36C24818R0140-009.pdf
PDF 153 KB Posted
- Attached to
- Replace Failing De-Aerating Tank Federal contract opportunity
- Solicitation number
- 36C24818R0140
About this file
36C24818R0140 Attachment 08 Drawing AC Controller.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24818R0140-00001000.docx | DOCX document | |
| 36C24818R0140-011.doc | DOC document | |
| 36C24818R0140-005.docx | DOCX document | |
| 36C24818R0140-007.doc | DOC document | |
| 36C24818R0140-004.doc | DOC document | |
| 36C24818R0140-006.doc | DOC document | |
| 36C24818R0140-001.docx | DOCX document | |
| 36C24818R0140-010.pdf | ||
| 36C24818R0140-008.docx | DOCX document | |
| 36C24818R0140-003.doc | DOC document | |
| 36C24818R0140-012.doc | DOC document | |
| 36C24818R0140-002.pdf | ||
| 36C24818R0140-000.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combustion Sales & Engineering - BOYNTON BEACH, FLORIDA 33426
Division of UniControl Inc.
MFG
R&D
CHK
DATE
DR.
SCALE DWG.
NO.
REV.
SHEET OF
Hays ClevelandAll revisions to hardware, wiring, and software must be approved in writing by
Hays
Cleveland
Division of
UniControl
Inc.
2.83"W x 5.67"H
ON
OFF
MAN
ALM3
LOC
0.1
MASTER
IN PANEL WIRING
FIELD WIRING
PANEL I/O BLOCKS
INTERCONNECTS, ANALOG
OR SIGNAL BUS
INTERCONNECTS, DIGITAL
LEGEND________________________________
STEAM PRESSURE MASTER
SYSTEM CONFIGURATION SCHEMATIC
1 8 none
B67756 B
MASTER (MLS) TO
BOILER 1 CONTROLLER
SHEET 3
MASTER (MLS) TO
BOILER 2 CONTROLLER
SHEET 3
MASTER (MLS) TO
BOILER 3 CONTROLLER
SHEET 3
A O
-1
A O
-2
A O
-3
A O
-4
Qty.1, C-07000-AC20-3000
MASTER STEAM
PRESSURE CONTROLLER
CONFIGURATION, F=2273
M
M
M
AI-5
HAYS CLEVELAND JOB No 152-IS
Qty.1, ALL ITEMS THIS SHEET, UNLESS OTHERWISE NOTED
1-5 VDC
WEST PALM BEACH, FLORIDA 33410
JOB 363. DELETING ALL AC-20 BOILER CONTROLLERS.
TM
NEW BOILER CABINET LOCATED UPAC SYSTEMS.
LTR
B
C
REVISIONS BY
DATE
CONTROL STRATEGY & I/OA
09-20-06
OUTSIDE AIR
TEMPERATURE
0-120°F
Qty.1 (Existing)
TE-155
2+SHD
4-20 MA
TT-155
FEED WATER HEADER
(ECON INLET) WATER
TEMPERATURE
0-400°F
2+SHD
4-20 MA
TE-154
TT-154
COMPUTE BOILER EFFICIENCY BASED
UPON BOILER STEAM AND GAS FLOWS
FOR SCADA DISPLAY, LOGGING
LOOP PWR
2+SHD
4-20 MA
PT-100C
90>125 PSIG
OPERATING
2+SHD
4-20 MA
PT-100
BOILER PLANT STEAM HEADER
CONTROL
HEADER
PRESSURE
70-145 PSIG
ALL ISOLATION, VENT
AND BLOW DOWN VALVES
by VA Facility
MONITOR
HEADER
PRESSURE
0-200 PSIG
Qty.1 Fox IGP20-T22D1F
Qty.1 Fox IGP20-T22D1F
