIN.
6 EXISTING ROOF DRAIN TO REMAIN.
m m
SIDE VIEW TRAPEZE HANGER FOR UP TO 453KG
[1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE
SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE
SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
mm
[IN]
mm
[FT]
mm
[FT]
[7]
[5]
[7]
[6]
[7]
[7]
[9]
[8]
[10]
[8]
[11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
[10]
[22]
[12]
[23]
[14]
[25]
[16]
[27]
[18]
[28]
[20]
[30]
[24]
[32]
PROVIDE INSULATION SHIELD &
INSERT FOR ALL PIPING (200mm
[8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA. HANGER RODS WITH 900mm [36"]
MAX. SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD AT
HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF MIN. DENSITY)
UNDER NSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTE:
SEE SPECIFER FOR DETAILED HANGER REQUIREMENTS
[1
M A
X
[3]
[2]
[1-1/2]
[1-1/4]
25[ 1]
THRU 20
[THRU 3/4]
STEAM TRAP ASSEMBLY
STEAM LINE DRIP POCKET
DRIP LEG (TYP.)
20mm [3/4"] DRAIN
(ALTERNATE LOCATIONS)
(TYPICAL)
STEAM LINE
(TYPICAL)
CAP (TYPICAL)
PIPE T0 STEAM
TRAP (TYPICAL)
20mm [3/4"] MIN.
FROM DRIP
CONNECTION DRIP RETURN
10mm [3/8"] TEST CONNECTION
NOTE:
DRIP POCKET PIPE SIZE SAME AS STEAM MAIN
UNLESS OTHERWISE NOTED.
m m
[1 2" m m
[6
M
IN
m m
[1 2"
M
IN
m m
[6
M
IN
DRAW THRU
BLOW THRU
2" [50mm]
PLUS X
1" [25mm]
MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME SIZE
AS THE NIPPLE ON THE DRAIN PAN PIPING SHALL
BE RIGID COPPER TYPE L OR TYPE M UNLESS
NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
FLOOR SINK
DRAIN
PAN
DIELECTRIC
FITTING
NOTE:
1. CPVC PIPE MAY BE USED ONLY IF APPROVED BYLOCAL VA AND IS
INDOORS AND DOES NOT PASS THROUGHRATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILARMETALS ARE
TO BE CONNECTED.
B A
1" [2
5m m
PIPE HANGERS - PROVIDE DOUBLE DEFLECTION
NEOPRENE (TYPE HN) FOR FIRST TWO ON EACH
SIDE OF PUMP (SEE NOTE NO. 1)
PRESSURE GAGE
1/2" [15mm]
STRAINERFLEXIBLE
CONNECTIONBALL OR
BUTTERFLY TYP.
NOTES:
1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.
BALANCING
DEVICE
NOTE:
1. SIZE WATER FILTER FOR 5%
OF TOTAL SYSTEM FLOW
1/2" [15mm]
WATER
FILTER/
FEEDER
PRESSURE
GAUGE
LOW POINT
DRAIN
AUTOMATIC FLOWCONTROL
DEVICE SEE NOTE 2
DRAIN
CONNECTION
T O
P U
M P
S U
C T
IO
N
F R
O M
P U
M P
D
IS
C H
A R
G E
NOTE:
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE REGARDLESS OF W DIMENSION.
3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM SPACE BETWEEN VANES AND A 3/4" [20mm] TRAILING EDGE.
4. WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL BE DOUBLE VANE TYPE.
W
W1
AIR SPLIT DUCT TAKE-OFF PLAN VIEW BRANCH DUCT TAKE-OFF PLAN VIEW
SUPPLY REGISTER OR
BRANCH DUCT
TURNING VANES
MAIN SUPPLY DUCT
SEE FLOOR PLAN FOR SPLIT
DIMENSION
PROVIDE VOLUME
DAMPER
PROVIDE
VOLUME
DAMPER
1/4 W OR 4" [100mm] MIN.
AIR FLOW
MAIN SUPPLY
DUCT
A
IR
F
LO
W
W
A
IR
F
LO
W
AIR FLOW
AIR FLOW
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR FLOW
AIR FLOW
PROVIDE VOLUME DAMPER AT
EACH BRANCH DUCT
1/4W OR 4"
[100mm] MIN.
BRANCH DUCT
VD
A
IR
F
LO
W
W
FLEXIBLE DUCT SIZE
SAME AS DIFFUSER
INLET: 5'-0" MAX LENGTH.
12"
CEILING
SUPPORT SADDLE
FROM STRUCTURE
VOLUME DAMPER
W/LOCKING QUAD
SHEET METAL
SADDLE
CONICAL OUTLET
BRANCH DUCT
USE RIGID ELBOWS FOR
CHANGE OF DIRECTION
GREATER THAN 45°
[300mm]
SEE SPECIFICATIONS FOR CLAMPS AND
SEALANT (TYP.)
