S05 RFI Questions _ Answers 6-27-2023.docx

DOCX document 16 KB Posted

Attached to
Y1DA--Ramp Replacement Bldg 12 & 16
Solicitation number
36C24623R0059
Issued by

About this file

This document contains questions and answers regarding a solicitation for ramp replacement projects at two buildings at a Department of Veterans Affairs medical center. The solicitation is set aside for certified service-disabled veteran-owned small businesses and requires that at least 85% of the contract value, excluding materials, be performed by SDVOSB subcontractors certified in the SBA database. The maximum EMR listed in the instructions is a hard threshold for responsiveness. Phase I of the proposal does not involve pricing and the design-build specification should be referenced for Phase I response requirements. The solicitation seeks to replace ramps at Buildings 12 and 16 under Project 658-23-103 with a performance period and pricing to be determined.

View the file

Other files

File Type Posted
4.29 DESIGN BUILD SPECIFICATIONS.docx DOCX document
36C24623R0059 0003.docx DOCX document
36C24623R0059 0002.docx DOCX document
S05 RFI Questions _ Answers.pdf PDF
Historic Resources Management Plan -NOV 1991.pdf PDF
P09 SOW upd. 5-31-23.pdf PDF
S04 Site Visit 5-31-2023.pdf PDF
36C24623R0059 0001.docx DOCX document
36C24623R0059.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question & Answer Ramp Replacement Building 12 &16 Project Number: 658-23-103 Solicitation Number: 36C24623R0059

1. Please clarify the subcontracting requirements identified in Para 4.15 ii. Confirm that 85% of the value of the project, not including material costs, shall be performed by SDVOSB Subcontractors. If the SDVOSB General Contractor is not self-performing the work, subcontractors shall be SDVOSB Certified. – VA response Yes Additional questions

2. Solicitation page 43 says 85% limit on subcontracting identifying this as a General Contract, page 10 says 75%, identifying this as a trade contract. Please clarify which controls. – General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. The cost of materials is excluded and not considered to be subcontracted.

3. Instructions to Offers Paragraph A states a maximum EMR of 1.0. Please clarify if this is a hard limit to render the offer nonresponsive, or an evaluation factor which may be used as part of an evaluation of an offeror. – Please follow the instructions, conditions, and other statements to bidder/offerors on page nine (9).

4. The solicitation clearly refers to a Phase I and Phase II proposal. However, we are unable to determine the contents of the Phase I proposal, as the solicitation only indicates filling in an offer. Given the description on the face of the solicitation document, we infer that there would be a separate submission for Phase I which does not involve pricing. Please clarify the Phase I response requirements. – See 4.29 Design Build Specification