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
B O
IL
E
R
C O
M P
E N
S A
T E
D S
T E
A M
F L
O W
SUMMED BOILER 1+2+3
COMPENSATED NAT GAS FLOWS
FROM SHEET 2
AI-
AI-4
AI-3
AI-1
S
GF
-5
V D
C
DIG I/O POWER
FROM BLR.3
PS, SHEET 3
DI-1
Qty.1
EXISTING LOW
STEAM PRESSURE
SET POINT SELECTOR
90 125
LO P
24V
117 VAC
20 VA
CN2
MODBUS
MB
SCADA
SHEET 8
CTRL FAULTD0-1
24 V DIG
POWER
CFM CF
Qty.1, Control Fault Module (CFM) 31313
STM
PRESSD0-2&-3
RELAY PA
SCADAD0-4
RELAY SA
MASTER CONTROL FAIL
STEAM PRESSURE ALARM
SCADA ALARMS
Qty.1 (Existing)
TO
ANNUNCIATOR
SHEET 7
SP
N/C
24 VDC TO
DIGITAL INPUTS
AND OUTPUT
RELAYS
Qty.1, Master Acopian 24EB35 and Mounting Kit
5 MA EA DIG IN
80 MA EA 24V RELAY
24V, 0.35A
DIG I/O
DC PWR
VAC
AI-2
AI-7
AI-8
12-05-06
2+SHD
4-20 MA
MASTER SIGNALS TO THREE NEW
BOILER CONTROL CABINETS
2+SHD
4-20 MA
COMPENSATED STEAM FLOW SIGNALS FROM
THREE NEW BOILER CONTROL CABINETS
2+SHD
4-20 MA
2+SHD
4-20 MA
09-30-11
SP
HEADER STEAM PRESS
TO PLANT AUX SHEET 2
TO COND, B68051, SHT 1
B O
IL
E
R
C O
M P
E N
S A
T E
D S
T E
A M
F L
O W
B O
IL
E
R
C O
M P
E N
S A
T E
D S
T E
A M
F L
O W
MFG
R&D
CHK
DATE
DR.
SCALE DWG.
NO.
REV.
SHEET OF
Hays ClevelandAll revisions to hardware, wiring, and software must be approved in writing by
Hays
Cleveland
Division of
UniControl
Inc.
2.83"W x 5.67"H
ON
OFF
MAN
ALM3
LOC
FLOWS
PLANT AUXILIARY FLOWS
SYSTEM CONFIGURATION SCHEMATIC
2 8 none
Qty.1, ALL ITEMS THIS SHEET, UNLESS OTHERWISE NOTED
IN PANEL WIRING
FIELD WIRING
PANEL I/O BLOCKS
INTERCONNECTS, ANALOG
OR SIGNAL BUS
INTERCONNECTS, DIGITAL
LEGEND________________________________
LOOP PWR
117 VAC
20 VA
CN2
MODBUS
MB
A O
-1
A O
-2
A O
-3
A O
-4
Qty.1, C-07000-AC20-3000
PLANT AUX FLOWS
CONFIGURATION, F=2274
24V
AI-1
AI-8
AI-7
CTRL
FAULTDO-1 FOR USE BY OTHERS AS NEEDED FOR
CONTROL OR ANNUNCIATION INTERFACING
AI-6
AI-2
AI-5
SCADA
SHEET 8
S
GF
WEST PALM BEACH, FLORIDA 33410
CONTROL STRATEGY & I/O
CHANGED NURSING HOME STEAM FLOW DP RANGE
AND TRANSMITTED RANGE. WAS 111.39”wc, 5,000 PPH
LTR
B
C
REVISIONS BY
DATE
FE-145 FS CHANGED FROM 2,000 TO 1,000 LB/HRA
HAYS CLEVELAND JOB No 152-IS
B67756 E
AI-3
AI-4
STEAM HEADER
STEAM PRESSURE
FROM SHEET 1
SP
B O
IL
E
R
P R
E S
S -T
E M
P C
O M
P G
A S
F L
O W
SUMMED NATURAL GAS FLOWS
TO MASTER, SHEET 1
1-5 VDC
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
09-20-06
10-05-06
12-05-06
03-20-07
JOB 363 AS INSTALLED. UPDATE STEAM FLOW RANGES
AND METERS INSTALLED BY OTHERS.
