36C24818R0222-000.docx
DOCX document 21 KB Posted
- Solicitation number
- 36C24818R0222
About this file
36C24818R0222 36C24818R0222.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24818C0190-000.docx | DOCX document | |
| 36C24818R0222-015.docx | DOCX document | |
| 36C24818R0222-004.pdf | ||
| 36C24818R0222-012.docx | DOCX document | |
| 36C24818R0222-014.docx | DOCX document | |
| 36C24818R0222-001.docx | DOCX document | |
| 36C24818R0222-009.pdf | ||
| 36C24818R0222-013.docx | DOCX document | |
| 36C24818R0222-008.pdf | ||
| 36C24818R0222-016.docx | DOCX document | |
| 36C24818R0222-003.pdf | ||
| 36C24818R0222-010.pdf | ||
| 36C24818R0222-006.pdf | ||
| 36C24818R0222-011.pdf | ||
| 36C24818R0222-005.pdf | ||
| 36C24818R0222-007.pdf | ||
| 36C24818R0222-002.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FedBizOpps Presolicitation Notice
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Presolicitation Notice Rev. March 2010 Z Upgrade Air Emission Control System and Data Collection for Standby Power Generators 00921-3201 36C24818R0222 08-13-2018 N 236220 Department of Veterans Affairs VA Caribbean Healthcare System Administrative Building #10 Calle Casia Suite #4M440 San Juan PR 00921-3201 Ana G. Alvarado Department of Veterans Affairs VA Caribbean Healthcare System 10 Casia Street San Juan, PR 00921-3200
USA
ana.alvarado@va.gov Contracting Officer's email DESCRIPTION: The contractor shall provide all labor, supervision, materials, tools, equipment, and design-build services necessary for design and construction to upgrade air emission control system & data collection for standby power generators at the VA Caribbean Healthcare System, San Juan, Puerto Rico, in accordance with the solicitation. This project will provide a data collection system compatible with existing equipment to meet local (EQB) and federal (EPA) requirements. The system shall be capable to monitor, document all NOx emissions rate, and to be able to perform testing and certification in compliance with environmental requirements. The air emission control system shall be considered in the design to have a reduction from the presumed baseline of 50% NOx levels, gas flow and temperatures.
Project No. & Title: 672-17-101, Upgrade Air Emission Control System and Data Collection for Standby Power Generators
Estimated Target Completion Period: 365 calendar days after receipt of the Notice to Proceed (NTP).
Magnitude of this project is between $500,000 and $1,000,000. NAICS 236220 - Commercial and Institutional Building Constructions. Size Standard is $36.5 Million. Product Service Code - Z1DA.
This is a design build project/solicitation that will use the two-phase design-build selection procedures in combination with trade-off source selection process, providing the best value to the Government. One solicitation will be issued to covering both phases. The solicitation will be issued on or about February 16, 2018.
All information for this solicitation will be available at the Federal Business Opportunities (FBO) web-site at www.fbo.gov.
At the time of proposal submission, contractors must have current registration/certification in the System for Award Management (SAM) www.sam.gov and VetBiz at www.vip.vetbiz.gov. Proposals of contractors not registered/certified in both databases will not be considered for award.
Green Environmental Management System (GEMS) - Contractors selected for award of this contract are expected to be good stewards of the environment by complying with federal, state and local environmental laws and other requirements such as medical center policy and project specifications. In addition contractors should incorporate pollution prevention and waste minimization into operations.
Point of Contact: Ana G. Alvarado, Contracting Officer, Email: ana.alvarado@va.gov
File details come from the government source that posted it.