36C24818R0107-003.pdf
PDF 539 KB Posted
- Attached to
- Pharmacy Compliance
- Solicitation number
- 36C24818R0107
About this file
36C24818R0107 Drawing Arch Pharmacy.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24818R0107-00002000.docx | DOCX document | |
| 36C24818R0107-00001007.jpeg | JPEG file | |
| 36C24818R0107-00001002.pdf | ||
| 36C24818R0107-00001005.jpeg | JPEG file | |
| 36C24818R0107-00001001.pdf | ||
| 36C24818R0107-00001004.jpeg | JPEG file | |
| 36C24818R0107-00001003.pdf | ||
| 36C24818R0107-00001000.docx | DOCX document | |
| 36C24818R0107-00001006.jpeg | JPEG file | |
| 36C24818R0107-00001008.jpeg | JPEG file | |
| 36C24818R0107-00001009.pdf | ||
| 36C24818R0107-002.pdf | ||
| 36C24818R0107-004.pdf | ||
| 36C24818R0107-001.docx | DOCX document | |
| 36C24818R0107-005.pdf | ||
| 36C24818R0107-000.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
KEY NOTE LEGEND
A. SEE SHEET G-011 FOR GENERAL ABBREVIATIONS AND
ARCHITECTURAL SYMBOLS.
B. REFER TO SHEETS H-LS SERIES FOR LIFE SAFETY PLANS
C. ALL INTERIOR PARTITIONS ARE TYPE 27 U.O.N.
SEE SHEET H-AE5.600 SERIES FOR PARTITION TYPES
D.
SEE SHEETS H-AE4.301 FOR ENLARGED PLANS - TYPICAL
ROOMS.
E.
REFER TO EQUIPMENT PLAN SHEETS H-QH4.000 SERIES
FOR ADDITIONAL DIMENSIONS AND INFORMATION.
G.
REFER TO SHEET H-AE6.000 SERIES FOR DOOR, FRAME AND
BORROWED LITE SCHEDULES AND DETAILS
H.
DIMENSIONS ARE TO COLUMN GRID, FACE OF MASONRY
OR CONCERETE OR FACE OF METAL STUD U.O.N.
DIMENSIONS NOTED AS "CLEAR" ARE FINISH FACE TO
FINISH FACE INCLUDING ALL FINISHES SUCH AS TILE,
WALL PANELS, ETC.
F.
REFER TO SHEET H-QH6.101 FOR NON-MEDICAL
EQUIPMENT LIST. REFER TO H-QH6.102 FOR TYPICAL
MOUNTING HEIGHTS AND TOILET INFORMATION.
I.
SEE H-AE6.4 SERIES FOR WINDOW AND LOUVER TYPES.
J.
REFER TO PLUMBING PANS, H-MP1 SERIES, FOR FLOOR
DRAIN LOCATIONS
K.
REFER TO SHEET H-AE5.210 FOR TYPICAL EXPANSION
JOINT DETAILS.
L.
REFER TO SHEET H-AE5.201 THRU H-AE5.302 FOR TYPICAL
PLAN DETAILS.
REFER TO 1/16" AREA PLANS FOR INTERSTITIAL SPACE
PLANS AND LEVEL 6 OVERALL ROOF PLANS.
M.
