About this file

36C24618R0669 0003 SPEC SECTION 27 15 00 COMM STRUCT CABLING.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Generator Capacity H. H. McGuire VAMC 1201 Broad Rock Blvd. Richmond, VA, newest first.
File Type Posted
36C24618C0099-000.docx DOCX document
36C24618R0669-0004000.docx DOCX document
36C24618R0669-0004001.docx DOCX document
36C24618R0669-0004002.pdf PDF
36C24618R0669-0003003.pdf PDF
36C24618R0669-0003011.pdf PDF
36C24618R0669-0003005.pdf PDF
36C24618R0669-0003004.pdf PDF
36C24618R0669-0003001.xlsx XLSX spreadsheet
36C24618R0669-0003002.pdf PDF
36C24618R0669-0003008.pdf PDF
36C24618R0669-0003013.docx DOCX document
36C24618R0669-0003010.pdf PDF
36C24618R0669-0003009.pdf PDF
36C24618R0669-0003012.pdf PDF
36C24618R0669-0003000.docx DOCX document
36C24618R0669-0003007.pdf PDF
36C24618R0669-0002000.docx DOCX document
36C24618R0669-0001001.pdf PDF
36C24618R0669-0001000.docx DOCX document
36C24618R0669-007.pdf PDF
36C24618R0669-006.pdf PDF
36C24618R0669-005.docx DOCX document
36C24618R0669-001.docx DOCX document
36C24618R0669-003.docx DOCX document
36C24618R0669-002.docx DOCX document
36C24618R0669-004.docx DOCX document
36C24618R0669-000.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPGRADE GENERATOR CAPACITY 652-17-100

DEPARTMENT OF VETERANS AFFAIRS

RICHMOND, VIRGINIA

27 15 00 - 1

SECTION 27 15 00

COMMUNICATIONS STRUCTURED CABLING

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies a complete and operating voice and digital structured cabling distribution system and associated equipment and hardware to be installed in VA Medical Center, here-in-after referred to as the “facility”.

1.2 SUBMITTALS

A. Certifications:

1. Submit written certification from OEM indicating that proposed supervisor of installation and proposed provider of contract maintenance are authorized representatives of OEM. Include individual's legal name and address and OEM warranty credentials in the certification.

2. Pre-acceptance Certification: Submit in accordance with test procedures.

3. Test system cables and certify to COR before proof of performance testing can be conducted. Identify each cable as labeled on as-installed drawings.

4. Provide current and qualified test equipment OEM training certificates and product OEM installation certification for contractor installation, maintenance, and supervisory personnel.

B. Closeout Submittal: Provide document from OEM certifying that each item of equipment installed conforms to OEM published specifications.

1.3 WARRANTY

A. Work subject to terms of Article "Warranty of Construction," FAR clause

52.246-21.

PART 2 - PRODUCTS

2.1 PERFORMANCE AND DESIGN CRITERIA

A. Provide system including fiber optic distribution cables and connectors.

B. Industry Standards:

1. Cable distribution systems provided under this section are connected to systems identified as critical care performing life support functions.

27 15 00 - 2

2. Conform to National and Local Life Safety Codes (whichever are more stringent), NFPA, NEC, this section, Joint Commission Life Safety

Accreditation requirements, and OEM recommendations, instructions, and guidelines.

3. Provide supplies and materials listed by a nationally recognized testing laboratory where such standards are established for supplies, materials or equipment.

4. Active and passive equipment required by system design and approved technical submittal; must conform to each UL standard in effect for equipment, when technical submittal was reviewed and approved by

Government or date when COR accepted system equipment to be replaced. Where a UL standard is in existence for equipment to be used in completion of this contract, equipment must bear approved

NRTL label.

C. Coordinate size and type of conduit, pathways and firestopping for maximum 40 percent cable fill with subcontractors.

D. Terminate all interconnecting twisted pair, fiber-optic patch panels or punch blocks. Terminate unused or spare conductors and fiber strands.

Do not leave unused or spare twisted pair wire, fiber-optic unterminated, unconnected, loose or unsecured.

E. Color code distribution wiring to conform to ANSI/TIA 606-B and construction documents, whichever is more stringent. Label all equipment, conduit, enclosures, jacks, and cables on record drawings, to facilitate installation and maintenance.