NOTE:
THE USE OF FLEXIBLE AIR DUCT IS NOT PERMITTED FOR DUCTWORK SERVING THE C-SCA OR
VESTIBULE SPACES.
TYPICAL
DIFFUSER OR
REGISTER IN
LAY-IN CLG.
THERMAL INSULATION SEE
SPECIFICATIONS
THERMOMETER
UNDER CANOPY
FLEXIBLE
CONNECTORS
IF REQUIRED
TEST PLUGS
CHS
EVAPORATOR
CHR
PRESSURE
GAUGE
NOTE:
NOT REQUIRED FOR AIR
TERMINAL UNITS.
SEISMIC BRACING FOR LIGHT
SUSPENDED EQUIPMENT
FLOOR MOUNT EQUIPMENT
RESTRAINED BY RESILIENT PADS
(TYPE DS)
RESILIENT
PAD
FLOOR
BONDED STEEL
PLATE
NEOPRENE WASHER
& SLEEVE
ANCHOR
BOLT
EQUIPMENT
BASE
EQUIPMENT WEIGHT
250 LBS. [114KG] OR
LESS
LOCK
NUTS
(TYP)
HANGER
ROD
(TYP)
CLAMP
CROSS BRACING
RODS ALL FOUR
SIDES
1"
SLEEVE, NOTE 2
DUCT
CONNECTION
NOTE 4
DAMPER,
NOTE 1
DAMPER COLLAR
EXTENSION INTEGRAL
PART OF SLEEVE
SLEEVE, NOTE 2
NOTE 6
FIRE BARRIER
PARTITION OR CHASE
TYPICAL DUCT
INSULATION
PERIMETER ANGLE, NOTE 3
(NOTE FASTENED TO PARTITION)
ACCESS PANEL
NOTE 5
[2 5m m
NOTE:
1. A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, IS SIMILAR. FOLLOW DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAGES FOR SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE INSTALLED IN THE PARTITION OR FLOOR AND NOT
OUTSIDE THE PENETRATION.
2. GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO DAMPER FRAME AND TO PERIMETER ANGLES.
3. PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO PROVIDE 1" [25mm] MINIMUM OVERLAP OF OPENING
ON ALL 4 SIDES.
4. BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA. ACCESS PANELS: SIZE AND LOCATION TO PERMIT
SERVICING THE FUSIBLE LINK OR LINKS.
5. PROVIDE 1/4" TO 1/2" [6 TO 15mm] CLEARANCE ON HEIGHT AND WIDTH. FILL OPEN SPACE WITH ROCK WOOL FIRESTOP FIBER.
6. ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS AND MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [75mm] HIGH CONCRETE CURB AROUND OPENING FOR DUCT.
7. PLACE ACTUATOR IN ROOM WITH LAY-IN CEILING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:0
A
M
M501
MECHANICAL DETAILS
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
NTS
PIPE HANGERS
NTS
STEAM LINE DRIP POCKET AND STEAM TRAP ASSEMBLY
NTS
AIR HANDLING UNIT DRAIN TRAP DETAIL
NTS
IN-LINE PUMPS - CONNECTIONS
NTS
WATER FILTER FEEDER - CLOSED LOOP HYDRONIC SYSTEMS
NTS
DUCTWORK SQUARE VANE ELBOWS
NTS
SUPPLY DUCTWORK TAKE-OFFS
NTS
EXHAUST OR RETURN BRANCH DUCTWORK
NTS
FLEXIBLE AIR DUCT CONNECTOR
NTS
AIR COOLED CHILLER - PIPING CONNECTIONS
NTS
SEISMIC BRACING FOR EQUIPMENT
NTS
SECTION THROUGH FIRE DAMPER INSTALLATION
1/2" 1/2" 1 1/2"
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED
CONNECTION
ON FAN SIDE
WASHER
1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" [25x3mm] DRAW BAND
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
5/16" [8mm] FLANGE
DUCT
SHEET METAL SCREWS ON 12"
[300mm] CENTERS
RIVET ON 4" [100mm]
CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
1" [25mm] FLANGE & HEM
ALTERNATE
POSITION OF
BOLT
1 1/2" [40mm] POCKET SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
[15mm] [15mm] [40mm]
1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUT
FLANGED CONNECTION ON FAN
SIDE
WASHER
FLEXIBLE MATERIAL AS
SPECIFIED
SINGLE COIL
WATER COIL
AIR VENT WHEN
COIL IS NOT
SELF-VENTING
DRAIN WHEN COIL IS NOT
SELF-DRAINING
TEST PLUG
(TYP.)
PIPE HANGER SHALL SUPPORT
PIPING INDEPENDENT OF COIL
REDUCER, IF REQUIRED
DRAIN
MV
MV
MV
NOTES:
PROVIDE RESTRAINING CLAMPS 2438mm [8'-0"] O.C.