H-AE3.245
H-AE3.245
H-AE2.363
H-AE2.3631
W18k
W18k
W18k
W18k
W18k
W18k
W18k
W18k
W18k
W18k
W18k
W18k
W18k
W18kW18kW108SRW108SRW18kW18k
H-AE3.332
1' - 10" 1' - 10" 1' - 10" 1' - 10"1' - 10"
H-AE5.116
H-AE5.116
H-AE5.116
H-AE5.116
OPH
SIM
H-AE5.116
4' - 11" 1' - 10" 1' - 10"
H-AE5.132
2627282930
G
H
J
K
L
AS
29.4 28.4 27.6
K.7
J.6
H.7
G.7
26.8 26.427.5
K.6 2Q403
UNION OFFICE
2P118
PHARMACIST
2L809
TRAINING
2L813
WORKROOM
2L815
WARD CHIEF
2L816
WARD. MAN
2Q207
SECRETARY
2Q205
CHIEF RESP
2Q207a
REPORT CALC ROOM
2Q908
EQUIPMENT STORAGE
ROOM2Q906
CLEAN UP
2Q809
ELEC
2Q406
STORAGE
2Q304
OFFICE SCREENING
2Q309
OFFICE MID LEVEL
2Q307
OFFICE MRO
2Q305
EXAM ROOM
2Q301 EXAM ROOM 2Q303a
TOILET
2P821
INVESTIGATIVE DRUGS
2P815a
IV PREP
2P920
DRUG REC'G
2Q210a
FEMALE LOCKERS
TOILETS
2Q804a
OFFICE
2Q804b
OFFICE
2Q804c
OFFICE
2Q804
CARE COORDINATION
2Q804d
OFFICE
2Q101
ELEC
2L808
MAA
2L810
MAA
2L814
WAITING
2P815b
CHEMO PREP
2P815
ANTE RM
2P113
STUDY CUBICLES
2Q302
PSA/FILES
2P920a
HAC
2L818
WARD. MAN
2Q402
CONF RM
2Q401
UNION OFFICE
2Q107
OFFICE OFFICER
2Q811
ELEC2Q211
WAITING
B30
B30
B5
2Q202
STAFF LOUNGE
2Q210b
FEMALE TOILETS
2Q210
VESTIBULE
2Q215
CLOSET
2K805a
HIMS/MIS CHIEF
2Q212b
MALE TOILETS
2K808 CODING SUPV2K516g
CODING
2L205
EMS STORAGE2K805
SECRETARY
2Q909
CLASSROOM/CONFERENCE
2Q212a
MALE LOCKERS
TOILETS
2Q103
COMM
2P801
PREPACKAGING
2Q404
UNION OFFICE
2Q209
TELEPHONE
OPERATOR'S ROOM
2Q207b
CHIEF THER
2P920b
STAFF TOILET
2L811
TRAINING
2P820
SUPV PHARM
2L812
SECRETARY
2P806
I.P. ROBOT
2P804
IP CHECKING
2K605
OFFICE
2K516f
CODING
2K516h
CODING
2K516i
CODING
2Q105
OFFICE OFFICER
2Q112
UNASSIGNED
2LC08
CORRIDOR
2QC09
CORRIDOR
2QC02
CORRIDOR
2QC08
CORRIDOR
2QC01
CORRIDOR
2Q212
VESTIBULE
2Q209a
STAFF TOILET
2Q813
ELECTRICAL
2QC04
CORRIDOR
2QC03
CORRIDOR
2QC06
CORRIDOR
2PC08
CORRIDOR
2K C
08 2L205
2Q804.1
2Q804.2
2Q C
2Q813.1
2Q
3.
2Q
9.
2QC09
2QC09a
2Q309.1
2Q309.2
2Q307.2
2Q
7.
2Q
6.
2Q906.2
2QC03
2PC08.2
67bs 67bs
4bs
67bs
68c68c
68c
68c
27b
27b
27b
27b 27b
68c
68cs
68cs
68cs
68cs
36b
36bs
27bs
68c
36bs
2P
2VS01
STAIR
2QC09a
CORRIDOR
27b
27b
4bs
67bs
67bs
9 9
68cs
67bs
27b
A
2Q809.1
5' - 10" 3' - 7 3/4"
6'
/8
1' - 2 1/2"
0' - 11 3/8"
19' - 0 1/4" 1' - 2 1/2"
1' - 3 1/8"
2'
3/
8"
9' - 8 7/8" 7' - 5"
C
LE
AR
8'
0"
CLEAR
6' - 0"
CLEAR
6' - 0"
8' - 3 7/8" 12' - 5" 0' - 8 3/8"
19' - 3 1/4"
10' - 11 7/8" 5' - 6 1/2"
C
LE
AR
5'
0"
14' - 6 1/4" 14' - 4"
8' - 5" 6' - 1 1/4"
"5'
3/
4"
/4
3'
3/
4" 6'
9'
1/ 4"
1'
7/
8" 7'
1"
7'
1/ 8"
/8
9' - 5 1/2"
C
LE
AR
8'
0"
A
H -A
E 1.