2.2 EQUIPMENT AND MATERIALS

A. Cable Systems - Fiber optic:

1. General:

a. Provide cable (i.e. backbone, outside plant, and horizontal cabling) conforming to accepted industry standards with regards to size, color code, and insulation.

b. Provide proper test equipment to confirm that cable pairs meet each OEM’s standard transmission requirements, and ensure cable carries data transmissions at required speeds, frequencies, and fully loaded bandwidth.

2. Backbone Copper Cables:

a. Riser Cable:

27 15 00 - 3

1) Provide communication riser cables listed in NEC Table 800, 154(a) for the purpose and suited for electrical connection to a communication network.

2) Provide STP or Unshielded Twisted Pair (UTP), minimum 24

American Wire Gauge (AWG) solid, thermoplastic insulated conductors for communication (analog RF coaxial cable is not to be provided in riser systems) riser cables with a thermoplastic outer jacket.

3) Label and test complete riser cabling system.

3. Fiber Optics Backbone Cable:

a. Provide 50/125 micron OM4 multi-mode cable, containing at minimum

18 strands of fiber, unless otherwise specified.

b. Provide loose tube cable, which separates individual fibers from the environment, or indoor/outdoor cables, for outdoor runs or any area that includes an outdoor run.

c. Provide tight buffered fiber cable or indoor/outdoor cables for indoor runs.

d. Terminate multimode fibers at both ends with LC type female connectors installed in an appropriate patch or breakout panel and secured with a cable management system. Provide minimum 610 mm (2 ft.) cable loop at each end.

e. Provide single mode fiber optic cable 8.3 mm containing at minimum 12 strands of fiber, unless otherwise specified.

Terminate single mode fibers at both ends with LC type female connectors installed in an appropriate patch or breakout panel and secured with a cable management system. Provide minimum 610 mm (2 feet) cable loop at each end to allow for future movement.

f. Install fiber optic cables in TR’s, Voice (Telephone) Switch

Room, and Main Computer Room, in rack mounted fiber optic patch panels. Provide female LC couplers in appropriate panel for termination of each strand.

g. Test all fiber optic strands' cable transmission performance in accordance with TIA standards. Measure attenuation in accordance with fiber optic test procedures TIA-455-C ('-61', or -53).

Provide written results to COR for review and approval.

B. Air Blown Fiber: Alternative fiber optic cable installation method.

1. Fiber Bundles or Cables:

27 15 00 - 4

a. Provide fiber bundles or cables designed and manufactured to facilitate:

1) Rapid installation of fiber using air blown fiber installation process without risk or damage to fibers.

2) Re-installation without degradation of the optical specifications and performance of fiber.

3) Transition points from indoor to outdoor environments without splices.

b. Provide jacketed optical fibers manufactured so that the jacketed fiber strands meet GR409 and meet either UL 1666 for riser rated cables or UL 910 for plenum rated cables and are specific to the purpose of being blown throughout the bundled microduct system.

c. Provide fiber designed to be stripped and terminated with standard tools.

d. Provide fiber designed to be terminated with standard fiber optic connectors.

2.3 DISTRIBUTION EQUIPMENT AND SYSTEMS

1. Fiber Optic:

a. Multimode Fiber:

1) Provide OM4 Type general purpose multimode fiber optic cable installed in conduit for system locations with load-bearing support braid surrounding inner tube for strength during cable installation.

2) Technical Characteristics:

a) Bend Radius: Minimum 152 mm (6 inches); outer jacket as required.

b) Fiber Diameter: 50 microns.

c) Cladding: 125 microns.

d) Attenuation:

1) 1,300 nanometer: Maximum 2.0 dB per kilometer.

e) Bandwidth:

1) 1,300 nanometer: Minimum 500 MHz.

f) Connectors: Stainless steel.

B. Fiber Optic Terminators:

1. Pre-polished crimp on type that has proper ferrule to terminate fiber optic cable.

2. Technical Characteristics:

27 15 00 - 5

a. Frequency: Light wave.

b. Power Blocking: As required.

c. Return Loss: 25 dB.

d. Connectors: LC.

e. Construction: Ceramic.

C. Conduit and Signal Ducts:

1. Conduit:

a. Provide conduit or sleeves for cables penetrating walls, ceilings, floors, interstitial space, fire barriers, etc.

b. Minimum Conduit Size: 19 mm (3/4 inch).

c. Provide separate conduit and signal ducts for each cable type installation.

d. Maximum 40 percent conduit fill for cable installation.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install for ease of operation, maintenance, and testing.