SECURE TO ROOF SLAB WITH (4)
8.0mm [3/8"]⌀ EXPANSION BOLTS
OR WELD TO STEEL DECK
CONCRETE ROOF SLAB OR
STEEL ROOF DECK
WELD PLATE TO
PIPE
203x203x8.0mm [8"x8"x3/8"] STEEL PLATE
ROOF SURFACE
ROOF SYSTEM INSULATION
AND MEMBRANE
PRE-MOULDED FLEXIBLE
PIPE COUNTER FLASHING
CLAMPING RING
WELD PIPE SADDLE
SUPPORT TO PIPE. PROVIDE
WATER TIGHT CONNECTION
HIGH COMPRESSIVE
STRENGTH INSULATION
INSERT UNDER SHIELD
PROVIDE VAPOR BARRIER AS
SPECIFIED ON PIPING
CONVEYING FLUID TO
DEGREE #C° [#°F] OR LOWER
PROVIDE
ALUMINUM JACKET
PIPE AND
INSULATION
INSULATION
PROTECTION SHEILD
50mm [2"] STEEL PIPE
65mm [2-1/2"]
STEEL PIPE
SEALANT
0m m
0m m
[8
[4
0m m
[1 2"
M
IN
D
D
MV
150mm [6"]
HOUSEKEEPING PAD
COLD WATER FILL LINE. SEE
EXPANSION TANK SCHEDULE FOR
SIZE
DRAIN
FROM SYSTEM
RUN DRAIN LINE TO
NEAREST FD
UNLESSINDICATED
OTHERWISE
DRAIN
TO PUMP
SUCTION
AIR SEPARATOR
SEE NOTES 1 & 2
HANGER RODS
(TYP)
CONNECTOR PIPE.
DIAPHRAGM EXPANSION
TANK
REDUCED PRESSURE ZONE BACKFLOW
PREVENTER
NC
BUTTERFLY OR
BALL ISOLATION
VALVE
RUN DRAIN LINE TO
NEAREST FD
AIR CHARGING
SHRAEDER VALVE
AUTO. AIR VENT TO DRAIN
PI
OMIT PRESSURE GAUGE LINE
IF STRAINER IS NOT
INCLUDED.
NOTES:
1. SEE EXPANSION TANK SYSTEM SCHEDULE FOR
COMPONENT SIZES.
2. FOR HOT WATER SYSTEMS 50mm [2"] AND SMALLER
CHILLED WATER SYSTEMS USE IN-LINE AIR PURGER
IN LIEU OF AIR SEPARATOR.
3. SET PRESSURE REDUCING VALVE SO PRESSURE AT
HIGHEST POINT IN SYSTEM HAS A MINIMUM OF 28kPa
[4 PSIG].
4. PROVIDE STRAINER IN AIR SEPARATOR IF INDICATED
IN EXPANSION TANK SCHEDULE.
5. RELIEF VALVE FOR CHILLED WATER SYSTEM IS
SHOWN. OMIT WHEN RELIEF VALVE IS SHOWN ON
HEAT EXCHANGER DETAIL AND SYSTEM IS USED
ONLY FOR HOT WATER HEATING.
PIPE HANGER SHALL
SUPPORT PIPING
INDEPENDENT OF
COIL (TYP.)
FULL SIZE
TAPPING
PRESSURE GAGE
SCALE POCKET
STEAM CONDENSATE
RETURN
15mm [1/2"] C
HECK
VALVE VACUUM
BREAKER
STEAM SUPPLY
0m m
[6
M
IN
0m m
[1 2"
M
IN
NOTES:
1. PIPING SHALL BE INSTALLED IN
SUCH MANNER THAT IT WILL NOT
BLOCK THE SWING OR USE OF
ACCESS DOORS OR PANELS;
NEITHER SHALL IT BLOCK THE
SERVICING OF FILTERS, VALVES, OR
EQUIPMENT.IFB COIL
ST-1
NOTE:
ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 300mm [12"] MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 150mm [6"] SCALE POCKET BELOW TRAP INLET.
TO RETURN MAIN
PIPE SIZE SHALL BE SAME SIZE AS TRAP
FLOAT AND THERMOSTATIC TRAP.
SEE PLANS, AND SCHEDULES
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPE
FLOW
SCHEDULE 80
STEEL PIPE
BYPASS-INSTALL IN HORIZONTAL PLANE LEVEL
WITH TRAP OR IN VERTICAL PLANE & BELOW
TRAP PROVIDE BYPASS PIPING FOR ALL TRAPS
25mm [1"] AND LARGER.
DRIP LEG OR EQUIPMENT CONNECTION. MAKE THE
SAME SIZE AS THE SUPPLY MAIN OR EQUIPMENT
CONNECTION. SEE NOTE 1
SCHEDULE 80 STEEL PIPE
SEE DRAWINGS FOR PIPE SIZES
25mm [1"]
GATE VALVE
USE 4-BOLT RAISED FACE FLANGES
0m m
0m m
[1 2"
M
IN
[6
M
IN
MV
COIL
TEST PLUG (TYP.)