2F D
H -A
E 1.
2F D
H-AE1.2FD6
H-AE1.2FD3
1'
1/
2" 8'
3/ 4"
0' - 11 3/8" 5' - 5 5/8"
9'
7/
8"
4bs
68c
27b
5' - 6 5/8" 3' - 7 7/8"
36 36
36 36
A
A
A
H-AE4.306
2'
1/
4"
1'
1/
8"
9' - 11 3/4"
8'
3/
4"
9'
7/
8"8'
3/
4"
/8
1' - 9 3/8"
10' - 2 1/8"
9'
9"
5' - 7 1/8" 8' - 9 1/4"
4'
1/
4"
6'
1/
4"
1' - 3 1/8"
2' - 8 7/8"
10' - 1 1/2" 11' - 6 3/4"
12' - 11"
36 36
FINISH
5' - 5"
FINISH
0' - 4 5/8"
FINISH
5' - 5"
FINISH
0' - 7"
13' - 0 1/2"
1'
1/
8"
1' - 3 1/8"
CLEAR
5' - 9"
CLEAR
6' - 0"
3'
3/
4"
9' - 5 3/8"
A
A
11' - 9 3/8"
1' - 3 1/8"
1' - 6 1/4"
2' - 0 1/4"
8'
7/
8"
2'
1/
4" 2' - 6 1/4"
/8
2'
5/
8"
2' - 8 5/8"
2' - 4 1/4"
2'
5/
8" 2K
2Q211
2Q811
B7
B6
B20
B6
6'
3/
8"
4'
6"
36 27b
27b
1' - 9 1/8"
C
LE
AR
5'
9"
/4
A
1'
0"
CLEAR
6' - 0"
3'
2"
/2
C
LE
AR
8'
0" 3'
3/ 4"
5'
5"
5'
1/
4"
/4
7'
1/
4" 5'
3/ 4"
/8
67bs 67bs
1'
0"
1' - 7"1 2' - 3"
1 1
3"
28c
FINISH
5' - 5" 7" FINISH
1'
/4
2Q209b
1' - 9"
16 39
CC36 9
2Q209b
CLOSET
6" 1' - 2"
1' - 7 1/8"
9 6
27b
2Q106b
PRIVACY
2Q106c PRIVACY 2Q106d
ISO SHARED
2Q106 CLERICAL2Q106a
CBI OFFICE
2Q106e
CBI OFFICE
4"
4"
4"
4"
4"
1' - 3 3/8"
3'
7"
8'
1/
8"
2'
3"
A
27 36
A
4"
1' - 3"
28cs28cs
16' - 2"
A A
A
FIN
1' - 7 3/8"
FIN
6' - 3 1/2"
FIN
3' - 6"
FIN
6'-4".
FI
N
/4
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
on e ei gh th in ch o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB / RLF
NOTES:
SHEET NOTES:
HOSPITAL / CLINIC
01 AND 02
4322Checker
LEVEL 2, AREA D, ZONE 3
CONSTRUCTION PLAN
H-AE1.2FD3
N
1/8" = 1'-0" GRAPHIC SCALE
4' 8' 24'16'
A1
C2
KEY PLAN
C1
D3
D4
E2
A2 A3
B1 B2
AREA D, ZONE 3
D2
D5 D6
E1 E3
D1
D7
CLINIC
HOSPITAL
P-W P-E
A4
E4
W
1 LOW AIR RETURN. SEE MECH.
2 MODULAR CASEWORK SHOWN FOR
REFERENCE ONLY. REFER TO H-QH4 SERIES
FOR MANUFACTURER INFORMATION.
3 CONCRETE PAD. SEE H-EP1.2FD3. PROVIDE
BOND BREAKER BETWEEN PAD AND PARTITION
AND SEAL VOID AFTER PAD IS COMPLETE
No. Description Date
3 CPR 066 04/28/2011
4 CPR 068 07/08/2011
5 CPR 130 08/25/2011
6 CPR 139 09/08/2011
7 CPR 180 11/17/2011
8 CPR 182 11/21/2011
9 CPR 231 03/01/2012
10 CPR 327 08/23/2012
File details come from the government source that posted it.