36C24419B0045-A0001001.pdf
PDF 126 KB Posted
- Solicitation number
- 36C24419B0045
About this file
This solicitation and related federal contract opportunity document provide details for an upcoming procurement by the Department of Veterans Affairs Medical Center. The solicitation seeks a contractor to satisfy water safety issues and complete miscellaneous restroom work at the James E. Van Zandt VA Medical Center in Altoona, Pennsylvania. The contractor will be responsible for providing all labor, materials, equipment, permits, and supervision to eliminate cross connections, install backflow devices, renovate old restrooms, replace valves and water lines, and perform other upgrades. The procurement is set aside exclusively for service-disabled veteran small businesses. The estimated value is between $5-10 million and the period of performance is approximately 345 calendar days. The solicitation will be posted on August 30, 2019 and questions are due to the contracting officer by the specified deadline. Bidders must ensure their registrations in the System for Award Management and Vendor Information Pages are current and valid.
36C24419B0045 A0001 S06 36C24419B0045 A0001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24419B0045-A0003002.pdf | ||
| 36C24419B0045-A0003001.pdf | ||
| 36C24419B0045-A0003000.docx | DOCX document | |
| 36C24419B0045-A0003000.docx | DOCX document | |
| 36C24419B0045-A0003001.pdf | ||
| 36C24419B0045-A0003002.pdf | ||
| S04_Attendance_Sheet_PreBid_8AUG19.pdf | ||
| Water_Related_Issues_Project_503-17-110__Questions.pdf | ||
| 36C24419B0045-A0002001.pdf | ||
| 36C24419B0045-A0002000.docx | DOCX document | |
| 36C24419B0045-A0002001.pdf | ||
| 36C24419B0045-A0002000.docx | DOCX document | |
| 36C24419B0045-A0001000.docx | DOCX document | |
| 36C24419B0045-A0001001.pdf | ||
| 36C24419B0045-A0001000.docx | DOCX document | |
| 36C24419B0045-003.pdf | ||
| 36C24419B0045-004.pdf | ||
| 36C24419B0045-001.docx | DOCX document | |
| 36C24419B0045-002.pdf | ||
| 36C24419B0045-005.pdf | ||
| 36C24419B0045-004.pdf | ||
| 36C24419B0045-005.pdf | ||
| 36C24419B0045-003.pdf | ||
| 36C24419B0045-001.docx | DOCX document | |
| 36C24419B0045-002.pdf | ||
| 36C24419B0045-000.docx | DOCX document | |
| 36C24419B0045-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
A0001 08-01-2019
503-19-4-5071-0156
503-17-110
00244
Department of Veterans Affairs Network Contracting Office 4
00244
Department of Veterans Affairs Network Contracting Office 4
To all Offerors/Bidders
36C24419B0045
08-01-2019
X
X X
See CONTINUATION Page
X 1
Water Related Safety Issues Project # 503-17-110
This amendment is being posted to REMOVE statement in box 10 of SF1442 posted on July 31, 2019 and REPLACE WITH statement for this requirement.
Also, the offerors must submit bid amounts for each item; Base Bid Item #1, Bid Item #2, and Bid Item #3.
All bid items must be submitted on the required due date and time.
AT THIS TIME - ALL OTHER ITEMS REMAIN UNCHANGED.
Jeffrey Zbezinski Contracting Officer
CONTINUATION PAGE
Water Related Safety Issues Project # 503-17-110
REMOVE: This work consists of, but not limited to, the following: provide all labor, materials, tools, equipment, permits, testing, and reports required to repair and replace roofing, install insulation, install flashing, and install fall protection at identified areas of Building 1 and 19, as defined by the drawings and specifications. The project will include: demolition, roofing, insulating, asbestos removal, lead paint removal, tuck pointing, painting, flashing installation, and lightning protection.
REPLACE WITH: The work consists of, but not limited to the contractor providing all labor, materials, equipment, permits, license, and supervision for “Satisfy Issues Related to Water Safety and Misc. Restrooms”. All work is to be performed in buildings #1 and #3 unless noted otherwise. VA must eliminate cross connections, install backflow devices, check valves, remove hot water system dead legs, install circulation system in existing underground reservoir, install a second water feed from City water main, provide and install monitoring equipment, eliminate unused fixtures, relocate main water valves, renovate old restrooms, replace valves, replace main water lines, replace brass lines, gate valves, install ball valves, field tag and mark shut off valves, tagging all existing water lines and labeling direction of flow, replace existing Anti-Scald Devices and mixing valves.
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00
JB
Base Bid Item #1: for all tools, labor, materials, equipment, permits, license, and supervision for Water Safety Issue Project 503-17-110
Bid Item #2: DEDUCT ALTERNATE No 1: Reduce the Quantity of 199 Temperature Sensors as shown on the Design Drawings to 132 Temperature Sensors along with the cost of their installation.
Bid Item #3: DEDUCT ALTERNATE No 2: Eliminate all demolition and proposed renovation work as shown on Design Drawings sheets AD- 101 and A-101, which includes work in toilet rooms 140A, 307, 350A, 706, 708, 732@ and 734A.
End of Document
| A.1 PRICE/COST SCHEDULE |
| ITEM INFORMATION |