LTR
E
F
REVISIONS BY
DATE
D 09-30-11
JOB 363. DELETING ALL AC-20 BOILER CONTROLLERS.
TM
NEW BOILER CABINET LOCATED UPAC SYSTEMS.
2+SHD
4-20 MA
COMPENSATED NAT GAS FLOW SIGNALS FROM
THREE NEW BOILER CONTROL CABINETS
2+SHD
4-20 MA
2+SHD
4-20 MA
-5
V D
C
-5
V D
C
-5
V D
C
Qty.1 Each by Others Veris Accelabar with Endress+Hauser PMD55 Deltabar M DP Transmitter
2+SHD
4-20 MA
NURSING HOME STEAM FLOW
0-4,500 Lb/Hr @125 PSIG
FT-147
SPLITTER
ISOLATOR
by Others
TO DATA
SYSTEM
by Others
2.5-INCH
LINE
Qty.1 Each by Others Veris Accelabar with Endress+Hauser PMD55 Deltabar M DP Transmitter
2+SHD
4-20 MA
HOSPITAL HEAT STEAM FLOW
TO HEAT EXCHANGER
0-3,500 Lb/Hr @125 PSIG
FT-146
SPLITTER
ISOLATOR
by Others
TO DATA
SYSTEM
by Others
4-INCH
LINE
“DEAERATOR TANK” STEAM LINE
WITH EXISTING V-CONE FLOW NOZZLE
Qty.1, Fox IDP10 -T22A21F-M1
STEAM FLOW
0-1,000 Lb/Hr
@125 PSIG
2+SHD
4-20 MA
FT-145
H L
18.146”WC
V-CONE
FE-145
SEE M300
DATA SHEET
2-INCH
LINE
“HEAT EX” “CLC”
06-21-12
B O
IL
E
R
P R
E S
S -T
E M
P C
O M
P G
A S
F L
O W
B O
IL
E
R
P R
E S
S -T
E M
P C
O M
P G
A S
F L
O W
MFG
R&D
CHK
DATE
DR.
SCALE DWG.
NO.
REV.
SHEET OF
Hays ClevelandAll revisions to hardware, wiring, and software must be approved in writing by
Hays
Cleveland
Division of
UniControl
Inc.
WEST PALM BEACH, FLORIDA 33410
ADD “COMMON” NAMES FOR FE-142 & FE-143. CORRECT
MED STM FLOW FT-143 FROM 1,000 TO 10,000 LB/HR.
LTR
B
C
REVISIONS BY
DATE
HAYS CLEVELAND JOB No 152-IS
Qty.3, ALL ITEMS THIS SHEET, UNLESS OTHERWISE NOTED
B67756 D
PT-143C
NATURAL GAS
HEADER
PRESSURE
0-15 PSIG
Qty.1 Only Fox IGP20-A22D1F
2+SHD
4-20 MA
NATURAL GAS
HEADER
TEMPERATURE
0-130°F
2+SHD
4-20 MA
Qty.1 Only
TE
TT
Pyromation 3-wire Pt-385 RTD
R1T185L483-S4D0622-SL-8HN31
440-385U-S(0-130)F
BOILER 1, 2 & 3 FLOWS
SYSTEM CONFIGURATION SCHEMATIC
4 8
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
none
09-20-06
CONTROL STRATEGIES & I/OA
12-05-06
03-23-07
JOB 363. DELETING ALL AC-20 BOILER CONTROLLERS.
TM
NEW BOILER CABINET LOCATED UPAC SYSTEMS. 09-30-11
Qty.1 Existing (1 Ea Boiler) Acopian 24EB35 and Mounting Kit
24V, 0.35A
LOOP
DC PWR
VAC
ADDED TO MAIN PANEL
2+SHD
4-20 MA
NATURAL GAS HEADER
TEMPERATURE SIGNALS
TO THREE NEW
BOILER CONTROL
CABINETS
NATURAL GAS HEADER
PRESSURE SIGNALS
TO THREE NEW
BOILER CONTROL
CABINETS
2+SHD
4-20 MA
Qty.6
API 4380G
E-I SIGNAL
ISOLATOR
Items D
VAC
3 VA
EA
1-5 VDC 1-5 VDC
JOB 363 AS INSTALLED. UPDATE STEAM FLOW RANGES
AND METERS INSTALLED BY OTHERS.