REDUCER, IF REQUIRED
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS (TYP.)
WATER SUPPLY
SHUT OFF VALVE
DRAIN WITH HOSE CONNECTION
MODULATION CONTROL VALVE
FLOOR MOUNTING BASE RING
WITH DRAIN ACCESS OPENING
SHOWN. ANGLE IRON LEGS
MAY BE USED AS AN OPTION.
INTERNAL BAFFLE
2" NPT DRAIN
2" NPT VENT
FLANGED
CONNECTION
/4
"3
/4
/4
374"
/4
36" 86"
1 2 3 4 5
7 8
1591415
13 13
Plan View
ELEVATION VIEW
6 16
8"
18"
DISPERSION TUBES
ELECTRIC 2-POSITION
SHUTOFF VALVE
FROM
STEAM
MAIN
STRAINERELECTRIC MODULATING
CONTROL VALVE
ST-2
PROVIDE FLOAT
SWITCH
TO STEAM CONDENSATE
RETURN MAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:0
A
M
M502
MECHANICAL DETAILS
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
NTS
FLEXIBLE DUCT CONNECTIONS
NTS
205-RTU-4 CHILLED WATER COIL - PIPING CONNECTIONS
NTS
DETAIL FOR SUPPORTING PIPE ON ROOF
NTS
FLOOR MOUNTED EXPANSION TANK - PIPING CONNECTIONS
NTS
STEAM COIL - PIPING CONNECTIONS
NTS
FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY
NTS
TERMINAL UNIT REHEAT COILS - PIPING CONNECTIONS
NTS
FLOOR MOUNTED BUFFER TANK - PIPING CONNECTIONS
NTS
205-RTU-4
D R A W I N G N O T E S :
1. EXHAUST FAN
2. AIR-TO-AIR ENTHALPY HEAT EXCHANGER
3. STEAM FACE AND BYPASS COIL
4. CHILLLED WATER COIL
5. SUPPLY FAN
6. ACCESS SECTION
7. MERV 8 AND 13 COMBO FILTER
8. MERV 8 PRE-FILTER
9. MERV 14 FINAL FILTER
10. 24" ACCESS DOOR (TYP)
11. WEATHER HOOD
12. CONTROL PANNEL
13. PIPE VESTIBULE
14. HUMIDIFIER
15. DISCHARGE PLENUM
16. INTAKE PLENUM
NTS
HUMIDIFIER - PIPING CONNECTIONS
AIR HANDLING UNIT SCHEDULE
MARK LOCATION
AREA AND/OR BLDG
SERVED
TYPE
AIR FLOW
SUPPLY FAN
MARK
EXHAUST
FAN MARK
PREHEAT
COIL MARK
COOLING
COIL MARK
HUMIDIFIER
MARK
FILTER
MARK
REMARKSSUPPLY MIN OA EXHAUST
CFM [L/s] CFM [L/s] CFM [L/s]
205-RTU-4
BUILDING 205
ROOF
FIRST FLOOR / C-SCA
OUTDOOR CENTRAL
STATION AIR HANDLER
1500 [ 710 ] 1500 [ 710 ] 1100 [ 520 ] 205-RTU-4-SF 205-RTU-4-EF SHC-1 CWCC - 1 H-1
PF-1/2/3
FF-1
CHILLED WATER COOLING COIL SCHEDULE
MARK LOCATION
AREA AND/OR BLDG
SERVED
SYSTEM
AND/OR
SERVICE
AIR FLOW
MAX FACE
VELOCITY
APD
EAT LAT
TOTAL CAPACITY
SENSIBLE
CAPACITY
CHILLED WATER
REMARKSDb Wb Db Wb FLOW EWT LWT WPD
CFM [L/s] FPM [M/s] IN WG [Pa] °F [°C] °F [°C] °F [°C] °F [°C] MBH [kW] MBH [kW] GPM [L/s] °F [°C] °F [°C] FT [M]
CWCC-1
BUILDING 205
ROOF
FIRST FLOOR / C-SCA 205-RTU-4 1500 710.00 391 2.00 1.15 290.00 90.5 32.5 71.8 22.1 47.9 8.80 47.7 8.70 111 33.00 70.00 21.00 22 1.40 45 7.20 55 12.80 8.7 2.60
STEAM HEATING COIL SCHEDULE
MARK LOCATION
AREA AND/OR BLDG
SERVED
SYSTEM
AND/OR
SERVICE
APPLICATION
AIR FLOW
MAX FACE
VELOCITY
APD
