36C24921B0011 0001.docx

DOCX document 29 KB Posted

Attached to
6115--Project 621-19-123 - Replace 750kW Emer Gen. in Bldg. 116
Solicitation number
36C24921B0011
Issued by

About this file

This document contains a solicitation for replacing an emergency generator and supporting equipment at a VA medical center. The Department of Veterans Affairs is seeking bids to replace a 750KW emergency generator at the James H. Quillen VA Medical Center in Mountain Home, Tennessee under Solicitation Number 36C24921B0011. The work includes removing the existing generator and installing a new generator and any supporting structures as defined in the specifications. The NAICS code is 238210 and the small business size standard is $16.5 million. The estimated value is between $500,000 to $1 million. The solicitation is open only to Service-Disabled Veteran-Owned Small Businesses and will be awarded following FAR Part 14 sealed bid procedures. Bids are due by July 28, 2021.

View the file

Other files

File Type Posted
36C24921B0011 0002.pdf PDF
Building 116 Lead and Asbestos Survey Results.pdf PDF
RFI Form - 750kW Emergency Gen.pdf PDF
Drawings 11-17.pdf PDF
Drawings 24-33.pdf PDF
Specs 621-19-123 Replace Emerg Generator Bldg 116 - Bid Documents .pdf PDF
EMR.pdf PDF
WD TN20210111 dated 1-1-2021.pdf PDF
Drawings 18-23.pdf PDF
Header - List of Attachments.txt TXT text file
36C24921B0011_1.docx DOCX document
Drawings 1-10.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 621-22-1-5082-0001 621-19-123 Department of Veterans Affairs Network Contracting Office 9 (90C)

NCO 9

1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129 90C Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129 To all Offerors/Bidders

36C24921B0011

X x x

See CONTINUATION Page

621-3620162-5082-854200-3241 23NRNR001

x The purpose of this amendment is to answer the questions submitted and revise the price schedule.

Bid opening will remain on September 14, 2021 at 2:00 PM CT. See solicitation for further instructions.

Diana K. Grube Contracting Officer

Questions and Answers:

1. Question: Can you please clarify if bid deduct 5 is included? Bid deduct 5 is missing from price schedule in the solicitation but, is included in the drawings and specs. It should have been included, verify with the CO if it was included in the solicitation.

Answer: See revised schedule

2. Question: Can you please provide a specification for re-bar for slab and masonry repairs?

Answer: There is a section within the 03 30 00 Cast-in-Place Concrete specification for reinforcement bars, as well as Concrete Reinforcement details in the structural design documents. There is a section within the 04 20 00 Unit Masonry specification for reinforcement bars, as well as Concrete Masonry details in the structural design documents.

3. Question: "The contractor will furnish all necessary fuel for approximately two (2) months and perform all required maintenance on the temporary generator and ensure that the generator assumes the load in accordance with NFPA 70, 2020 Edition, NFPA 99, 2021 Edition and NFPA 101, 2021 Edition."

1) Is any periodic testing /start-up of the temporary generator required? 2)If yes, what is required and what is the frequency? 3)If yes, will the periodic testing/start-up of the generator be the responsibility of the contractor or VA?

Answer: Since the temporary generator is taking the place of the permanent emergency generator, monthly testing would be required as is done with the permanent generator. The contractor will be required to perform the monthly test and a VA representative will witness the test.

4. Question: "K. At the completion of the field tests, fill the main storage tank and day tank with fuel” Can the VA please provide the volume of the main storage tank and its approximate current level of fuel?

Answer: The main storage tank is a 6000-gal tank, and the day tank will be 50 gal. The contractor will only be required to replace the fuel that was used during the testing. The fuel level can be determined prior to testing and then after testing to determine the fuel that the contractor is responsible for.

5. Question: Can the VA please provide the ACM and LBP survey?

Answer: Yes, we can provide the ACM/LBP survey. See attached for survey.

6. Question: The list of required special inspections appears to include areas of work that are beyond the scope of this project. Can the VA please provide an updated Schedule of Special Inspections?

Answer: The following inspection requirements can be removed from the Schedule of Special Inspections:

A. Structural Steel Welding Section C. Structural – Steel – Non-Destructive Testing Section H. Geotechnical – Soil Inspection Section

7. Question: Sheet ES-601 Electrical one line diagram the feeder from the quick connect box and the new transformer is listed as a T750P on the schedule. It is feeding a 3000A breaker in the manual transfer switch. This feeder that is being shown is only good for 1200 amps and the transformer can produce a little over 2000 amps. Is this the wrong conduit and wire label?

Answer: The T750P feeder is between the 1200A quick connects and the primary side of the transformer, so it is rated for the 1200A rating of the quick connects. T750S is the feeder from the secondary side of the transformer to the 3000A breaker in the manual transfer switch, which is rated for at least 3000A.

8. Question: 3.2 B." A UL representative shall inspect the lightning protection system. Obtain and install a UL numbered master label for each of the lightning protection systems at the location directed by the UL representative and the COR." After award will the VA be able to provide the current master label certification for the building?

Answer: The VA cannot guarantee the current master label can be provided.

9. Question: 3.2 B." A UL representative shall inspect the lightning protection system. Obtain and install a UL numbered master label for each of the lightning protection systems at the location directed by the UL representative and the COR." Reference RFI 8: If the VA is unable to provide the current master certifications, would the VA accept a letter of findings instead of the master label certification?

Answer: The VA is willing to accept a letter of findings.

10. Question: The industry is currently experiencing extended lead times on generators. The current best guess lead time from the manufacturer is 22 weeks after approved submittal. Would the Government consider adding a 45-day administrative period for submittal approval and material requirement or extending the POP to 285 days?

Answer: The period of performance will be extended to 45 calendar days on each bid item. See schedule for details.

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

Project Number 621-19-123, Replace the emergency generator and any supporting equipment or structures as defined in the design drawings and specifications. Period of performance is 285 calendar days

1.00
JB
__________________
__________________

Bid Deduct 1: Same as Bid Item 0001 except deduct costs include repairing the existing intake louvers, which includes repairing the weatherstripping, and repair and reinforce surrounding CMU where required, in lieu of replacing the louvers.

PoP: 285 days

1.00
JB
__________________
__________________

Bid Deduct 2: Same as Bid Item 0002 and including deduct costs to repair the existing generator silencer, which includes new insulation, in lieu of replacing the silencer.

1.00
JB
__________________
__________________

Bid Deduct 3: Same as Bid Item No. 3 and including deduct costs provide insulation at the new damper blades.

1.00
JB
__________________
__________________

Bid Deduct 4: Same as Bid Item 0004 and including deduct costs for connecting the existin day tank to the new generator, in lieu of installation a new day tank.

PoP: 275 days

1.00

JB

Bid deduct 5: Same as bid item 0005 and including deduct costs to install 3000A generator quick connects on the external wall of the generator building, which includes direct connection of the generator quick connects to the manual transfer switch, in lieu of installing 1200A generator quick connects and a step-down transformer with a concrete support pad and underground duct bank.

PoP: 275 days

GRAND TOTAL
__________________

See attached document: Header - List of Attachments.

See attached document: Building 116 Lead and Asbestos Survey Results.