LTR
E
F
REVISIONS BY
DATE
D 06-21-12
MFG
R&D
CHK
DATE
DR.
SCALE DWG.
NO.
REV.
SHEET OF
Hays ClevelandAll revisions to hardware, wiring, and software must be approved in writing by
Hays
Cleveland
Division of
UniControl
Inc.
IN PANEL WIRING
FIELD WIRING
PANEL I/O BLOCKS
INTERCONNECTS, ANALOG
OR SIGNAL BUS
INTERCONNECTS, DIGITAL
LEGEND________________________________
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
WEST PALM BEACH, FLORIDA 33410
SWAPPED FUEL OIL TANK 1 HI LEVEL WITH BOILER
MASTER FAIL WINDOW (WHICH HAD NO ALARM)
LTR
B
C
REVISIONS BY
DATE
HAYS CLEVELAND JOB No 152-IS
Qty.1, ALL ITEMS THIS SHEET, UNLESS OTHERWISE NOTED
B67756 C
EXISTING PANEL ANNUNCIATOR
SYSTEM CONFIGURATION SCHEMATIC
D
IE
S E
L T
A N
K
H
IG
H
L E
V E
L T
O B
E A
B A
N D
O N
E D
S
P A
R E
M A
S T
E R
C O
N T
R O
L L
E R
F A
IL
U
R E
F R
O M
S H
E E
T
ST
HL
S U
R G
E T
A N
K
H
IG
H L
E V
E L
F R
O M
E X
IS
T
IN
G
T A
N K
S W
IT
C
H
S U
R G
E T
A N
K
L O
W L
E V
E L
F R
O M
E X
IS
T
IN
G
T A
N K
S W
IT
C
H
D E
A E
R A
T O
R T
A N
K
H
IG
H L
E V
E L
F R
O M
E X
IS
T
IN
G
T A
N K
S W
IT
C
H
D E
A E
R A
T O
R T
A N
K
L O
W L
E V
E L
F R
O M
E X
IS
T
IN
G
T A
N K
S W
IT
C
H
H
IG
H /L
O W
H E
A D
E R
S T
E A
M P
R E
S S
U R
E F
R O
M M
A S
T E
R C
O N
T R
O L
L E
R
S H
E E
T
E M
E R
G E
N C
Y G
A S
V A
L V
E C
L O
S E
D F
R O
M E
X
IS
T
IN
G S
W
IT
C H
H
IG
H G
A S
H E
A D
E R
P R
E S
S U
R E
F R
O M
E X
IS
T
IN
G
H E
A D
E R
S W
IT
C
H
L P
I G
N
IT
O R
G A
S I
N U
S E
F R
O M
E X
IS
T
IN
G
F
IE
L D
C O
N T A
C T
H
IG
H I
N C
IN
E
R A
T O
R G
A S
P R
E S
S U
R E
A B
A N
D O
N E
D
S P
A R
E
B O
IL
E
R
L O
W E
X C
E S
S O
X Y
G E
N F
R O
M A
N A
L Y
Z E
R A
L M
B
S H
T
H
IG
H F
U E
L O
IL
T
A N
K
L E
V E
L T
O B
E A
B A
N D
O N
E D
S
P A
R E
D
IE
S E
L T
A N
K
H
IG
H
L E
V E
L T
O B
E A
B A
N D
O N
E D
S
P A
R E
RE-WIRE NEW SIGNALS TO EXISTING ANNUNCIATOR POINTS
7 8 none
CFPAST
LL
DA
HL
DA
LL
EM
GV
HG
HP SPLP SP SP SA SPB1
O2 B2 O2
B3 O2
09-20-06
S C
A D
A A
L A
R M
S F
R O
M M
A S
T E
R C
O N
T R
O L
L E
R
S H
E E
T
SCADA
ALARMS
UNUSED BOILER 4 LOW O2 ALARM WINDOW TO BE USED
FOR SCADA ALARMS. AS RELEASED.