TEMPERATURES
TOTAL MIN CAPACITY
STEAM
REMARKSEAT LAT ENT CONT VALVE ENT COIL FLOW
CFM [L/s] FPM [M/s] IN WG [Pa] °F [°C] °F [°C] MBH [kW] PSIG [kPa] PSIG [kPa] LBS/HR [kg/HR] LBS/HR [kg/HR]
SHC-1
BUILDING 205
ROOF
FIRST FLOOR / C-SCA 205-RTU-4 IFB PREHEAT COIL 1500 [ 710 ] 734 3.70 0.36 [ 90 ] 4.6 -15.20 51.4 10.80 76 [ 260 ] 30 [ 210 ] 15 [ 100 ] 79 [ 36 ] 160 [ 73 ]
STEAM HUMIDIFIER SCHEDULE
MARK LOCATION
SYSTEM
AND/OR
SEVICE
HUMIDIFIER
TYPE
AIR FLOW # OF
MANIFOLDS
EAT LAT
SOURCE
STEAM
TRAP CAPACITY
REMARKSDb
%RH
Db
%RH
PRESS ENT VALVE PRESS ENT HEATER FLOW
CFM [L/s] °F [°C] °F [°C] PSIG [kPa] PSIG [kPa] LBS/HR [kg/HR] LBS/HR [kg/HR]
H-1 3RD FLOOR ROOF 205-RTU-4 STEAM 1500 [ 710 ] 1 51.4 [ 11 ] 11% 52.4 [ 11 ] 53%
BUILDING
STEAM
30 [ 210 ] 15 [ 100 ] 24 [ 11 ] 5 [ 2 ] ----
AIR DEVICE SCHEDULE (SUPPLY)
MARK TYPE
AIR FLOW
MAX APD
MOUNTING
PANEL/FRAME SIZE NECK SIZE
MAX NC DAMPER FINISH REMARKSMIN MAX
IN x IN [mm x mm] IN [mm ]
CFM [L/s] CFM [L/s] IN WG [Pa]
SD-1 SQUARE CONE 175 [ 83 ] 200 [ 94 ] 0.050 [ 13 ] CEILING 24 X 24 [ 300 x 300 ] 8 ø [ 200 ø ] 20 NONE WHITE
SD-2 ROUND CONE 40 [ 19 ] 40 [ 19 ] 0.030 [ 8 ] DUCT - - 6 ø [ 150 ø ] 20 NONE WHITE
SD-3 ROUND CONE 310 [ 150 ] 310 [ 150 ] 0.070 [ 18 ] DUCT - - 10 ø [ 250 ø ] 20 NONE WHITE
AIR DEVICE SCHEDULE (RETURN/EXHAUST)
MARK TYPE
AIR FLOW
MAX APD
MOUNTING
PANEL/FRAME SIZE NECK SIZE
NC DAMPER FINISH REMARKSMIN MAX
CFM [L/s] CFM [L/s] IN WG [Pa] IN x IN [mm x mm] IN x IN [mm x mm]
EG-1 EGG CRATE 40 [ 19 ] 40 [ 19 ] 0.04 25 DUCT 8 x 8 [ 200 x 200 ] 6 X 6 [ 150 x 150 ] - NONE WHITE -----
EG-2 HEAVY DUTY RETURN GRILLE 175 [ 83 ] 175 [ 83 ] 0.10 25 WALL 12 x 8 [ 300 x 200 ] 10 x 6 [ 350 x 150 ] 20 NONE WHITE
EG-3 EGG CRATE 930 [ 440 ] 930 [ 440 ] 0.10 25 DUCT 20 x 14 [ 350 x 200 ] 18 x 12 [ 300 x 150 ] 20 NONE WHITE -----
HVAC DESIGN DATA
DESIGN CONDITIONS
SUMMER WINTER
LOWEST AVERAGE
ANNUAL
DEWPOINTTEMP WET BULB TEMP
% HUMIDITY
TEMP DEWPOINT TEMP
% HUMIDITY
°F [°C] °F [°C] °F [°C] °F [°C] °F [°C]
OUTDOOR DESIGN
CONDITIONS
90.5 [ 33 ] 71.8 [ 22 ] 41 4.5 [ -15 ] 3.3 [ -16 ] NA 1.9 [ -17 ]
INDOOR AREA DESIGN CONDITIONS
VESTIBULE 75 [ 24 ] 65.3 [ 19 ] 60 70 [ 21 ] 27.7 [ -2 ] 20
C-SCA 68 [ 20 ] 59.2 [ 15 ] 60 68 [ 20 ] 26.2 [ -3 ] 30
NON-HAZARDOUS PHARMACY
STORAGE
75 [ 24 ] 65.3 [ 19 ] 60 70 [ 21 ] 27.7 [ -2 ] 20
AIR FILTER SCHEDULE
MARK LOCATION
AREA AND/OR BLDG
SERVED
SYSTEM
AND/OR
SERVICE
MERV
RATING
AIR FLOW
APD
HOUSING
TYPE
REMARKSINITIAL CHANGEOVER
CFM [L/s] IN [mm] IN [mm]
PF-1 205-RTU-4 FIRST FLOOR / C-SCA EA 8 1100 [ 520 ] 0.08 [ 2 ] 0.54 [ 14 ] SIDE ACCESS -