B. Install system to comply with NFPA 70 National Electrical Code, NFPA 99

Health Care Facilities, NFPA 101 Life Safety Code, Joint Commission

Manual for Health Care Facilities, and original equipment manufacturers' (OEM) installation instructions.

C. Cable Systems Installation:

1. Install system cables in cable duct, conduit or when specifically approved, flexible NEC Article 800 communications raceway. Confirm drawings show sufficient quantity and size of cable pathways. If flexible communications raceway is used, install in same manner as conduit.

2. Coordinate outside plant and backbone cables to furnish number of cable pairs for system requirements and obtain approval of COR and

IT Service prior to installation.

3. Bond to ground metallic cable sheaths, etc. (i.e. risers, underground, horizontal, etc.).

4. Install temporary cable to not present a pedestrian safety hazard and be responsible for all work associated with removal. Temporary cable installations are not required to meet Industry Standards;

but, must be reviewed and accepted by COR, IT Service, FMS and SMCS

005OP2H3 (202-461-5310) prior to installation.

D. Labeling:

27 15 00 - 6

1. Industry Standard: Provide labeling in accordance with ANSI/TIA-606-

B.

2. Print lettering of labels with laser printers; handwritten labels are not acceptable.

3. Label both ends of all cables in accordance with industry standard.

Provide permanent Labels in contrasting colors and identify according to system “Record Wiring Diagrams”.

3.2 FIELD QUALITY CONTROL

A. Interim Inspection:

1. Perform fiber optical field inspection tests via attenuation measurements on factory reels and provide results along with manufacturer certification for factory reel tests. Remove failed cable reels from project site upon attenuation test failure.

2. Notify COR of the estimated date the contractor expects to be ready for interim inspection, at least 20 working days before requested inspection date, so interim inspection does not affect systems’ completion date.

3. Provide results of interim inspection to COR. If major or multiple deficiencies are discovered, COR can require a second interim inspection before permitting contractor to continue with system installation.

4. Do not proceed with installation until COR determines if an additional inspection is required. In either case, re-inspection of deficiencies noted during interim inspections must be part of the proof of performance test.

B. Pretesting:

1. Pretest entire system upon completion of system installation.

2. Verify during system pretest, utilizing the accepted equipment, that system is fully operational and meets system performance requirements of this section.

3. Provide COR four copies of recorded system pretest measurements and the written certification that system is ready for formal acceptance test.

C. Acceptance Test:

1. After system has been pretested and the contractor has submitted pretest results and certification to COR, then schedule an

27 15 00 - 7 acceptance test date and give COR 30 days' written notice prior to date acceptance test is expected to begin.

2. Test only in presence of a COR.

3. Test utilizing approved test equipment to certify proof of performance.

4. Verify that total system meets the requirements of this section.

5. Include expected duration oftest time, with notification of the acceptance test.

D. Verification Tests:

1. Multi-mode Fiber Optic Cable: Perform end-to-end attenuation tests in accordance with TIA-568-B.3 and TIA-526-14A using Method A, Optical Power Meter and Light Source. Perform verification acceptance test.

E. Performance Testing:

1. Fiber Optic Links: Perform end-to-end fiber optic cable link tests in accordance with TIA-568-B.3.

F. Total System Acceptance Test: Perform verification tests for multi-mode fiber optic cabling systems after complete telecommunication distribution system are installed.

3.3 MAINTENANCE

A. Accomplish the following minimum requirements during one year warranty period:

1. Respond and correct on-site trouble calls, during standard work week:

a. A routine trouble call within one working day of its report. A routine trouble is considered a trouble which causes a system outlet, station, or patch cord to be inoperable.

b. Standard work week is considered 8:00 A.M. to 5:00 P.M., Monday through Friday exclusive of Federal holidays.

2. Respond to an emergency trouble call within six hours of its report.

An emergency trouble is considered a trouble which causes a subsystem or distribution point to be inoperable at any time.

3. Respond on-site to a catastrophic trouble call within four hours of its report. A catastrophic trouble call is considered total system failure.

a. If a system failure cannot be corrected within four hours

(exclusive of standard work time limits), provide alternate

27 15 00 - 8 equipment, or cables within four hours after four hour trouble shooting time.

4. Provide COR written report itemizing each deficiency found and the corrective action performed during each official reported trouble call. Provide COR with sample copies of reports for review and approval at beginning of total system acceptance test.

- - - E N D - - -