A 10-05-06
RONAN MODEL RF 24-1
H
IG
H F
U E
L O
IL
T
A N
K
L E
V E
L T
O B
E A
B A
N D
O N
E D
S
P A
R E
SP
BOILER
MASTER
FAILURE
FUEL OIL TANK #1
HIGH LEVEL
03-20-07
B O
IL
E
R
L O
W E
X C
E S
S O
X Y
G E
N F
R O
M A
N A
L Y
Z E
R A
L M
B
S H
T
B O
IL
E
R
L O
W E
X C
E S
S O
X Y
G E
N F
R O
M A
N A
L Y
Z E
R A
L M
B
S H
T
JOB 363. DELETING ALL AC-20 BOILER CONTROLLERS.
TM
NEW BOILER CABINET LOCATED UPAC SYSTEMS. 09-30-11
MFG
R&D
CHK
DATE
DR.
SCALE DWG.
NO.
REV.
SHEET OF
Hays ClevelandAll revisions to hardware, wiring, and software must be approved in writing by
Hays
Cleveland
Division of
UniControl
Inc.
24 VDC TO
DIGITAL INPUT
SWITCHES
AND OUTPUT
RELAYS
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
117 VAC
20 VA
CN2 MODBUS MB
Qty.1, C-07000-AC20-3000
CONDENSATE TANK AND
TRANSFER PUMP CONTROL
CONFIGURATION, F=2355
24V2.83"W x 5.67"H
ON
OFF
MAN
ALM3
LOC
BOILER
A O
-1 Qty.1 Ea, Acopian 24EB60 + Mtg Kit
5 MA EA DIG IN
80 MA EA 24V RELAY
24V, 0.6A
DIG I/O
DC PWR
VAC
POS
2+SHD
4-20 MA
CONDENSATE
TREATED MAKEUP
WATER
CONTROL VALVE
I/P
POSITIONER
1, 2
2, 1
P1 AUTO
P2 AUTO DO-3
PUMP
SEQUENCE
SELECTOR
1 EA., PUMP 1,2
MANUAL-OFF-AUTO
SELECTORS
1 2M O A
AB 800T-H2BV
DIG I/O
POWER
M A
N U
A L
M
N U
LOW VOLTAGE DC
START/STOP CONTACTS
TO VFD PUMP CONTROLLER
RELAY RELAY
Qty.2
24 VDC COIL RELAYS
AB 700-HA32Z24
R U
N P
M P
SPEED
PUMP 1
SPEED
PUMP 2
R U
N P
M P
DIG I/O
POWER
CONDENSATE TRANSFER
PUMPS WITH VFD'S by VA facility
VFD VFD
AB 800T-J2BV
A O
-2
DO-4
P1 P2
Qty.2, GRN RUN LAMPS, AB 800T-P16G Qty.2, RED STOP LAMPS, AB 800T-P16R
EXISTING
1.78"W 1.83"H
CTP 1
1.78"W 1.83"H
CTP 2
2+SHD
4-20 MA
2+SHD
4-20 MA
DI-1
AI-1
M O A A O
-3
AI-3
AI-2
PUMP & VALVE OPERATION
LOOP: COND TRASFER PRESSURE CONTROL.
DESIGN - ONE PUMP OPERATION WITH BACK
UP TO SECOND PUMP, WITH BOTH RUNNING.
IF TWO PUMPS ARE REQUIRED, EACH IS TO
RUN AT THE SAME SPEED.
NORMAL - OPERATE ONE PUMP AT ALL TIMES.
BACK UP - START SECOND PUMP IF UNABLE
TO MAINTAIN MINIMUM WATER PRESSURE.
SINGLE PID LOOP LEVEL CONTROL.
