36C24918R0163-003.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Construct Parking Garage on West Lot - Project 614-320 Federal contract opportunity
- Solicitation number
- 36C24918R0163
About this file
36C24918R0163 Copy of S02-Solicitation Attachment-Price Schedule.xlsx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24918R0163-00004000.docx | DOCX document | |
| 36C24918R0163-00003008.pdf | ||
| 36C24918R0163-00003006.docx | DOCX document | |
| 36C24918R0163-00003007.pdf | ||
| 36C24918R0163-00002000.docx | DOCX document | |
| 36C24918R0163-00001000.docx | DOCX document | |
| 36C24918R0163-011.pdf | ||
| 36C24918R0163-014.docx | DOCX document | |
| 36C24918R0163-006.pdf | ||
| 36C24918R0163-010.pdf | ||
| 36C24918R0163-007.pdf | ||
| 36C24918R0163-004.pdf | ||
| 36C24918R0163-005.pdf | ||
| 36C24918R0163-016.pdf | ||
| 36C24918R0163-008.pdf | ||
| 36C24918R0163-015.xlsx | XLSX spreadsheet | |
| 36C24918R0163-002.docx | DOCX document | |
| 36C24918R0163-009.pdf | ||
| 36C24918R0163-012.pdf | ||
| 36C24918R0163-013.pdf | ||
| 36C24918R0163-001.docx | DOCX document | |
| 36C24918R0163-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Breakdown JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900 Solicitation Number Project Title Solicitation Number Project Number Proposal Date
SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS
| DIVISION 1 | GENERAL REQUIREMENTS | $3706.00 | |||
| 13526 | Infection Control Walls | $5.00 | $3.00 | $44.00 | |
| Submittal Process | $1.00 | $5.00 | |||
| Supervision | $2.00 | $44.00 | |||
| Demolition | $3.00 | $55.00 | $33.00 | ||
| Dumpsters | $3.00 | $3.00 | |||
| Job-site Office Equipment | $3.00 | $3333.00 | |||
| Safety & First Aid-ICRA | $33.00 | $3.00 | |||
| Final Cleaning | $5.00 | $44.00 | $2.00 | ||
| Punchlist/Closeout | $4.00 | $77.00 | $1.00 | ||
| DIVISION 2 | SITE WORK | $373.00 | |||
| 02 41 00 | Demolition | $151.00 | $222.00 | ||
| 02 82 11 | Traditional Asbestos Abatement | ||||
| DIVISION 3 | CONCRETE | $38.00 | |||
| 03 30 53 | Cast in Place Concrete | $5.00 | $33.00 | ||
| DIVISION 4 | MASONRY | ||||
| DIVISION 5 | STEEL | ||||
| DIVISION 6 | CARPENTRY | $32.00 | |||
| 06 10 00 | Rough Carpentry | $17.00 | $15.00 | ||
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $918.00 | |||
| 07 21 13 | Thermal Insulation | $5.00 | $5.00 | ||
| 07 84 00 | Firestopping | $888.00 | |||
| 07 92 00 | Joint Sealants | $10.00 | $10.00 | ||
| DIVISION 8 | DOORS AND WINDOWS | $6,630.00 | |||
| 08 11 13 | Hollow Metal Frames | $5.00 | $5.00 | $54.00 | |
| 08 14 00 | Interior Wood Doors | $4,545.00 | |||
| 08 31 13 | Access Doors and Frames | $555.00 | |||
| 08 41 13 | Alum Framed Entrance and Storefronts | ||||
| 08 56 19 | Pass Windows (2 each) | $5.00 | $5.00 | ||
| 08 71 00 | Door Hardware | $999.00 | |||
| 08 80 00 | Glazing | $456.00 | $1.00 | ||
| DIVISION 9 | FINISHES | $11,101.00 | |||
| 09 05 16 | Subsurface Prep for Floor Finishing | $84.00 | |||
| 09 06 00 | Schedule for Finishes | $55.00 | $888.00 | ||
| 09 22 16 | Non Struct Metal Framing | $66.00 | $88.00 | ||
| 09 29 00 | Gypsum Board | $5.00 | |||
| 09 30 13 | Ceramic/Porcelain Tile | $55.00 | |||
| 09 51 00 | Acoustical Ceilings | $8.00 | $22.00 | ||
| 09 65 13 | Resil Base and Access | $4,888.00 | $2,223.00 | ||
| 09 65 16 | Resilient Sheet Flooring | $486.00 | |||
| 09 90 00 | Painting | $2,233.00 | |||
| DIVISION 10 | ACCESSORIES | $426.00 | |||
| 10 14 00 | Signage | $7.00 | $5.00 | 66.00 | |
| 10 21 23 | Cubicle Curtain Tracks | $5.00 | $9.00 | 8.00 | |
| 10 26 00 | Wall and Door Protection | $32.00 | $5.00 | 49.00 | |
| 10 28 00 | Toilet Bath and Laundry Access | $11.00 | $58.00 | ||
| 10 44 13 | Fire Ext Cabinets | $99.00 | $17.00 | 55.00 | |
| DIVISION 11 | EQUIPMENT | ||||
| DIVISION 12 | FURNISHINGS | $999.00 | |||
| 12 31 00 | Manuf Metal Casework | ||||
| 12 32 00 | Manuf Wood Casework | ||||
| 12 36 00 | Countertops | $999.00 | |||
| DIVISION 13 | SPECIAL CONSTRUCTION | ||||
| DIVISION 14 | CONVEYING EQUIPMENT | ||||
| DIVISION 21‐23 | MECHANICAL | $240.00 | |||
| DIVISION 21 | Fire Protection | $75.00 | $78.00 | ||
| DIVISION 22 | Plumbing | $40.00 | |||
| DIVISION 23 | HVAC | $25.00 | |||
| DIV 24 | Controls | $22.00 | |||
| DIVISION 25 | INTEGRATED AUTOMATION | ||||
| DIVISION 26 | ELECTRICAL | $252.00 | |||
| Electrical | $252.00 | ||||
| Fire Alarm | |||||
| Other… | |||||
| DIVISION 27 | COMMUNICATIONS | ||||
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | ||||
| DIVISION 31 | EARTHWORK | ||||
| DIVISION 32 | EXTERIOR IMPROVEMENTS | ||||
| DIVISION 33 | UTILITIES | ||||
| DIVISION 34 | TRANSPORTATION | ||||
| DIVISION 48 | ELECTRICAL POWER GENERATION |
TOTALS
TOTAL LABOR $9,324.00
TOTAL MATERIALS $2,863.00
TAX FOR MATERIALS 6% $171.78
TOTAL EQUIPMENT $12,528.00
DIVISION GRAND TOTALS $24715.00
| DIVISION GRAND TOTALS | $24,715 | INSTRUCTIONS |
| TAX FOR MATERIALS | $172 | |
| 1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number; | ||
| SUBTOTAL | $24,887 |
| OVERHEAD | 10% | $2,489 | |
| PROFIT | 10% | $2,489 | 2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree; |
SUBTOTAL $29,864
| BOND/FEE | 3% | $896 | |
| PERMITS/LICENSES | $5 | 3. Divisions must still be listed even if not applicable to the construction requirement; |
| GRAND TOTAL | $30,765 | |
| 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and |
5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.
6. You will also need to breakdown your General Conditions cost.
Sheet3
File details come from the government source that posted it.