PF-2A 205-RTU-4 FIRST FLOOR / C-SCA OA 8 1500 [ 710 ] 0.12 [ 3 ] 0.56 [ 14 ] SIDE ACCESS -
PF-2B 205-RTU-4 FIRST FLOOR / C-SCA OA 13 1500 [ 710 ] 0.11 [ 3 ] 0.55 [ 14 ] SIDE ACCESS -
FF-1 205-RTU-4 FIRST FLOOR / C-SCA SA 14 1500 [ 710 ] 0.41 [ 10 ] 0.95 [ 24 ]
FRONT
ACCESS
FAN SCHEDULE
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM
AND/OR
SERVICE
AIR FLOW ESP
FAN MOTOR ELECTRICAL
CONTROL
SEQUENCE
REMARKS
TYPE
ARRANGEMENT,
ROTATION, AND
DISCHARGE
DRIVE FAN RPM
NOMINAL POWER
PHASE VOLT RPM
SPEED
CONTROL
CFM [L/s] IN [Pa] BHP HP [kW]
EF-1 3RD FLOOR ROOF G101-E C-SCA
SPECIAL
EXHAUST
425 [ 200 ] 0.75 [ 190 ]
HIGH PLUME,
BACKWARD INCLINED
9, N/A, VERTICAL BELT 2593 0.31 3/4 [ 1 ] 3 460 3600 VFD SEE DRAWINGS 1,2
205-RTU-4-EF 3RD FLOOR ROOF FIRST FLOOR 205-RTU-4 1100 [ 520 ] 0.3 [ 75 ] PLENUM, AIRFOIL 4, N/A, AXIAL DIRECT 1991 0.58 5.2 [ 4 ] 3 460 4194 ECM SEE DRAWINGS -
205-RTU-4-SF 3RD FLOOR ROOF FIRST FLOOR 205-RTU-4 1500 [ 710 ] 1.2 [ 300 ] PLENUM, AIRFOIL 4, N/A, AXIAL DIRECT 3396 2.35 5.2 [ 4 ] 3 460 4194 ECM SEE DRAWINGS -
NOTES:
1. PROVIDE VFD WITH BYPASS.
2. FAN SHALL DISCHARGE AT OR ABOVE 3,000 FPM.
SINGLE DUCT AIR TERMINAL UNIT SCHEDULE
MARK LOCATION
SYSTEM AIR
HANDLING
APPROX. DUCT
INLET SIZE
MAX APD MAX
ROOM
NC
AIR FLOW
CONTROL
TYPE
CONTROL
SEQUENCE
HOT WATER HEATING COIL
REMARKSMAX MIN HEATING EAT EWT FLOW MAX WPD
PIPE RUNOUT
SIZE TO COIL
MIN
CAPACITY
AUTO
VALVE
TYPE
AUTO
VALVE CV
IN [mm] IN WG [Pa] CFM [L/s] CFM [L/s] CFM [L/s] °F [°C] °F [°C] GPM [L/m] FT [kPa] IN [mm] MBH
VAV-1
G101F NON-HAZARDOUS
PHARMACY STORAGE
205-RTU-4 4 [ 100 ] 0.5 [ 130 ] 35 200 [ 94 ] 200 [ 94 ] 200 [ 94 ] CVR SEE DRAWINGS 52 [ 11 ] 180 [ 82 ] 0.6 [ 2 ] 0.22 [ 6 ] 0.75 [ 19 ] 7.3 2-WAY 1.94
VAV-2
G101F NON-HAZARDOUS
PHARMACY STORAGE
205-RTU-4 4 [ 100 ] 0.5 [ 130 ] 35 175 [ 83 ] 175 [ 83 ] 175 [ 83 ] CVR SEE DRAWINGS 52 [ 11 ] 180 [ 82 ] 0.5 [ 2 ] 0.03 [ 6 ] 0.75 [ 19 ] 4.3 2-WAY 4.39
VAV-3
G101F NON-HAZARDOUS
PHARMACY STORAGE
205-RTU-4 10 [ 250 ] 0.5 [ 130 ] 35 930 [ 440 ] 930 [ 440 ] 930 [ 440 ] CVR SEE DRAWINGS 52 [ 11 ] 180 [ 82 ] 4.5 [ 17 ] 1.8 [ 6 ] 1 [ 25 ] 26.3 2-WAY 5.08
NOTES:
1. MAX APD IS THE PRESSURE DIFFERENCE BETWEEN THE UNIT INLET AND DISCHARGE, INCLUDING REHEAT COIL AND SOUND ATTENUATOR. IT IS ALSO THE MINIMUM PRESSURE REQUIRED AT THE UNIT INLET TO OBTAIN THE SCHEDULED MAX AIRFLOW.
2. PROVIDE HOSPITAL GRADE SOUND ATTENUATOR WHERE REQUIRED TO COMPLY WITH THE SCHEDULED MAX ROOM NC VALUE.
3. UNIT SOUND POWER LEVEL SHALL NOT EXCEED THE SCHEDULED MAX ROOM NC FROM BOTH AIRBORNE AND RADIATED NOISE, BASED ON A 10 DB ROOM ABSORPTION COEFFICIENT, WITH 3" INLET STATIC PRESSURE.