1.78"W 1.83"H
CTP 1
1.78"W 1.83"H
CTP 2
DI-2
DI-3
DI-4
CONDENSATE TANK & TRANSFER PUMP
SYSTEM CONFIGURATION SCHEMATIC
none
HAYS CLEVELAND Job No 297-LS
Qty.1, ALL ITEMS THIS SHEET, UNLESS OTHERWISE NOTED
EB68051
1 3
06-10-08
WEST PALM BEACH, FLORIDA 33410
2+
SHD
2+
SHD
P U
M P
O N
P U
M P
O N
120 VAC RUN
CONTACTS
FROM VFD PUMP
CONTROLLER
CTRL
FAULTDO-1
FOR USE BY OTHERS AS NEEDED FOR
CONTROL OR ANNUNCIATION INTERFACING
DO-6 HI ALM
DO-7 LO ALM
LOOP PWR
PT
2+SHD
4-20 MA
Qty.1, Foxboro
IGP20-T22D1F
ALL ANALOG INPUTS
SHUNTED TO 1-5 VDC
CONDENSATE
PUMP HEADER
PRESS X’MTR
0-80 PSIG
OPERATE
40 PSIG
ALL ISOLATION, VENT
& BLOW DOWN VALVES
AND GAUGE COLUMNS
by Contractor
2+SHD
4-20 MA
LT
L H
IND/CONTRL
-20/0/+20”WC
Qty.1, Fox
IDP10-T22B21F
COND TANK LEVEL
(4 to 20 mADC)
11.25 to 51.25 IN WC
SURGE TANK HL
LL
NEW LEVEL
SWITCHES
TO ANNUNCIATOR
TE
Qty.1, Pyromation RTD 3-wire Pt-385, R1T185L483
-S4D0609T2-SL-8HN31
3/4” SS T-WELL, U=2.5”
With 4-20 mADC X’mtr 440-385U-S(0-400)°F
TT
2+SHD
4-20 MA
LEVEL SWITCH ALARMS
TO EXISTING
ANNUNCIATOR
REF STANDARD CONDENSATE TANK INSTALLATION,
DEPT OF VETERANS AFFAIRS SD232111-05.DWG
ISSUED DECEMBER 2008.
CONDENSATE TANK ALARM LOCATIONS
1. OVERFLOW LINE IS ESTABLISHED BY DA TANK
MANUFACTURER FOR TANK DESIGN, CLEAVER
BROOKS, USING ORIGINAL OVERFLOW PORT.
2. HIGH LEVEL ALARM IS 4” BELOW THE OVER
FLOW LEVEL.
3. NORMAL CONTROL LEVEL IS 12” ABOVE THE
EMERGENCY MAKE-UP LEVEL (VALVE BEHIND
THE TANK).
4. LOW LEVEL ALARM IS 6” ABOVE THE
EMERGENCY MAKE-UP LEVEL, OR 6” BELOW THE
NORMAL MAKE-UP WATER OPERATING LEVEL.
VENT
VENT
AS RELEASED
TRANSMITTER AND CONTROLS RANGES - STARTUP
LTR
A
C
REVISIONS BY
DATE
B AS DESIGNED
03-06-09
03-31-09
07-02-09
LTR
E
F
REVISIONS BY
DATE
D 09-30-11
JOB 363. DELETING ALL AC-20 BOILER CONTROLLERS.
TM
NEW BOILER CABINET LOCATED UPAC SYSTEMS.
IN PANEL WIRING
FIELD WIRING
PANEL I/O BLOCKS
INTERCONNECTS, ANALOG
OR SIGNAL BUS
INTERCONNECTS, DIGITAL
LEGEND________________________________
FT-142, HIGH PRESS STEAM
AKA BASEMENT & RISERS
0-3000 LB/HR @ 125 PSIG
Qty.3 by Others, Veris Accelabar with Endress+Hauser PMD55 Deltabar M DP Transmitter
2+SHD
4-20 MA
FT-143
SPLITTER
ISOLATOR
by Others
TO DATA
SYSTEM
by Others
FT-143
MED PRESS STEAM
0-4500 LB/HR @125 PSIG
2+SHD
4-20 MA
FT-144
SPLITTER
ISOLATOR
by Others
FT-144
LAUNDRY/KITCHEN
0-4500 LB/HR @125 PSIG
AI-7
AI-6
AI-5
AI-4
SPHEADER STEAM PRESS
FROM B67756, SHEET 1
STEAM FLOW MONITORING
MONITOR DP TRANSMITTERS FOR THREE
STEAM FLOW ELEMENTS AND PRESSURE
COMPENSATE FLOWS WITH STEAM HEADER
PRESSURE TRANSMITTER SIGNAL.
