36C24918R0163 Copy of S02-Solicitation Attachment-Price Schedule.xlsx

View the file

Other files for this federal contract opportunity

Other files attached to Construct Parking Garage on West Lot - Project 614-320, newest first.
File Type Posted
36C24918R0163-00004000.docx DOCX document
36C24918R0163-00003008.pdf PDF
36C24918R0163-00003006.docx DOCX document
36C24918R0163-00003007.pdf PDF
36C24918R0163-00002000.docx DOCX document
36C24918R0163-00001000.docx DOCX document
36C24918R0163-011.pdf PDF
36C24918R0163-014.docx DOCX document
36C24918R0163-006.pdf PDF
36C24918R0163-010.pdf PDF
36C24918R0163-007.pdf PDF
36C24918R0163-004.pdf PDF
36C24918R0163-005.pdf PDF
36C24918R0163-016.pdf PDF
36C24918R0163-008.pdf PDF
36C24918R0163-015.xlsx XLSX spreadsheet
36C24918R0163-002.docx DOCX document
36C24918R0163-009.pdf PDF
36C24918R0163-012.pdf PDF
36C24918R0163-013.pdf PDF
36C24918R0163-001.docx DOCX document
36C24918R0163-000.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900 Solicitation Number Project Title Solicitation Number Project Number Proposal Date

SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS

DIVISION 1GENERAL REQUIREMENTS$3706.00
13526Infection Control Walls$5.00$3.00$44.00
Submittal Process$1.00$5.00
Supervision$2.00$44.00
Demolition$3.00$55.00$33.00
Dumpsters$3.00$3.00
Job-site Office Equipment$3.00$3333.00
Safety & First Aid-ICRA$33.00$3.00
Final Cleaning$5.00$44.00$2.00
Punchlist/Closeout$4.00$77.00$1.00
DIVISION 2SITE WORK$373.00
02 41 00Demolition$151.00$222.00
02 82 11Traditional Asbestos Abatement
DIVISION 3CONCRETE$38.00
03 30 53Cast in Place Concrete$5.00$33.00
DIVISION 4MASONRY
DIVISION 5STEEL
DIVISION 6CARPENTRY$32.00
06 10 00Rough Carpentry$17.00$15.00
DIVISION 7THERMAL AND MOISTURE PROTECTION$918.00
07 21 13Thermal Insulation$5.00$5.00
07 84 00Firestopping$888.00
07 92 00Joint Sealants$10.00$10.00
DIVISION 8DOORS AND WINDOWS$6,630.00
08 11 13Hollow Metal Frames$5.00$5.00$54.00
08 14 00Interior Wood Doors$4,545.00
08 31 13Access Doors and Frames$555.00
08 41 13Alum Framed Entrance and Storefronts
08 56 19Pass Windows (2 each)$5.00$5.00
08 71 00Door Hardware$999.00
08 80 00Glazing$456.00$1.00
DIVISION 9FINISHES$11,101.00
09 05 16Subsurface Prep for Floor Finishing$84.00
09 06 00Schedule for Finishes$55.00$888.00
09 22 16Non Struct Metal Framing$66.00$88.00
09 29 00Gypsum Board$5.00
09 30 13Ceramic/Porcelain Tile$55.00
09 51 00Acoustical Ceilings$8.00$22.00
09 65 13Resil Base and Access$4,888.00$2,223.00
09 65 16Resilient Sheet Flooring$486.00
09 90 00Painting$2,233.00
DIVISION 10ACCESSORIES$426.00
10 14 00Signage$7.00$5.0066.00
10 21 23Cubicle Curtain Tracks$5.00$9.008.00
10 26 00Wall and Door Protection$32.00$5.0049.00
10 28 00Toilet Bath and Laundry Access$11.00$58.00
10 44 13Fire Ext Cabinets$99.00$17.0055.00
DIVISION 11EQUIPMENT
DIVISION 12FURNISHINGS$999.00
12 31 00Manuf Metal Casework
12 32 00Manuf Wood Casework
12 36 00Countertops$999.00
DIVISION 13SPECIAL CONSTRUCTION
DIVISION 14CONVEYING EQUIPMENT
DIVISION 21‐23MECHANICAL$240.00
DIVISION 21Fire Protection$75.00$78.00
DIVISION 22Plumbing$40.00
DIVISION 23HVAC$25.00
DIV 24Controls$22.00
DIVISION 25INTEGRATED AUTOMATION
DIVISION 26ELECTRICAL$252.00
Electrical$252.00
Fire Alarm
Other…
DIVISION 27COMMUNICATIONS
DIVISION 28ELECTRONIC SAFETY AND SECURITY
DIVISION 31EARTHWORK
DIVISION 32EXTERIOR IMPROVEMENTS
DIVISION 33UTILITIES
DIVISION 34TRANSPORTATION
DIVISION 48ELECTRICAL POWER GENERATION

TOTALS

TOTAL LABOR $9,324.00

TOTAL MATERIALS $2,863.00

TAX FOR MATERIALS 6% $171.78

TOTAL EQUIPMENT $12,528.00

DIVISION GRAND TOTALS $24715.00

DIVISION GRAND TOTALS$24,715INSTRUCTIONS
TAX FOR MATERIALS$172
1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number;
SUBTOTAL$24,887
OVERHEAD10%$2,489
PROFIT10%$2,4892. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree;

SUBTOTAL $29,864

BOND/FEE3%$896
PERMITS/LICENSES$53. Divisions must still be listed even if not applicable to the construction requirement;
GRAND TOTAL$30,765
4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and

5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.

6. You will also need to breakdown your General Conditions cost.