4. CONTROL TYPES: VVR = VARIABLE AIR VOLUME WITH REHEAT, CVR = CONSTANT AIR VOLUME WITH REHEAT, VAV = VARIABLE AIR VOLUME WITHOUT REHEAT, CAV = CONSTANT AIR VOLUME WITHOUT REHEAT.
5. THE MINIMUM HOT WATER REHEAT COIL FLOW RATE SCHEDULED IS 0.5 GPM PER VA DESIGN MANUAL REQUIREMENTS. THE ACTUAL FLOW RATE REQUIRED TO MEET THE MINIMUM COIL CAPACITY MAY BE LESS.
AIR FLOW CONTROL VALVE SCHEDULE
MARK LOCATION
SYSTEM
AND/OR
SERVICE
TYPE
SIZE
DESIGN AIR
FLOW
MAX AIR FLOW
APD AT MAX AIR
FLOW CONTROL
TYPE
CONNECT TO
ECC
APPLICATION REMARKS
IN [mm] CFM [L/s] CFM [L/s] IN WG [Pa]
VV-1
G101F NON-HAZARDOUS
PHARMACY STORAGE
EF-1 VENTURI VALVE 8 [ 200 ] 200 [ 94 ] 500 [ 240 ] 0.3 [ 75 ] SEE DRAWINGS YES
EXHAUST, BIO-
SAFETY CABINET
VV-2 G101 G EQUIP EF-1 VENTURI VALVE 8 [ 200 ] 175 [ 83 ] 500 [ 240 ] 0.3 [ 75 ] SEE DRAWINGS YES EXHAUST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:0
A
M
M601
MECHANICAL SCHEDULES
09/15/2021 PDP JPG
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
AIR SEPARATOR SCHEDULE
MARK LOCATION TYPE
AIR SEPARATOR
REMARKSSIZE IN FLOW WPD BUILT-IN
STRAINER
REQ'DIN [mm] GPM [L/s] FT [kPa]
AS-1 G101G EQUIP
IN-LINE AIR
PURGER
2 [ 50 ] 23 [ 2 ] 0.1 [ .3 ] NO ---
BUFFER TANK SCHEDULE
MARK LOCATION
SYSTEM
AND/OR
SERVICE
TYPE
TANK VOLUME
PIPE
CONNECTION
SIZE
VENT SIZE
REMARKS
GAL [L] IN [mm] IN [mm]
CHT-1 G101G EQUIP CWR VERTICAL 50 [ 190 ] 2 [ 50 ] 2 [ 50 ]
EXPANSION TANK SCHEDULE
MARK LOCATION
SYSTEM
AND/OR
SERVICE
TYPE
APPROX SYSTEM
VOLUME
SYSTEM TEMPERATURE RANGE INITIAL
PRESSURE IN
TANK
MAX OPERATING
PRESSURE
FILL PRESSURE AT TANK
MIN VOLUME
TANK
MIN
ACCEPTANCE
VOLUME
PIPE SIZE TO
TANK
MAKE-UP WATER
FILL SIZE REMARKSMIN MAX RELIEF VALVE AT TANK
GAL [L] °F [°C] °F [°C] PSIG [kPa] PSIG [kPa] PSIG [kPa] PSIG [kPa] GAL [L] GAL [L] IN [mm] IN [mm]
ET-1 G101G EQUIP
CHILLED
WATER
DIAPHRAGM 100 [ 380 ] 40 [ 4 ] 70 [ 21 ] 14 [ 97 ] 39 [ 270 ] 75 [ 520 ] 14 [ 97 ] 8 [ 30 ] 2.4 [ 9 ] 0.5 [ 13 ] 0.75 [ 19 ]
FAN COIL UNIT SCHEDULE
MARK LOCATION TYPE
FAN AIR FLOW EXTERNAL APD FILTER
FAN MOTOR
REMARKSPOWER
PHASE VOLT RPM
SPEED
CONTROL
CFM [L/s] IN WG [Pa]
MERV
RATING
HP [W]
FCU-1
G101F, NON-HAZARDOUS
PHARMACY STORAGE
HORIZONTAL
EXPOSED
930 440 0 0 8 0.323 240 1 115 1800 ECM -----
FCU-2
G101F, NON-HAZARDOUS
PHARMACY STORAGE
HORIZONTAL
EXPOSED
930 440 0 0 8 0.323 240 1 115 1800 ECM -----
FIRE DAMPER SCHEDULE
MARK LOCATION
FAN
SYSTEM
SYSTEM AND/OR
SERVICE
DUCT SIZE
DUCT PRESSURE
CLASS REMARKS
IN [mm] IN WG [Pa]
FD - 1 EQUIPMENT EF - 1
C-SCA SPECIAL
EXHAUST
10" ø [254] 2 [ 500 ]
FD - 2 EQUIPMENT SF - 1 205-RTU-4 14" x 12" [350 x 300] 2 [ 500 ]