DISPLAY COMPENSATED FLOWS & TOTALS.
2+SHD
4-20 MA
FT-143
SPLITTER
ISOLATOR
by Others
JOB 363 AS INSTALLED. UPDATE STEAM FLOW RANGES
AND METERS INSTALLED BY OTHERS 06-21-12
“DOM”
“LAUNDRY”
MFG
R&D
CHK
DATE
DR.
SCALE DWG.
NO.
REV.
SHEET OF
Hays ClevelandAll revisions to hardware, wiring, and software must be approved in writing by
Hays
Cleveland
Division of
UniControl
Inc.LTR REVISIONS BY
DATE
DEAEREATOR TANK & FEED WATER PUMP
SYSTEM CONFIGURATION SCHEMATIC
none
Qty.1, ALL ITEMS THIS SHEET, UNLESS OTHERWISE NOTED
C2 3
117 VAC
20 VA
CN2 MODBUS MB
06-10-08
Qty.1, C-07000-AC20-3000
DA TANK AND
FEED WATER PUMP CONTROL
CONFIGURATION, F=2356
LOOP PWR
24V2.83"W x 5.67"H
ON
OFF
MAN
ALM3
LOC
BOILER
A O
-1
PT
2+SHD
4-20 MA
Qty.1, Foxboro
IGP20-A22D1F
1-5 VDC ALL ANALOG INPUTS
POS
2+SHD
4-20 MA
CONDENSATE
INLET WATER
CONTROL VALVE
I/P
POSITIONER
1,2,3
P1 AUTO
P3 AUTO
PUMP
SEQUENCE
SELECTOR
1 EA., PUMP 1,2,3
MANUAL-OFF-AUTO
SELECTORS
M O A
800T-J2-KC7-BV
DIG I/O
POWER
M A
N U
M
N U
RELAY RELAY
SPEED
PUMP 1
SPEED
PUMP 3
DIG I/O
POWER
BOILER FEED WATER
PUMPS WITH VFD'S
by VA facility
VFD VFD
AB 800T-J2BV
P1 P2
RELAY
Qty.3, GREEN RUN LAMPS, AB 800T-P16G Qty.3, RED STOP LAMP, AB 800T-P16R
EXISTING
2+SHD
4-20 MA
FEED WATER
HEADER
PRESS X’MTR
0-300 PSIG
DI-4
AI-1
M O A
OPERATE
160 PSIG
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
FIELD
PANEL
IN PANEL WIRING
FIELD WIRING
PANEL I/O BLOCKS
INTERCONNECTS, ANALOG
OR SIGNAL BUS
INTERCONNECTS, DIGITAL
LEGEND________________________________
2+SHD
4-20 MA
LT
L H
IND/CONTRL
-20/0/+20”WC
DA TANK
EXISTING STEAM
PRESSURE CONTROL
HHL
HL
1 2 3
DI-5
DI-6
2,3,1 3,1,2
M O A
M A
N U
P2 AUTO
DI-1
DI-2
DI-3
VFD
2+SHD
4-20 MA
1.78"W 1.83"H
FWP 1
1.78"W 1.83"H
FWP 2
1.78"W 1.83"H
FWP 1
1.78"W 1.83"H
FWP 2
1.78"W 1.83"H
FWP 3
1.78"W 1.83"H
FWP 3
AI-3
E X
IS
T
IN
G
D A
O U
T L E
T T
E M
P S
IG
N
A L
P3DO-5
DO-4
DO-3
HAYS CLEVELAND Job No 297-LS
B68051
WEST PALM BEACH, FLORIDA 33410
PUMP & VALVE OPERATION
LOOP: FEED WATER PRESSURE CONTROL.
