36C24818R0222-003.pdf
PDF 95 KB Posted
- Solicitation number
- 36C24818R0222
About this file
36C24818R0222 Specification 00 11 21 Request for Proposal to Design Build [2 pages].pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24818C0190-000.docx | DOCX document | |
| 36C24818R0222-015.docx | DOCX document | |
| 36C24818R0222-004.pdf | ||
| 36C24818R0222-012.docx | DOCX document | |
| 36C24818R0222-014.docx | DOCX document | |
| 36C24818R0222-001.docx | DOCX document | |
| 36C24818R0222-009.pdf | ||
| 36C24818R0222-013.docx | DOCX document | |
| 36C24818R0222-008.pdf | ||
| 36C24818R0222-016.docx | DOCX document | |
| 36C24818R0222-010.pdf | ||
| 36C24818R0222-006.pdf | ||
| 36C24818R0222-011.pdf | ||
| 36C24818R0222-005.pdf | ||
| 36C24818R0222-007.pdf | ||
| 36C24818R0222-002.pdf | ||
| 36C24818R0222-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11-01-15
00 11 21-1
SECTION 00 11 21
REQUEST FOR PROPOSAL TO DESIGN BUILD
UPGRADE AIR EMISSION CONTROL SYSTEM & DATA COLLECTION FOR STANDBY POWER GENERATORS
672-17-101
A. PART I - GENERAL
A1. Scope of Contract
Provide all labor, materials, tools and equipment, and design-build services necessary for design and construction of a project described here in other specific tasks as further defined by this request for proposal (RFP)number 36C24818R0222.
A2. Definitions
A. Design-Build (DB) as defined by the Department of Veterans Affairs (VA) is the procurement by the Government, under one contract, with one firm or joint venture (JV) for both design and construction services for a specific project.
1. Contracting Officer: The services to be performed under this contract are subject to the general supervision, direction, control and approval of the Contracting Officer.
2. Project Manager: The Contracting Officer's Representative responsible for administering contracts under the immediate direction of the Contracting Officer.
4. Design Build Contract: This term, as used herein, refers to the
Contract to perform the design and construction of the project.
5. Contractor: This term, as used herein, refers to the contractor under this contract or the DB team.
6. AE: This term, as used herein, refers to the Architect-Engineer firm(s)that are a part of the DB team, also referred to as DB/AE.
B. Selection Procedure – See solicitation 36C24818R0222 and FAR 52. 215-1, Instructions to Offerors - Competitive Acquisition (JAN 2017).
11-01-15
00 11 21-2
B. PART II - RESPONSIBILITIES
B2. Design-Build Team:
A. The DB team includes all J/V partners, consultants and sub contractors to the one firm. The DB team shall provide Architectural and
Engineering disciplines for the preparation of construction documents, and construction contractor capabilities for construction of the project.
B. If the DB Team A/E and contractor are a J/V (not one and the same firm) engineering and other technical consultants shall be subcontractors of the J/V Architect - not the Design-Build construction contractor or sub contractors. If the DB Team A/E and contractor are one and the same firm (not a J/V) those consultants shall be subcontractors of DB firm not the construction subcontractors.
C. The RFP documents are intended to define existing conditions, certain required items, and design parameters to be included in the project. It is the DB Team’s responsibility to complete the documents and construction in a manner consistent with the intent of the RFP documents within the required time period (contract length).
C. PART III - PROPOSAL REQUIREMENTS
Refer to solicitation 36C24818R0222
D. PART IV - POST AWARD REQUIREMENTS
Refer to solicitation 36C24818R0222