FD - 3 EQUIPMENT EF - 2 205-RTU-4 14" x 12" [350 x 300] 2 [ 500 ]
PUMP SCHEDULE
MARK LOCATION
AREA AND/OR BLDG
SERVED
SYSTEM AND/OR
SERVICE
TYPE
CIRCULATING FLUID
MIN %
EFF
ELECTRICAL MOTOR
REMARKS
FLUID
FLOW HEAD TEMPERATURE
SP GR
NOMINAL
POWER PHASE VOLT
MAX
RPM
SPEED
CONTROL
GPM [L/s] FT [kPa] °F [°C] HP
P-1 G101G EQUIP FIRST FLOOR / C-SCA CHILLED WATER INLINE WATER 22 [ 1 ] 40 [ 640 ] 45 [ 7 ] 1 46.1 1/2 1 208 4600 ECM 1
P-2 G101G EQUIP FIRST FLOOR / C-SCA CHILLED WATER INLINE WATER 22 [ 1 ] 40 [ 640 ] 45 [ 7 ] 1 46.1 1/2 1 208 4600 ECM 1
AIR COOLED CHILLER SCHEDULE
MARK LOCATION
AREA
AND/OR
BLDG
SERVED
TYPE
CAPACITY # OF
COMP
MAX
kW/TON
MIN COP
MAX IPLV
(BTU/Wh)
EVAPORATOR CONDENSER ELECTRICAL
REMARKSFLOW EWT LWT MAX WPD FOULING
FACTOR
AMBIENT OA
TEMP # FANS MCA MOCP HZ PHASE VOLT
TONS [kW] GPM [L/s] °F [°C] °F [°C] FT [kPa] °F [°C]
ACCH - 1
BUILDING 205
ROOF
FIRST FLOOR /
C-SCA
DIGITAL
SCROLL
9.8 [ 34 ] 2 1.1 3 17.29 23.3 [ 2 ] 55 [ 13 ] 45 [ 7 ] 12.1 [ 36 ] 0.001 95 [ 35 ] 2 24.7 35 60 3 460
FILTER FEEDER SCHEDULE
MARK LOCATION
SYSTEM
AND/OR
SERVICE
TYPE SIZE
CAPACITY MAX WPD
REMARKS
GPM [L/s] FT [kPa]
PFF-1 G101G EQUIP
CHILLED
WATER
BYPASS FILTER
FEEDER
5 GALLONS 25 [ 2 ] 8 [ 24 ] -
STEAM TRAP SCHEDULE
MARK LOCATION
SYSTEM
AND/OR
SERVICE
CAPACITY AT MIN DIFF
PRESS
MIN DIFF PRESS MIN INLET PRESS
TRAP TYPE
TRAP SIZE
REMARKS
LBS/HR [kg/HR] PSI [kPa] PSI [kPa] IN [mm]
ST-1
G201
WAREHOUSE
205-RTU-4
PREHEAT COIL
250 [ 110 ] 0.25 [ 2 ] 15 [ 100 ]
FLOAT AND
THERMOSATIC
0.75 [ 19 ] 1
ST-2
G201
WAREHOUSE
205-RTU-4
HUMIDIFIER
8 [ 4 ] 0.25 [ 2 ] 15 [ 100 ]
FLOAT AND
THERMOSATIC
0.75 [ 19 ] 2
ST-3
G201
WAREHOUSE
205-RTU-4
DRIP TRAP
2 [ 1 ] 24 [ 170 ] 30 [ 210 ] INVERTED BUCKET 0.75 [ 19 ] 3
ST-4
G201
WAREHOUSE
205-RTU-4
DRIP TRAP
2 [ 1 ] 24 [ 170 ] 30 [ 210 ] INVERTED BUCKET 0.75 [ 19 ] 3
NOTES:
1. REFER TO "STEAM COIL - PIPING CONNECTIONS" DETAIL ON SHEET M502 FOR TRAP LOCATION.
2. REFER TO "HUMIDIFIER - PIPING CONNECTIONS" DETAIL ON SHEET M502 FOR TRAP LOCATION.
3. REFER TO SHEET MP102 FOR TRAP LOCATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
205/77
C U s e rs
\c ra ig \D o c u m e n ts \F
F E
M t H o m e C
-S C
A c ra ig .l ie g ib e l@ ff e -s e rv
.c o m
.r v t
/1
/2
:3
:0
A
M
M602
MECHANICAL SCHEDULES
09/15/2021 Checker Author
CONSTRUCT CONTAINMENT
SEGREGATED COMPOUNDING
AREA (C-SCA)
621-22-106
MOUNTAIN HOME, TENNESSEE
CONSTRUCTION
DOCUMENTS
JAMES H
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
File details come from the government source that posted it. Updated .