DESIGN - ONE PUMP OPERATION WITH BACK
UP TO 2 OR 3 PUMPS.
IF 2 OR 3 PUMPS ARE REQUIRED, EACH IS TO
RUN AT THE SAME SPEED.
NORMAL - OPERATE ONE PUMP AT ALL TIMES.
BACK UP - START SECOND PUMP IF UNABLE
TO MAINTAIN MINIMUM WATER PRESSURE.
SINGLE PID LOOP LEVEL CONTROL.Qty.3
24 VDC COIL RELAYS
AB 700-HA32Z24
LOW VOLTAGE DC
START/STOP CONTACTS
TO VFD PUMP CONTROLLER
R U
N P
M P
R U
N P
M P
2+
SHD
2+
SHD
R U
N P
M P
2+
SHD 22
P U
M P
O N
P U
M P
O N
120 VAC RUNNING CONTACTS
FROM VFD PUMP CONTROLLER
P U
M P
O N
AS RELEASEDA
03-06-09
HIGH & LOW LEVEL SWITCH
ALARMS TO EXISTING
ANNUNCIATOR
NEW LEVEL
SWITCHES
B AS DESIGNED
03-31-09
AI-2TEMP
A O
-2
A O
-3
A O
-4
Qty.1, Fox
IDP10-T22B21F
DA TANK LEVEL
(4 to 20 mADC) -44.8 to -4.8 IN WC
TO OVERFLOW
CONTROL VALVE
CTRL
FAULTDO-1 FOR USE BY OTHERS AS NEEDED FOR
CONTROL OR ANNUNCIATION INTERFACINGDO-6 HI ALM
DO-7 LO ALM
TRANSMITTER AND CONTROLS RANGES - STARTUP.
DA TANK LEVEL ALARMS.C
07-06-09
LL
REFERENCE STANDARD DA TANK INSTALLATION,
DEPT OF VETERANS AFFAIRS SD232111-06.DWG
ISSUED DECEMBER 2008.
DEAERAETOR TANK ALARM LOCATIONS
1. OVERFLOW LINE IS ESTABLISHED BY DA TANK
MANUFACTURER FOR TANK DESIGN, CLEAVER
BROOKS MODEL SMP-45, S/N DG-6245... FROM
ORIGINAL OVERFLOW PORT (NOW BLOCKED),
OR 39”ABOVE THE BOTTOM OF THE TANK.
2. HIGH LEVEL ALARM IS 4” BELOW THE OVER
FLOW LEVEL.
3. NORMAL CONTROL LEVEL IS 4” BELOW THE
HIGH ALARM (8” BELOW OVER FLOW LEVEL).
4. LOW LEVEL ALARM IS 1/3 OF WAY UP FROM
THE BOTTOM OF TANK TO THE OVERFLOW PORT,
WHICH IS 26” BELOW THE OVER FLOW LEVEL.
RECOMMENDED WIRING, PANEL & FIELD
RS485/MODBUS - BELDEN 9841, FIELD, PANEL & BURNER SAFETY TO SCADA.
COMPUTER LAN CABLE - BELDEN 11872A, CATEGORY 6 DATA CABLE
PANEL/FIELD INSTRUMENT CABLE - BELDEN 1030A, 2-COND SHIELDED, 16 AWG, 300 V
PANEL/FIELD INSTRUMENT CABLE - BELDEN 1031A, 3-COND SHIELDED, 16 AWG, 300 V
PANEL/FIELD INSTRUMENT CABLE - BELDEN 1033A, 2-COND SHIELDED, 20 AWG, 300 V
PANEL/FIELD INSTRUMENT CABLE - BELDEN 9364, 3-COND SHIELDED, 20 AWG, 300 V
NO CHANGES, THIS SHEET
File details come from the government source that posted it.